Search NASA⌕ Search

SEARCH · Search NASA

Results for “resource assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Clear Sky Tampa Bay: Project and Toolkit Overview - Resilience-Based Resources for Assessing Solar + Storage on Critical Facilities

The Clear Sky Tampa Bay Team, convened by the Tampa Bay Regional Planning Council (TBRPC) and composed of county and city partners, private and public sector stakeholders, solar energy experts, and academic partners, collaboratively developed a set of resources to support the expanded use of solar + storage in the context of community resilience in Florida. Key questions guiding the project included: (1) What types of buildings and systems provide the maximum resilience benefits? (2) Where within our communities should we prioritize future solar + storage analysis or investment to mitigate the impacts of disasters? (3) How might other societal variables be incorporated into a site assessment when considering solar + storage for resilience? (4) Can a standardized process be developed that leverages existing resources to assist local governments with solar + storage for resilience research and decision-making?

14 SOLAR ENERGY↗

Adversarial super-resolution of climatological wind and solar data

Accurate and high-resolution data reflecting different climate scenarios are vital for policy makers when deciding on the development of future energy resources, electrical infrastructure, transportation networks, agriculture, and many other societally important systems. However, state-of-the-art long-term global climate simulations are unable to resolve the spatiotemporal characteristics necessary for resource assessment or operational planning. We introduce an adversarial deep learning approach to super resolve wind velocity and solar irradiance outputs from global climate models to scales sufficient for renewable energy resource assessment. Using adversarial training to improve the physical and perceptual performance of our networks, we demonstrate up to a 50 × resolution enhancement of wind and solar data. In validation studies, the inferred fields are robust to input noise, possess the correct small-scale properties of atmospheric turbulent flow and solar irradiance, and retain consistency at large scales with coarse data. An additional advantage of our fully convolutional architecture is that it allows for training on small domains and evaluation on arbitrarily-sized inputs, including global scale. We conclude with a super-resolution study of renewable energy resources based on climate scenario data from the Intergovernmental Panel on Climate Change’s Fifth Assessment Report.

14 SOLAR ENERGY↗

A Multi-Fidelity Gaussian Process Regression Method for Probabilistic Wind Farm Power Curve Estimation

Accurate estimation of the power curve for wind turbines or wind farms is crucial to ensure their efficient operation and management. However, conventional methods for power curve estimation rely either on expensive and infrequent measurements or on low-quality numerical simulations. Moreover, the majority of previous studies on power curve estimation for wind turbines or wind farms focused on deterministic estimation, which provides a point estimate of the relationship between wind speed and power generation. Nevertheless, the deterministic approach fails to consider the inherent uncertainty associated with wind energy production resulting from varying turbine characteristics. This can lead to inaccurate power generation estimation and suboptimal decisions regarding energy management. In this paper, a kernel density estimation (KDE) based Multi-Fidelity Gaussian Process Regression (MFGPR) model is proposed to fuse theoretical power curve data and the ground true measurements to create a mapping of wind speed and wind power. By conducting a case study on an actual wind farm in China, the efficacy of the proposed MFGPR model was demonstrated in characterizing the variability of wind power. The probabilistic MFGPR model was also able to generate confidence intervals that encompassed the measured power, thereby improving the accuracy and confidence in wind power estimation or wind resource assessment. Overall, the proposed MFGPR model offers a reliable approach to integrate high-fidelity ground measurements and theoretical power curve data, resulting in precise wind resource assessment and power estimation.

Gaussian process regression↗

An Overview of Wind Energy Production Prediction Bias, Losses, and Uncertainties

The financing of a wind farm directly relates to the preconstruction energy yield assessments which estimate the annual energy production for the farm. The accuracy and the precision of the preconstruction energy estimates can dictate the profitability of the wind project. Historically, the wind industry tended to overpredict the annual energy production of wind farms. Experts have been dedicated to eliminating such prediction errors in the past decade, and recently the industry is recording near-zero average energy prediction bias. Herein, we present an overview of the energy yield assessment errors across the global wind energy industry. We identify a long-term trend of reduction in the overprediction bias, whereas the uncertainty associated with the prediction error is prominent. We also summarize the recent advancements of the wind resource assessment process that justify the bias reduction, including the improvements in modeling and measurement techniques. Additionally, because the energy losses and uncertainties substantially influence the prediction error, we document and examine the estimated and observed loss and uncertainty values from the literature, according to the proposed framework in the International Electrotechnical Commission 61400-15 wind resource assessment standard. From our findings, we highlight the opportunities for the industry to move forward, such as the validation and reduction of prediction uncertainty, and the prevention of energy losses caused by wake effect and environmental events. Overall, this study provides a summary on how the wind energy industry has been quantifying and reducing prediction errors, energy losses, and production uncertainties. Finally, for this work to be as reproducible as possible, we include all of the data used in the analysis in appendices to the manuscript.

literature review↗

Physically based correction of systematic errors of Rotating Shadowband Irradiometers

Accurate measurements of direct normal, diffuse horizontal and global horizontal irradiance (DNI, DHI and GHI) are needed for meteorological studies and are essential for the solar resource assessment at potential solar power plant sites. Often, these potential sites are remote and hence require robust sensors that require minimal maintenance that are not affected strongly by soiling. Therefore, Rotating Shadowband Irradiometers (RSI) are widely used for resource assessment. To achieve the required accuracy, corrections for the raw values of RSIs depending on systematic temperature, incidence angle and spectral errors must be used, and a thorough calibration of the sensor head must be applied. The existing correction functions are derived from comparisons of RSIs to thermopile radiometers at selected sites and therefore empirical. Their accuracy is considered to be site dependent. In this work a new correction and calibration method is presented that removes the systematic errors using a physical approach. It is based on information of the sensor properties as well as measurements of its directional response, and incorporates the atmospheric conditions at the measurement site. In this case, no empiric relations obtained from a specific site are required. The method requires estimates of the current DHI and GHI spectra during each measurement of the RSI. Based on these spectra, a spectral correction, which includes a spectrum dependent temperature correction, can be made without employing empirical relationships. The new physical calibration and correction method is tested at three sites and reaches similar results compared to the empirical functions. This is already achieved with rudimentary estimations of the GHI and DHI spectra and we expect that these estimations can be improved in the future. The results indicate that the physical approach reduces the problematic location dependence of the current calibration and correction methods. The physical correction and calibration method show promise for a further improvement of the RSI accuracy.

47 OTHER INSTRUMENTATION↗

Analysis of Selected Publicly Available Geothermal Exploration Data Gaps

As part of a United States Department of Energy (DOE) supported retrospective analysis of DOE's Play Fairway Analysis (PFA) projects, the National Renewable Energy Laboratory (NREL) compiled and analyzed publicly available geothermal exploration datasets to identify and highlight data gaps in areas prospective for hosting geothermal resources. The analysis was intended to understand the existing geographic coverage of selected datasets commonly utilized both by the PFA projects and geothermal developers during resource assessments including geologic mapping, temperature gradient drilling, and aeromagnetic, gravimetric, and lidar surveys. Results indicate that broad areas of the western United States estimated to have geothermal potential lack sufficient geologic and geophysical coverage necessary for even regional resource exploration. The study directly informed the recent Geoscience Data Acquisition for Western Nevada, or GeoDAWN - which united DOE's Geothermal Technologies Office (GTO) with the U.S. Geological Survey (USGS) of the U.S. Department of the Interior to assist U.S. needs for energy and critical minerals. The study also has the potential to inform public investment in further data acquisition for characterization of the Earth both for geothermal and other natural resource assessments.

data↗

Factors Determining Commercially Optimal Development Strategies for CO 2 Storage With and Without CO 2 -EOR

This report is a draft white paper on the factors determining commercially optimal development strategies for CO 2 storage with and without CO 2 -EOR. The draft report provides a summary of accomplishments during the first budget period of the Southeast Offshore Storage Resource Assessment for the Gulf of Mexico (SECARB Offshore GOM) project. It also identifies “Next Steps” to be undertaken during Budget Period II. A final white paper will be prepared at the end of Budget Period II. The goal of this draft white paper is to expand the knowledge base required for commercially viable, secure, longterm, large-scale carbon dioxide (CO 2 ) subsea storage in the U.S. Gulf of Mexico (GOM), both with and without enhanced hydrocarbon recovery. This effort supports the U.S. Department of Energy’s (DOE) long-term objective of ensuring a comprehensive assessment of the potential for offshore CO 2 subsea storage in the GOM. The groundwork that has been completed in the draft white paper advanced by expanding the membership of the Southern States Energy Board’s (SSEB) existing Southeast Offshore Storage Resource Assessment (DE-FE0026082) GOM government-industry partnership during the next budget period. Further, the team plans to consult with U.S. federal and state agencies to develop recommendations to remove barriers and streamline the regulatory process to encourage subsea CO 2 storage with or without enhanced hydrocarbon recovery.

02 PETROLEUM↗

Acoustic Impedance Inversions for Offshore CO 2 Storage: South Georgia Embayment, United States

This study builds and expands on previous CO 2 storage resource assessment studies of the southeastern offshore Atlantic margin by providing a detailed evaluation on how rock porosities and permeabilities are distributed across the Upper Cretaceous strata restricted to the South Georgia Embayment (SGE). Using legacy industry two-dimensional seismic reflection and well data, this assessment is the first application of multiple seismic inversion techniques in this area. This workflow provides a reliable and repeatable model-based inversion which gives an improved image to discriminate lithology and predict porosity. The workflow is applicable to future CO 2 storage resource assessment studies elsewhere. The inversion results indicate that distinct porosity and permeability regimes are present and distributed in the Upper Cretaceous strata within the SGE. The impedance and porosity relationships show well-founded and reliable correlation. These relationships reveal low impedance coincident to the high porosity intervals which are proposed as potential reservoir intervals for CO 2 storage. In addition, the result shows that the Upper Cretaceous strata have two main potential reservoirs in the lower part. These are overlain by a thick impermeable interval, mostly shale, which has high impedance, low porosity, and low permeability and extends within the SGE. This result is in agreement with a previous study that also proposed two significant storage reservoirs for CO 2 in the Upper Cretaceous strata. Since porosity distribution is estimated using multiple methods, it follows the trends of seismic signature and structures of the Upper Cretaceous strata. The extracted values of porosity, ranging from 15 to 36%, and permeability, ranging from 1 to 100 mD, are close to the measured values from the well core data at the Upper Cretaceous strata interval.

54 ENVIRONMENTAL SCIENCES↗

Benchmarking Near-Surface Winds in the HRRR Analyses Using Multisource Observations over Complex Terrain in the Southeastern United States

Wind energy plays a crucial role in sustainable power generation, yet its full potential in the southeast United States (SEUS) remains underexplored. This study advances wind resource assessment in the SEUS using existing regional modeling and multisource observations. We find that terrain complexity, influenced by orography and forest canopy, significantly impacts the accuracy of modeled wind speed. While the High-Resolution Rapid Refresh (HRRR) model effectively simulates wind profiles over flat, nonforested terrain, larger errors are produced above forest canopies, and particularly for those stands in hilly and mountainous terrain where there are no observations aloft that could be used by HRRR’s data assimilation software. Seasonal variations, e.g., changes in the leaf area index, further complicate the relationship between terrain complexity and simulation errors. Here, our findings emphasize the critical need for comprehensive wind profile measurements, extending from below the canopy to height above the canopy and through the lower planetary boundary layer, to fully quantify model performance over and near forests, and for improving wind resource assessment, planning, and management. This study provides valuable insights not only for further model development but also for future field campaign deployment with the goal of further improving our understanding of wind resources in the region.

Complex terrain↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

An independent analysis of bias sources and variability in wind plant pre-construction energy yield estimation methods

The wind resource assessment community has long had the goal of reducing the bias between wind plant pre-construction energy yield assessment (EYA) and the observed annual energy production (AEP). This comparison is typically made between the 50% probability of exceedance (P50) value of the EYA and the long-term corrected operational AEP (hereafter OA P50), and is known as the P50 bias. The industry has critically lacked an independent analysis of bias reduction investigated across multiple consultants to identify the greatest sources of uncertainty and variance in the EYA process and the best opportunities for uncertainty reduction. The present study addresses this gap by benchmarking consultant methodologies against each other and against operational data at a scale not seen before in industry collaborations. We consider data from 10 wind plants and evaluate discrepancies between eight consultancies in the steps taken from estimates of gross to net energy. Consultants tend to overestimate the gross energy produced at the turbines and then compensate by further overestimating downstream losses, leading to a mean P50 bias near zero, still with significant variability among the individual wind plants. Within our data sample, we find that consultant estimates of all loss categories, except environmental losses, tend to reduce the project-to-project variability of the P50 bias. The disagreement between consultants, however, remains flat throughout the addition of losses. Finally, we find that differences in consultants’ estimates of project performance can lead to differences up to $10/MWh in the levelized cost of energy for a wind plant.

Todd, Austin C.↗

Evaluating the WFIP2 updates to the HRRR model using scanning Doppler lidar measurements in the complex terrain of the Columbia River Basin

The wind-energy (WE) industry relies on numerical weather prediction (NWP) forecast models as foundational or base models for many purposes, including wind-resource assessment and wind-power forecasting. During the Second Wind Forecast Improvement Project (WFIP2) in the Columbia River Basin of Oregon and Washington, a significant effort was made to improve NWP forecasts through focused model development, to include experimental refinements to the High Resolution Rapid Refresh (HRRR) model physics and horizontal grid spacing. In this study, the performance of an experimental version of HRRR that includes these refinements is tested against a control version, which corresponds to that of the operational HRRR run by National Oceanic and Atmospheric Administration/National Centers for Environmental Protection at the outset of WFIP2. Furthermore, the effects of horizontal grid resolution were also tested by comparing wind forecasts from the HRRR (with 3-km grid spacing) with those from a finer-resolution HRRR nest with 750-m grid spacing. Model forecasts are validated against accurate wind-profile measurements by three scanning, pulsed Doppler lidars at sites separated by a total distance of 71 km. Model skill and improvements in model skill, attributable to physics refinements and improved horizontal grid resolution, varied by season, by site, and during periods of atmospheric phenomena relevant to WE. In general, model errors were the largest below 150 m above ground level (AGL). Experimental HRRR refinements tended to reduce the mean absolute error (MAE) and other error metrics for many conditions, but degradation in skill (increased MAE) was noted below 150 m AGL at the two lowest-elevation sites at night. Finer resolution was found to produce the most significant reductions in the error metrics.

17 WIND ENERGY↗

Mapping and Synthesis of International Biomass Supply Assessments

This report, Mapping and Synthesis of International Biomass Supply Assessments (or Global Biomass Resource Assessment) is the first step in a long-term process to assemble data from around the globe into a virtual repository that can be updated and provide user-friendly access to the data. The Clean Energy Ministerial (CEM) Biofuture Platform Initiative recommended that research be completed to “address the need for internationally accepted benchmarks quantifying sustainable biomass feedstock supplies.” To act upon the CEM Biofuture recommendation, in 2024, the U.S. Department of Energy (DOE) commissioned Oak Ridge National Laboratory (ORNL) to prepare this report as the primary deliverable for a one-year assignment to assemble data into a citable form that could help resolve the persistent question presented related to bioenergy policy, “Is there enough sustainable biomass?” In response to that query, this report includes information received by August 2024 from national CEM representatives, collaborators, and public sources on current and future sustainable biomass supplies in 62 nations,and subsequently documents (a) the approach used by ORNL to analyze and categorize the information received in a manner that enables aggregation and comparability; and (b) recommendations for next steps and guidelines to help others update and harmonize future assessments of global sustainable biomass supplies.

09 BIOMASS FUELS↗

Tidal Resource Gaps Analysis Technical Report

The tidal resource gaps project was created to address a growing body of evidence that models underpredict tidal current speeds compared to measurements at a number of the top-ranking tidal energy sites. In response, this project compared opportunistic tidal power density measurements from 16 tidal energy hot spot sites with estimates from resource assessment data to identify discrepancies. To improve the accuracy of resource estimates from model data, updated data from eight improved model simulations were obtained. Model improvements included grid refinement, domain coupling, and the use of unstructured or nested grids. New resource estimates were calculated from the updated models, and these data were used to update the tidal hot spots-a list of promising tidal energy sites around the United States.

16 TIDAL AND WAVE POWER↗

The Baseline Performance Reference for Irradiance in PV System Applications

This report proposes the definition of a new baseline performance reference (BPR). The definition goes beyond existing standards pertaining to photovoltaic (PV) reference cells and devices to define the response under all possible operating conditions in the field. Field evaluations using BPR devices will be more sensitive to performance anomalies than pyranometers because they track PV system power output more closely. At the same time, they will be able to detect a broader range of performance anomalies than traditional matched reference devices, which might have matching defects. The BPR definition also opens the door to new practices in resource assessment and yield prediction. Solar resource data can be collected or modeled and validated directly as BPR irradiance, and PV system simulations based on BPR irradiance need fewer assumptions and less processing to obtain the effective irradiance on modules. As a result, lower uncertainty in yield assessments can be expected.

14 SOLAR ENERGY↗

Wave resource characterization at regional and nearshore scales for the U.S. Alaska coast based on a 32-year high-resolution hindcast

A wave resource characterization was performed for the southern coast of Alaska based on a 32-year hindcast covering the period from 1979 to 2010. The characterization closely followed International Electrotechnical Commission (IEC) Technical Specifications. An unstructured-grid Simulating WAves Nearshore (SWAN) model, which had an approximate spatial resolution of 300 m within 30 km from the nearest shoreline, was developed. Additionally, extensive model validation and error characterization was performed. The model was found to perform well with an average absolute percent error of 8.6% in significant wave height, averaged over 18 buoys. Statistics for the six IEC wave resource parameters were calculated and aggregated at 20 km from shore to quantify the incident wave power and its variability at a regional scale. The southern coast of the Aleutian Archipelago was found to have the most available wave energy in the region. A nearshore resource assessment was performed by evaluating resource hotspots located 1 km from shore. More than 900 nearshore stations had an Optimum Hotspot Identifier value of 5 (kW/m) at diverse water depths, thereby positioning Alaska as a promising location for wave energy development.

54 ENVIRONMENTAL SCIENCES↗

Wind Plant Performance Prediction Benchmark Phase 1 (Technical Report)

Financial risk resulting from the uncertainty associated with developing, owning, and operating wind power plants remains a barrier to reducing the levelized cost of energy (LCOE). On average, modern wind power plants in the U.S. underperform their expected annual energy output by 3.5-4.5% , with many underperforming by over 10%. To compensate for this uncertainty, investors require a larger return on investment (ROI) and apply "knock-down" factors that mask much of the underlying sources of uncertainty. Wind energy projects thus have reduced access to low-cost capital. Furthermore, operating wind plants often take a simple approach to estimating operations & maintenance (O&M) costs (e.g. straight-line estimates based on similar plants), which can eat into profits. To overcome these issues, the wind industry must improve the models they use for estimating wind plant performance and operations. An industry consortium (IC) requested that the National Renewable Energy Laboratory (NREL) lead a Department of Energy (DOE) working group to benchmark the accuracy of wind power plant energy predictions against real operational data. The IC was also motivated by DOE and NREL's potential to characterize systematic energy underperformance, identify sources of uncertainty, and explore root causes. The Wind Plant Performance Prediction (WP3) project was created out of this request, and this report represents the successful completion of Phase 1 of the WP3 project. During the project, wind plant owners provided both pre-construction and operational data to NREL. The pre-construction data was provided to wind resource assessment (WRA) consultants so they could conduct energy yield assessments (EYA). NREL took all of the completed EYAs, along with the operational data, and conducted an operational assessment to benchmark the EYA results against actual operational data. Given the large amounts of sensitive data required for this effort, as well as historical opposition to sharing data within industry, successful completion of Phase 1 represents an unprecedented milestone for industry data sharing. To improve the accuracy and confidence of pre-construction EYAs, wind plant owners and investors need better, more certain, energy yield predictions. The WP3 Benchmark Project is an industry-driven response to this reality. For the first time, industry has taken the important step of working together at scale, sharing valuable operational data with DOE and NREL in order to investigate the sources of bias and uncertainty in these energy estimates. This IC provides wind plant preconstruction and operational data to NREL in an organized and documented fashion and provides guidance and feedback as needed. The IC also provides introspection of the design of experiment, key metrics of success, data challenges, analysis best practices, and quality of results.

17 WIND ENERGY↗