Search NASA⌕ Search

SEARCH · Search NASA

Results for “resource surveys”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Mitigation for Removal of Building 01-103 in the Area 1 Subdock, Nevada National Security Site, Nye County, Nevada

Building 01-103, the Drill Bit Repair Building was originally recorded as SHPO Resource No. B18848 in 2020 during an architectural survey of the Area 1 Subdock (Collins et al. 2022). It was recommended individually eligible for listing in the NRHP under Criteria A and C and contributing to the significance of the Area 1 Subdock Historic District. The SHPO concurred with these determinations in a letter dated April 29, 2022 (Reed 2022). The Drill Bit Repair Building retains all seven aspects of integrity. The location, materials, workmanship, feeling, and association have not changed since its original construction. The design was modified slightly in 1996 with the addition of a removable and non-destructive chain-link fence. Nearby buildings 01-101 and 01-102 were removed (Collins and Menocal 2020) but the other buildings and storage yards remain. Therefore, the integrity of setting has been changed, but not to the degree that the building no longer conveys its significance (see Figures 4 and 5 for comparison). Building 01-103 was constructed in 1985 to coincide with the relocation of the Area 3 Subdock to Area 1. The design for the new Subdock provided a centralized cluster of buildings surrounded by two large storage yards. The buildings included administrative and engineering office space, warehouses, a radiograph building, and Building 01-103 as the drill bit maintenance and repair building, among others. The Drill Bit Repair Building was critical to the success of underground nuclear testing and is eligible under Criterion A for its contribution to broad patterns of history by maintaining specially designed equipment for underground nuclear testing at the NNSS. It is also eligible under Criterion C as it is the only recorded example of a facility built specifically for the maintenance of big-hole drill bits on the NNSS. As it retains both significance and integrity, it remains individually eligible under Criteria A and C. In addition to its individual significance, the Drill Bit Repair Building also contributes to the significance of the Area 1 Subdock Historic District as a representative of a big-hole drilling support facility necessary for underground nuclear testing. The building and the equipment therein were designed specifically for testing at the NNSS, where much of the early technology and methods for big-hole drilling were developed. Its removal will result in not only the demolition of a contributing element but also a change in the physical features of the district’s setting that contribute to its historic significance. The change in setting will diminish the district’s integrity. However, the district still contains numerous examples of other buildings constructed for the purpose of supporting big-hole drilling and remains eligible under Criteria A and C.

54 ENVIRONMENTAL SCIENCES↗

Hydrological dataset for reservoir sedimentation in Texas

This dataset provides comprehensive hydrological information about reservoir sedimentation in Texas, including observed and remotely sensed sediment concentration, river discharge, watershed boundary, lake geometry, reservoir capacity, land use and land cover (LULC), and population data. In-depth interpretation of the dataset is elaborated in in a journal article, entitled " Sedimentation and nonlinear trapping in Texas reservoirs identified using remote sensing and bathymetric survey records (will be accepted soon at Water Resources Research)."

Lee, Jiyong [Oak Ridge National Laboratory (ORNL),↗

An Architectural Survey of the Area 25 Nuclear Rocket Development Station, Nevada National Security Site, Nye County, Nevada, Volume 2 Of 3

The purpose of the current architectural survey is to record the Nuclear Rocket Development Station (NRDS) district, which is recommended eligible for listing to the NRHP under all four criteria as the testing center for the Rover/NERVA (Nuclear Engine for Rocket Vehicle Application) program from the initial boundary survey in 1956 to the end of nuclear rocket development on January 5, 1973. Resources within the boundary of the NRDS district were evaluated to determine if they are eligible for listing to the National Register as district contributors. Subdistricts within the larger NRDS district were defined to provide a temporal, spatial, and functional framework for organizing the resources involved in the NRDS operations. However, developing contexts for the individual subdistricts was beyond the scope of the NRDS survey. Therefore, the potentially eligible subdistricts were not individually evaluated under any of the Secretary of Interior’s Significance Criteria for eligibility to the National Register.

54 ENVIRONMENTAL SCIENCES↗

GeoDAWN West Central Nevada EarthMRI Data

This submission includes both the original product resolution (OPR) and LiDAR point cloud (LPC) LiDAR data collected as part of GeoDAWN: Geoscience Data Acquisition for Western Nevada. The USGS Earth Mapping Resources Initiative (EarthMRI) and USGS 3D Elevation Program (3DEP), Department of Energy Geothermal Technologies Office, Natural Resources Conservation Services, and Bureau of Land Management have partnered to conduct airborne geophysical and 3DEP lidar surveys over parts of Nevada and California to collect information on undiscovered geothermal, critical mineral, and groundwater resources in the western Great Basin and the Walker Lane region.

15 GEOTHERMAL ENERGY↗

GeoDAWN Northwestern Elko County Nevada EarthMRI Data

This submission includes both the original product resolution (OPR) and LiDAR point cloud (LPC) LiDAR data collected as part of GeoDAWN: Geoscience Data Acquisition for Northwestern Elko County, Nevada. The USGS Earth Mapping Resources Initiative (EarthMRI) and USGS 3D Elevation Program (3DEP), Department of Energy Geothermal Technologies Office, Natural Resources Conservation Services, and Bureau of Land Management have partnered to conduct airborne geophysical and 3DEP lidar surveys over parts of Nevada and California to collect information on undiscovered geothermal, critical mineral, and groundwater resources in the western Great Basin and the Walker Lane region.

15 GEOTHERMAL ENERGY↗

Play Fairway Analysis: Structurally Controlled Geothermal Systems in the Eastern Great Basin Extensional Regime, Utah

A research team with membership from the University of Utah/Energy & Geoscience Institute, the University of Utah/Dept. of Geology & Geophysics, and the Utah Geological Survey, undertook a play fairway analysis (PFA) for geothermal resources in the Eastern Great Basin (EGB) extensional tectonic regime of western Utah. This is a high-priority region for geothermal exploration because active Basin and Range (B&R) extension with volcanism having a N-S strike is superimposed upon pre-existing E-W belts of plutonic rocks and large-scale structural lineaments. Cumulative heat flow along the N-S strike of the state totals approximately 5 GWt above background stable interior. Three electricity producing power plants currently exist with substantial potential for increase. Succinctly, our PFA approach aims to resolve potential sources of heat and permeability in the region, which are the two principal criteria for establishing a geothermal resource. An initial Phase 1 was carried out using only existing geoscientific data in the area. Criteria selected for focusing heat potential include direct heat flow measurements in boreholes, magnetotelluric (MT) low resistivity anomalies, fluid/gas geochemistry, and proximity to recent volcanic eruptions. Permeability is established through geological structures (fault density, critically stressed areas, seismicity, gravity), and MT low resistivity anomalies. In Phase II of this PFA project, additional geological, geophysical and geochemical data were acquired and analysis carried out primarily over promising composite common risk (CCR) areas initially identified in Phase I in order to focus prospectivity and prepare for drilling recommendations. These prospects are near the Twin Peaks rhyolite field, high heat flow areas north of the producing Cove Fort system, and geophysical structure beneath the Crater Knoll area off the northeast flank of the Mineral Mountains. Additional data included MT site fill-in, structural mapping and analysis using high-resolution imagery, gravity and on-ground mapping, Nodal 3C passive seismic collection, and passive 3He surveying. Heat source and permeability potential are again expressed in terms of their individual common risk segment (CRS) maps, with a color scheme using green for most favorable (low risk) and red for least favorable (high risk). Diverse data types are united through the technique of probability kriging, which establishes prospectivity thresholds for each data type and then computes probability of exceeding that threshold over the PFA area. Modified CRS and CCRS maps are compared to those of Phase I to highlight tighter prospectivity focus. In doing so, the prospectivity threshold for heat was increased significantly to narrow the targeting. In the final Phase III of this project where a recommended deep thermal gradient hole was sited, additional geophysical, geochemical and geological field collection and analysis was carried out to refine drill hole targeting. This includes prospect-scale MT, gravity, structure, passive seismic deployment (Cove Fort area), and detailed 3He isotope profiling. It was the recommendation of the DOE Technical Monitoring Team (TMT) that one or more holes be sited in the north-ern Cove Fort area where legacy TG gradient holes showed high cumulative heat flow. These were to be of moderate depth, 2000-3000 feet, to reach the geothermal fluid table expected to start in excess of 1000 feet depth. The drilling organization stipulated by the DOE/GTO was that of the USGS Research Drilling Program (RDP) centered in Las Vegas, NV. A detailed well plan, appended to this report, was developed principally by Dr. Ben Barker consulting to University of Utah, Dr. Steve Pye on the DOE TMT, Mr. Steven Crawford of the USGS-RDP, and the project PI Phil Wannamaker. However, temperature and possible H 2 S at the systems lead to cancellation of the drilling last-minute as this appeared outside the experience base of the USGS-RDP. We hope to have the opportunity to revisit the test drilling and expand the Play Fairway Analysis of this region at some point in the future.

15 GEOTHERMAL ENERGY↗

Burrowing Owl Survey Report for Sandia National Laboratories: 2025

The Burrowing Owl Survey Report for Sandia National Laboratories: 2025 provides data and analysis on occupancy surveys that were conducted during the 2025 survey season. The surveys were conducted in partnership with Kirtland Air Force Base’s Natural Resource Program and the United States Fish and Wildlife Service to maintain and expand on the long-term dataset on burrowing owls on base. Ecology Program biologists conducted roadside census surveys at survey areas previously identified by Kirtland Air Force Base along with several additional survey areas deemed suitable for occupancy. Remote sensor camera monitoring was also conducted on three nest burrows. In total, 12 breeding pairs of burrowing owls were confirmed in 2025. Several owls were confirmed to have leg bands, indicating previous captures and recurrence of these specific individuals on base. Occupancy surveys on burrowing owls continue to provide valuable information on ecosystem health and can serve to inform future management direction and decisions.

54 ENVIRONMENTAL SCIENCES↗

Community Planning for Solar: Compiling a Community Solar Action Plan

This document provides an annotated outline for a Community Solar Action Plan. This document is designed to assist community officials, volunteers, and regional planning agency staff in preparing a draft Community Solar Action Plan for a municipality, community, or other jurisdiction. Preparing a Community Solar Action Plan is the fifth step in the Community Planning for Solar process (ag.umass.edu/solarplanning). The plan is intended to be the culmination of the planning process. The contents of the plan will include summaries of information gathered as part of foregoing steps in the process, including completion of a Solar Resource and Infrastructure Assessment, administering of a Community Solar Survey, interpretation of survey results, and review of Solar Financing and Ownership Options and tools. Once the Community Solar Action Plan has been drafted, it should be reviewed by municipal board and commission members and presented at an open community forum. Any important comments or revisions can be incorporated before the final Community Solar Action Plan is approved and implemented. The approved Community Solar Action Plan is a living document that guides community solar planning action over time. As conditions change, new information becomes available, or actions progress over the life of the plan, adjustments may be necessary to maintain the plan's relevance. The Monitoring, Evaluating, and Updating Your Community Solar Action Plan fact sheet (Step 6, Item a) describes some things to consider when updating the Community Solar Action Plan over time.

14 SOLAR ENERGY↗

Multi-Unit Dwelling Plug-in EV Charging Innovation Pilots (Final Report)

Nearly one-third of residences in the U.S. are multi-unit dwellings (MUDs), e.g., apartments and condominiums, and MUDs with five or more units account for approximately 45% of rental households. While 80% of EV charging takes place at home, less than 5% of home charging takes place at MUDs. With public electric vehicle (EV) charging still underdeveloped, lack of access to reliable home charging is a major barrier to EV adoption for MUD residents. Challenges to siting electric vehicle supply equipment (EVSE) at MUDs include the high upfront cost of EVSE installation, physical and/or electrical infrastructure constraints, a lack of clear incentives for property managers to invest in installing EV charging for tenants, and a limited number of EV charging service providers that offer solutions adapted to the unique needs of MUDs. Through award DE-EE0008473 from the U.S. Department of Energy’s Office of Energy Efficiency and Renewable Energy (EERE), Center for Sustainable Energy (CSE), Energetics, and Forth, along with a diverse team of partners, led a three-year project to address barriers to EV charging at MUDs by developing an online toolkit geared toward residents, homeowner associations (HOAs), and property managers. The project, referred to as Vehicle Charging Innovations – Multi-Unit Dwellings (VCI-MUD project), engaged stakeholders across the country to identify real and perceived barriers to EV charging at MUDs and explored innovative technologies that attempt to alleviate the identified barriers. Over the course of three and a half years, the project conducted 60 interviews with industry stakeholders, compiled findings in an easy-to-use toolkit, and disseminated the toolkit across national, regional, state, and local channels. Key findings and outcomes of the VCI-MUD project include: Identifying six primary barriers to the installation of EV charging at MUDs; Developing five fact sheets and eight case studies highlighting innovative charging solutions to address barriers, including real-world operational and financial data; Developing a user-friendly, online empowerment toolkit with five important points for “making your pitch” to support EV charging to assist residents, property managers, building managers, and HOAs explore options for MUD charging. The VCI-MUD online toolkit was designed with replicability in mind. It includes general tools and guides to evaluate EV charging demand, gauge readiness for EV charging installation, and develop actionable plans. The fact sheets and case studies highlight the diversity of emerging MUD EV charging solutions, featuring different geographic and structural installation scenarios and providing interested parties with a menu of options, rather than prescribing a one-size-fits-all solution. The following resources are included in the toolkit to provide MUD stakeholders with all the information needed to navigate EV charging installation at their MUD location: Empowerment Toolkit – Easy-to-read FAQ overview, stakeholder roles and responsibilities, and additional resources for MUD EV charging installations; Charging Basics – Glossary of terms and descriptions of charging features, installation and operating expenses; EV Charging Survey Templates – Resident-to-Resident, Property Manager-to-Resident and HOA-to-Resident template letters with pre-populated template questions; Technology Selection Tool – Charging barrier fact sheets and case study examples; Installation Checklist – Submittal document requirements for EVSE installations; MUD Building Self-Evaluation Survey – Self-guided evaluation of potential barriers to EV charging installation at MUD locations; Curbside Resources – Case studies and fact sheets for curbside charging options; Find a Certified Electrician – Approved list of certified EV charging installers; “Right-to-Charge” State Legal References – Legal requirements for charging equipment at MUD locations. The online toolkit was promoted extensively in the final six months of the project and will continue to be disseminated by the Clean Cities Coalitions and other partners after the end of the VCI-MUD project to encourage, support, and demonstrate viable solutions for vehicle charging infrastructure in MUDs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Workshop Summary: Bridging the Gap Between Atmospheric Science and Grid Integration

The need for dedicated, accurate, expertly curated weather data is increasingly important as the share of variable renewable energy increases on the power system. Projections for futures with very high (50+% annual energy) shares of variable generation require ongoing assessment of data requirements from industry stakeholders in their power system operation and planning contexts. In March 2024, NREL organized a workshop entitled "Bridging the Gap Between Atmospheric Science and Grid Integration Workshop", which brought atmospheric scientists and power system experts together to refine the requirements of atmospheric datasets for grid integration, and to describe a holistic approach to creating new and regularly updated national scale wind datasets for power system planning and operations. The results of this workshop are being used to inform the near-term development and a longer-term strategy for DOE to produce relevant wind resource datasets and inform wider use of wind/solar/load data sets in power system planning. This presentation provides an overview of a preworkshop survey, an assessment of current state of the art of national-scale datasets for wind resource assessment and grid integration, insights on appropriate uses of the WTK-LED, power system perspectives on data needs, as well as recommended next steps as discussed in the workshop and how these steps support longer-term strategies.

17 WIND ENERGY↗

Predicting plant attractiveness to coccinellids with plant trait profiling, citizen science, and common garden surveys

Lady beetles are key predators in agricultural systems and their impact can be enhanced by plant resources. Facilitation of lady beetles is a potentially effective pest management strategy but a lack of data on which plant species attract and nurture them limits implementation. Here we investigate which plant species might optimize lady beetle impact by developing a profile of plant characteristics most likely to attract lady beetles and testing if the subset of “potentially preferred” plant families exhibiting those characteristics are significantly more attractive to lady beetles than other families. This testing encompassed a combination of observations submitted to a citizen science program, the Lost Ladybug Project, and two repeated site surveys. Traits reported to be most attractive to lady beetles included the presence of trichomes that provide protection from predation, nutritional resources such as nectar or prey, and visual or chemical cues associated with those traits. Significantly more lady beetles were observed on the three plant families which most often exhibit these traits, Apiaceae, Asteraceae, and Rosaceae, than on other families. Furthermore, strategies for incorporating plants from these families into production systems to attract lady beetles and limit pest damage are discussed.

59 BASIC BIOLOGICAL SCIENCES↗

Sensitive Resources Assessment and Forest Analysis for The SSP-2A Parcel and Proposed Oak Ridge Enhanced Technology and Training Center (ORETTC), Oak Ridge, Tennessee

This report summarizes current knowledge of natural and cultural resources associated with potential land use changes within an 81-acre (32.8-hectare) parcel, termed SSP-2A, on the US Department of Energy’s (DOE’s) Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee (Figure 1). A primary goal for the work presented here was to evaluate potential impacts to sensitive resources within the SSP-2A parcel that might result from land disturbance and construction of the Oak Ridge Enhanced Technology and Training Center (ORETTC). In addition to on-the-ground surveys of the ORETTC footprint and SSP-2A parcel during summer 2020 (Figure 1), this report leverages historical (pre-1995) and contemporary (1995–present) data from additional sources such as the Tennessee Department of Environment and Conservation (TDEC). The individuals who obtained and compiled the data that are presented here are familiar with and routinely assess, manage, and research sensitive resources on the ORR. This report should facilitate more environmentally sound decisions during planning and development of the ORETTC, provide a foundation for further assessment of sensitive and cultural resources associated with the broader SSP-2A parcel (should additional actions take place), and help project managers address regulatory guidance and DOE policy on sustainable development. Those who reference this report must consider that the timing of surveys does not permit complete delineation of resources. Data deficiencies are indicated where possible. Additional surveys may be required to account for seasonal patterns of various threatened and endangered species (e.g., bats), and additional assessment will be required if activities extend beyond the ORETTC site (Figure 2).

54 ENVIRONMENTAL SCIENCES↗

Finding of Effect, And Mitigation Documentation for Building 23-620, Mercury, Area 23, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) plans to demolish Building 23-620 in the town of Mercury (Nevada State Historic Preservation Office [SHPO] Resource No. B15283), which is on the Nevada National Security Site (NNSS) in Nye County, Nevada (see Figure 1). The purpose of the undertaking is related to the modernization of Mercury for future mission needs. The NNSA/NFO will implement this undertaking in accordance with the Programmatic Agreement between the National Nuclear Security Administration Nevada Field Office and the Nevada State Historic Preservation Officer Regarding Modernization and Operational Maintenance of the Nevada National Security Site, at Mercury in Nye County, Nevada, hereafter referred to as the Mercury PA. Building 23-620 was built in 1968 as office space for the Los Alamos Scientific Laboratory (LASL), who worked on the design and engineering of nuclear weapons. In the 1990s, it became a maintenance facility for Reynolds Electrical & Engineering Company (REECo), and eventually, it became the Real Estate Services building in 2004. The town of Mercury and the immediate surrounding area have been formally determined eligible for listing in the National Register of Historic Places (National Register, NRHP) as the Mercury Historic District (MHD, SHPO Resource No. D230) under Criteria A and C for its importance in supporting nuclear testing and scientific research from 1951 through 1992. Building 23-620 was identified as a contributing element to the MHD in a 2018 architectural survey of the district (Reno et al.) and recorded on a Nevada Architectural Resource Assessment (ARA) form (Reno et al. 2017). Building 23-620 was also identified in Appendix C of the Mercury PA as a Category I contributing element, indicating that it might be individually eligible for the NRHP. It is a historic property for the purposes of compliance with Section 106 of the National Historic Preservation Act (NHPA) and subject to the stipulations of the Mercury PA. Mitigation Report: The purpose of this letter report is to submit documentation related to the mitigation of the demolition of Building 23-620 (Nevada State Historic Preservation Office [SHPO] Resource No. B15283) in the Mercury Historic District (MHD, SHPO Resource No. D230). This submission is intended to comply with the stipulations in the Programmatic Agreement between the National Nuclear Security Administration Nevada Field Office and the Nevada State Historic Preservation Officer Regarding Modernization and Operational Maintenance of the Nevada National Security Site, at Mercury in Nye County, Nevada, hereafter referred to as the Mercury PA.

54 ENVIRONMENTAL SCIENCES↗

Finding of No Adverse Effect for the Façade Alteration of Building 23-117, Administration Building, Mercury, Area 23, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) plans to update the façade of Building 23-117 in the town of Mercury (Nevada State Historic Preservation Office [SHPO] Resource No. B15256), which is on the Nevada National Security Site (NNSS) in Nye County, Nevada. The purpose of the undertaking is to incorporate Building 23-117 into the new Mercury campus in accordance with the master plan for the modernization of Mercury. The NNSA/NFO will implement this undertaking in accordance with the Programmatic Agreement between the National Nuclear Security Administration Nevada Field Office and the Nevada State Historic Preservation Officer Regarding Modernization and Operational Maintenance of the Nevada National Security Site, at Mercury in Nye County, Nevada, hereafter referred to as the Mercury PA. Building 23-117 was built in 1982 as the architect-engineer Administration Building1 for Holmes & Narver, a government contractor who helped design and engineer the town of Mercury and other areas on the NNSS from its inception until the termination of their contract in 1990. The building continued to be used by subsequent government contractors and is currently still in use by MSTS. The town of Mercury and the immediate surrounding area have been formally determined eligible for listing in the National Register of Historic Places (National Register, NRHP) as the Mercury Historic District (MHD, SHPO Resource No. D230) under Criteria A and C for its importance in supporting nuclear testing and scientific research from 1951 through 1992. Building 23-117 was identified as a contributing element to the MHD in a 2018 architectural survey of the district (Reno et al.) and recorded on a Nevada Architectural Resource Assessment (ARA) form (Reno et al. 2017). It is a historic property for the purposes of compliance with Section 106 of the National Historic Preservation Act (NHPA) and is subject to the stipulations of the Mercury PA. The NNSA/NFO requested that Desert Research Institute (DRI), cultural resource subject matter experts, analyze the effects of the proposed project on historic properties in the Area of Potential Effect (APE) and make a recommended finding for the undertaking in accordance with Section 106 of the NHPA and the Mercury PA. The purpose of this letter report is to submit documentation related to the mitigation of the façade alteration of Building 23-117 (Nevada State Historic Preservation Office [SHPO] Resource No. B15256) in the Mercury Historic District (MHD, SHPO Resource No. D230). This submission is intended to comply with the stipulations in the Programmatic Agreement between the National Nuclear Security Administration Nevada Field Office and the Nevada State Historic Preservation Officer Regarding Modernization and Operational Maintenance of the Nevada National Security Site at Mercury in Nye County, Nevada, hereafter referred to as the Mercury PA.

54 ENVIRONMENTAL SCIENCES↗

Report Series: Finding of Effect, and Mitigation Documentation for Building 23-702, Mercury, Area 23, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) plans to demolish Building 23-702 in the town of Mercury (Nevada State Historic Preservation Office [SHPO] Resource No. B15278), which is on the Nevada National Security Site (NNSS) in Nye County, Nevada (see Figure 1). The purpose of the undertaking is related to the modernization of Mercury for future mission needs. The NNSA/NFO will implement this undertaking in accordance with the Programmatic Agreement between the National Nuclear Security Administration Nevada Field Office and the Nevada State Historic Preservation Officer Regarding Modernization and Operational Maintenance of the Nevada National Security Site, at Mercury in Nye County, Nevada, hereafter referred to as the Mercury PA. Building 23-702 was built in 1965 as a foil handling building for the Los Alamos Scientific Laboratory (LASL), who worked on the design and engineering of nuclear weapons and other nuclear experiments. The building appeared to have secondarily functioned as a storage for radioactive sources in the 1980s and 1990s. The building was operational until 2004, then deactivated sometime between 2005 and 2014. The town of Mercury and the immediate surrounding area have been formally determined eligible for listing in the National Register of Historic Places (National Register, NRHP) as the Mercury Historic District (MHD, SHPO Resource No. D230) under Criteria A and C for its importance in supporting nuclear testing and scientific research from 1951 through 1992. Building 23-702 was identified as a contributing element to the MHD in a 2018 architectural survey of the district (Reno et al.) and recorded on a Nevada Architectural Resource Assessment (ARA) form (Reno et al. 2017). Building 23-702 was also identified in Appendix C of the Mercury PA as a Category I contributing element, indicating that it might be individually eligible for the NRHP. It is a historic property for the purposes of compliance with Section 106 of the National Historic Preservation Act (NHPA) and subject to the stipulations of the Mercury PA.

54 ENVIRONMENTAL SCIENCES↗

Bringing Alaska's Carbon Ore, Rare Earth, and Critical Minerals (CORE-CM) into Perspective

The final report outlines the outcomes of the Alaska CORE-CM Program, funded by the U.S. Department of Energy under award DE-FE0032050. Led by the University of Alaska Fairbanks and the Alaska Division of Geological and Geophysical Surveys, with assistance from other organizations, the project assessed Alaska's potential for Carbon Ore, Rare Earth Elements, and Critical Minerals (CORE-CM). Leveraging advanced analytical techniques, the project identified high-potential resource basins, evaluated geochemical and satellite data, and conducted targeted field investigations. Findings revealed promising concentrations of critical minerals in legacy samples and newly collected materials. The project also investigated innovative extraction technologies, including BioExtraction and use of supercritical CO2, which show significant promise for sustainable resource recovery. Additionally, the study explored the reuse of waste streams from active mining operations and coal byproducts such as using alkali-activated coal ash to manufacture concrete. Infrastructure and logistical challenges in Alaska’s remote regions are discussed, alongside strategies to establish a Technology Innovation Center aimed at advancing CORE-CM development in Alaska. The report includes actionable insights to support Alaska’s critical role in securing domestic supplies of essential minerals while addressing economic, environmental, and technological challenges.

01 COAL, LIGNITE, AND PEAT↗

HydroBio: Hydropower Capacity and Freshwater Biodiversity in Conterminous United States Sub-basins

This dataset summarizes existing and potential hydropower capacity and freshwater biodiversity at the sub-basin level throughout the conterminous United States (CONUS). It contains descriptive information regarding each sub-basin (e.g., 8-digit hydrologic unit code identifier, name, states, and size) along with sub-basin-level summaries of: 1) existing hydropower capacity (MW), 2) potential nominal non-powered dam (NPD) capacity (MW), 3) potential capacity of new stream reach development (NSD) (MW), and 4) freshwater biodiversity, including the total richness of fish, crayfish, and mussels and metrics that account for how rare and threatened those species tend to be. Hydropower data were obtained from Oak Ridge National Laboratory data resources (Existing Hydropower Assets, Non-Powered Dam Technical Potential, and New Stream Reach Development). Freshwater biodiversity data were obtained from NatureServe. Sub-basin characteristic information was obtained from the United States Geological Survey. Additionally, long data that provide lists of unique elements within each sub-basin for each constituent data resource (e.g., NatureServe, Existing Hydropower Assets) are provided to enhance dataset utility for users. The dataset provides, for the first time, a national-level assessment of existing and potential hydropower capacity in the context of freshwater biodiversity and is a valuable resource for stakeholders tasked with providing affordable, reliable energy to the American public while maintaining or enhancing invaluable freshwater resources. The dataset contains six data files in comma separated (*.csv) format that are within a zipped file.

Bozeman, Bryan [Oak Ridge National Laboratory (ORN↗

Energy-Storage Modeling: State-of-the-Art and Future Research Directions

Given its physical characteristics and the range of services that it can provide, energy storage raises unique modeling challenges. This paper summarizes capabilities that operational, planning, and resource-adequacy models that include energy storage should have and surveys gaps in extant models. Existing models that represent energy storage differ in fidelity of representing the balance of the power system and energy-storage applications. Modeling results are sensitive to these differences. The importance of capturing chronology can raise challenges in energy-storage modeling. Some models ‘decouple’ individual operating periods from one another, allowing for natural decomposition and rendering the models relatively computationally tractable. Energy storage complicates such a modeling approach. Improving the representation of the balance of the system can have major effects in capturing energy-storage costs and benefits.

25 ENERGY STORAGE↗