Results for “risk analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Risk Analysis of Various Design Architectures for High Safety-significant Safety-related Digital Instrumentation and Control Systems of Nuclear Power Plants during Accident Scenarios

This report documents the plus-up activities performed by Idaho National Laboratory (INL) during Fiscal Year (FY) 2022 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) risk assessment project. In FY 2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a strong technical basis to support effective, licensable, and secure DI&C technologies for digital upgrades/designs. An integrated risk assessment technology for the DI&C systems was proposed for this strategy, which aims to (1) provide a best-estimate, risk-informed capability to quantitatively and accurately estimate the safety margin obtained from plant modernization, especially for the high safety-significant safety-related (HSSSR) DI&C systems, (2) support and supplement existing advanced risk-informed DI&C design guides by providing quantitative risk information and evidence, (3) offer a capability of design architecture evaluation of various DI&C systems to support system design decisions and diversity and redundancy applications, (4) assure the long-term safety and reliability of HSSSR DI&C systems, and (5) reduce uncertainty in costs and support integration of DI&C systems in the plant. To achieve these technical goals and deal with the expensive licensing justifications from regulatory insights, the LWRS-developed framework instructs nuclear vendors and utilities on how to effectively lower the costs associated with digital compliance and speed industry advances by: (1) defining an integrated risk-informed analysis process for DI&C upgrade, including hazard analysis, reliability analysis, and consequence analysis, (2) applying systematic and risk-informed tools to address common cause failures (CCFs) and quantify corresponding failure probabilities for DI&C technologies, particularly software CCFs, (3) evaluating the impact of digital failures at the component level, system level, and plant level, and (4) providing insights and suggestions on designs to manage the risks, thus to support the development, licensing, and deployment of advanced DI&C technologies on nuclear power plant (NPPs). Adding diversity within system or components is the main means to eliminate and mitigate CCFs, but diversity also increases plant complexity and errors and may not address all sources of systematic failures. How to optimize the diversity and redundancy applications for the safety-critical DI&C systems remains a challenge. To deal with the technical issues in addressing potential software CCFs in HSSSR DI&C systems of NPPs and supporting relevant design optimization, the framework provides: ? An integrated best-estimate, risk-informed capability to address new technical digital issues quantitatively, accurately, and efficiently in plan modernization progress, such as software CCFs in HSSSR DI&C systems of NPPs ? A common and a modularized platform for DI&C designers, software developers, cybersecurity analysts, and plant engineers to efficiently predict and prevent risk in the early design stage of DI&C systems ? Technical bases and risk-informed insights to assist U.S. Nuclear Regulatory Commission (NRC) and industry to address and fulfill the risk-informed alternatives for evaluation of CCFs in HSSSR DI&C systems of NPPs ? An integrated risk-informed tool that offers a capability of design architecture evaluation of various DI&C systems to support system design decisions in diversity and redundancy applications. The plus-up research and development efforts of this project in FY 2022 are focused on methodology improvement of software CCF modeling and estimation, prevention analysis, importance analysis and risk analysis of various design architectures of HSSSR DI&C systems. This work greatly enhances the capability of the LWRS-developed framework for the risk assessment and design optimization of safety-critical DI&C systems. It should be noted that all the analyses are performed for the demonstration of the LWRS-developed framework, not for the evaluation of relevant systems. Results are obtained based on very limited design information and testing data.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Dynamic probabilistic risk assessment and game theory for cyber security risk analysis in nuclear power plants

Nuclear Power Plants and energy systems have become more prone to cyber-attacks with their digitalization and the increased use of smart equipment. Hence, it is important to quantify the risk associated with cyber-attacks in such systems. Dynamic Probabilistic Risk Assessment which involves studying the evolution of a system due to random events and operator and attacker actions during a cyber-attack by employing a physics-based model of the system is a suitable framework to quantify cybersecurity risk in nuclear power plants. In addition to the plant dynamics, it is also important to model the strategies of the attackers and plant operators for an effective cybersecurity risk assessment. Game theory provides a set of necessary tools to model such strategic interactions. In this research, a framework that integrates dynamic probabilistic risk assessment with game theory for cybersecurity risk analysis in nuclear power plants is presented. The mathematical formulation is derived based on the theory of continuous event trees. We propose a game theory based action model, that utilizes physics-based rewards to define the strategies of attackers and operators at every decision epoch. As a case study, the risk associated with cyber-attacks on the digital components in the secondary side of a pressurized water reactor is studied using a reduced order model. A set of attacker actions and a set of operator actions are defined for the system. The operator and attacker interactions were modelled using simultaneous game, their action policies were computed using the concept of mixed strategy Nash equilibrium and the evolution of the system was studied.

97 MATHEMATICS AND COMPUTING↗

ORNL Peer Review Summary and Recommendations for: Advanced Reactor Designs Security Analysis, Risk, and Recommendations: Risks, Consequences, and Possible Design Mitigation Approaches Associated with Select Advanced Reactors Study

The purpose of this document is to provide a summary of the peer review conducted for the "Advanced Reactor Designs Security Analysis, Risk, and Recommendations: Risks, Consequences, and Possible Design Mitigation Approaches Associated with Select Advanced Reactors" study prepared by researchers at Idaho National Laboratory (INL), Argonne National Laboratory (ANL), and Oak Ridge National Laboratory (ORNL). The National Nuclear Security Administration (NNSA) International Nuclear Security (INS) program team requested that ORNL perform a peer review of the study report prior to publication as a final peer check before distributing the report to a broader audience.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Use of the NetBeans Platform for NASA Robotic Conjunction Assessment Risk Analysis

The latest Java and JavaFX technologies are very attractive software platforms for customers involved in space mission operations such as those of NASA and the US Air Force. For NASA Robotic Conjunction Assessment Risk Analysis (CARA), the NetBeans platform provided an environment in which scalable software solutions could be developed quickly and efficiently. Both Java 8 and the NetBeans platform are in the process of simplifying CARA development in secure environments by providing a significant amount of capability in a single accredited package, where accreditation alone can account for 6-8 months for each library or software application. Capabilities either in use or being investigated by CARA include: 2D and 3D displays with JavaFX, parallelization with the new Streams API, and scalability through the NetBeans plugin architecture.

assessment↗

Development of an Expert Judgement Elicitation and Calibration Methodology for Risk Analysis in Conceptual Vehicle Design

A comprehensive expert-judgment elicitation methodology to quantify input parameter uncertainty and analysis tool uncertainty in a conceptual launch vehicle design analysis has been developed. The ten-phase methodology seeks to obtain expert judgment opinion for quantifying uncertainties as a probability distribution so that multidisciplinary risk analysis studies can be performed. The calibration and aggregation techniques presented as part of the methodology are aimed at improving individual expert estimates, and provide an approach to aggregate multiple expert judgments into a single probability distribution. The purpose of this report is to document the methodology development and its validation through application to a reference aerospace vehicle. A detailed summary of the application exercise, including calibration and aggregation results is presented. A discussion of possible future steps in this research area is given.

Unal, Resit↗

Nuclear Radiation Fields on the Mars Surface: Risk Analysis for Long-term Living Environment

Mars, our nearest planet outward from the sun, has been targeted for several decades as a prospective site for expanded human habitation. Background space radiation exposures on Mars are expected to be orders of magnitude higher than on Earth. Recent risk analysis procedures based on detailed dosimetric techniques applicable to sensitive human organs have been developed along with experimental data regarding cell mutation rates resulting from exposures to a broad range of particle types and energy spectra. In this context, simulated exposure and subsequent risk for humans in residence on Mars are examined. A conceptual habitat structure, CAD-modeled with duly considered inherent shielding properties, has been implemented. Body self-shielding is evaluated using NASA standard computerized male and female models. The background environment is taken to consist not only of exposure from incident cosmic ray ions and their secondaries, but also include the contribution from secondary neutron fields produced in the tenuous atmosphere and the underlying regolith.

Brooke M Anderson↗

Closure to “Coincidence Risk Analysis of Floods Using Multivariate Copulas: Case Study of Jinsha River and Min River, China” by Yang Peng, Yulong Shi, Hongxiang Yan, Kai Chen, and Jipeng Zhang

We would like to thank the discusser for his comments on the coincidence flood risk modeling in Jinsha River and Min River, China. The discusser’s comment brings focus to the discussion of extreme-value selection methodology and historical flood information. In flood risk analysis, we acknowledge that there is always an alternative modeling approach that could be used to generate desired prediction results. In this comment, the discusser made two valuable points regarding the original paper, and the following two paragraphs provide our responses.

42 ENGINEERING↗

Quantifying Investment Risk: Analysis of the Purchase Decision of a Nuclear Power Plant

Cost overruns are an ill-fated part of the deployment history of nuclear power plants (NPPs) in the United States, and yet studies increasingly show the important role nuclear technologies must play in decarbonizing the U.S. economy. Paradoxically, then, a key piece of a coherent decarbonization strategy depends on attracting investor action to a purchase where historical cost overruns have been sizeable. To address this challenge, this study aims to develop a financial model that quantifies risk of cost overruns in the decision-making process for purchasing advanced reactor concepts. Using the concept of Value at Risk (VaR), the model is built to evaluate financial risk nuclear construction with the aim to identify risk mitigation strategies. The objective is to identify strategies to mitigate cost-risk challenges and to assess the potential reduction in investor risk exposure. The paper presents the initial development and preliminary verification of the financial risk analysis model. The development of this model involved a comprehensive approach to estimating financial risk over the operating life of NPP that stems from construction uncertainties. By utilizing net present value (NPV) with discounted cash flows, the model captures the complex interconnections of project costs, construction timelines, revenue, and uncertainties. Verification of the model involved testing historical data from previous reactor construction projects against the construction project of Vogtle 3 and 4. The results of this paper present the comparison of the preconstruction cost overrun prediction with the current cost estimates from a nearly complete Vogtle 3 and 4.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Quantifying Investment Risk: Analysis of the Purchase Decision of a Nuclear Power Plant (Presentation)

Cost overruns are an ill-fated part of the deployment history of nuclear power plants (NPPs) in the United States, and yet studies increasingly show the important role nuclear technologies must play in decarbonizing the U.S. economy. Paradoxically, then, a key piece of a coherent decarbonization strategy depends on attracting investor action to a purchase where historical cost overruns have been sizable. To address this challenge, this study aims to develop a financial model that quantifies the risk of cost overruns in the decision-making process for purchasing advanced reactor concepts. Using the concept of value at risk (VaR), the model is built to evaluate financial risk nuclear construction with the aim to identify risk mitigation strategies. The objective is to identify strategies to mitigate cost-risk challenges and assess the potential reduction in investor risk exposure. This paper presents the initial development and preliminary verification of the financial risk analysis model. The development of this model involved a comprehensive approach to estimating financial risk over the operating life of NPP that stems from construction uncertainties. By utilizing net present value (NPV) with discounted cash flows, the model captures the complex interconnections of project costs, construction timelines, revenue, and uncertainties. Verifying the model involved testing historical data from previous reactor construction projects against the construction project of Vogtle 3 and 4. This paper’s results present the comparison of the preconstruction cost overrun prediction with the current cost estimates from a nearly complete Vogtle 3 and 4.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A Comprehensive Open-Source R Software For Statistical Metrology Calculations: From Uncertainty Evaluation To Risk Analysis

Whether calibrating equipment or inspecting products on the factory floor, metrology requires many complicated statistical calculations to achieve a full understanding and evaluation of measurement uncertainty and quality. In order to assist its workforce in performing these calculations in a consistent and rigorous way, the Primary Standards Lab at Sandia National Laboratories (SNL) has developed a free and open-source software package for computing various metrology calculations from uncertainty propagation to risk analysis. In addition to propagating uncertainty through a measurement model using the well-known Guide to Expression of Uncertainty in Measurement or Monte Carlo approaches, evaluating the individual Type A and Type B uncertainty components that go into the measurement model often requires other statistical methods such as analysis of variance or determining uncertainty in a fitted curve. Once the uncertainty in a measurement has been calculated, it is usually evaluated from a risk perspective to ensure the measurement is suitable for making a particular conformance decision. Finally, SNL’s software can perform all these calculations in a single application via an easy-to-use graphical interface, where the different functions are integrated so the results of one calculation can be used as inputs to another calculation.

97 MATHEMATICS AND COMPUTING↗

Risk Analysis of the Space Shuttle: Pre-Challenger Bayeisan Prediction of Failure

Dalal et al performed a statistical analysis of field and nozzle O-ring data collected prior to the ill-fated launch of the Challenger in January 1986. The purpose of their analysis was to show how statistical analysis could be used to provide information to decisionmakers prior to the launch, information that could have been expected to lead to a decision to abort the launch due to the low temperatures (~30o F.) present at the launch pad on the morning of the scheduled launch. Dalal et al. performed a frequentist analysis of the O-ring data, and found that a logistic regression model provided a relatively good fit to the past data. In the second portion of their paper, Dalal et al. propagated parameter uncertainties through the fitted logistic regression model in order to estimate the probability of shuttle failure due to O-ring failure at the estimated launch temperature of ~30o F. Because their analysis was frequentist in nature, probability distributions representing epistemic uncertainty in the input parameters were not available, and the authors had to resort to an approximate approach based on bootstrap confidence intervals. In this paper, we will re-evaluate the analyses of Dalal et al. from a Bayesian perspective. Markov chain Monte Carlo (MCMC) sampling will be used to sample from the joint posterior distribution of the model parameters, and to sample from the posterior predictive distributions at the estimated launch temperature, a temperature that had not been observed in prior launches of the space shuttle. Uncertainties, which are represented by probability distributions in the Bayesian approach, are propagated through the model to obtain a probability distribution for O-ring failure, and subsequently for shuttle failure as a result of O-ring failure. No approximations are required in the Bayesian approach and the resulting distributions can be input to a decision analysis to obtain expected utility for the decision to launch.

42 ENGINEERING↗

Evolution and Implementation of the NASA Robotic Conjunction Assessment Risk Analysis Concept of Operations

Reacting to potential on-orbit collision risk in an operational environment requires timely and accurate communication and exchange of data, information, and analysis to ensure informed decision-making for safety of flight and responsible use of the shared space environment. To accomplish this mission, it is imperative that all stakeholders effectively manage resources: devoting necessary and potentially intensive resource commitment to responding to high-risk conjunction events and preventing unnecessary expenditure of resources on events of low collision risk. After 10 years of operational experience, the NASA Robotic Conjunction Assessment Risk Analysis (CARA) is modifying its Concept of Operations (CONOPS) to ensure this alignment of collision risk and resource management. This evolution manifests itself in the approach to characterizing, reporting, and refining of collision risk. Implementation of this updated CONOPS is expected to have a demonstrated improvement on the efficacy of JSpOC, CARA, and owner/operator resources.

operations↗

Risk Analysis Virtual ENvironment

RAVEN has 3 major functionalities: 1. Provides a Graphical User Interface for the pre- and post-processing of the RELAP-7 input and output. 2. Provides the capability to model nuclear power plants control logic for the RELAP-7 code and dynamic control of the accident scenario evolution. This capability is based on a software structure that realizes a direct connection between the RELAP-7 solver engine (MOOSE) and a python environment where the variables describing the plant status are accessible in a scripting environment. RAVEN support the generation of the probabilistic scenario control by supplying a wide range of probability and cumulative distribution functions and their inverse functions. 3. Provides a general environment to perform probability risk analysis for RELAP-7, RELAP-5 and any generic MOOSE based applications. The probabilistic analysis is performed by sampling the input space of the coupled code parameters and it is enhanced by using modern artificial intelligence algorithms that accelerate the identification of the areas of major risk (in the input parameter space). This environment also provides a graphical visualization capability to analyze the outcomes. Among other approaches, the classical Monte Carlo and Latin Hypercube sampling algorithms are available. For the acceleration of the convergence of the sampling methodologies, Support Vector Machines, Bayesian regression, and collocation stochastic polynomials chaos are implemented. The same methodologies here described could be used to solve optimization and uncertainties propagation problems using the RAVEN framework.

Rabiti, Cristian↗

Risk Analysis and System Trades inthe Mars Sample Return (MSR) Mission

Risk Managenent advocates have long sought to directly influence the early stages of the systems engineering process through a more effective role in system design trade studies. The principal obstacle to this has been the lack of credible ways to represent and quantify mission risk that is, missios return form a probablistic viewpoint-for the project manager and the rest of the design team.

Risk Analysis Mars Sample Return↗

GPS Spoofing Mitigation and Timing Risk Analysis in Networked Phasor Measurement Units via Stochastic Reachability

To address phasor measurement unit (PMU) vulnerability to spoofing, we propose the use of a set-valued state estimation technique known as stochastic reachability (SR)-based distributed Kalman filter (DKF) that computes secure global positioning system (GPS) timing across a network of receivers. Utilizing SR, we estimate not only GPS time but also its stochastic reachable set, which is parameterized by probabilistic zonotope (p-Zonotope). While requiring known measurement error bounds in only non-spoofed conditions, we designed a two-tiered approach. We first performed measurement-level spoofing mitigation via deviation of a measurement innovation from its expected p-Zonotope. We then performed state-level timing risk analysis via a determination of the intersection probability of the estimated p-Zonotope with an unsafe set that violates IEEE C37.118.1a-2014 standards. Finally, we validated our SR-DKF algorithm by subjecting it to a simulated receiver network to coordinate signal-level spoofing. We demonstrate improved timing accuracy and successful spoofing mitigation via the use of our SR-DKF algorithm. We also validated the robustness of the estimated timing risk as the number of receivers were varied.

47 OTHER INSTRUMENTATION↗

Plant-Level Scenario-Based Risk Analysis for Enhanced Resilient PWR – SBO and LBLOCA

This report documents the activities performed during the FY2018 for the DOE Light Water Reactor Sustainability (LWRS) Program, Risk-Informed System Analysis (RISA) Pathway, Enhanced Resilient Plant (ERP) Systems research. The purpose of the RISA Pathway research and development is to support plant owner-operator decisions with the aim to improve the economics, reliability, and maintain the high levels of safety of current nuclear power plants over periods of extended plant operations. The concept of ERP refers to the combinations of Accident Tolerant Fuel (ATF), optimal use of Diverse and Flexible Coping Strategy (FLEX), enhancements to plant components and systems, and the incorporation of augmented or new passive cooling systems, as well as improved fuel cycle efficiency. The objective of the ERP research effort is to use the RISA methods and toolkit in industry applications, including methods development and early demonstration of technologies, in order to enhance existing reactors safety features (both active and passive) and to substantially reduce operating costs through risk-informed approaches to plant design modifications to the plant and their characterization. There are two main focus areas in FY2018 for the ERP R&D efforts. One is to evaluate the risk impact brought by the ATF designs and FLEX in the selected accident scenarios. The other is to investigate various approaches to accomplish the ERP research objective, i.e., use RISA methods and toolkit to enhance existing reactors safety features and reduce plant operating costs.

99 GENERAL AND MISCELLANEOUS↗

Vulnerabilities, Influences and Interaction Paths: Failure Data for Integrated System Risk Analysis

We describe graph-based analysis methods for identifying and analyzing cross-subsystem interaction risks from subsystem connectivity information. By discovering external and remote influences that would be otherwise unexpected, these methods can support better communication among subsystem designers at points of potential conflict and to support design of more dependable and diagnosable systems. These methods identify hazard causes that can impact vulnerable functions or entities if propagated across interaction paths from the hazard source to the vulnerable target. The analysis can also assess combined impacts of And-Or trees of disabling influences. The analysis can use ratings of hazards and vulnerabilities to calculate cumulative measures of the severity and importance. Identification of cross-subsystem hazard-vulnerability pairs and propagation paths across subsystems will increase coverage of hazard and risk analysis and can indicate risk control and protection strategies.

Malin, Jane T.↗