Search NASA⌕ Search

SEARCH · Search NASA

Results for “river current”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Unlocking America's Abundant Marine Energy Resources

NREL Marine Energy One-Pager: A resource designed for use during NREL campus visits - especially with high-profile guests - as well as at events in Washington, D.C., when engaging with the new administration, and for displays at WPTO or lab booths. The U.S. holds vast untapped marine energy resources - wave, tidal, river, and ocean currents - that can strengthen grid resilience, support coastal communities, and advance energy independence. NREL leads innovation in this space through advanced modeling tools, patented technologies, and world-class testing facilities. NREL's simulation platforms, like OpenFAST and SAM, help reduce development time and risk. Patented devices such as PKelp and FlexWEC demonstrate flexible, resilient approaches to energy capture. At Flatirons Campus, NREL offers motion simulation, structural testing, wave tanks, and megawatt-scale microgrid emulation via the ARIES platform. These capabilities help developers refine and validate devices before in-water trials. With upcoming open-water testing at PacWave and strong partnerships, NREL is accelerating the path to commercialization - positioning the U.S. as a global leader in marine energy innovation.

17 WIND ENERGY↗

pyflowline: a mesh-independent river network generator for hydrologic models

River networks are crucial in hydrologic and Earth system models. Accurately representing river networks in spatially distributed hydrologic models requires considering the model's spatial discretization and computational mesh. However, current methods of generating river networks for hydrologic models do not typically support unstructured meshes. Unstructured meshes offer numerous advantages over traditional, structured meshes. To overcome this limitation, we developed PyFlowline, a Python package that generates mesh-independent river networks. With PyFlowline, hydrologic modelers can generate conceptual river networks and their topological relationships for both structured and unstructured meshes.

47 OTHER INSTRUMENTATION↗

Acoustic Doppler Current Profiler Surveys of Velocity Downstream of Albeni Falls Dam

The U.S. Army Corps of Engineers (USACE), Seattle District, is studying the potential to locate fish bypass systems at Albeni Falls Dam. The USACE requested Pacific Northwest National Laboratory (PNNL) to survey velocity magnitude and direction in the dam tailrace. The empirical data collected will be used to support future numerical modeling, physical modeling, and evaluation of fish bypass system alternatives. In May 2010, PNNL conducted velocity surveys of the Albeni Falls Dam using a boat-mounted acoustic Doppler current profiler. The surveys were conducted over three days (May 25 through 27). During the survey period, total river discharge at the dam varied between 30.2 and 31.0 kcfs. A small amount of spill discharge, 2 kcfs, was present on two days (May 26 and 27). This report presents data plots showing measured velocity direction and magnitude averaged over the entire depth and over 5-ft depth increments from 5 to 30 ft.

13 HYDRO ENERGY↗

A periodic freshwater patch detachment process from the Block Island Sound estuarine plume: BIS PERIODIC FRESHWATER PATCH DETACHMENT

Previous observations suggest periodic freshwater patches separating from the Block Island Sound (BIS) estuarine plume. In this study, the dynamics of the separation process is investigated through a series of numerical experiments using the Regional Ocean Modeling System (ROMS). In addition, we explore the seasonal variability of the freshwater patches and their response to river discharge and ambient current. The model results indicate that episodic freshwater patches are triggered by small changes in tidal currents over the spring-neap tidal cycle. The spring-neap variation in tidal currents causes significant, monthly fluctuations in turbulent mixing and vertical stratification in BIS, modulating the freshwater discharge thereby generating episodic freshwater patches that move both downstream along the southern shore of Long Island and toward Rhode Island Sound (RIS). The realistically configured model shows that the freshwater patches experience strong seasonal variability. They are largest in spring when the river discharge peaks, and smallest in summer due to the weak river discharge and a robust upstream ambient current from RIS. According to the analysis of the freshwater transport out of BIS, we conclude that such detachment occurs at tidal mixing fronts.

54 ENVIRONMENTAL SCIENCES↗

TGW Hydrology, River Routing, and Hydropower Simulation Datasets

he current dataset contains data upload links to the following hydrologic (water balance), river routing (water management), and hydropower simulation data over CONUS: Climate Forcing: TGW (https://tgw-data.msdlive.org/) Simulation Scenario: Historical, Mid-Century, End-Century Simulation Period: 1980-2024, 2020-2059, 2060-2099 Simulation Models: VIC (Variable Infiltration Capacity), mosartwmpy (Model for Scale Adaptive River Transport-Water Management in Python), and PNNL B1Hydro Output Format: NetCDF and CSV

Tidwell, Vincent C [Pacific Northwest National Lab↗

Summary of Expedited Results from Samples Supporting Tank Closure Cesium Removal (TCCR) Batch 3

Savannah River Remediation (SRR) is currently operating the Tank Closure Cesium Removal (TCCR) process to remove 137 Cs from tank waste supernate using an ion exchange process. As part of that process, Savannah River National Laboratory (SRNL) receives and analyzes samples in support of the qualification of each batch to be processed. SRNL recently received supernate samples retrieved from Tank 10H as well as in-tank batch contact samples for characterization in support of qualifying Batch 3 for processing through the TCCR unit. SRNL received and characterized a set of dip samples collected from Tank 10H (one surface and one variable depth sample). No solids were observed in either sample and therefore the samples were combined, and a suite of analyses were performed on the composite sample. The density of the combined sample was 1.174 g/mL (0.18 %RSD), which was consistent with the measured sodium concentration of 3.54 M (0.08 %RSD). The 137Cs activity in the sample was 4.75E+07 dpm/mL (4.28 %RSD) and the total Cs concentration was calculated to be 1.54 mg/L (1.16E-05 M). The in-tank batch contact samples consist of 0.1 g of crystalline silicotitanate (CST) contained within a teabag device. Duplicate samples were submerged in Tank 10H supernate for a period of about 13 days, after which time they were retrieved and transferred to SRNL for analysis. At SRNL the CST was rinsed to remove excess salt solution and the CST was then air dried before being digested for analysis. Results of the analysis indicated a 137 Cs loading of 3.66E+10 ± 1.40E+09 dpm/g or 16.5 ± 0.63 Ci/kg CST . This value represents a bounding upper limit as it includes the addition of two sigma uncertainty from replicate analysis of the individual teabag samples as well as the addition of the small amount of 137 Cs activity measured in the rinse solutions. The above values are based on the air-dried mass of CST. Correcting to the true dry mass using a F-factor of 0.8191 results in a maximum loading of 20.2 ± 0.77 Ci/kg CST .

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Summary of Analytical Results from Samples Supporting Tank Closure Cesium Removal (TCCR) Batch 3 and Modeling Results for Cs Loading on CST

Savannah River Remediation (SRR) is currently operating the Tank Closure Cesium Removal (TCCR) process to remove 137 Cs from tank waste supernate using an ion exchange process. As part of that process, Savannah River National Laboratory (SRNL) receives and analyzes samples in support of the qualification of each batch to be processed. SRNL recently received supernate samples retrieved from Tank 10H as well as in-tank batch contact samples for characterization in support of qualifying Batch 3 for processing through the TCCR unit. Some results from analysis of those samples have been previously reported. This report documents the remaining analyses of the in-tank batch contact samples as well as the results of ZAM (Zheng, Anthony, Miller) isotherm modeling performed for comparison to the measured results. Results of the additional analyses include analysis of the loading of other radionuclides besides 137 Cs on the crystalline silicotitanate (CST) contained within the in-tank batch contact test samples. Results from those analyses revealed the next highest contributor to the activity on the CST was 90 Sr with an average loading of 2.76E+08 dpm/g CST compared to 3.56E+10 dpm/g CST for the 137Cs. Isotopes of plutonium were also detected on the samples. ZAM modeling was performed using the measured composition of the Tank 10H Batch 3 qualification samples. The modeling predicted a maximum Cs loading approximately 2.2x higher than the measured result. This is a slightly lower ratio (expected/measured) compared to what was observed for the prior TCCR in-tank batch contact testing performed for Batches 1A and 2 where the ZAM results were 2.7-2.8x higher than the measured values.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Summary of Results from November 2021 Qualification Samples for Tank Closure Cesium Removal 1A (TCCR 1A)

Savannah River Remediation (SRR) is currently operating the Tank Closure Cesium Removal 1A (TCCR 1A) process to remove 137 Cs from tank waste supernate using an ion exchange process. As part of that process, Savannah River National Laboratory (SRNL) receives and analyzes samples in support of the qualification of each batch to be processed. SRNL recently received supernate samples retrieved from Tank 10H as well as in-tank batch contact samples for characterization in support of qualifying Batch 1 for processing through the TCCR 1A unit.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Summary of Results from Batch 1 Qualification Samples for Tank Closure Cesium Removal 1A (TCCR 1A)

Savannah River Remediation (SRR) is currently operating the Tank Closure Cesium Removal 1A (TCCR 1A) process to remove 137 Cs from tank waste supernate using an ion exchange process. As part of that process, Savannah River National Laboratory (SRNL) receives and analyzes samples in support of the qualification of each waste supernate batch to be processed. SRNL recently received supernate samples retrieved from Tank 10H as well as in-tank batch contact samples for characterization in support of qualifying Batch 1 for processing through the TCCR 1A unit.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CO2 partial pressure and fluxes in the Amazon River Plume using in situ and remote sensing data

Estimations of the global carbon budget include a quantitative understanding of the evolving processes that occur along river-to-ocean gradients. However, high spatiotemporal resolution observations of these processes are limited. Here we present in situ measurements of the partial pressure of CO2 (pCO2) made through the Amazon River plume (ARP) during different discharge seasons, from 2010-2012. We evaluated the spatiotemporal distribution of pCO2 using Soil Moisture and Ocean Salinity (SMOS) satellite observations for each hydrologic period in the ARP. Regression models were used to estimate pCO2 at the ARP for the period of 2010-2014. From these distributions we calculated sea-air gas exchange of CO2 between the plume waters and the atmosphere (F_co2^sea). Intra-annual variability of F_co2^sea was related to discharge at the river mouth and ocean currents as well as trade winds in the plume. Climatic events during the study period had a significant impact on the F_co2^sea. Including the plume area closer to the river mouth makes the ARP a net source of CO2 with an annual net sea-air flux of 8.6 ±7.1 Tg C y-1 from 2011-2014.

Amazon↗

Life extension program for the modular caustic side solvent extraction unit at Savannah River Site

Caustic Side Solvent Extraction (CSSX) is currently used at the U.S. Department of Energy (DOE) Savannah River Site (SRS) for removal of cesium from the high-level salt-wastes stored in underground tanks. At SRS, the CSSX process is deployed in the Modular CSSX Unit (MCU). The CSSX technology utilizes a multi-component organic solvent and annular centrifugal contactors to extract cesium from alkaline salt waste. Coalescers and decanters process the Decontaminated Salt Solution (DSS) and Strip Effluent (SE) streams to allow recovery and reuse of the organic solvent and to limit the quantity of solvent transferred to the downstream facilities. MCU is operated in series with the Actinide Removal Process (ARP) which removes strontium and actinides from salt waste utilizing monosodium titanate. ARP and MCU were developed and implemented as interim salt processing until future processing technology, the CSSX-based Salt Waste Processing Facility (SWPF), is operational. SWPF is slated to come on-line in October 2014. The three year design life of the ARP/MCU process, however, was reached in April 2011. Nevertheless, most of the individual process components are capable of operating longer. An evaluation determined ARP/MCU can operate until 2015 before major equipment failure is expected. The three year design life of the ARP/MCU Life Extension (ARP/MCU LE) program will bridge the gap between current ARP/MCU operations and the start of SWPF operation. The ARP/MCU LE program introduces no new technologies. As a portion of this program, a Next Generation Solvent (NGS) and corresponding flowsheet are being developed to provide a major performance enhancement at MCU. This paper discusses all the modifications performed in the facility to support the ARP/MCU Life Extension. It will also discuss the next generation chemistry, including NGS and new stripping chemistry, which will increase cesium removal efficiency in MCU. Possible implementation of the NGS chemistry in MCU accomplishes two objectives. MCU serves as a demonstration facility for improved flowsheet deployment at SWPF; operating with NGS and boric acid validates improved cesium removal performance and increased throughput as well as confirms Defense Waste Processing Facility (DWPF) ability to vitrify waste streams containing boron. NGS implementation at MCU also aids the ARP/MCU LE operation, mitigating the impacts of delays and sustaining operations until other technology is able to come on-line.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SRS Defense Waste Processing Facility - the Nation's Only Operating Vitrification Facility - Completes 20 Years of Radioactive Operations - 17407

Savannah River Remediation (SRR) is the current Liquid Waste contractor at the U.S. Department of Energy's (DOE) Savannah River Site (SRS), located near Aiken, South Carolina, and operates the Defense Waste Processing Facility (DWPF), along with the other SRS liquid waste facilities. The DWPF, the nation's only operating vitrification facility, completed 20 years of radioactive operations in 2016. During this period, DWPF has safely treated the high-level liquid waste at this DOE facility since radioactive operations began with the first transfer of sludge waste feed to DWPF on March 12, 1996. A little over a month later, on April 29, 1996, the first radioactive canister was poured. DWPF poured its 4,000. canister of vitrified waste on December 31, 2015. As of September 30, 2016, DWPF has removed approximately 59.9 million curies from the liquid waste system at SRS and placed them in 4,106 canisters. SRS has operationally closed 8 high-level waste tanks. The DWPF melter has poured nearly 7.14 million kg of molten glass, and the facility has used only two melters in its lifetime. Melter 1 poured 1,339 canisters (1996-2002), while melter 2 to date (September 30, 2016) has poured 2,767 canisters (2003-present). Melter 2 continues to safely and efficiently operate. In order to achieve these accomplishments, the facility has chronicled a history of continued operational improvements such as the installation of bubblers in the melter to increase production, incorporation of glass compositions to achieve higher waste loadings, and improvements to melter design to extend melter life. As SRR moves forward to the next 20 years, continued improvements as well as maintaining the aging infrastructure through a proactive system health program are key priorities. This paper chronicles 20 years of challenges, improvements and accomplishments, and discusses future operations and infrastructure upgrades including implementation of a key flowsheet change to significantly reduce hydrogen generation in the Chemical Process Cell. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ZAM Modeling Study to Support the Tank Closure Cesium Removal (TCCR) 1A Unit

Currently at the Savannah River Site (SRS), the Tank Closure Cesium Removal (TCCR) is an “at-tank” process designed to remove cesium from aqueous tank waste. Cesium will be removed by ion exchange using the engineered IONSIV® R9120 form of Crystalline Silicotitanate (CST) media. The current TCCR design has two columns online in a lead-lag configuration to optimize media usage and achieve the target decontamination. Once the lead column is saturated with cesium, it will be removed from service, the lag column will rotate into the lead position, and a new column with fresh ion-exchange media will be placed into the lag position. The TCCR process for cesium removal from Tank 10H is detailed in X-SOW-H- 00002. Demonstration of the system began in early calendar year 2019 with two batches of salt solution generated by dissolving saltcake in Tank 10H, followed by processing of these batches through the TCCR system. A third TCCR Tank 10H dissolved saltcake batch is scheduled for processing soon. Upon completion of the demonstration with Tank 10H dissolved saltcake, Tank 9H salt solution will be transferred to Tank 10H and subsequently processed through the TCCR unit with new CST media (referred to as R9120-B 30x60) added to new IX columns. The TCCR processing campaign of Tank 9H salt solution is referred to as TCCR-1A .

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Life Extension Program for the Modular Caustic Side Solvent Extraction Unit at Savannah River Site - 13179

Caustic Side Solvent Extraction (CSSX) is currently used at the U.S. Department of Energy (DOE) Savannah River Site (SRS) for removal of cesium from the high-level salt-wastes stored in underground tanks. Currently, the Actinide Removal Process (ARP) and the CSSX process are deployed in the (ARP)/Modular CSSX Unit (MCU), to process salt waste for permanent disposition. The CSSX technology utilizes a multi-component organic solvent and annular centrifugal contactors to extract cesium from alkaline salt waste. The original plant was permitted for a three year design life; however, given the successful operation of the plant, a life extension program was completed to continue operations. The program included detailed engineering analyses of the life-expectancy of passive and active components, resulting in component replacement and/or maintenance and monitoring program improvements. The program also included a review of the operations and resulted in a series of operational improvements. Since the improvements have been made, an accelerated processing rate has been demonstrated. In addition, plans for instituting a next-generation solvent are in place and will enhance the decontamination factors. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Status of Redband Trout in the Upper Snake River Basin of Idaho

Abstract Redband Trout Oncorhynchus mykiss gairdneri are likely the most abundant and most widely distributed native salmonid in the Columbia River basin, yet their current distribution and abundance across the landscape have not been well documented. We sampled 1,032 randomly distributed stream sites (usually 100 m in length) across more than 60,000 km of stream network to assess Redband Trout occupancy, abundance, and genetic purity in the upper Snake River basin of Idaho. Study locations were more often in dry desert subbasins (49% of sites) than in montane subbasins (20%), and 25% of the dry “stream sites” had no discernible stream channel whatsoever, indicating a lack of flowing water for perhaps millennia. Redband Trout were estimated to occupy 13,485 km of stream (22% of the total) and were captured more often (389 sites) than Brook Trout Salvelinus fontinalis (128 sites), Bull Trout Salvelinus confluentus (37 sites), or Brown Trout Salmo trutta (16 sites). Redband Trout were also the most abundant species of trout, with an approximate abundance of 3,449,000 ± 402,000 (90% confidence interval) of all sizes, followed by Brook Trout (1,501,000 ± 330,000), Bull Trout (159,000 ± 118,000), and Brown Trout (43,000 ± 25,000). Approximately 848,000 ± 128,000 Redband Trout were adults. From 1913 (the earliest year of record) to 2001, roughly 43 million hatchery Rainbow Trout were stocked in streams in the study area, 17.5 million of which were of catchable size (i.e., ≥200 mm total length); since 2001, all catchable trout have been sterilized prior to stocking. Genetic results from 61 study sites suggest that hybridization with hatchery Rainbow Trout is more likely to occur in streams that were directly stocked with catchable trout from 1913 to 2001. Applying these results across the landscape, we estimated that Redband Trout likely remain pure in about 68% of the streams occupied in the upper Snake River basin. Received November 13, 2012; accepted January 9, 2014

Meyer, Kevin A.↗

Tidal-Fluvial and Estuarine Processes in the Lower Columbia River: II. Water Level Models, Floodplain Wetland Inundation, and System Zones

Spatially varying water-level regimes are a factor controlling estuarine and tidal-fluvial wetland vegetation patterns. As described in Part I, water levels in the Lower Columbia River and estuary (LCRE) are influenced by tides, river flow, hydropower operations, and coastal processes. In Part II, regression models based on tidal theory are used to quantify the role of these processes in determining water levels in the mainstem river and floodplain wetlands, and to provide 21-year inundation hindcasts. Analyses are conducted at 19 LCRE mainstem channel stations and 23 tidally exposed floodplain wetland stations. Sum exceedance values (SEVs) are used to compare wetland hydrologic regimes at different locations on the river floodplain. A new predictive tool is introduced and validated, the potential SEV (pSEV), which can reduce the need for extensive new data collection in wetland restoration planning. Models of water levels and inundation frequency distinguish four zones encompassing eight reaches. The system zones are the wave- and current-dominated Entrance to river kilometer (rkm) 5; the Estuary (rkm-5 to 87), comprised of a lower reach with salinity, the energy minimum (where the turbidity maximum normally occurs), and an upper estuary reach without salinity; the Tidal River (rkm-87 to 229), with lower, middle, and upper reaches in which river flow becomes increasingly dominant over tides in determining water levels; and the steep and weakly tidal Cascade (rkm-229 to 234) immediately downstream from Bonneville Dam. The same zonation is seen in the water levels of floodplain stations, with considerable modification of tidal properties. The system zones and reaches defined here reflect geological features and their boundaries are congruent with five wetland vegetation zones

54 ENVIRONMENTAL SCIENCES↗

Development and Implementation of an Optimization Model for Hydropower and Total Dissolved Gas in the Mid-Columbia River System

Managing energy, water, and environmental priorities and constraints within a cascade hydropower system is a challenging multiobjective optimization effort that requires advanced modeling and forecasting tools. Within the mid-Columbia River system, there is currently a lack of specific solutions for predicting how coordinated operational decisions can mitigate the impacts of total dissolved gas (TDG) supersaturation while satisfying multiple additional policy and hydropower generation objectives. In this study, a reduced-order TDG uptake equation is developed that predicts tailrace TDG at seven hydropower facilities on the mid-Columbia River. The equation is incorporated into a general multiobjective river, reservoir, and hydropower optimization tool as a prioritized operating goal within a broader set of system-level objectives and constraints. A test case is presented to assess the response of TDG and hydropower generation when TDG supersaturation is optimized to remain under state water-quality standards. Satisfaction of TDG as an operating goal is highly dependent on whether constraints that limit TDG uptake are implemented at a higher priority than generation requests. According to the model, an opportunity exists to reduce TDG supersaturation and meet hydropower generation requirements by shifting spillway flows to different time periods. In conclusion, a coordinated effort between all project owners is required to implement systemwide optimized solutions that satisfy the operating policies of all stakeholders.

13 HYDRO ENERGY↗

Characterization of Tank 9H Salt Dissolution Batch 2A in Support of Tank Closure Cesium Removal (TCCR) 1A Batch 2 Preparations

Savannah River Remediation (SRR) is currently preparing the second batch of material to be processed through the Tank Closure Cesium Removal (TCCR) 1A system. The feed for TCCR 1A consists of dissolved saltcake from Tank 9H. The first batch of salt to make up Batch 2 (Batch 2A) has been dissolved in Tank 9H and will later be transferred to Tank 10H. Savannah River National Laboratory (SRNL) received samples from the batch of dissolved salt for characterization.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗