Search NASA⌕ Search

SEARCH · Search NASA

Results for “safety planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Plan for the Development and Application of a Risk Assessment Approach for Transportation Package Approval of a Transportable Nuclear Power Plant for Maritime Shipment (Rev. 1)

This plan proposes a strategy for licensing a transportable nuclear power plant, containing its unirradiated and irradiated fuel, as a transportation package for maritime transport using a probabilistic risk assessment framework in order to meet the regulatory requirements of 10 CFR Part 71. It is anticipated that initially, the deterministic transportation package licensing approach will be challenging due to the functional requirements of the transportable nuclear power plant. As such, a partial exemption request from the U.S. Nuclear Regulatory Commission coupled with applied compensatory measures are anticipated in support of providing equivalent safety to the public, worker, and environment. A plan is outlined as to how this would be demonstrated and a pathway is primarily outlined using the accompanying low accident rates which in turn support very low probabilities of release for a maritime application. Wherever possible, the proposed plan is supported by actual accident (casualty) data. Additional supporting information regarding a highway transportation probabilistic risk assessment in support of the Project Pele demonstration reactor that is currently under development is also referenced and discussed.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

New Beginnings: Optimising Waste and End-state at UK Nuclear Sites to Enable Environmental Permit surrender (the GRR) - 20193

The decommissioning of nuclear sites involves the management of large volumes of radioactive waste, other conventional waste, and the clean-up of land and groundwater contamination. In the UK, the disposal of radioactive waste from nuclear sites is regulated by the Environment Agency (England), Natural Resources Wales (Wales) and the Scottish Environment Protection Agency (Scotland). All three environment agencies seek to make sure that the generation and disposal of radioactive waste is optimised: ensuring impacts to people are 'as low as reasonably achievable' (ALARA). With a large proportion of UK nuclear sites embarking on decommissioning, the environment agencies have collaboratively developed new guidance: the 'Management of radioactive waste from the decommissioning of nuclear sites: Guidance on the Requirements for Release from radioactive substances regulation' (referred to as the GRR)[1]. The environment agencies worked in liaison with the Office for Nuclear Regulation (ONR), the UK nuclear safety regulator, and the UK government body responsible, the Nuclear Decommissioning Authority (NDA). Prior to finalising the guidance, a 12 month trial was completed at three of the NDA's nuclear sites, enabling the environment agencies to test their draft GRR guidance against 'real world scenarios' and the challenge of incorporating its requirements into decommissioning plans. Experience gained during the trial was incorporated into the current version of the GRR, published in July 2018. The GRR represents the 'new beginning' of this paper's title because for the first time, the UK environmental regulators have expressed in detail their requirements for surrender of environmental permits for nuclear sites. The GRR provides a framework for a UK nuclear site to plan, assess and justify its management of radioactive waste and deliver through decommissioning, an optimal, environmentally safe and sustainable end-state. This paper will describe the requirements and technical standards within the GRR, the establishment of defensible clean-up criteria and the production of a Waste Management Plan (WMP), supported by a Site-Wide Environmental Safety Case (SWESC). It will describe the experience gleaned by operators and regulators during the trial and it will highlight current work by regulators to implement the new approach proportionately. Finally, this paper will look forward and outline planned amendments to legislation in the UK affecting nuclear sites that should enable the full benefits of the GRR to be realised in the future. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Agentic artificial intelligence for multistage physics experiments at a large-scale user facility particle accelerator

We present a language-model-driven agentic artificial intelligence (AI) system to autonomously execute multistage physics experiments on a production synchrotron light source. Implemented at the Advanced Light Source particle accelerator, the system translates natural language user prompts into structured execution plans that combine archive data retrieval, control-system channel resolution, automated script generation, controlled machine interaction, and analysis. In a representative machine physics task, we show that preparation time was reduced by 2 orders of magnitude relative to manual scripting even for a system expert, while operator-standard safety constraints were strictly upheld. Core architectural features, plan-first orchestration, bounded tool access, and dynamic capability selection, enable transparent, auditable execution with fully reproducible artifacts. These results establish a blueprint for the safe integration of agentic AI into accelerator experiments and demanding machine physics studies, as well as routine operations, with direct portability across accelerators worldwide and, more broadly, to other large-scale scientific infrastructures.

Accelerator/storage ring control systems↗

Energy-Efficient Driving in Connected Corridors via Minimum Principle Control: Vehicle-in-the-Loop Experimental Verification in Mixed Fleets

Connected and automated vehicles (CAVs) can plan and actuate control that explicitly considers performance, system safety, and actuation constraints in a manner more efficient than their human-driven counterparts. In particular, eco-driving is enabled through connected exchange of information from signalized corridors that share their upcoming signal phase and timing (SPaT). This is accomplished in the proposed control approach, which follows first principles to plan a free-flow acceleration-optimal trajectory through green traffic light intervals by Pontryagin's Minimum Principle in a feedback manner. Urban conditions are then imposed from exogeneous traffic comprised of a mixture of human-driven vehicles (HVs) - as well as other CAVs. As such, safe disturbance compensation is achieved by implementing a model predictive controller (MPC) to anticipate and avoid collisions by issuing braking commands as necessary. The control strategy is experimentally vetted through vehicle-in-the-loop (VIL) of a prototype CAV that is embedded into a virtual traffic corridor realized through microsimulation. Up to 36% fuel savings are measured with the proposed control approach over a human-modelled driver, and it was found connectivity in the automation approach improved fuel economy by up to 26% over automation without. Additionally, the passive energy benefits realizable for human drivers when driving behind downstream CAVs are measured, showing up to 22% fuel savings in a HV when driving behind a small penetration of connectivity-enabled automated vehicles.

33 ADVANCED PROPULSION SYSTEMS↗

Safe and Private Forward-trading Platform for Transactive Microgrids

Power grids are evolving at an unprecedented pace due to the rapid growth of distributed energy resources (DER) in communities. These resources are very different from traditional power sources, as they are located closer to loads and thus can significantly reduce transmission losses and carbon emissions. However, their intermittent and variable nature often results in spikes in the overall demand on distribution system operators (DSO). To manage these challenges, there has been a surge of interest in building decentralized control schemes, where a pool of DERs combined with energy storage devices can exchange energy locally to smooth fluctuations in net demand. Building a decentralized market for transactive microgrids is challenging, because even though a decentralized system provides resilience, it also must satisfy requirements such as privacy, efficiency, safety, and security, which are often in conflict with each other. As such, existing implementations of decentralized markets often focus on resilience and safety but compromise on privacy. In this article, we describe our platform, called TRANSAX, which enables participants to trade in an energy futures market, which improves efficiency by finding feasible matches for energy trades, enabling DSOs to plan their energy needs better. TRANSAX provides privacy to participants by anonymizing their trading activity using a distributed mixing service, while also enforcing constraints that limit trading activity based on safety requirements, such as keeping planned energy flow below line capacity. We show that TRANSAX can satisfy the seemingly conflicting requirements of efficiency, safety, and privacy. We also provide an analysis of how much trading efficiency is lost. Trading efficiency is improved through the problem formulation, which accounts for temporal flexibility, and system efficiency is improved using a hybrid-solver architecture. Lastly, we describe a testbed to run experiments and demonstrate its performance using simulation results.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Radiation Hardened Foam Cold Test Plan - Phase II: Foam Characterization Testing and Environmental Chamber Testing of FoamBag Fixative Foam

This document outlines the Phase II test objectives and implementation plan for a down-select foam fixative technology intended to facilitate activities in support of the Savannah River Site (SRS) F/H labs deactivation and decommissioning (D&D) efforts. It is a collaborative effort between Savannah River National Laboratory (SRNL), Florida International University (FIU), and the SRS F/H labs team intended to test and evaluate the potential of a polyurethane resin foam in mitigating the release of contamination during dismantling operations on radioactively contaminated piping in legacy facilities. The cold test plan addresses specific requirements highlighted by site and safety personnel and will be executed at FIU and SRNL test and lab facilities. Results from the cold tests will inform the hot test at F/H labs, which will use the foam fixative to confine and/or isolate residual contamination within a 3-dimensional void space of Hastelloy C-22 piping designated for removal from the area and transported to a designated disposal facility. Phase I testing was previously conducted using Hilti CP620 fixative foam. Results from Phase I testing indicate Hilti CP-620 fixative foam is incompatible with SRS site hot taps as an effective foam delivery method into Hastelloy C-22 piping. Phase II testing will be conducted using FoamBag TM fixative foam as an alternative fixative foam option. Phase II testing will address eight test objectives: (1) evaluation of the adhesion and bonding properties of FoamBag TM in Hastelloy C-22 piping, (2) evaluation of the adhesion of FoamBag TM in piping under various moisture conditions, (3) determination of the heat profile of FoamBag TM during curing, (4) determination of the internal pipe pressure after FoamBag TM deployment and curing, (5) conduct a leak test to determine if FoamBag TM is effective at creating a full seal within piping, (6) headspace testing of FoamBag TM to determine if there are any associated off-gas hazards during FoamBag TM curing, (7) conduct environmental chamber testing of FoamBag TM to understand how environmental parameters impacts FoamBag TM curing, and (8) conduct fire testing to evaluate FoamBag TM fire retardant characteristics.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Instrumentation and Control Digital Modernization Research Plan for Long-Term Sustainability in the Nuclear Industry

This report, developed by Idaho National Laboratory (INL) in collaboration with Oak Ridge National Laboratory (ORNL), outlines a comprehensive research plan to support the digital modernization of safety-related instrumentation and control (I&C) systems in the U.S. nuclear industry. The modernization effort is critical to ensuring the long-term safety, reliability, and economic viability of both existing and future nuclear power plants (NPPs), particularly as aging analog systems become increasingly obsolete and difficult to maintain.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Application of the ANSI/ANS-8.3-2022 Minimum Accident to Tube Vault Storage

In support of planned site activities, the existing basis for criticality safety in nuclear facilities is being revisited. One such technical basis is the demonstration of Criticality Accident Alarm System (CAAS) coverage in tube vaults at Y-12 National Security Complex. The configuration of the vaults places significant shielding between the source and the detector stations and is dissimilar to drum storage or other processes. This paper describes tube vault storage at Y-12, describes the basis for the application of the 2022 minimum accident for system design (MASD) to the analysis, and presents how the accident is implemented in the analysis.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

TEX-HEU: Integral Experiments with Highly Enriched Uranium and Polyethylene [Slides]

This presentation discusses Thermal/Epithermal eXperiments (TEX) in relation to integral experiments spanning a wide range of fission energy spectra utilizing existing NCSP fissile material assets, TEX-Pu for plutonium, and TEX-HEU highly enriched uranium (HEU) for highly enriched uranium. It also discusses the TEX-HEU design, the use of HEU fuel, and polyethylene parts. The experiment, executed in the Nuclear Criticality Experiment Research Center of the Nevada National Security Site is discussed, specifically how it was assembled on the Comet Universal Critical Assembly Machine. Measured quantities and various critical configurations are listed. In conclusion, the presentation states that they successfully assembled and documented the baseline TEX-HEU experiments, that six critical configurations and one reproducibility measurement were produced, and that they are compiling results to submit to the International Criticality Safety Benchmark Evaluation Project. A future experiment campaign is planned in 2021 with Hafnium as a diluent.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Reduced Contracting Time To Accelerate Construction: A Streamlined Approach for Speed and Scale

In the fast-paced construction world, efficiency isn't just an advantage - it's a necessity. By implementing the Cooperative Construction Contracting Agreement (CCCA), we are transforming how we approach major projects, replacing traditional multistep contracting with a streamlined, one-step process. This innovative contracting approach saves valuable time and resources, enabling us to accelerate delivery across our portfolio of projects. Under the old model, each construction phase required separate competitive solicitations for design, build, and other services. With the CCCA, we've consolidated these steps, working with a trusted partner from start to finish. This results in significant time savings that translate into faster project execution without compromising quality or safety.

collaborative partnerships↗

LANSCE Facility Longevity Assessment

This LANSCE Facility Longevity Assessment examined 34 total systems critical to the operation of the LANSCE accelerator complex. These systems are primarily owned, operated, and maintained by AOT Division. Based on the criteria used in this assessment, there are 12 AOT Division systems that are potential high risk as related to longterm LANSCE operations. These systems may also impact the success of LAMP. Also summarized in this report are the facility activities planned over the next decade. These include general facility maintenance and infrastructure upgrades, as well as planned electrical system upgrades. The LANSCE Facility Operations (LFO) Division is responsible for this activity scope and budget planning. Most of the planned activities are general in nature and should have little impact on accelerator operations or LAMP activities as currently envisioned. However, close coordination with between AOT, LFO, and LAMP would be prudent. A next step should be to develop an actionable plan to address the high-risk systems. Potential criteria for developing such a plan could include: (1) Evaluating the global impact of the system (operations, program, safety, etc.), (2) Ranking by impact (ranked now by risk), (3) Estimating cost to implement the corrective actions (Is there already a plan or not?), and (4) Estimating the time required for corrective actions. An alternative could include integration of the assessment data into both the Asset Management System and the Maintenance Analytics Risk Register.

43 PARTICLE ACCELERATORS↗

Illinois Storage Corridor CarbonSAFE Phase III: Stakeholder Engagement and Outreach Plan

The Stakeholder Engagement and Outreach Plan provides a comprehensive framework for engaging stakeholders of the Illinois Storage Corridor (ISC) project. The ISC project is a CarbonSAFE Phase III project designed to facilitate commercial deployment of carbon capture, utilization, and storage (CCUS) in Illinois. The project aims to establish a multi-industry carbon storage corridor through development of storage sites near the One Earth Energy (OEE) ethanol production facility in north-central Illinois and the Prairie State Generating Company (PSGC) coal-fired power plant in south-central Illinois, with combined annual CO 2 capture ultimately exceeding 8.6 million tons per year. Stakeholder engagement is recognized as a critical component for successful CCUS deployment, alongside technical and economic considerations. As an emerging technology, CCUS may not be well understood by the general population, and lack of public awareness can lead to opposition that poses significant barriers to project development. This plan addresses this challenge through systematic stakeholder identification, analysis, planning, and implementation of engagement actions. The plan is structured around four main sections: Communication, Stakeholder Analysis, Stakeholder Engagement, and Environmental Justice. Activities will be conducted under Tasks 1 and 4 of the project's Statement of Project Objectives, with two key subtasks: (1) developing a stakeholder analysis and engagement plan through face-to-face meetings, facilitated discussions, and surveys; and (2) implementing stakeholder engagement and public outreach activities including meetings, open houses, and permit hearings. The Illinois State Geological Survey (ISGS) will manage engagement activities following DOE-NETL best practices, focusing on providing objective, fact-based information about CCUS and the ISC project. A comprehensive Communication Plan establishes protocols for media contacts, site visits, and crisis communications. The stakeholder analysis follows a structured workflow process divided into Pre-feasibility and Feasibility phases, incorporating contextual understanding, assessment, data collection, and analysis. Key stakeholder groups include government bodies, educational organizations, conservation and environmental groups, agricultural communities, and religious organizations. The plan addresses common stakeholder questions regarding project risks, benefits, safety, property values, liability, and environmental impacts. Recommendations emphasize developing clear messaging, creating informational materials, and preparing to address both project-specific and broader environmental concerns to ensure transparent communication and build stakeholder support throughout project implementation.

25 ENERGY STORAGE↗

Electric Utility Distribution Costs: Scoping Study on Trends, Drivers, and Possible Response Strategies [Slides]

This scoping study synthesizes information that will help stakeholders understand the scope, scale, and drivers of recent increases in investor-owned utility (IOU) expenditures on local distribution power grids, while providing regulators and other decision-makers with potential strategies to keep electricity bills down. The study includes five distinct components. Drawing first on data from FERC Form 1, it summarizes key trends in past and recent IOU distribution costs. Next, through a review of a sample of distribution-system plans, it characterizes material drivers of planned distribution expenditures. Ultimately, regulators must approve cost recovery for IOU expenditures, including those for the distribution system. The study therefore also: examines trends in utility requests and regulatory approvals related to changes in retail rates and return on equity; identifies areas where utility shareholder and customer incentives may be misaligned; and develops a menu of options that state regulators might consider to optimize distribution system expenditures. Some of the key findings include: - IOU distribution spending at a national level has grown by 6%/yr since 2014 in real dollar terms, 4x faster than in the prior 20 years and consisting mostly of capital (not operating) expenditure. - On a per-kWh basis, increases in IOU distribution costs since 2014 represent over 30% of the overall national-average increase in retail electricity rates. - Regional spending growth has ranged from 2-8%/yr, with larger estimated rate impacts in CAISO, then NYISO & ISO-NE, and then the Southeast, MISO & PJM (see figure). - Some utilities are planning for significantly increased distribution system spending. Planned spending on managing the existing system (asset replacement, safety & reliability, and resilience are all important drivers) exceeds that for capacity expansion. - IOU rate increase requests ($18 billion in 2025) and public utility commission (PUC) approval levels (average of 64% of requested amounts from 2021-2025) have recently hit multi-decadal highs. - PUCs in New England and the Southeast have recently approved a greater fraction of rate requests (>75%, on average) than in ther regions, while PUCs in California and the Southeast have generally authorized higher equity returns than in other regions. - Regulators have many tools to tackle potential misalignments between utility and customer interests and, more specifically, to optimize and reduce distribution costs. Shorter-term options include those related to return on equity, capital structure, depreciation, trackers, construction work in progress, and securitization. Longer-term options include performance-based regulation and a wide variety of planning-related requirements. All options embed important tradeoffs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distributionally Safe Path Planning: Wasserstein Safe RRT

In this paper, we propose a Wasserstein metric-based random path planning algorithm. Wasserstein Safe RRT (W-Safe RRT) provides finite-sample probabilistic guarantees on the safety of a returned path in an uncertain obstacle environment. Vehicle and obstacle states are modeled as distributions based upon state and model observations. Additionally, we define limits on distributional sampling error so the Wasserstein distance between a vehicle state distribution and obstacle distributions can be bounded. This enables the algorithm to return safe paths with a confidence bound through combining finite sampling error bounds with calculations of the Wasserstein distance between discrete distributions. W-Safe RRT is compared against a baseline minimum encompassing ball algorithm, which ensures balls that minimally encompass discrete state and obstacle distributions do not overlap. The improved performance is verified in a 3D environment using single, multi, and rotating non-convex obstacle cases, with and without forced obstacle error in adversarial directions, showing that W-Safe RRT can handle poorly modeled complex environments.

42 ENGINEERING↗

Integrating Resilience Planning in Distribution System Planning

Electric utilities, regulators, and stakeholders face increasing risks of severe storms, freezes, floods, and heat waves damaging grid infrastructure and causing power outages—and increasing risks of utility equipment igniting wildfires. At the same time, customer electricity rates have risen substantially in recent years, due in part to replacing aging infrastructure and improving resilience to natural hazards and physical threats. To address these challenges, utilities are beginning to move beyond traditional, siloed planning processes to balance resilience with other fundamental grid objectives such as affordability, reliability, safety, and serving new loads. This study presents a framework for states and utilities that want to advance integration of resilience and distribution planning processes to improve planning efficiency, better prioritize cost-effective grid expenditures, and balance planning objectives. The framework includes 7 key integration points between these planning processes: -Strategy process -Data -Threat assessments -Solution identification and prioritization -Optimization opportunities -Consideration of other grid needs -Metrics Lawrence Berkeley National Laboratory reviewed utility distribution system plans and interviewed subject matter experts to identify emerging practices for each of the 7 integration points. This report presents these practices, which can be used as a guide toward more holistic planning and cohesive investment strategies. It also includes 3 case studies to provide practical examples of how utilities apply such integrated planning processes: two pole hardening programs and one microgrid planning effort. The report concludes by identifying opportunities for future research.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Towards Risk-Informed Performance-Based Emergency Planning: Review of Regulation, Guidance, and Methods

At a fundamental level, nuclear facility safety is built upon the concept of defense-in-depth (DID), which entails multiple, independent layers of protection for public health and safety. Within the DID structure, emergency preparedness (EP) is the last layer of defense and provides reasonable assurance that adequate protective measures can and will be taken in the event of a radiological emergency. Over several decades, the EP regulatory framework has evolved in response to lessons learned from actual events, experience with maintaining and testing EP capabilities, and advances in a wide range of technologies. Furthering this evolution, recent developments in risk-informed performance-based (RIPB) design and licensing approaches provide an opportunity to leverage insights regarding the attributes of the specific facility and site to inform EP.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Four-Stage Multi-Physics Simulations to Assist Temperature Sensor Design for Industrial-Scale Coal-Fired Boiler

The growth of renewable energy sources presents a pressing challenge to the operation and maintenance of existing fossil fuel power plants, given that fossil fuel remains the predominant fuel source, responsible for over 60% of electricity generation in the United States. One of the main concerns within these fossil fuel power plants is the unpredictable failure of boiler tubes, resulting in emergency maintenance with significant economic and societal consequences. A reliable high-temperature sensor is necessary for in situ monitoring of boiler tubes and the safety of fossil fuel power plants. In this study, a comprehensive four-stage multi-physics computational framework is developed to assist the design, optimization installation, and operation of the high-temperature stainless-steel and quartz coaxial cable sensor (SSQ-CCS) for coal-fired boiler applications. With the consideration of various operation conditions, we predict the distributions of flue gas temperatures within coal-fired boilers, the temperature correlation between the boiler tube and SSQ-CCS, and the safety of SSQ-CCS. With the simulation-guided sensor installation plan, the newly designed SSQ-CCSs have been employed for field testing for more than 430 days. The computational framework developed in this work can guide the future operation of coal-fired plants and other power plants for the safety prediction of boiler operations.

42 ENGINEERING↗