Search NASA⌕ Search

SEARCH · Search NASA

Results for “scheduling software”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Updating a PWR Simulator in Python

A nuclear reactor is a complicated system that is comprised of many systems and components. In order to fully model a reactor, several approximations and correlations must be used for a real-time simulation. In 1984 as part of a doctoral dissertation at Massachusetts Institute of Technology (MIT), a FORTRAN 77 program was developed to simulate a four-loop, Westinghouse pressurized water reactor (PWR). The program was later called PRISM and extended to include a comprehensive set of features accessible in a DOS-based user interface. This present work seeks to update the original PRISM program for cross platform deployment using the Python language. The goal of this present work is to update and improve a teaching tool for both students and reactor operators. Originally, PRISM was created as part of a PhD project in FORTRAN 77, but the code no longer works readily on modern operating systems. Python was chosen to rewrite the program because of the ease of use of the Python modules including Kivy as well as the portability of the program to various operating systems. This project aims to develop desktop and mobile versions of the software, allowing the user flexibility in choice of platform. This simulator is scheduled to be deployed in time for a live demonstration at the 2016 Annual ANS meeting. The project aims to produce a reactor simulator that will showcase the dynamics of a PWR system in real-time under various conditions. Some potential scenarios include startup conditions, scram operations, or failure conditions such as a break in a coolant leg. The user will be able to induce various failure scenarios and the program will simulate how the reactor will behave. The simulation will include a suite of monitoring functions that will allow automatic systems to attempt to adapt to the changing conditions, e.g., control rod movement. This program will provide an educational resource for anyone learning about nuclear reactor kinetics or dynamics of a reactor system. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Using OpenMP for HEP framework algorithm scheduling

The OpenMP standard is the primary mechanism used at high performance computing facilities to allow intra-process parallelization. In contrast, many HEP specific software packages (such as CMSSW, GaudiHive, and ROOT) make use of Intel’s Threading Building Blocks (TBB) library to accomplish the same goal. In these proceedings we will discuss our work to compare TBB and OpenMP when used for scheduling algorithms to be run by a HEP style data processing framework. This includes both scheduling of different interdependent algorithms to be run concurrently as well as scheduling concurrent work within one algorithm. As part of the discussion we present an overview of the OpenMP threading model. We also explain how we used OpenMP when creating a simplified HEP-like processing framework. Using that simplified framework, and a similar one written using TBB, we will present performance comparisons between TBB and different compiler versions of OpenMP.

97 MATHEMATICS AND COMPUTING↗

14 Steps to Creating Value in Cost and Schedule Resources for Nuclear Waste Management - 20188

While Waste Management budgets are shrinking, DOE required cost and schedule controls are becoming increasingly stringent. At the same time, there is a scarcity of adept, qualified, and competent projects controls staff who both understand nuclear waste management and are capable of addressing today's cost and schedule challenges. In response, we have developed a systematic approach to training and mentoring project controls staff. The approach is based on the observations and lessons learned on projects, both successful and unsuccessful, over the past 20 years. During that time, we evaluated staff development and used that experience to design a program that progresses the maturity, knowledge and experience of the individual. The program is based on the unique needs of cost and schedule specialists while incorporating the best leadership and managerial applications. The system is not limited to developing individual software skills, which is a primary focus of many project controls training programs. Instead, our system develops an individual's soft and hard skill sets. The system develops the user's skill, talent, attitude, and drive to do the best job possible. It focuses on all aspects of becoming a more productive technical team while accepting responsibility for individual growth. It also enhances the project controls team by setting up checks and balances that everyone is aware of and participates in. The system is based on 14 steps of increasing complexity in knowledge and application. The system clarifies roles, responsibilities and expectations. It helps eliminate uncertainty and reduces stress on staff and managers. It contains everyday routine actions and is simple to implement. It allows the development of a consistent rhythm to staff growth and development. Mastering the steps will allow the user to achieve excellence in cost and schedule control. The 14 steps are: 1 - Key Performance Objectives, 2 - Check Lists, 3 - Desktop Guides, 4 - System Description, 5 - Procedures, 6 - Software and On the Job Training (OTJ), 7 - Traceability Checks, 8 - Surveillances, 9 - 32 Criteria, 10 - The Contract, 11 - Customer/Government Guidance, 12 - Training and Mentoring Others, 13 - Master your weekly and daily schedules, 14 - Improving your interpersonal skills. Application and mastery of this system will produce better cost and schedule control results. Your project controls staff will write better reports, analyze data better, make better use of their time, and be more valuable to decision makers. If followed rigorously, our system will produce a great project controls team, which is invaluable to the success of each project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Independent Verification and Validation Of SAPHIRE 8 Software Acceptance Test Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE 8 Software Acceptance Test Plan is to assess the approach to be taken for intended testing activities. The plan typically identifies the items to be tested, the requirements being tested, the testing to be performed, test schedules, personnel requirements, reporting requirements, evaluation criteria, and any risks requiring contingency planning. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production.

99 GENERAL AND MISCELLANEOUS↗

Using OpenMP for HEP Framework Algorithm Scheduling [Slides]

The OpenMP standard is the primary mechanism used at high performance computing facilities to allow intra-process parallelization. In contrast, many HEP specific software (such as CMSSW, GaudiHive, and ROOT) make use of Intel's Threading Building Blocks (TBB) library to accomplish the same goal. In this talk we will discuss our work to compare TBB and OpenMP when used for scheduling algorithms to be run by a HEP style data processing framework (i.e. running hundreds of interdependent algorithms at most once for each event read from the detector). This includes both scheduling of different algorithms to be run concurrently as well as scheduling concurrent work within one algorithm. As part of the discussion we present an overview of the OpenMP threading model. We also explain how we used OpenMP when creating a simplified HEP-like processing framework. Using that simplified framework, and a similar one written using TBB, we will present performance comparisons between TBB and different compiler versions of OpenMP.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Human Factors and Modeling Methods in the Development of Control Room Modernization Concepts

nuclear power plants. Although the nuclear industry has made steady improvement in outage optimization, each day of a refueling outage still represents an opportunity to save millions of dollars and each day an outage extends past its planned end date represents millions of dollars that may have been spent unnecessarily. Reducing planned outage duration or preventing outage extensions requires careful management of the outage schedule as well as constant oversight and monitoring of work completion during the outage execution. During a typical outage, there are typically more than 10,000 activities on the schedule that, if not managed efficiently, may cause expensive outage delays. Management of outages currently relies largely on paper-based resources and general-purpose office software. A typical tool currently used to monitor work performance is a burn-down curve, where total remaining activities are plotted against the baseline schedule to track bulk work completion progress. While these tools are useful, there is still considerable uncertainty during a typical outage that bulk work progress is adequate and therefore a lot of management time is spent analyzing the situation on a daily basis. This paper describes recent advances made in developing a framework for the design of visual outage information presentation, as well as an overview of the scientific principles that informed the development of the visualizations. To test the utility of advanced visual outage information presentation, an outage management dashboard software application was created as part of the Department of Energy’s Advanced Outage Control Center project. This dashboard is intended to present all the critical information an outage manager would need to understand the current status of a refueling outage. The dashboard presents the critical path, bulk work performance, key performance indicators, outage milestones and metrics relating current performance to historical performance. Additionally, the dashboard includes data analysis tools to allow outage managers to drill down into the underlying data to understand the drivers of the indicators.

99 GENERAL AND MISCELLANEOUS↗

Human Factors Principles in Information Dashboard Design - 278

Refueling outages remain one of the largest opportunities for improving capacity factor and reducing costs available to commercial nuclear power plants. Although the nuclear industry has made steady improvement in outage optimization, each day of a refueling outage still represents an opportunity to save millions of dollars and each day an outage extends past its planned end date represents millions of dollars that may have been spent unnecessarily. Reducing planned outage duration or preventing outage extensions requires careful management of the outage schedule as well as constant oversight and monitoring of work completion during the outage execution. During a typical outage, there are typically more than 10,000 activities on the schedule that, if not managed efficiently, may cause expensive outage delays. Management of outages currently relies largely on paper-based resources and general-purpose office software. A typical method currently used to monitor work performance is a burn-down curve, where total remaining activities are plotted against the baseline schedule to track bulk work completion progress. While methods like this are useful, there is still considerable uncertainty during a typical outage whether bulk work progress is adequate and therefore a lot of management time is spent analyzing the situation on a daily basis. This paper is a case study of how new technology, in combination with established human-factors and user-centered design knowledge, can be used to support Outage Control Center (OCC) personnel decision making. In particular, we describe recent advances made in developing a framework for the design of visual outage information presentation, as well as an overview of the human factors principles that informed the development of the visualizations. To test the utility of advanced visual outage information presentation, an outage management dashboard software application was created as part of the Department of Energy's Advanced Outage Control Center project (AOCC). This dashboard is intended to present all the critical information an outage manager would need to understand the current status of a refueling outage. The dashboard presents the critical path, bulk work performance, key performance indicators, outage milestones and metrics relating current performance to historical performance. Additionally, the dashboard includes data analysis tools to allow outage managers to drill down into the underlying data to understand the drivers of the indicators. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Applications of Optimal Building Energy System Selection and Operation

Berkeley Lab has been developing the Distributed Energy Resources Customer Adoption Model (DER-CAM) for several years. Given load curves for energy services requirements in a building microgrid (u grid), fuel costs and other economic inputs, and a menu of available technologies, DER-CAM finds the optimum equipment fleet and its optimum operating schedule using a mixed integer linear programming approach. This capability is being applied using a software as a service (SaaS) model. Optimisation problems are set up on a Berkeley Lab server and clients can execute their jobs as needed, typically daily. The evolution of this approach is demonstrated by description of three ongoing projects. The first is a public access web site focused on solar photovoltaic generation and battery viability at large commercial and industrial customer sites. The second is a building CO2 emissions reduction operations problem for a University of California, Davis student dining hall for which potential investments are also considered. And the third, is both a battery selection problem and a rolling operating schedule problem for a large County Jail. Together these examples show that optimization of building u grid design and operation can be effectively achieved using SaaS.

25 ENERGY STORAGE↗

The Uniform Methods Project: Smart Thermostat Evaluation Protocol

A smart thermostat is an internet-connected device that controls home heating, ventilation, and air-conditioning (HVAC) equipment and can automatically adjust temperature set points to optimize performance and achieve energy savings. Smart thermostat features often include two way communication, occupancy detection (such as geofencing and occupancy sensors), schedule learning, and seasonal optimization algorithms. Smart thermostats can control most conventional HVAC systems, including central air conditioners, heat pumps, and forced air furnaces. Several types of residential utility programs offer smart thermostats as replacements measures. Working with smart thermostat vendors, utilities can offer separate optimization programs to produce energy savings beyond those achieved by installing a smart thermostat. From an evaluation perspective, smart thermostat programs have several noteworthy features. First, the energy savings from a smart thermostat may change over the life of the device. As a smart thermostat is connected to the internet, original equipment manufacturers can update the thermostat software to improve the thermostat's energy efficiency. Likewise, users can adjust the thermostat settings and schedules over time in response to changes in weather, thermal comfort, energy prices, or preferences for energy efficiency. Additionally, many thermostat manufacturers offer seasonal optimization programs that recommend changes or make minor, automated adjustments to the thermostat settings to improve energy efficiency. These opt-in programs are now standard offerings for many smart thermostat manufacturers and provided at no additional cost to users. The potential for software updates and continuous optimization and the evolving nature of user interactions mean future energy savings may differ from first-year savings and the energy savings of smart thermostats may need to be evaluated more than once. Second, smart thermostats often have small unit energy savings relative to a home's total energy consumption, especially in comparison to whole- home retrofit programs. This can make it difficult to detect the smart thermostat savings in billing or advanced metering infrastructure (AMI) meter consumption data. For example, as cooling loads in many regions average about 20% of annual electricity consumption, smart thermostat savings of 10% of cooling energy use would equate to a 2% reduction in home electricity consumption. Evaluators should use regression analysis of whole-home billing consumption or advanced metering infrastructure (AMI) meter consumption data to evaluate smart thermostat savings because, as explained at greater length below , these data are usually available to evaluators and regression can control for the impacts of weather and other potentially confounding factors on a home's energy consumption. Finally, as with other energy efficiency programs, participation in smart thermostat programs is self-selective. As discussed at greater length below , smart thermostat participants tend to be, among other things, younger, higher-income, and more likely to adopt electric vehicles (EVs) and internet connected devices than nonparticipants. These differences are often unobservable to the evaluator and correlated with a home's energy consumption, creating the potential for bias in estimating savings. Due to the small unit savings of thermostats, errors and biases from self-selection that may not be very consequential when evaluating a whole- home retrofits (e.g., ±2% of home electricity consumption) can have a major impact when evaluating the savings and cost-effectiveness of smart thermostat programs. A percentage point change in the estimated savings could affect the cost-effectiveness of a program. This means it is important for evaluators to assess and to minimize the potential for error from selection bias in estimating smart thermostat program savings. The Uniform Methods Project provides model protocols for determining energy savings and demand reductions that result from specific energy efficiency measures implemented through state and utility programs. In most cases, the measure protocols are based on a particular option identified by the International Performance Verification and Measurement Protocol ; however, this work provides a more detailed approach to implementing that option. Each chapter is written by technical experts in collaboration with their peers, reviewed by industry experts, and subject to public review and comment. The UMP protocols can be used by utilities, program administrators, public utility commissions, evaluators, and other stakeholders for both program planning and evaluation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Orchestration of materials science workflows for heterogeneous resources at large scale

In the era of big data, materials science workflows need to handle large-scale data distribution, storage, and computation. Any of these areas can become a performance bottleneck. We present a framework for analyzing internal material structures (e.g., cracks) to mitigate these bottlenecks. We demonstrate the effectiveness of our framework for a workflow performing synchrotron X-ray computed tomography reconstruction and segmentation of a silica-based structure. Our framework provides a cloud-based, cutting-edge solution to challenges such as growing intermediate and output data and heavy resource demands during image reconstruction and segmentation. Specifically, our framework efficiently manages data storage, scaling up compute resources on the cloud. The multi-layer software structure of our framework includes three layers. A top layer uses Jupyter notebooks and serves as the user interface. A middle layer uses Ansible for resource deployment and managing the execution environment. A low layer is dedicated to resource management and provides resource management and job scheduling on heterogeneous nodes (i.e., GPU and CPU). At the core of this layer, Kubernetes supports resource management, and Dask enables large-scale job scheduling for heterogeneous resources. The broader impact of our work is four-fold: through our framework, we hide the complexity of the cloud’s software stack to the user who otherwise is required to have expertise in cloud technologies; we manage job scheduling efficiently and in a scalable manner; we enable resource elasticity and workflow orchestration at a large scale; and we facilitate moving the study of nonporous structures, which has wide applications in engineering and scientific fields, to the cloud. While we demonstrate the capability of our framework for a specific materials science application, it can be adapted for other applications and domains because of its modular, multi-layer architecture.

97 MATHEMATICS AND COMPUTING↗

SMART-COM – Scalable Multi-Agent Adaptive Resolution Tools for Collaborative Outage Management

The purpose of this grant was to conduct scientific research and prototype applications to support NPP outage staff in their adaptive decision-making in efficient scheduling and resource allocation while preventing violation of safety technical specifications. The project contributed to scientific knowledge and engineering methods in (1) user interface design, (2) scheduling optimization and risk estimation, and (2) natural language processing that would benefit the nuclear power plants in minimizing schedule overruns and even unexpected shutdowns. The research team conducted site visits at a test reactor facility and an operating nuclear power plant to gather necessary information and inputs for research and development of a software application to support NPP staff in executing their outages. The final software application consisted of three modules. First, the natural language processing module supports interactive processing of technical documentation to build a database for outage staff to query non-permissible actions on system components. This module can alleviate outage staff from reviewing extensive documentation and minimize violation of technical specifications, especially in time-sensitive situations. Second, the schedule optimization module schedules outage activities and compute risk indices that outperform existing software and current practice. This module can reduce completion time of an outage that typically have too many activities for human to optimize based on current practice that does not apply the latest operations research. Finally, the visualization module presents progress and risk information of the overall outage and individual activities, as well as enabling access to the natural language processing and schedule optimization modules. This module can provide outage staff with situation awareness that are necessary to make risk-informed decisions in response to unexpected events during the execution of an outage.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Air compressor load forecasting using artificial neural network

Air compressor systems are responsible for approximately 10% of the electricity consumed in United States and European Union industry. As many researches have proven the effectiveness of using Artificial Neural Network inair compressor performance prediction, there is still a need to forecast the air compressor electrical load profile. The objective of this study is to predict compressed air systems’ electrical load profile, which is valuable to industry practitioners as well as software providers in developing better practice and tools for load managementand look-ahead scheduling programs. Two artificial neural networks, Two-Layer Feed-Forward Neural Networkand Long Short-Term Memory were used to predict an air compressors electrical load. Compressors with three different control mechanisms are evaluated with a total number of 11,874 observations. Here, the forecasts were validated using out-of-sample datasets with 5-fold cross-validation. Models produced average coefficient ofdetermination values from 0.24 to 0.94, average root-mean-square errors from 0.05 kW - 5.83 kW, and meanabsolute scaled errors from 0.20 to 1.33. The results indicate that both artificial neural networks yield goodresults for compressors using variable speed drive (average R 2 = 0.8 and no naïve forecasting), only the longshort-term memory model gives acceptable results for compressors using on/off control (average R 2 = 0.82 and no naïve forecasting), and no satisfactory results are obtained for load/unload type air compressors (models constituting active forecasting).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Advanced Tri-lab Software Environment (ATSE)

The Advanced Tri-lab Software Environment (ATSE) is an effort to build an open, modular, extensible, community-engaged, and vendor-adaptable software ecosystem that enables the prototyping of new technologies for improving the ASC computing environment. The initial target for ATSE is to accelerate the maturity of the Arm ecosystem for supporting ASC computing and the high-performance computing community more broadly. ATSE provides an integrated and optimized software stack that includes: 1) Application development environment and libraries including compilers, math libraries, tools, MPI, and OpenMP, 2) Low-level system software including optimized Linux, network stack, file systems, containers, and virtual machines, 3) Job scheduling and management including workload manager, application launcher, and user tools, and 4) System administration and management tools supporting booting, monitoring, and operating system image management. SAND2020-12377 M Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA0003525.

Younge, Andrew J.↗

Ibis Networks/WattIQ (IN2 Final Report)

Ibis Networks is a full-stack cleantech company that provides plug-level energy monitoring and control to solve energy and asset management problems for the enterprise. During DATES – DATES, an NREL research team worked with the Ibis team to validate their product, the InteliSocket. The Ibis InteliSocket is a pass-through plug-load energy monitor and controller that is designed to reduce energy wasted by common 120 V plug-in devices in commercial office buildings, such as computer peripherals, conference room AV equipment, and break-room appliances. The system can shut off supply power to these end uses via remote control, manual switches, pre-set schedules, or automated control algorithms. The scope of this IN2 project was the development and refinement of “smart” learning behavior algorithms (LBAs), which could help installation processes and dramatically expand the sockets’ capabilities and energy-saving potential by suggesting suitable control schedules that are based on monitored use patterns. While Ibis has the analytical and software expertise for algorithm development, the lack of test data, both in a controlled laboratory setting and in real-life deployment scenarios, represented a key barrier toward commercialization of the product. Assistance through the IN2 program provided an opportunity to conduct the needed “trial and error” algorithm development. The project included baseline field-data collection, laboratory testing, and field validation components, all of which were conducted at the NREL campus between April 2017 and July 2019.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Pursuing Cost Effective Tank Waste Characterization at the Savannah River Site - 16172

The U. S. Department of Energy Office of Environmental Management has tasked the Savannah River National Laboratory (SRNL) with developing strategies and technologies to understand, optimize, scale, and speed up tank waste characterization. This scope is part of a multi-year project with the end goal of implementing programmatic changes that accelerate tank waste processing and tank closure schedules, and at the same time reduce characterization costs, while maintaining data integrity. The project is currently in its second year. During the first year of the project, SRNL completed a series of activities focused on understanding the range of current characterization practices, needs, gaps, risks, and potential alternative approaches. Based on the results, conclusions were drawn regarding aspects of the programs that are most costly and time consuming; particular waste constituents that drive costs, schedule, and program risks; alternative characterization approaches (other than sampling and analysis) that are less expensive and more rapid; new laboratory methods holding the greatest promise for reducing characterization costs and schedule; and in whole, the primary areas where current characterization practices can be improved. SRNL's current scope is focusing on three primary activities: 1) development of a technical basis/strategy for improving the cost effectiveness and schedule of SRNL's tank closure characterization program; 2) design/assembly of hardware, plumbing, and software for automating select radiochemical separation and waste removal processes; and 3) development and testing of alternative radiochemical separation protocols most likely to improve high resource demand/time consuming analysis methods (such as Ra-226, Pa-231, Tc-99/I-129, and/or Y/trivalent actinide separations). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transportation of Radioactive Waste in Support of Ontario Power Generation's Darlington Nuclear Generating Station Refurbishment Project - 19384

Ontario Power Generation's (OPG) Darlington Nuclear Generating Station (DNGS) is currently executing a major refurbishment of the first of their four Candu reactors. As expected, the volumes of Low and Intermediate Level Waste (LILW) generated from this large-scale project have been significant. As a result, unique solutions were needed for the safe and efficient transportation of radioactive waste from the Darlington Nuclear Generating Station to OPG's Western Waste Management Facility for volume reduction and interim storage. OPG's Nuclear Waste Management Division and the Darlington Refurbishment Project worked together to identify unique radioactive waste transportation solutions. These solutions included staging and temporary storage facilities, new waste containers and specialized transportation packages, additional human resources and enhanced planning and logistics required to transport large volumes of routine and non-routine radioactive waste in a manner that minimized the impact on employee and public safety, project schedule and project costs. From a facilities perspective a shielded 'Marshalling Area' that allowed for loaded transportation packages to be staged was built on the Darlington site and a temporary licensed off-site radioactive waste storage facility close to the DNGS was contracted through a third party vendor. These two facilities allowed for more consistent and efficient schedules that limited radioactive waste shipments during off-hours and avoided peak traffic periods thereby limiting the risk to Refurbishment critical path activities. Special purpose-built transportation packages and waste containers were designed and fabricated to handle unique waste streams such as feeder pipes and other miscellaneous intermediate level waste items associated with reactor dismantling. Twenty-four Type A qualified transportation packages mounted to six flat deck trailers were designed and fabricated to support the shipment of contaminated feeder pipes. An Intermediate Level Waste Utility Container (ILWUC) to be used in conjunction with the Type B qualified Trillium Transportation Package was designed and fabricated to handle unique intermediate level waste streams arising from the reactor dismantling process. Logistics software was used to plan the shipments to ensure waste transportation packages could be loaded, transported, unloaded and returned safely to the project site in a timely manner without impacting project schedules. Several shipping scenarios were simulated and adjusted using the software to ensure that the most efficient use of equipment and resources for the radioactive waste transportation aspects of the project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

BigData Express: Toward Schedulable, Predictable, and High-Performance Data Transfer

Big Data has emerged as a driving force for scientific discoveries. Large scientific instruments (e.g., colliders, and telescopes) generate exponentially increasing volumes of data. To enable scientific discovery, science data must be collected, indexed, archived, shared, and analyzed, typically in a widely distributed, highly collaborative manner. Data transfer is now an essential function for science discoveries, particularly within big data environments. Although significant improvements have been made in the area of bulk data transfer, the currently available data transfer tools and services can not successfully address the high-performance and time-constraint challenges of data transfer required by extreme-scale science applications for the following reasons: disjoint end-to-end data transfer loops, cross-interference between data transfers, and existing data transfer tools and services are oblivious to user requirements (deadline and QoS requirements). Fermilab has been working on the BigData Express project to address these problems. BigData Express seeks to provide a schedulable, predictable, and high-performance data transfer service for big data science. The BigData Express software is being deployed and evaluated at multiple research institutions, which include UMD, StarLight, FNAL, KISTI, KSTAR, SURFnet, Ciena, and other sites. Meanwhile, the BigData Express research team is collaborating with the StarLight International/National Communications Exchange Facility to deploy BigData Express at various research platforms, including Pacific Research Platform, National Research Platform, and Global Research Platform. It is envisioned that we are working toward building a high-performance data transfer federation for big data science.

Lu, Qiming↗

Smart Electric Vehicle Charging Infrastructure Overview

WINSmartEV™ is a smart electric vehicle charging system that has been built and is currently in operation. It is a software and network based EV charging system designed and built around the ideas of intelligent charge scheduling, multiplexing (connecting multiple vehicles to each circuit) and flexibility. This paper gives an overview of this smart charging system with an eye toward its unique features and capabilities.

Chynoweth, Joshua↗