Search NASA⌕ Search

SEARCH · Search NASA

Results for “sequencing test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

4.5-kW Hall Effect Thruster Evaluated

As part of an Interagency Agreement with the Air Force Research Lab (AFRL), a space simulation test of a Russian SPT 140 Hall Effect Thruster was completed in September 1999 at Vacuum Facility 6 at the NASA Glenn Research Center at Lewis Field. The thruster was subjected to a three-part test sequence that included thrust and performance characterization, electromagnetic interference, and plume contamination. SPT 140 is a 4.5-kW thruster developed under a joint agreement between AFRL, Atlantic Research Corp, and Space Systems/Loral, and was manufactured by the Fakal Experimental Design Bureau of Russia. All objectives were satisfied, and the thruster performed exceptionally well during the 120-hr test program, which comprised 33 engine firings. The Glenn testing provided a critical contribution to the thruster development effort, and the large volume and high pumping speed of this vacuum facility was key to the test s success. The low background pressure (1 10 6 torr) provided a more accurate representation of space vacuum than is possible in most vacuum chambers. The facility had been upgraded recently with new cryogenic pumps and sputter shielding to support the active electric propulsion program at Glenn. The Glenn test team was responsible for all test support equipment, including the thrust stand, power supplies, data acquisition, electromagnetic interference measurement equipment, and the contamination measurement system.

Mason, Lee S.↗

Microelectronics Instrument Products Shock and Vibration Electro-Optics: Acceptance Data Package - Section B

The motor/encoder (henceforth referred to as the UUT) test sequence began with a baseline functional evaluation, which demonstrated that the motor satisfied the operating torque, cogging torque, winding resistance, and mechanical requirements of SOW. In addition, the encoder electrical requirements were verified, as well as the alignment of the encoder outputs relative to the motor shaft position. There were no discrepancies observed in this portion of the test. The UUT was then exposed to a number of environments, including thermal vacuum, thermal cycling, random and sine vibration, and mechanical shock. During the thermal environments, the performance of the UUT under load was verified at specified points in the cycles, as described in ATP 20049. In addition, the UUT was bench tested between the two thermal environments. No anomalies were observed during the thermal tests. The vibration and shock tests were performed by East-West Technology Corporation, West Babylon, New York. The UUT was delivered to the lab in a sealed vibration fixture in order to maintain the cleanliness levels required by the SOW. In addition, a three ounce load was attached to the motor shaft. The attachment method of this load caused damage to the shaft and bearing during random vibration of S/N 0003 on April 28, 1995, and is described further in NCR 00168.

Source record↗

Microelectronics Instrument Products Shock and Vibration Electro-optics: C-Qualification Test Report

In this test report all measurements made during testing are recorded in ATP 20049 DS data sheets and are included in the log. The motor/encoder (henceforth referred to as the UUT) test sequence began with a baseline functional evaluation, which demonstrated that the motor satisfied the operating torque, cogging torque, winding resistance, and mechanical requirements of SOW. In addition, the encoder electrical requirements were verified, as well as the alignment of the encoder outputs relative tc, the motor shaft position. There were no discrepancies observed in this portion of the test. The UUT was then exposed to a number of environments, including thermal vacuum, thermal cycling, random and sine vibration, and mechanical shock. During the thermal environments, the performance of the UUT under load was verified at specified points in the cycles, as described in ATP 20049. In addition, the UUT was bench tested between the two thermal environments. No anomalies were observed during the thermal tests. The load attachment method was subsequently corrected, and vibration of S/N 0002 began while 0003 was being repaired.

Source record↗

High Pressure Vent Line Mishap: Investigation Summary

During testing on the E-1 Test Stand, the High Pressure (HP) Liquid Hydrogen (LH) vent line was displaced off its supports, damaging the expansion joints (EJ), piping, and pipe supports of the line. The damage to the vent line is believed to have occurred during Cell 3 testing on Thursday, September 21, during the first test of the day. The fuel systems being used for Cell 3 testing are connected to the LP and HP LH Vent systems and are being used in Liquid Natural Gas (LNG) service. The Cell 3 interface bleed valve that discharges to the HP LH Vent system was inadvertently left at 100% open during the chill-in process for longer than the typical amount of time. Since this valve is usually at a lower set point or intermittently closed during the chill-in process, more than the typical amount of LNG flowed into the vent line as pre-test procedures continued as normal. The open bleed valve was noticed before test preparations were completed and prior to refilling of the HP LH Tank before test. The test sequence was started, run, and shutdown normally. Video of the flare stack showed an atypical discharge of liquid at the flare stack exit. Pressure downstream of the Cell 3 interface bleed valve (a valve connected to the southernmost part of the vent system) spiked to a higher-than-normal level. No evidence of damage was captured at the time of the event. The system was used in a typical fashion after the event and for 4 subsequent tests on Thursday and Friday, before the damage was observed. A drive-by inspection of the flare stack was performed on Friday (September 22nd) morning before sunrise and before test activities began, but no damage of the vent line was observed at that time. No abnormal system behavior was observed during testing on Friday. The damage was discovered and reported to NASA Test Operations on Monday, initiating the Incident Response Team. The Mishap appointment letter was issued September 27th to formally initiate the Mishap Investigation.

LNG↗

Concept of Operations for OSIRIS-REx Optical Navigation Image Planning

Optical navigation (OpNav) is a critical subsystem of the OSIRIS-REx asteroid sample return mission, which operated in the vicinity of near-Earth asteroid (101955) Bennu from August 2018 through April 2021. A substantial amount of mission resources across multiple subsystems and institutions is required to ensure that the OpNav data are successfully acquired. The KinetX OpNav team, part of the Flight Dynamics System (FDS), is responsible for performing required analysis to develop the OpNav operations plans; requesting, reviewing and verifying the plans; and ultimately using the image data for critical navigation operations. The FDS team, responsible for the mission navigation, is operated by KinetX Aerospace with management and operations support from NASA’s Goddard Space Flight Center. The Science Processing and Operations Center (SPOC), located at the University of Arizona’s Lunar and Planetary Laboratory, is responsible for generating the planning products for all science and most OpNav data. These plans are integrated into the spacecraft sequences, tested, and commanded by the Mission Support Area (MSA) at Lockheed Martin Space. To ensure mission-critical navigation image data are successfully acquired, the plan is developed through a waterfall of planning cycles over the course of 3 months prior to onboard plan execution. During the initial strategic planning for a mission phase, detailed analysis is performed by the OpNav team to conceptualize the concept of operations (ConOps) for image data collection. This phase OpNav Narrative is included along with other strategic planning documents for the key ground segment stakeholders to review and provide feedback. The detailed OpNav plans get defined in the tactical planning cycle, which spans 8 to 3 weeks before the week-long integrated sequence is executed on-board the spacecraft. During the tactical cycle, the initial OpNav Request is submitted along with the science requests, kicking off development of the science and OpNav plans. Once the initial plan is drafted, interfaces are exercised so that the plan can be reviewed and iterated, if necessary. A rigorous schedule is followed by the planning teams during the implementation cycle, spanning the last 18 days before uplink, to ensure all the necessary integration, testing, and reviewing can occur on time. The development of the OpNav planning ConOps, including responsibilities, interfaces, timelines, and procedures, took extensive collaboration across mission elements and institutions. The process was robust throughout the 137 weeks of continuous Optical Navigation Operations at Bennu, which concluded on April 9th, 2021.

Coralie D. Adam↗

Performance of the MIR Cooperative Solar Array After 2.5 Years in Orbit

The Mir Cooperative Solar Array (MCSA) was developed jointly by the United States and Russia to produce 6 kW of power for the Russian space station Mir. Four, multi-orbit test sequences were executed between June 1996 and December 1998 to measure MCSA electrical performance. A dedicated Fortran computer code was developed to analyze the detailed thermal-electrical performance of the MCSA. The computational performance results compared very favorably with the measured flight data in most cases. Minor performance degradation was detected in one current generating section of the MCSA. Yet overall, the flight data indicated the MCSA was meeting and exceeding performance expectations. There was no precipitous performance loss due to contamination or other causes after 2.5 years of operation. In this paper, we review the MCSA flight electrical performance tests, data and computational modeling and discuss findings from data comparisons with the computational results.

Kerslake, Thomas W.↗

The buckling response of symmetrically laminated composite plates having a trapezoidal planform area

The focus of this work is the buckling response of symmetrically laminated composite plates having a planform area in the shape of an isosceles trapezoid. The loading is assumed to be inplane and applied perpendicular to the parallel ends of the plate. The tapered edges of the plate are assumed to have simply supported boundary conditions, while the parallel ends are assumed to have either simply supported or clamped boundary conditions. A semi-analytic closed-form solution based on energy principles and the Trefftz stability criterion is derived and solutions are obtained using the Rayleigh-Ritz method. Intrinsic in this solution is a simplified prebuckling analysis which approximates the inplane force resultant distributions by the forms Nx=P/W(x) and Ny=Nxy=0, where P is the applied load and W(x) is the plate width which, for the trapezoidal planform, varies linearly with the lengthwise coordinate x. The out-of-plane displacement is approximated by a double trigonometric series. This analysis is posed in terms of four nondimensional parameters representing orthotropic and anisotropic material properties, and two nondimensional parameters representing geometric properties. For comparison purposes, a number of specific plate geometry, ply orientation, and stacking sequence combinations are investigated using the general purpose finite element code ABAQUS. Comparison of buckling coefficients calculated using the semi-analytical model and the finite element model show agreement within 5 percent, in general, and within 15 percent for the worst cases. In order to verify both the finite element and semi-analytical analyses, buckling loads are measured for graphite/epoxy plates having a wide range of plate geometries and stacking sequences. Test fixtures, instrumentation system, and experimental technique are described. Experimental results for the buckling load, the buckled mode shape, and the prebuckling plate stiffness are presented and show good agreement with the analytical results regarding the buckling load and the prebuckling plate stiffness. However, the experimental results show that for some cases the analysis underpredicts the number of halfwaves in the buckled mode shape. In the context of the definitions of taper ratio and aspect ratio used in this study, it is concluded that the buckling load always increases as taper ratio increases for a given aspect ratio for plates having simply supported boundary conditions on the parallel ends. There are combinations of plate geometry and ply stackling sequences, however, that reverse this trend for plates having clamped boundary conditions on the parallel ends such that an increase in the taper ratio causes a decrease in the buckling load. The clamped boundary conditions on the parallel ends of the plate are shown to increase the buckling load compared to simply supported boundary conditions. Also, anisotropy (the D16 and D26 terms) is shown to decrease the buckling load and skew the buckled mode shape for both the simply supported and clamped boundary conditions.

Radloff, H. D., II↗

Hemodynamic and thermal responses to head and neck cooling in men and women

Personal cooling systems are used to alleviate symptoms of multiple sclerosis and to prevent increased core temperature during daily activities. The objective of this study was to determine the operating characteristics and the physiologic changes produced by short term use of one commercially available thermal control system. A Life Support Systems, Inc. Mark VII portable cooling system and a liquid cooling helmet were used to cool the head and neck regions of 12 female and 12 male subjects (25-55 yr) in this study. The healthy subjects, seated in an upright position at normal room temperature (approximately 21 degrees C), were tested for 30 min with the liquid cooling garment operated at its maximum cooling capacity. Electrocardiograms and scalp and intracranial blood flows were recorded periodically during each test sequence. Scalp, right and left ear, and oral temperatures and cooling system parameters were logged every 5 min. Scalp, right and left ear canal, and oral temperatures were all significantly (P <0.05) reduced by 30 min of head and neck cooling. Oral temperatures decreased approximately 0.2-0.6 degrees C after 30 min and continued to decrease further (approximately 0.1-0.2 degrees C) for a period of approximately 10 min after removal of the cooling helmet. Intracranial blood flow decreased significantly (P < 0.05) during the first 10 min of the cooling period. Both right and left ear temperatures in the women were significantly lower than those of the men during the cooling period. These data indicate that head and neck cooling may be used to reduce core temperature to that needed for symptomatic relief of both male and female multiple sclerosis patients. This study quantifies the operating characteristics of one liquid cooling garment as an example of the information needed to compare the efficiency of other garments operated under different test conditions.

NASA Center ARC↗

A preliminary 'test case' manufacturing sequence for 50 cents/watt solar photovoltaic modules in 1986

The paper describes a 'test case' manufacturing process sequence for solar photovoltaic modules which will cost 50 cents/watt in 1986. The process, which starts with the purification of silicon grown into 75-mm-wide thin ribbons, is discussed, and the plant layout is depicted; each department is sized to produce 250 MW of modules/per year. The cost of this process sequence is compared to present technology at various companies showing considerable spread for each process; data are tabulated in a composite state-of-the-art cell processing cost summary for these processes.

Bickler, D. B.↗

Nondestructive spot tests allow rapid identification of metals

Ordered qualitative test sequence, presented in flow chart form, permits identification of all common metallurgical elements and many high-temperature, stainless, high and low carbon, and tool steels within about 30 minutes. Identification is made from colors or specific reactions produced by the addition of standard chemical reagents.

Wilson, M. L.↗

Development and testing of the television instrument for the Mariner Mars 1971 spacecraft

The Mariner Mars 1971 television instrument is described. It emphasizes those aspects that are different from the Mariner Mars 1969 television subsystem. The various modes of operation are described and functional descriptions of the major elements in the system summarized. An electronic description of the circuits that differ from those of Mariner Mars 1969 is also presented along with a brief description of the calibration and test sequences.

Source record↗

Evaluation of tantalum 316 stainless steel transition joints

Tubular transition joints providing a metallurgically bonded connection between tantalum and 316 stainless steel pipe sections were comparatively evaluated for durability under thermal cycling conditions approximating the operation of a SNAP-8 mercury boiler. Both coextruded and vacuum brazed transition joints of 50mm (2 inch) diameter were tested by thermal cycling 100 times between 730 C and 120 C(1350 F and 250 F) in a high vacuum environment. The twelve evaluated transition joints survived the full test sequence without developing leaks, although liquid penetrant bond line indications eventually developed in all specimens. The brazed transition joints exhibited the best dimensional stability and bond line durability.

Stoner, D. R.↗

Launch vehicle test and checkout plan. - Volume 2: Saturn 1B launch vehicle Skylab R (rescue) and AS-208 flow plan and listings

The launch operations test and checkout plan is a planning document that establishes all launch site checkout activity, including the individual tests and sequence of testing required to fulfill the development center and KSC test and checkout requirements. This volume contains the launch vehicle test and checkout plan encompassing S-1B, S-4B, IU stage, and ground support equipment tests. The plan is based upon AS-208 flow utilizing a manned spacecraft, LUT 1, and launch pad 39B facilities.

Source record↗

The development of sine vibration test requirements for Viking lander capsule components

In connection with the Viking project for exploring the planet Mars, two identical spacecraft, each consisting of an orbiter and a lander, will be launched in the third quarter of 1975. Upon arrival at the planet, the Viking lander will separate from the Viking orbiter and descend to a soft landing at a selected site on the Mars surface. It was decided to perform a sine vibration test on the Viking spacecraft, in its launch configuration, to qualify it for the booster-induced transient-dynamic environment. It is shown that component-level testing is a cost- and schedule-effective prerequisite to the system-level, sine-vibration test sequences.

Barrett, S.↗

Design automation techniques for custom LSI arrays

The standard cell design automation technique is described as an approach for generating random logic PMOS, CMOS or CMOS/SOS custom large scale integration arrays with low initial nonrecurring costs and quick turnaround time or design cycle. The system is composed of predesigned circuit functions or cells and computer programs capable of automatic placement and interconnection of the cells in accordance with an input data net list. The program generates a set of instructions to drive an automatic precision artwork generator. A series of support design automation and simulation programs are described, including programs for verifying correctness of the logic on the arrays, performing dc and dynamic analysis of MOS devices, and generating test sequences.

Feller, A.↗

Compressed air demand-type firefighter's breathing system, volume 1

The commercial availability of lightweight high pressure compressed air vessels has resulted in a lightweight firefighter's breathing apparatus. The improved apparatus, and details of its design and development are described. The apparatus includes a compact harness assembly, a backplate mounted pressure reducer assembly, a lightweight bubble-type facemask with a mask mounted demand breathing regulator. Incorporated in the breathing regulator is exhalation valve, a purge valve and a whistle-type low pressure warning that sounds only during inhalation. The pressure reducer assembly includes two pressure reducers, an automatic transfer valve and a signaling device for the low pressure warning. Twenty systems were fabricated, tested, refined through an alternating development and test sequence, and extensively examined in a field evaluation program. Photographs of the apparatus are included.

Sullivan, J. L.↗

Transition heating rates obtained on a matted and isolated 0.006 scale model (41-OT) space shuttle orbiter and external tank in the NASA/LaRC variable density hypersonic tunnel (IH17)

Model information and data obtained from wind tunnel tests performed on a 0.006 scale model of the Rockwell International space shuttle orbiter and external tank in the 18 inch Variable Density Hypersonic Wind Tunnel (VDHT) at NASA Langley Research Center are presented. Tests were performed at a Mach number of 8.0 over a Reynolds Number range from 0.1 to 10.0 million per foot at 0 deg and -5 deg angle of attack and 0 deg sideslip angle. Transition heating rates were determined using thin skin thermocouples located at various locations on the orbiter and ET. The test was conducted in three stages: orbiter plus external tank (mated configuration); orbiter alone, and external tank alone. The effects of boundary layer trips were also included in the test sequence. The plotted results presented show the effect of configuration interference on the orbiter lower surface and on the ET. Tabulated data are given.

Cummings, J.↗