Search NASA⌕ Search

SEARCH · Search NASA

Results for “software design software architecture validation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Integrated Application of Active Controls (IAAC) technology to an advanced subsonic transport project: Test act system validation

The primary objective of the Test Active Control Technology (ACT) System laboratory tests was to verify and validate the system concept, hardware, and software. The initial lab tests were open loop hardware tests of the Test ACT System as designed and built. During the course of the testing, minor problems were uncovered and corrected. Major software tests were run. The initial software testing was also open loop. These tests examined pitch control laws, wing load alleviation, signal selection/fault detection (SSFD), and output management. The Test ACT System was modified to interface with the direct drive valve (DDV) modules. The initial testing identified problem areas with DDV nonlinearities, valve friction induced limit cycling, DDV control loop instability, and channel command mismatch. The other DDV issue investigated was the ability to detect and isolate failures. Some simple schemes for failure detection were tested but were not completely satisfactory. The Test ACT System architecture continues to appear promising for ACT/FBW applications in systems that must be immune to worst case generic digital faults, and be able to tolerate two sequential nongeneric faults with no reduction in performance. The challenge in such an implementation would be to keep the analog element sufficiently simple to achieve the necessary reliability.

Source record↗

Knowledge-Based System for Flight Information Management

The use of knowledge-based system (KBS) architectures to manage information on the primary flight display (PFD) of commercial aircraft is described. The PFD information management strategy used tailored the information on the PFD to the tasks the pilot performed. The KBS design and implementation of the task-tailored PFD information management application is described. The knowledge acquisition and subsequent system design of a flight-phase-detection KBS is also described. The flight-phase output of this KBS was used as input to the task-tailored PFD information management KBS. The implementation and integration of this KBS with existing aircraft systems and the other KBS is described. The flight tests are examined of both KBS's, collectively called the Task-Tailored Flight Information Manager (TTFIM), which verified their implementation and integration, and validated the software engineering advantages of the KBS approach in an operational environment.

Ricks, Wendell R.↗

VERSE - Virtual Equivalent Real-time Simulation

Distributed real-time simulations provide important timing validation and hardware in the- loop results for the spacecraft flight software development cycle. Occasionally, the need for higher fidelity modeling and more comprehensive debugging capabilities - combined with a limited amount of computational resources - calls for a non real-time simulation environment that mimics the real-time environment. By creating a non real-time environment that accommodates simulations and flight software designed for a multi-CPU real-time system, we can save development time, cut mission costs, and reduce the likelihood of errors. This paper presents such a solution: Virtual Equivalent Real-time Simulation Environment (VERSE). VERSE turns the real-time operating system RTAI (Real-time Application Interface) into an event driven simulator that runs in virtual real time. Designed to keep the original RTAI architecture as intact as possible, and therefore inheriting RTAI's many capabilities, VERSE was implemented with remarkably little change to the RTAI source code. This small footprint together with use of the same API allows users to easily run the same application in both real-time and virtual time environments. VERSE has been used to build a workstation testbed for NASA's Space Interferometry Mission (SIM PlanetQuest) instrument flight software. With its flexible simulation controls and inexpensive setup and replication costs, VERSE will become an invaluable tool in future mission development.

virtual real time↗

GPS and Galileo Developments on Board the International Space Station With the Space Communications and Navigation (SCaN) Testbed

The Space Communications and Navigation (SCaN) is a facility developed by NASA and hosted on board the International Space Station (ISS) on an external truss since 2013.It has the objective of testing navigation and communication experimentations with a Software Defined Radio (SDR) approach, which permits software updates for testing new experimentations.NASA has developed the Space Telecommunications Radio System (STRS) architecture standard for SDRs used in space and ground-based platforms to provide commonality among radio developments to provide enhanced capability. The hardware is equipped with both L band front-end radios and the NASA space network communicates with it using S-band, Ku-band and Ka-band links.In May 2016 Qascom started GARISS (GPS and Galileo Receiver for the ISS), an activity of experimentation in collaboration with ESA and NASA that has the objective to develop and validate the acquisition and processing of combined GPS and Galileo signals on board the ISS SCaN testbed. This paper has the objective to present the mission, and provide preliminary details about the challenges in the design, development and verification of the waveform that will be installed on equipment with limited resources. GARISS is also the first attempt to develop a waveform for the ISS as part of an international collaboration between US and Europe. Although the final mission objective is to target dual frequency processing, initial operations will foresee a single frequency processing. Initial results and trade-off between the two options, as well as the final decision will be presented and discussed. The limited resources on board the SCaN with respect to the challenging requirements to acquire and track contemporaneously two satellite navigation systems, with different modulations and data structure, led to the need to assess the possibility of aiding from ground through the S-band. This option would allow assistance to the space receiver in order to provide knowledge of GNSS orbits and reduce the processing on board. Trade off and various options for telemetry and uplink data are presented and discussed. Finally, integration and validation of the waveform are one of the major challenges of GARISS: The Experiment Development System (EDS) and the the Ground Integration Unit (GIU) for VV will be used prior to conducting the experiment on the ISS. The EDS can be used in lab environment and allows prototyping and verification activities with the simulator, but does not include all hardware components. The GIU on the other side is the flight model which replicates the flying equipment, but has limited flexibility for testing.As conclusion, the project is now approaching the Preliminary Design Review (PDR) and indeed only preliminary results are available. This paper is an opportunity to present the GARISS mission as part of an International cooperation between ESA, NASA and Qascom. The preliminary results include GPS and Galileo processing from space signals, the challenges and trade off decisions, the high level STRS architecture and foreseen experimentation campaign. Detailed results from the test campaigns are expected in 2017.

space navigation↗

Recent Successes and Future Plans for NASA's Space Communications and Navigation Testbed on the International Space Station

Flexible and extensible space communications architectures and technology are essential to enable future space exploration and science activities. NASA has championed the development of the Space Telecommunications Radio System (STRS) software defined radio (SDR) standard and the application of SDR technology to reduce the costs and risks of using SDRs for space missions, and has developed an on-orbit testbed to validate these capabilities. The Space Communications and Navigation (SCaN) Testbed (previously known as the Communications, Navigation, and Networking reConfigurable Testbed (CoNNeCT)) is advancing SDR, on-board networking, and navigation technologies by conducting space experiments aboard the International Space Station. During its first year(s) on-orbit, the SCaN Testbed has achieved considerable accomplishments to better understand SDRs and their applications. The SDR platforms and software waveforms on each SDR have over 1500 hours of operation and are performing as designed. The Ka-band SDR on the SCaN Testbed is NASAs first space Ka-band transceiver and is NASA's first Ka-band mission using the Space Network. This has provided exciting opportunities to operate at Ka-band and assist with on-orbit tests of NASA newest Tracking and Data Relay Satellites (TDRS). During its first year, SCaN Testbed completed its first on-orbit SDR reconfigurations. SDR reconfigurations occur when implementing new waveforms on an SDR. SDR reconfigurations allow a radio to change minor parameters, such as data rate, or complete functionality. New waveforms which provide new capability and are reusable across different missions provide long term value for reconfigurable platforms such as SDRs. The STRS Standard provides guidelines for new waveform development by third parties. Waveform development by organizations other than the platform provider offers NASA the ability to develop waveforms itself and reduce its dependence and costs on the platform developer. Each of these new waveforms requires a waveform build environment for the particular SDR, helps assess the usefulness of the platform provider documentation, and exercises the objectives of STRS Standard and the SCaN Testbed. There is considerable interest in conducting experiments using the SCaN Testbed from NASA, academia, commercial companies, and other space agencies. There are approximately 25 experiments or activities supported by the project underway or in development, with more proposals ready, as time and funding allow, and new experiment solicitations available. NASA continues development of new waveforms and applications in communications, networking, and navigation, the first university experimenters are beginning waveform development, which will support the next generation of communications engineers, and international interest is beginning with space agency partners from European Space Agency (ESA) and the Centre National d'Etudes Spatiales (CNES). This paper will provide an overview of the SCaN Testbed and discuss its recent accomplishments and experiment activities.Its recent successes in Ka-band operations, reception of the newest GPS signals, SDR reconfigurations, and STRS demonstration in space when combined with the future experiment portfolio have positioned the SCaN Testbed to enable future space communications and navigation capabilities for exploration and science.

SOFTWARE DEFINED RADIO↗

A Framework for Performing V&V within Reuse-Based Software Engineering

Verification and validation (V&V) is performed during application development for many systems, especially safety-critical and mission-critical systems. The V&V process is intended to discover errors, especially errors related to critical processing, as early as possible during the development process. Early discovery is important in order to minimize the cost and other impacts of correcting these errors. In order to provide early detection of errors, V&V is conducted in parallel with system development, often beginning with the concept phase. In reuse-based software engineering, however, decisions on the requirements, design and even implementation of domain assets can be made prior to beginning development of a specific system. In this case, V&V must be performed during domain engineering in order to have an impact on system development. This paper describes a framework for performing V&V within architecture-centric, reuse-based software engineering. This framework includes the activities of traditional application-level V&V, and extends these activities into domain engineering and into the transition between domain engineering and application engineering. The framework includes descriptions of the types of activities to be performed during each of the life-cycle phases, and provides motivation for the activities.

Addy, Edward A.↗

Crew Health and Performance Integrated Data Architecture (CHP-IDA) TechPort May 2024

Future exploration missions to Mars will have increased need for crew autonomy. Crew Health & Performance (CHP) related data on the ISS is currently, manually downlinked and in disparate locations, which limits crew autonomy for future missions. The CHP-IDA project is developing a backend data system platform that grants the ability to seamlessly collect, store, process, and display CHP-related data for exploration missions. This platform allows for integration of data and advanced analytics that offer crew and ground teams better insight into the crew’s health and performance. It also enables applications that can improve the crew’s ability to provide more autonomous medical care during exploration missions. Data will be collected automatically to reduce crew and ground team time and effort and will synchronize across all in-mission vehicles, habitats, and ground as communication delay permits. The Human Research Program’s (HRP) Medical Data Architecture (MDA) project focused on this backend data architecture but for medical data only. The CHP-IDA project, a joint effort between HRP’s Exploration Medical Capability (ExMC) element and the Exploration Medical Integrated Product Team (XMIPT), expands this capability to all relevant CHP-related data. The additional inputs from nutrition, environment, exercise, radiation, and any other relevant sources will give more insight into crew’s health and performance. Currently, the Human Systems Engineering and Integration Division at Johnson Space Center (JSC) is designing the system. The team completed a system requirements review (SRR) in FY22 and now the focus is on core software development, testbed buildup, and use case scenario demonstration. An end-to-end demonstration with multiple data sources across CHP domains is schedule for the end of FY24 where all three focus areas will be displayed. Following this ground demo, the software will be completed, tested, and validated for flight.

Courtney M Schkurko↗

In-Depth Modeling and Simulation Analysis of Artemis Missions Using the Impact Probabilistic Risk Assessment Tool

BACKGROUND The Artemis campaign is a Moon exploration program with a series of six planned missions, five of which will be crewed. These five crewed missions will contain a single mission segment (space flight), or multiple mission segments involving space flight (Orion), lunar landing (LTV) and/or space habitat (Gateway). Each crewed segment faces the risk of unique medical conditions, necessitating medical sets/kits tailored to those specificities. To support and enable a data-driven and evidence-based decision-making process through out a mission’s life cycle, a software tool called IMPACT was developed. Using probabilistic risk assessment (PRA) methodologies, IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces) is a novel tool built for analyzing the possibility of encountering complex medical risks during space flight, and for identifying the medical resources and capabilities needed to treat those potential at-risk medical conditions. IMPACT achieves this by performing hundreds of thousands of Monte Carlo simulations of missions to build aggregate pictures of medical risk. During an extended simulation modeling phase, IMPACT generated analytical results for medical risks, and the medical resources and capabilities to address those risks, for every segment of every crewed Artemis mission. This presentation will highlight the reliability, consistency and validity of IMPACT’s computational modeling techniques and will showcase the library of analytical outcomes generated for the Artemis missions. OVERVIEW During the early stages of IMPACT’s design, architecture and technical requirements collection, “scenarios” (use cases) - achievement goals required for acceptance testing, were identified by stakeholders. IMPACT successfully completed the scenario testing requirements and undertook an extensive operational run phase utilizing a wide range of input combinations with a goal of delivering a cohesive, trustworthy, reliable, vast, and diverse body of evidence. The intent of these modeling runs was to validate consistency in output, ensure solidity of executable operations and to streamline processes by identifying areas requiring efficiency improvements. Using the many missions of Artemis, IMPACT ran variations of operational runs to assess the output for acceptable, as well as unusual characteristics. This rigorous long-term “shakedown” analysis was implemented to help build a collective body of evidence to aid in securing a high level of confidence, reliability, and validity in the output, whether from the applicational components of IMPACT, or the entirety of the operational process. ANTICIPATED ANALYSIS AND CONCLUSION This presentation will discuss the various categories of input criteria; the comparisons in the application of these input criteria to various Artemis missions; the preparation and collection of the body of evidence, and reliability of the computational modeling techniques. This paper serves as an initial analytical overview of IMPACT’s probabilistic risk assessment (PRA) medical risk outputs covering Artemis missions and is not intended to be deemed the official medical response for the Artemis campaign.

Crew Composition↗

Space Communications and Navigation Validation: Extracting Data for the Strategic Center for Networking, Integration, and Communications Scheduling Algorithms

Efficiency in communication system architecture performance between Space Communications and Navigation (SCaN) assets and missions is crucial, as space communication is varied, complex, and often not utilized to its full potential. The SCaN Strategic Center for Networking, Integration, and Communications (SCENIC) new scheduling algorithms, which are designed to simulate the allocation of resources between SCaN assets and missions, have the potential to simulate an increase of this efficiency; however, they require real-world data to be validated against. The purpose of this project was to extract said validation data, which details the frequency and duration of utilized contact windows between missions and assets in the Near Earth Network (NEN), Space Network (SN), and Deep Space Network (DSN). Stored as images in daily operations summaries (DOSs), the tabular data existed in a variety of file formats such as.pdf, .docx, and .doc. Since the tables were stored as images, ABBYY® FineReader® (ABBYY Software Ltd.) optical character recognition (OCR) was implemented, which is a proprietary software that reads images from text. The comma separated value (CSV) output was utilized as input to a series of MATLAB® (The MathWorks, Inc.) methods for reformatting, at which point it was ready to be machine-read. Finally, the results were converted to a Microsoft Excel format for human readability. Along with being used for validation purposes, the data will also be used to map equipment degradation as a function of time to analyze the reliability of network assets.

Kontur, Noah P.↗

Connecting Research and Practice: An Experience Report on Research Infusion with SAVE

NASA systems need to be highly dependable to avoid catastrophic mission failures. This calls for rigorous engineering processes including meticulous validation and verification. However, NASA systems are often highly distributed and overwhelmingly complex, making the software portion of these systems challenging to understand, maintain, change, reuse, and test. NASA's systems are long-lived and the software maintenance process typically constitutes 60-80% of the total cost of the entire lifecycle. Thus, in addition to the technical challenges of ensuring high life-time quality of NASA's systems, the post-development phase also presents a significant financial burden. Some of NASA's software-related challenges could potentially be addressed by some of the many powerful technologies that are being developed in software research laboratories. Many of these research technologies seek to facilitate maintenance and evolution by for example architecting, designing and modeling for quality, flexibility, and reuse. Other technologies attempt to detect and remove defects and other quality issues by various forms of automated defect detection, architecture analysis, and various forms of sophisticated simulation and testing. However promising, most such research technologies nevertheless do not make the transition from the research lab to the software lab. One reason the transition from research to practice seldom occurs is that research infusion and technology transfer is difficult. For example, factors related to the technology are sometimes overshadowed by other types of factors such as reluctance to change and therefore prohibits the technology from sticking. Successful infusion might also take very long time. One famous study showed that the discrepancy between the conception of the idea and its practical use was 18 years plus or minus three. Nevertheless, infusing new technology is possible. We have found that it takes special circumstances for such research infusion to succeed: 1) there must be evidence that the technology works in the practitioner's particular domain, 2) there must be a potential for great improvements and enhanced competitive edge for the practitioner, 3) the practitioner has to have strong individual curiosity and continuous interest in trying out new technologies, 4) the practitioner has to have support on multiple levels (i.e. from the researchers, from management, from sponsors etc), and 5) to remain infused, the new technology has to be integrated into the practitioner's processes so that it becomes a natural part of the daily work. NASA IV&V's Research Infusion initiative sponsored by NASA's Office of Safety & Mission Assurance (OSMA) through the Software Assurance Research Program (SARP), strives to overcome some of the problems related to research infusion.

Lindvall, Mikael↗

Medical System Concept of Operations for Mars Exploration Mission-11: Exploration Medical Capability (ExMC) Element - Human Research Program

NASA’s exploration missions to Mars will have durations of 2-3 years and will take humans farther away from Earth than ever before. This will result in a paradigm shift for mission planning, spacecraft design, human systems integration, and in-flight medical care. Constraints on real-time communication, resupply, and medical evacuation are major architectural drivers. These constraints require medical system development to be tightly integrated with mission and vehicle design to provide crew autonomy and enable mission success. This concept of operations provides a common vision of medical care for developing a medical system for Mars exploration missions. It documents an overview of the stakeholder needs and goals of a medical system and provides examples of the types of activities the system will be used for during the mission. Development of the concept of operations considers mission variables such as distance from Earth, duration of mission, time to definitive medical care, communication protocols between crewmembers and ground support, personnel capabilities and skill sets, medical hardware and software, and medical data management. The information provided in this document informs the ExMC Systems Engineering effort to define the functions to be provided by the medical system. In addition, this concept of operations will inform the subsequent systems engineering process of developing technical requirements, system architectures, interfaces, and verification and validation approaches for the medical system. This document supports the closure of ExMC Gap Med01: We do not have a concept of operations for medical care during exploration missions, corresponding to the ExMC-managed human system risk: Risk of Adverse Health Outcomes & Decrements in Performance due to Inflight Medical Conditions. This document is applicable to the ExMC Element Systems Engineering process and may be used for collaboration within the Human Research Program.

Urbina, Michelle↗

Is Structured Agile an Oxymoron? Tales from Implementing and Executing Agile in a US Government Environment

To paraphrase a famous quote, "No plan survives contact with the reality." Software (SW) development is often a classic example of this: whatever the plan was for a particular development, it often does not survive contact with technical realities, budget realities, program realities and schedule realities. Traditionally, SW development has followed a waterfall methodology with requirements being rigorously specified before the design, which was completed before the coding and unit testing started, which were in turn finished before validation and verification started. This model of SW engineering derives much from the HW engineering of large systems, and has been the standard methodology used in US government software acquisitions and systems for decades, with highly variable results. US Government SW requirements are built around Waterfall concepts, which assume that the plan will survive contact with reality, or at least that modifications to the plan are relatively small, and relatively few.Because of the inefficiencies and difficulties inherent in Waterfall, the commercial SW world started using a different SW development methodology called Agile more than 20 years ago. Agile believes that a plan should evolve and learn rapidly in response to the realities encountered. At its core, there are a few key elements of Agile:- A small team of people which is highly flexible and adaptive. The team collaborates and interoperates through sophisticated development architectures and release environments- An iterative, incremental development and release approach which is based upon the concept that knowledge comes from experience within the team, and that the team makes decisions based upon what it knows- A team culture which prizes transparency, inspection and adaptation. These values are necessary so that the team experience and decision making is transparent and responsive to the realities encountered during development and testingSo, how to use Agile in a US Government environment? GMSEC (Goddard Mission Services Evolution Center) develops satellite ground system software for NASA and other US Government agencies. The SW developed by the team contains a large code base of many applications used within satellite mission operations centers. It spans the full gamut of SW development types: from SW which is in a classic maintenance and sustainment mode, to new developments with a fairly well understood scope and approach, to new developments whose scope and approach are quite unclear and which require significant research and prototyping. Team members move between all of these different types of SW development. Waterfall was inadequate to the programmatic and technical needs of the team, as well as the various types of SW development being done. The software plan was not surviving contact with the technical and programmatic realities experienced by the team. To address this, the team started a small pilot project in 2016 to test the use of Agile within a small subset of the team for a new web services application. In early 2018, the use of Agile was expanded to the whole team and all the software, but we had to fulfill the NASA SW development requirements. And we needed to do this while still remaining true to the key Agile elements of transparency, inspection and adaption. In order to do this, the team worked very closely with the Software Process Improvement (SPI) team at NASA Goddard, as well as NASA engineering manageme

Beech, Theresa W.↗

Sensor Data Quality and Angular Rate Down-Selection Algorithms on SLS EM-1

The NASA Space Launch System Block 1 launch vehicle is equipped with an Inertial Navigation System (INS) and multiple Rate Gyro Assemblies (RGA) that are used in the Guidance, Navigation, and Control (GN&C) algorithms. The INS provides the inertial position, velocity, and attitude of the vehicle along with both angular rate and specific force measurements. Additionally, multiple sets of co-located rate gyros supply angular rate data. The collection of angular rate data, taken along the launch vehicle, is used to separate out vehicle motion from flexible body dynamics. Since the system architecture uses redundant sensors, the capability was developed to evaluate the health (or validity) of the independent measurements. A suite of Sensor Data Quality (SDQ) algorithms is responsible for assessing the angular rate data from the redundant sensors. When failures are detected, SDQ will take the appropriate action and disqualify or remove faulted sensors from forward processing. Additionally, the SDQ algorithms contain logic for down-selecting the angular rate data used by the GNC software from the set of healthy measurements. This paper explores the trades and analyses that were performed in selecting a set of robust fault-detection algorithms included in the GN&C flight software. These trades included both an assessment of hardware-provided health and status data as well as an evaluation of different algorithms based on time-to-detection, type of failures detected, and probability of detecting false positives. We then provide an overview of the algorithms used for both fault-detection and measurement down selection. We next discuss the role of trajectory design, flexible-body models, and vehicle response to off-nominal conditions in setting the detection thresholds. Lastly, we present lessons learned from software integration and hardware-in-the-loop testing.

Park, Thomas↗

Next Generation Remote Agent Planner

In May 1999, as part of a unique technology validation experiment onboard the Deep Space One spacecraft, the Remote Agent became the first complete autonomous spacecraft control architecture to run as flight software onboard an active spacecraft. As one of the three components of the architecture, the Remote Agent Planner had the task of laying out the course of action to be taken, which included activities such as turning, thrusting, data gathering, and communicating. Building on the successful approach developed for the Remote Agent Planner, the Next Generation Remote Agent Planner is a completely redesigned and reimplemented version of the planner. The new system provides all the key capabilities of the original planner, while adding functionality, improving performance and providing a modular and extendible implementation. The goal of this ongoing project is to develop a system that provides both a basis for future applications and a framework for further research in the area of autonomous planning for spacecraft. In this article, we present an introductory overview of the Next Generation Remote Agent Planner. We present a new and simplified definition of the planning problem, describe the basics of the planning process, lay out the new system design and examine the functionality of the core reasoning module.

Jonsson, Ari K.↗

Compact, Engineered, 2-Micron Coherent Doppler Wind Lidar Prototype: A New NASA Instrument Incubator Program Project

A new project, selected in 2005 by NASA s Science Mission Directorate (SMD) under the Instrument Incubator Program (IIP), will be described. The 3-year effort is intended to design, fabricate, and demonstrate a packaged, rugged, compact, space-qualifiable coherent Doppler wind lidar (DWL) transceiver capable of future validation in an aircraft and/or Unmanned Aerial Vehicle (UAV). The packaged DWL will utilize the numerous advances in pulsed, solid-state, 2-micron laser technology at NASA s Langley Research Center (LaRC) in such areas as crystal composition, architecture, efficiency, cooling techniques, pulse energy, and beam quality. The extensive experience of Raytheon Space and Airborne Systems (RSAS) in coherent lidar systems, in spacebased sensors, and in packaging rugged lidar systems will be applied to this project. The packaged transceiver will be as close to an envisioned space-based DWL system as the resources and technology readiness allow. We will attempt to facilitate a future upgrade to a coherent lidar system capable of simultaneous wind and CO2 concentration profile measurements. Since aerosol and dust concentration is also available from the lidar signal, the potential for a triple measurement lidar system is attractive for both Earth and Mars remote sensing. A key follow on step after the IIP will be to add a telescope, scanner, and software for aircraft validation. This IIP should also put us in a position to begin a parallel formulation study in the 2006-2007 timeframe for a space-based DWL demonstration mission early next decade.

Kavaya, Michael J.↗

Implementation of Human System Integration Workshop at NASA for Human Spaceflight

The human is a key element in the complex system of systems underlying space exploration missions. As a critical system, its operating bands and requirements need to be characterized and integrated with other systems. Optimal integration of the human system with hardware and software elements has an impact on multiple aspects of mission execution, including human health and performance, risk mitigation, effective design and functionality, enhanced safety, and reduced lifecycle costs. The field of Human Systems Integration (HSI) represents an interdisciplinary and comprehensive cross-cutting approach encompassing technical and management processes for integrating human as a system consideration and objective within and across all other system components and multiple domains. In addition to human activities, HSI covers training, operations and support dimensions. Moreover, HSI is an essential enabler to systems engineering practice, emphasizing human system aspects toward optimizing fully integrated system of systems performance while systematically infusing the needs of all users during the earliest stages of development. Consistent with the National Space Exploration Campaign, NASA is developing the Gateway, a lunar orbiting platform that will serve as astronaut habitat, support transit to deep space, validate new technologies and systems, and function as a science laboratory and communications hub, among other uses. It is an essential element of a phase that will extend human exploration into deep space through evolvable infrastructure and advanced technology, supporting assembly and logistics of other exploration architecture elements. In an effort to explore the current status and forward plan of HSI implementation in the mission (system of systems) lifecycle, the HSI Employee Resource Group conducted an HSI workshop using the Gateway Program as a case study. It revealed how different organizations at the Johnson Space Center incorporate HSI in their processes in preparation for the development and operation of the Gateway. The workshop focused on HSI methodology for implementation of the six NASA HSI domains: Human Factors Engineering, Operations Resources, Habitability and Environment, Maintainability and Supportability, Safety, and Training. Results from the workshop are reported on this paper, as well as some historical background of HSI at NASA, and the success in using an Employee Resource Group to promote technical knowledge. The authors hope that this information can be used to disseminate best practices for translational applications to other space exploration systems.

Silva-Martinez, Jackelynne↗

Implementation of Human System Integration Workshop at NASA for Human Spaceflight

The human is a key element in the complex system of systems underlying space exploration missions. As a critical system, its operating bands and requirements need to be characterized and integrated with other systems. Optimal integration of the human system with hardware and software elements has an impact on multiple aspects of mission execution, including human health and performance, risk mitigation, effective design and functionality, enhanced safety, and reduced lifecycle costs. The field of Human Systems Integration (HSI) represents an interdisciplinary and comprehensive cross-cutting approach encompassing technical and management processes for integrating human as a system consideration and objective within and across all other system components and multiple domains. In addition to human activities, HSI covers training, operations and support dimensions. Moreover, HSI is an essential enabler to systems engineering practice, emphasizing human system aspects toward optimizing fully integrated system of systems performance while systematically infusing the needs of all users during the earliest stages of development. Consistent with the National Space Exploration Campaign, NASA is developing the Gateway, a lunar orbiting platform that will serve as astronaut habitat, support transit to deep space, validate new technologies and systems, and function as a science laboratory and communications hub, among other uses. It is an essential element of a phase that will extend human exploration into deep space through evolvable infrastructure and advanced technology, supporting assembly and logistics of other exploration architecture elements. In an effort to explore the current status and forward plan of HSI implementation in the mission (system of systems) lifecycle, the HSI Employee Resource Group conducted an HSI workshop using the Gateway Program as a case study. It revealed how different organizations at the Johnson Space Center incorporate HSI in their processes in preparation for the development and operation of the Gateway. The workshop focused on HSI methodology for implementation of the six NASA HSI domains: Human Factors Engineering, Operations Resources, Habitability and Environment, Maintainability and Supportability, Safety, and Training. Results from the workshop are reported on this paper, as well as some historical background of HSI at NASA, and the success in using an Employee Resource Group to promote technical knowledge. The authors hope that this information can be used to disseminate best practices for translational applications to other space exploration systems.

Silva-Martinez, Jackelynne↗

6DOF Testing of the SLS Inertial Navigation Unit

The Navigation System on the NASA Space Launch System (SLS) Block 1 vehicle performs initial alignment of the Inertial Navigation System (INS) navigation frame through gyrocompass alignment (GCA). Because the navigation architecture for the SLS Block 1 vehicle is a purely inertial system, the accuracy of the achieved orbit relative to mission requirements is very sensitive to initial alignment accuracy. The assessment of this sensitivity and many others via simulation is a part of the SLS Model-Based Design and Model-Based Requirements approach. As a part of the aforementioned, 6DOF Monte Carlo simulation is used in large part to develop and demonstrate verification of program requirements. To facilitate this and the GN&C flight software design process, an SLS-Program-controlled Design Math Model (DMM) of the SLS INS was developed by the SLS Navigation Team. The SLS INS model implements all of the key functions of the hardware-namely, GCA, inertial navigation, and FDIR (Fault Detection, Isolation, and Recovery)-in support of SLS GN&C design requirements verification. Despite the strong sensitivity to initial alignment, GCA accuracy requirements were not verified by test due to program cost and schedule constraints. Instead, the system relies upon assessments performed using the SLS INS model. In order to verify SLS program requirements by analysis, the SLS INS model is verified and validated against flight hardware. In lieu of direct testing of GCA accuracy in support of requirement verification, the SLS Navigation Team proposed and conducted an engineering test to, among other things, validate the GCA performance and overall behavior of the SLS INS model through comparison with test data. This paper will detail dynamic hardware testing of the SLS INS, conducted by the SLS Navigation Team at Marshall Space Flight Center's 6DOF Table Facility, in support of GCA performance characterization and INS model validation. A 6-DOF motion platform was used to produce 6DOF pad twist and sway dynamics while a simulated SLS flight computer communicated with the INS. Tests conducted include an evaluation of GCA algorithm robustness to increasingly dynamic pad environments, an examination of GCA algorithm stability and accuracy over long durations, and a long-duration static test to gather enough data for Allan Variance analysis. Test setup, execution, and data analysis will be discussed, including analysis performed in support of SLS INS model validation.

Geohagan, Kevin↗