Search NASA⌕ Search

SEARCH · Search NASA

Results for “software triggering”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Summary of the Second Workshop on Liquid Argon Time Projection Chamber Research and Development in the United States

The second workshop to discuss the development of liquid argon time projection chambers (LArTPCs) in the United States was held at Fermilab on July 8-9, 2014. The workshop was organized under the auspices of the Coordinating Panel for Advanced Detectors, a body that was initiated by the American Physical Society Division of Particles and Fields. All presentations at the workshop were made in six topical plenary sessions: i) Argon Purity and Cryogenics, ii) TPC and High Voltage, iii) Electronics, Data Acquisition and Triggering, iv) Scintillation Light Detection, v) Calibration and Test Beams, and vi) Software. This document summarizes the current efforts in each of these areas. It primarily focuses on the work in the US, but also highlights work done elsewhere in the world.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

A readout digitization system for the ATLAS muon spectrometer phase-I tRPC trigger upgrade

The front-end digitization electronics for thin-Resistive Plate Chambers to be installed as part of the ATLAS Muon Spectrometer Phase-I upgrade project is described. Here, the design is based on the CERN HPTDC and GOL chips. In this paper, the design of the digitization system is presented, including power, connection interfaces to front-end amplifier-shaper-discriminator board and to the low level trigger processor board. System performance tests were conducted and validated with a prototype which includes one HPTDC/GOL pair.

Digital electronic circuits↗

The implementation of Global Feature EXtractor (gFEX) - the ATLAS Calorimeter Level 1 Trigger system for LHC Run-3 upgrade

As part of the ATLAS Phase-I Upgrade, the global Feature EXtractor (gFEX) is one of several hardware modules designed to help maintain the ATLAS Level-1 trigger acceptance rate with the increasing Large Hadron Collider (LHC) luminosity and the increasing Pile-Up conditions. The gFEX is used to identify patterns of energy associated with the hadronic decays of high momentum Higgs, W & Z bosons, top quarks, and exotic particles in real time at the 40 MHz LHC bunch crossing rate. The board is required to receive coarse-granularity (Δη×Δphiv = 0.2×0.2 gTower) information from the entire ATLAS calorimeters on 276 optical fibers. A prototype v1 with one Xilinx ZYNQ FPGA, and one Vertex-7 FPGA for technology validation has been designed and tested in 2015. With the lessons learned from the prototype v1, a prototype v2 with three Vertex UltraScale FPGAs and one ZYNQ FPGA has been implemented to verify full functionalities of gFEX in 2016. Based on the prototype v2 design, a prototype v3, the final gFEX prototype, is implemented, which is an ATCA module consisting of three Vertex UltraScale+ FPGAs, one ZYNQ UltraScale+ SoC, and 35 MiniPODs. This board receives up to 300 fiber optical links from calorimeters and transmits trigger data on 96 links to the to the ATLAS Level-1 Topological trigger (L1Topo [1]) at the speed up to 12.8 Gb/s. There are also 24 electrical links on board for communication between two FPGAs with the speed up to 25.6 Gb/s. The performance of three prototype boards have been tested and evaluated. For the prototype v3 board, the high-speed optical links are stable at 12.8 Gb/s with Bit Error Ratio (BER) < 1 × 10 -15 . The low-latency parallel GPIO (General Purpose I/O) buses between FPGAs are stable at 1.12 Gb/s. The peripheral components of ZYNQ UltraScale+ SoC, such as 16 GB DDR4 DIMM, UART, SPI flashes, and Ethernet, have also been verified. Here, the test results of the prototype v3 board validate the gFEX technologies, architecture and full functionalities. Now the final production board is being produced.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Neutrino identification with scintillation light in MicroBooNE

MicroBooNE is a neutrino experiment which employs a liquid argon (LAr) time projection chamber (TPC) to record neutrino interactions from Fermilab's neutrino beamlines. The experiment's primary objective is to study low-energy νe interactions from the Booster Neutrino Beamline (BNB). Located on the surface, the detector is affected by a continuous rate of cosmic-rays. This leads to one neutrino interaction for every 104 cosmic rays observed in the TPC, making it difficult to isolate neutrino interactions in the detector using charge alone. MicroBooNE's trigger makes use of prompt scintillation light and plays an essential role in both performing strong background rejection and significantly reducing data-rates. Furthermore, a series of novel techniques relying on scintillation light are used to isolate beam-induced activity. This document briefly presents MicroBooNE's scintillation-light based trigger and novel Flash-Matching pattern recognition techniques for cosmic-rejection. This work serves as the foundation of neutrino analyses in LArTPC detectors and is therefore of interest to the broader short- and long-baseline neutrino programs being launched at Fermilab.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

FPGA-based tracking for the CMS Level-1 trigger using the tracklet algorithm

The high instantaneous luminosities expected following the upgrade of the Large Hadron Collider (LHC) to the High-Luminosity LHC (HL-LHC) pose major experimental challenges for the CMS experiment. A central component to allow efficient operation under these conditions is the reconstruction of charged particle trajectories and their inclusion in the hardware based trigger system. There are many challenges involved in achieving this: a large input data rate of about 20–40 Tb/s; processing a new batch of input data every 25 ns, each consisting of about 15,000 precise position measurements and rough transverse momentum measurements of particles (“stubs”); performing the pattern recognition on these stubs to find the trajectories; and producing the list of trajectory parameters within 4 µs. Here, this paper describes a proposed solution to this problem, specifically, it presents a novel approach to pattern recognition and charged particle trajectory reconstruction using an all-FPGA solution. The results of an end-to-end demonstrator system, based on Xilinx Virtex-7 FPGAs, that meets timing and performance requirements are presented along with a further improved, optimized version of the algorithm together with its corresponding expected performance.

47 OTHER INSTRUMENTATION↗

Performance of the ATLAS muon triggers in Run 2

The performance of the ATLAS muon trigger system is evaluated with proton-proton ( pp ) and heavy-ion (HI) collision data collected in Run 2 during 2015–2018 at the Large Hadron Collider. It is primarily evaluated using events containing a pair of muons from the decay of Z bosons to cover the intermediate momentum range between 26 GeV and 100 GeV. Overall, the efficiency of the single-muon triggers is about 68% in the barrel region and 85% in the endcap region. The p T range for efficiency determination is extended by using muons from decays of J ψ mesons, W bosons, and top quarks. The performance in HI collision data is measured and shows good agreement with the results obtained in pp collisions. The muon trigger shows uniform and stable performance in good agreement with the prediction of a detailed simulation. Dedicated multi-muon triggers with kinematic selections provide the backbone to beauty, quarkonia, and low-mass physics studies. The design, evolution and performance of these triggers are discussed in detail.

47 OTHER INSTRUMENTATION↗

Performance of the upgraded PreProcessor of the ATLAS Level-1 Calorimeter Trigger

The PreProcessor of the ATLAS Level-1 Calorimeter Trigger prepares the analogue trigger signals sent from the ATLAS calorimeters by digitising, synchronising, and calibrating them to reconstruct transverse energy deposits, which are then used in further processing to identify event features. During the first long shutdown of the LHC from 2013 to 2014, the central components of the PreProcessor, the Multichip Modules, were replaced by upgraded versions that feature modern ADC and FPGA technology to ensure optimal performance in the high pile-up environment of LHC Run 2. This paper describes the features of the new Multichip Modules along with the improvements to the signal processing achieved.

47 OTHER INSTRUMENTATION↗

Production and tests of the ADDC for the Micromegas detector of the ATLAS New Small Wheel

The Large Hadron Collider (LHC) at CERN will perform a series of upgrades to allow luminosity increases during the next physics runs expected from 2022 on. These will also significantly increase the trigger rates of all the detectors. As part of the ATLAS Phase-I upgrade, the current Small Wheel muon detectors will be replaced with state-of-the-art New Small Wheel (NSW) detectors to cope with the increased luminosity of the LHC. The Address in Real Time Data Driver Card (ADDC) is designed to transmit the trigger data from the resistive Micro-Mesh Gaseous Structure (Micromegas) detectors of the NSW. The ART ASIC on the ADDC is a customdesigned chip to receive theAddress in Real Time (ART) signals from theVMMfront-end ASIC and perform hit-selection processing. The processed trigger data is then sent to the Trigger Processor (TP) through optical links. A total of 512 ADDCs will be installed on the detector close to the front-end boards. Therefore, those cards must be able to work properly in a high radiation and magnetic field environment. Furthermore, after four rounds of prototyping, the ADDC production was launched in January of 2019. 600 ADDC boards have been produced and tested with an automated test stand. This test setup can simulate the front-end signals and provide "Level-1 Data Driver Card" (L1DDC) functions as well as part of the TP functions. Thus, the ADDC functionality and stability can be verified without the remaining NSW electronics. This paper describes the ADDC hardware prototype development, radiation and integration testing, and the ADDC automated production test procedure.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Prototype hardware design and testing of the global common module for the global trigger subsystem of the ATLAS phase-II upgrade

We report the High-Luminosity Large Hadron Collider (HL-LHC) will deliver more than ten times the integrated luminosity of the previous runs combined. Meeting its stricter throughput requirements poses new challenges to the Trigger and Data Acquisition (TDAQ) systems of the LHC experiments. Introduced in the framework of the ATLAS experiment’s HL upgrade, the Global Trigger (GT) is a new subsystem which will perform offline-like algorithms on full-granularity calorimeter data. The implementation of the GT’s functionality is firmware-focused and is composed of three layers: multiplexing (or data aggregating), global event processing, and demultiplexing interface to the central trigger processor. Each layer will be composed of several, similar nodes, hosted on replicas of identical hardware, the Global Common Module (GCM), an ATCA front board which is designed to be adopted throughout the entire GT subsystem. This article proceeds from the TWEPP 2021 conference and presents the GCM hardware design, performed in 2020, and focuses on some key results of its extensive testing performed in 2021.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Machine learning on FPGA for event selection

Real-time data processing is a frontier field in experimental particle physics. The application of FPGAs at the trigger level is used by many current and planned experiments (CMS, LHCb, Belle2, PANDA). Usually they use conventional processing algorithms. LHCb has implemented Machine Learning (ML) elements for real-time data processing with a triggered readout system that runs most of the ML algorithms on a computer farm. The work described in this article aims to test the ML-FPGA algorithms for streaming data acquisition. Herein, there are many experiments working in this area and they have a lot in common, but there are many specific solutions for detector and accelerator parameters that are worth exploring further. This report describes the purpose of the work and progress in evaluating the ML-FPGA application.

47 OTHER INSTRUMENTATION↗

System design and prototyping for the CMS Level-1 Trigger at the High-Luminosity LHC

For the High-Luminosity Large Hadron Collider, the trigger and data acquisition system of the CMS experiment will be entirely replaced. Novel design choices have been explored, including ATCA prototyping platforms with SoC controllers and newly available interconnect technologies with serial optical links with data rates up to 28 Gb/s. Trigger analyses will be performed through sophisticated algorithms, including widespread use of Machine Learning, in large FPGAs, such as the Xilinx Ultrascale family. The system will process over 50 Tb/s of detector data with an event rate of 750 kHz. Here, we describe system design and prototyping and review trigger algorithm exemplars.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Particle flow reconstruction for the CMS Phase-II Level-1 Trigger

The upgrade of the CMS detector for the high-luminosity LHC will include trackfinding for the first time in the Level-1 trigger, enabling Particle Flow reconstruction of every event in addition to comprehensive pileup mitigation. The Correlator trigger will reconstruct isolated leptons and photons, hadronic jets, and energy sums, assisted in many cases by machine learning to benefit from the complete particle-level event record. Here, we present the logic of these algorithms, possible implementations using large FPGAs and their demonstration in prototype hardware, in addition to the expected physics performance.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Fast b -tagging at the high-level trigger of the ATLAS experiment in LHC Run 3

The ATLAS experiment relies on real-time hadronic jet reconstruction and b-tagging to record fully hadronic events containing b-jets. These algorithms require track reconstruction, which is computationally expensive and could overwhelm the high-level-trigger farm, even at the reduced event rate that passes the ATLAS first stage hardware-based trigger. In LHC Run 3, ATLAS has mitigated these computational demands by introducing a fast neural-network-based b-tagger, which acts as a low-precision filter using input from hadronic jets and tracks. It runs after a hardware trigger and before the remaining high-level-trigger reconstruction. This design relies on the negligible cost of neural-network inference as compared to track reconstruction, and the cost reduction from limiting tracking to specific regions of the detector. In the case of Standard Model HH → bb̅bb̅, a key signature relying on b-jet triggers, the filter lowers the input rate to the remaining high-level trigger by a factor of five at the small cost of reducing the overall signal efficiency by roughly 2%.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

L1 track triggers for ATLAS in the HL-LHC

The HL-LHC, the planned high luminosity upgrade for the LHC, will increase the collision rate in the ATLAS detector approximately a factor of 5 beyond the luminosity for which the detectors were designed, while also increasing the number of pile-up collisions in each event by a similar factor. This means that the level-1 trigger must achieve a higher rejection factor in a more difficult environment. This presentation discusses the challenges that arise in this environment and strategies being considered by ATLAS to include information from the tracking systems in the level-1 decision. The main challenges involve reducing the data volume exported from the tracking system for which two options are under consideration: a region of interest based system and an intelligent sensor method which filters on hits likely to come from higher transverse momentum tracks.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Summary of the Second Workshop on Liquid Argon Time Projection Chamber Research and Development in the United States

The second workshop to discuss the development of liquid argon time projection chambers (LArTPCs) in the United States was held at Fermilab on July 8-9, 2014. The workshop was organized under the auspices of the Coordinating Panel for Advanced Detectors, a body that was initiated by the American Physical Society Division of Particles and Fields. All presentations at the workshop were made in six topical plenary sessions: i) Argon Purity and Cryogenics, ii) TPC and High Voltage, iii) Electronics, Data Acquisition and Triggering, iv) Scintillation Light Detection, v) Calibration and Test Beams, and vi) Software. This document summarizes the current efforts in each of these areas. It primarily focuses on the work in the US, but also highlights work done elsewhere in the world.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Asynchronous data change notification between database server and accelerator controls system

Database data change notification (DCN) is a commonly used feature. Not all database management systems (DBMS) provide an explicit DCN mechanism. Even for those DBMS's which support DCN (such as Oracle and MS SQL server), some server side and/or client side programming may be required to make the DCN system work. This makes the setup of DCN between database server and interested clients tedious and time consuming. In accelerator control systems, there are many well established software client/server architectures (such as CDEV, EPICS, and ADO) that can be used to implement data reflection servers that transfer data asynchronously to any client using the standard SET/GET API. This paper describes a method for using such a data reflection server to set up asynchronous DCN (ADCN) between a DBMS and clients. This method works well for all DBMS systems which provide database trigger functionality. Asynchronous data change notification (ADCN) between database server and clients can be realized by combining the use of a database trigger mechanism, which is supported by major DBMS systems, with server processes that use client/server software architectures that are familiar in the accelerator controls community (such as EPICS, CDEV or ADO). This approach makes the ADCN system easy to set up and integrate into an accelerator controls system. Several ADCN systems have been set up and used in the RHIC-AGS controls system.

43 PARTICLE ACCELERATORS↗

FPGA Trigger System to Run Klystrons

The Klystron Department is in need of a new trigger system to update the laboratory capabilities. The objective of the research is to develop the trigger system using Field Programmable Gate Array (FPGA) technology with a user interface that will allow one to communicate with the FPGA via a Universal Serial Bus (USB). This trigger system will be used for the testing of klystrons. The key materials used consists of the Xilinx Integrated Software Environment (ISE) Foundation, a Programmable Read Only Memory (Prom) XCF04S, a Xilinx Spartan 3E 35S500E FPGA, Xilinx Platform Cable USB II, a Printed Circuit Board (PCB), a 100 MHz oscillator, and an oscilloscope. Key considerations include eight triggers, two of which have variable phase shifting capabilities. Once the project was completed the output signals were able to be manipulated via a Graphical User Interface by varying the delay and width of the signal. This was as planned; however, the ability to vary the phase was not completed. Future work could consist of being able to vary the phase. This project will give the operators in the Klystron Department more flexibility to run various tests.

43 PARTICLE ACCELERATORS↗

Distributed Timing and Triggering Control System

This document is a slide show type presentation regarding the need and realization of a new control system for work at the Nevada National Security Site. Commercial products that met the need are identified, both hardware and software. Particular emphasis is on the Integrated Signal Programmer.

42 ENGINEERING↗