Search NASA⌕ Search

SEARCH · Search NASA

Results for “state regulatory commissions”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

State Regulatory Opportunities to Advance Distributed Energy Resource Aggregations in Wholesale Markets

The report discusses how state regulators can promote the participation of DERs in wholesale markets, including complementary actions that they can take to support Federal Energy Regulatory Commission Order 2222 implementation. It also summarizes wholesale market operators’ Order 2222 compliance and associated compliance challenges along with potential state regulator roles. The report identifies actions that state regulators can take to accelerate DER aggregations providing grid services.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Energy Resilience Reference Guide Chapter One: Developing A Shared Definition of Energy Resilience

The NARUC Resilience Reference Guide is envisioned as a one-stop primer for state public utility commissions (PUCs) to assist in the development of a shared language, valuation framework, and educational tool on the topic of energy resilience. The resilience of the energy system has increasingly become part of commissions’ regulatory scope so informed decisions are made regarding how to best enhance system resiliency. Several states have already established evaluative resilience criteria (via legislative statute or regulatory directive). This guide is intended to summarize many of the critical topic areas within energy resilience and to facilitate adoption of resilience valuation frameworks by which PUCs can weigh investment decisions regarding energy system resiliency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Energy Resilience Reference Guide Chapter Two: Developing a Shared Framework to Value Resilience Investments

The NARUC Resilience Reference Guide is envisioned as a one-stop primer for state public utility commissions (PUCs) to assist in the development of a shared language, valuation framework, and educational tool on the topic of energy resilience. The resilience of the energy system has increasingly become part of commissions’ regulatory scope so informed decisions are made regarding how to best enhance system resiliency. Several states have already established evaluative resilience criteria (via legislative statute or regulatory directive). This guide is intended to summarize many of the critical topic areas within energy resilience and to facilitate adoption of resilience valuation frameworks by which PUCs can weigh investment decisions regarding energy system resiliency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Energy Resilience Reference Guide, Chapter Three: Climate Resilience Strategies for Regulators

The NARUC Energy Resilience Reference Guide is envisioned as a one-stop primer for state public utility commissions (PUCs) to assist in the development of a shared language, valuation framework, and educational tool on the topic of energy resilience. The resilience of the energy system has increasingly become part of commissions’ regulatory scope so informed decisions are made regarding how to best enhance system resilience. Several states have already established evaluative resilience criteria (via legislative statute or regulatory directive). This guide is intended to succinctly summarize many of the critical topic areas within energy resilience and to facilitate adoption of resilience valuation frameworks by which PUCs can weigh investment decisions regarding energy system resiliency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

State Spotlight on Resilience: The Michigan Public Service Commission and Data Informed Accountability

Resilience activities are an emerging area within regulatory utility policy. As resilience frameworks develop, many Public Utility Commissions (PUCs) are looking to initiate resilience activities and have identified enhancing grid reliability as a practical starting point. Reliability describes the grid’s ability to deliver electricity steadily and without interruptions under normal or “blue sky” conditions. Reliability is measured using industry standard metrics such as outage frequency (SAIFI) and outage duration (SAIDI). Resilience is broader, reflecting the grid’s ability to both withstand and recover from disruptions, particularly those caused by extreme events such as severe storms. A reliable grid minimizes routine disruptions; a resilient grid ensures the system can recover quickly when disruptions occur, preventing them from escalating into widespread or prolonged crises.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Closed-Loop Pumped Storage Hydropower Resource Assessment for the United States. Final Report on HydroWIRES Project D1: Improving Hydropower and PSH Representations in Capacity Expansion Models

Pumped storage hydropower represents the bulk of the United States' current energy storage capacity: 23 gigawatts (GW) of the 24-GW national total (Denholm et al. 2021). This capacity was largely built between 1960 and 1990. PSH is a mature and proven method of energy storage with competitive round-trip efficiency and long life spans. These qualities make PSH a very attractive potential solution to energy storage needs, particularly for longer-duration storage (8 hours or more); such storage will be crucial to bridge gaps in electricity production as variable wind and solar production continue to comprise an ever-larger portion of the United States' energy portfolio (Cole et al. 2021; Frazier et al. 2021). However, it is unclear how much potential the United States has for the development of new PSH. No new large PSH has been constructed in the United States since the 1990s, and attempts to quantify technical potential capacity from PSH project applications to the Federal Energy Regulatory Commission (FERC) suffer from inconsistent site and cost evaluation methodologies and likely are not representative of all PSH opportunities. This study seeks to better under understand the technical potential for PSH development in the United States by developing a national-scale resource assessment for closed-loop PSH. Individual sites are not modeled in sufficient detail for project-level development, but they do provide valuable insights into potential resource areas across the United States, including the ability to provide estimates for a range of long-term development scenarios.

13 HYDRO ENERGY↗

Bulk Power System Flow Control

On July 28, 2023, the Federal Energy Regulatory Commission (FERC) issued Order Number 2023, targeting an improved generation-interconnection process in the United States. FERC Order No. 2023 requires transmission providers to evaluate transmission technologies, other than network expansion, that could provide system improvements and help expand bulk-power system capacity. Transmission providers must consider technologies that would fall under the category of Grid Enhancing Technologies (GETs), which provide capacity-expansion options other than conventional transmission expansion.

32 - ENERGY CONSERVATION, CONSUMPTION, AND UTILIZA↗

Environmental Impacts of Closed-Loop Pumped Storage Hydropower

The goal of this report is to help license applicants, resource agencies, and other members of the hydropower community involved in closed-loop pumped storage hydropower permitting and licensing process, focus the scope of environmental reviews, and more quickly identify impacts with project nexus and potential mitigation measures for these impacts. Pumped storage hydropower (PSH) is an energy storage technology that uses energy to pump water up from a lower reservoir to an upper reservoir where water is stored until electricity is needed and the water is released to a lower reservoir passing through turbines. Closed-loop PSH—PSH that is not continuously connected to a naturally flowing water feature—is one of the lowest greenhouse gas emitting energy storage technologies and is therefore a critical part of the transition to renewable energy (Simon et al. 2023). Proposals for closed-loop PSH facilities in the United States currently account for more than 40% of original licenses and 99% of potential generation capacity in the Federal Energy Regulatory Commission (FERC) hydropower licensing pipeline (Johnson et al. 2023). While closed-loop PSH facilities can have lower environmental impacts than open-loop PSH facilities, no closed-loop facilities have been constructed in the United States to enable direct accounting of project impacts and efficacy of mitigations. Many proposals for closed-loop PSH submitted to FERC are abandoned early in the permitting and licensing process prior to license applications and environmental assessments, so there is little documentation describing potential project impacts and proposed mitigations. The newness of closed-loop PSH proposals in the United States may mean that tribal, federal, and state agencies with authorities for cultural and natural resources protection and management involved in the FERC licensing process may not have experience with closed-loop PSH regulation. Moreover, many proposed closed-loop PSH facilities are in areas that do not have high concentrations of conventional hydropower, so these agencies may also be unfamiliar with the FERC hydropower licensing process. The goal of this report is to help license applicants, resource agencies, and other members of the hydropower community focus the scope of environmental review for the closed-loop PSH development, licensing, and federal authorization process enabling quicker identification of potential impacts, mitigations, and situations where mitigation may not be possible. We found that environmental impacts of closed-loop PSH are highly site-specific, and generalizations about the types of environmental impacts across closed-loop PSH projects are difficult to make. Environmental impacts of closed-loop PSH are like those for open-loop PSH with a few exceptions including water sourcing, which can lead to delays and contention due to potential complexities with water rights, impacts to aquatic resources, and greenhouse gas emission potential. Cultural resource impacts were commonly reported in National Environmental Policy Act (NEPA) documents reviewed and discussed in interviews, but in many cases such impacts cannot be mitigated.

13 HYDRO ENERGY↗

Preliminary Plan for Evaluation of Reactor Pressure Vessel Surveillance Materials from Palisades Nuclear Generating Station

The Palisades Nuclear Generating Station (PNGS), located in Michigan, is owned and operated by Entergy. It is a Combustion Engineering 2-loop pressurized water reactor (PWR) producing 805 MWe (2,565 MWth). The PNGS was built between 1967 and 1970, with approval to operate at full power in 1973; the plant’s original license was due to expire on March 24, 2011. An application for 20-year extension was filed in 2005 with the Nuclear Regulatory Commission and was granted on January 18, 2007. Although the plant was scheduled for decommissioning by 2031, Entergy currently plans to close the PNGS in 2022. The PNGS included in its reactor pressure vessel (RPV) surveillance program a capsule, designated A-60, containing specimens of one of the vessel plates and a weld metal with nickel content of about 1.36 wt% and copper content of about 0.20 wt%. This capsule was irradiated to a fluence of 1.8 x 10 20 n/cm 2 . The capsule was removed from its surveillance position in 1995 and has been resident in the spent fuel pool since that time. The material is also of special interest because of its very high nickel content and because of the potential for development of NiMnSi (nickel-manganese-silicon) precipitates, dubbed “late blooming phases.” The surveillance program also includes a capsule, designated T-150, dedicated specifically for thermal aging, which would provide results for at least 33 effective full power years, which is beyond the current thermal-aging database for such materials. Given that license extensions to 60 years of operation have been approved by the US Nuclear Regulatory Commission for most of the currently operating light water reactors in the United States, and that the first extension to 80 years was recently approved, there exists the probability that some RPVs will reach and possibly exceed a fast neutron fluence (> 1 MeV) of 1 x 10 20 n/cm 2 . This is a fluence regime with no US surveillance data and very little test reactor data, except for the Light Water Reactor Sustainability Program–sponsored University of California Santa Barbara Advanced Test Reactor (ATR) ATR-2 project. Thus, the materials in the A-60 capsule represent a valuable resource for directly exploring the effects of commercial surveillance irradiation on a typical plate and a high-nickel weld with similar materials irradiated in the ATR-2 test reactor project. This report provides background information for the surveillance program, previous results of surveillance materials testing, the preliminary plan for capsule retrieval and disassembly, and the plan for testing and microstructural examination of the mechanical test specimens of these unique materials to assess the features induced by very high irradiation fluence or very long thermal aging time

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Resource Adequacy for State Utility Regulators: Current Practices and Emerging Reforms

This report was developed by staff in the National Association of Regulatory Utility Commissioners (NARUC) Center for Partnerships and Innovation (CPI). Additional support was provided from commissioners, commission staff, and other technical experts to provide foundational information for state utility regulators on the evolving nature of resource adequacy for the electric system. With the changing nature of the system, state commissioners will continue to play a vital role in their respective jurisdictions. Their roles in overseeing resource decisions are growing in complexity, with consideration for customer costs, state and federal environmental requirements, extreme weather events, fuel supply limitations, generation retirements, shifting requirements for system operators, and growing levels of intermittent and energy-limited resources (e.g., wind, solar, and battery storage). Reliability concerns continue to be an urgent and immediate priority for utility regulators in most parts of the United States. The information in this report is designed to support state commissioners and their respective staff members as they navigate an evolving resource adequacy landscape to maintain reliability amidst a rapidly changing system.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Alaska Liquid Natural Gas Pipeline Front-End Engineering & Design (Final Technical Report)

The Alaska Gasline Development Corporation (AGDC) is Alaska’s natural gas infrastructure development corporation established in 2013. AGDC’s mission is to maximize the benefit of Alaska’s vast North Slope natural gas resources for Alaskans through the development of infrastructure necessary to move the gas into local and international markets. AGDC was identified for a Congressionally Directed Spending (CDS) project for funding in the Energy and Water Development and Related Agencies Appropriations Act, 2023 under the heading: “Congressionally Directed Energy Efficiency and Renewable Energy Projects.” The CDS included $\$$4,000,000 of direct funding, with required match funds, to move the project forward. Alaska’s North Slope holds America’s largest proven and conventional natural gas supply. The integrated Alaska LNG Project will deliver 3.5 billion cubic feet of natural gas per day from Alaska’s North Slope gas fields to Alaskans as well as to a marine terminal located at tidewater in Cook Inlet. Alaska LNG is an integrated gas infrastructure project with three major components: a gas treatment plant (GTP) located at Prudhoe Bay, an 807-mile (1,287 km) gas pipeline (Mainline Pipeline) to Southcentral Alaska with interconnections for in-state gas use, and a natural gas liquefaction facility (LNG Facility) in Nikiski, Alaska. The integrated Alaska LNG Project has several strategic advantages including proven gas resources, existing upstream infrastructure, an advantageous arctic climate for LNG production, proximity to LNG markets, a track record of reliability from a state that first began exporting LNG to Japan in 1969, and broad support from Alaskans. North Slope natural gas is a conventional resource and can be produced with minimal drilling at a fraction of the carbon dioxide emissions of shale gas from the Lower 48 states. Through the development of the Alaska LNG Project, Alaska can provide energy security to Alaskans and a stable source of LNG to the Asia-Pacific region for generations. The Alaska LNG Project has been progressed through Pre-Front-End Engineering Design (Pre-FEED) and has obtained all major federal and State of Alaska permits and authorizations to construct the project, including the Federal Energy Regulatory Commission (FERC) Order Granting Authorization Under Section 3 of the Natural Gas Act. On September 5, 2024, the U.S. Department of Energy (DOE), National Energy Technology Laboratory (NETL) awarded Project No. DE-FE0032307 to AGDC with the objective to progress the project to Front-End Engineering Design (FEED) entry for the Alaska LNG Project Phase 1 Pipeline. The award Start Date was made effective July 1, 2023, with a Period of Performance through June 30, 2025. On March 27, 2025, AGDC announced the execution of definitive commercial agreements with Glenfarne Alaska LNG, LLC, an affiliate of Glenfarne Group, LLC, (together as “Glenfarne”), to lead the development of the Alaska LNG Project and enter FEED for the Phase 1 Pipeline. Project activities are now funded and directed by this private sector partner who holds a 75% interest in 8 Star Alaska, LLC (8 Star). 8 Star holds the assets of the Alaska LNG Project. As planned, AGDC continues to hold 25% minority interest in 8 Star and will play a governance role moving forward with Alaska LNG. This definitive commercial agreement milestone led to the successful completion of AGDC’s Statement of Project Objectives (SOPO) for FEED entry and led to the completion of DOE Project No. DE-FE0032307. At conclusion of the SOPO, AGDC also reached the award’s maximum federal cost share of $\$$4,000,000. AGDC is, therefore, providing Final Technical Report to close out DOE Project No. DE-FE0032307.

02 PETROLEUM↗

A Comparison of RESRAD and GoldSim Models for Assessing Radiological Dose for a RCRA Landfill - 20418

US Ecology Idaho (USEI) operates a Resource Conservation and Recovery Act (RCRA) Subtitle C, Hazardous Waste Treatment, Storage, and Disposal (TSD) Facility on a 640-acre property in Owyhee County, Idaho. USEI accepts a wide variety of RCRA-exempt low activity radioactive wastes, including naturally occurring radioactive material (NORM) and technologically enhanced NORM (TENORM) (USEI 2009). The performance of the landfill with regard to radiological operating permit requirements was previously assessed using a model constructed with the residual radioactivity (RESRAD) computer program, developed by Argonne National Laboratory for the U.S. Department of Energy (DOE). RESRAD supports the evaluation of several environmental transport pathways related to a radionuclide-contaminated soil source term, but it was not conceived as a model for the evaluation of landfill radiological performance. A more comprehensive and realistic model is desired in order to better support submissions to both the State of Idaho's Department of Environmental Quality as well as the U.S. Nuclear Regulatory Commission. A Performance Assessment (PA) computer model was developed using GoldSim software for the USEI RCRA Subtitle C landfill. The RESRAD computer model was specifically developed for calculating soil cleanup criteria and radiological dose and cancer risk from residual radioactive material in soil. To evaluate site-specific conditions, users may select from among a number of available environmental transport and exposure pathways and modify 'default' parameter values. In GoldSim, a user must construct the model 'from scratch.' However, this modeling is facilitated by a number of specialized elements available in GoldSim to support a radiological mass transport model. These include elements for defining radiological decay and ingrowth, container failure and radiological release, advective and diffusive transport, and other processes. Advantages afforded by the use of RESRAD for modeling radiological dose for a RCRA Subtitle C landfill include ease of use and reasonable flexibility in specifying site-specific conditions. GoldSim allows for considerably more flexibility and site-specificity than RESRAD, including evaluation of potentially relevant environmental transport processes not supported in RESRAD. The probabilistic modeling capabilities of GoldSim also far exceed those of RESRAD. The pros and cons of RESRAD and GoldSim for this modeling problem are explored with a focus on identifying approaches and critical factors in identifying the appropriate platform. The capabilities of RESRAD and GoldSim for mathematically modeling the disposal system will be contrasted and compared. For example, the existing RESRAD radiological safety assessment evaluated potentially complete exposure pathways related to infiltration to groundwater and upwards diffusion of radon. Additional transport pathways identified in the USEI Idaho facility Conceptual Site Model include deposition of radon decay products in cover material, root uptake of radionuclides in disposed wastes by native plants, and mixing of cover material by burrowing animals. Results of the two models and how the different transport and dose pathways affect results will be discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Degradation and Failure Phenomena of Accident Tolerant Fuel Concepts: FeCrAl Alloy Cladding

The U.S. Nuclear Regulatory Commission (NRC) is anticipating licensing applications and commercial use of accident tolerant fuel (ATF) in United States commercial nuclear power reactors. Pacific Northwest National Laboratory is providing technical assistance to the NRC related to the newly proposed nuclear fuel and cladding designs. This report focuses specifically on the iron-chromium-aluminum (FeCrAl) alloys being investigated to replace zirconium-based alloys for fuel cladding and provides current state-of-the-industry information on material properties and fuel performance considerations under reactor operating conditions and design basis accident conditions. Currently, Global Nuclear Fuels (GNF) is the only U.S.-based fuel vendor considering FeCrAl cladding as a near-term ATF design. GNF has tested several different FeCrAl alloys including Kanthal APMT, C26M, and MA956; fueled C26M rods and unfueled Kanthal APMT, C26M, and MA956 rods have been inserted in lead test assemblies at Plants Hatch and Clinton. This report will focus on those three alloys specifically, with broader information given regarding in-reactor and ex-reactor testing of FeCrAl alloys. To support the NRC’s readiness efforts, this report will identify and discuss degradation and failure modes of FeCrAl cladding concepts, including fuel performance characteristics that may not be addressed within existing regulatory documents.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Onshore U.S. Carbon Pipeline Deployment: Siting, Safety, and Regulation

Carbon capture, utilization, and storage (CCUS) technology has significant potential to reduce greenhouse gas (GHG) emissions and mitigate the impact of climate change, particularly in hard to decarbonize industrial and commercial sectors. CCUS involves capturing carbon dioxide (CO 2 ) from industrial processes or power generation and utilizing it for other purposes, such as enhanced oil recovery (EOR), or storing the captured CO 2 underground. CCUS technology can reduce the environmental impact of continued fossil fuel use while smoothing the transition to a low-carbon economy. CCUS can create new economic opportunities, such as the development of new industries and job creation, and can enhance energy security by diversifying energy sources. For these reasons, enabling CCUS has become a key objective of the Biden-Harris administration’s clean energy policy and has received bipartisan support. Despite its environmental and economic potential, CCUS faces multiple barriers to widespread deployment. One of the main challenges is the high cost and technical difficulty of implementing and operating large-scale CCUS infrastructure. CCUS remains a relatively expensive way to reduce carbon emissions (e.g., compared to solar photovoltaic technology’s displacement of coal generation). Additionally, financial incentives and supportive policies like those enacted to support solar photovoltaic development, especially at the state level, are inconsistent or nonexistent, which can discourage investment in CCUS projects. There are also technical challenges associated with safe and secure underground CO 2 storage and the development of new carbon utilization technologies. Public opposition to various aspects of CCUS technologies, ranging from concerns that CCUS will extend reliance on fossil fuels to CCUS infrastructure being sited in disadvantaged communities, is a growing challenge. This paper focuses on another significant barrier to broad CCUS deployment: the need for considerable expansion of the dedicated land-based CO 2 pipeline network in the United States to meet CCUS goals and the unique regulatory challenges to its development. To reach carbon emissions targets in the United States by 2050, CCUS technology will need to be supported by tens of thousands of miles of CO 2 pipelines. Estimates range from a minimum of roughly 29,000 pipeline miles (according to a 2020 Great Plains Institute study) to 66,000 pipeline miles (as per a 2021 Princeton University–led study). As of October 2022, however, the U.S. Department of Transportation (U.S. DOT) reports fewer than 5,400 miles of U.S. pipelines carrying CO 2 . This deficit—and what it means for the prospect of moving substantially larger quantities of CO 2 from source to use or storage—threatens to stifle the development of CCUS projects and technologies identified as an important tool to meet emissions targets. The current regulatory landscape facing CO 2 pipeline development can best be described as uncertain. At the federal level, the U.S. DOT Pipeline and Hazardous Materials Safety Administration (PHMSA) oversees safety regulation of pipelines transporting hazardous materials, including CO 2 upon commencement of operation. However, PHMSA’s definition of CO 2 as “a fluid consisting of more than 90 percent CO 2 molecules compressed to a supercritical state” has not been updated since its 1991 addition to the Federal Register. Because CO 2 can be transported in a gaseous, liquid, or supercritical state (indeed, the physical state of CO 2 can fluctuate within a single pipeline due to environmental changes), doubts persist about the extent of PHMSA’s purview—and raise questions about what, if anything, states should do to address this apparent gap. PHMSA has begun a major revision of its existing rules, but the agency does not expect a first draft before 2024. Economic oversight of CO 2 pipelines is even less clear. The Federal Energy Regulatory Commission (FERC) and Surface Transportation Board (STB)—which regulate the rates of interstate oil/natural gas and non-energy pipelines, respectively—have both declined jurisdiction over interstate CO 2 pipelines. This presumably leaves economic regulation to state and/or local governments, but few if any states have the laws or resources in place to oversee just and reasonable rates. Further, the interstate nature of CO 2 pipeline development creates questions around how different states should align their rate-making decisions. Onshore U.S. Carbon Pipeline Deployment: Siting, Safety, and Regulation Currently, regulatory responsibilities regarding CO 2 pipeline siting and permitting fall to state and local governments. The variety of laws and regulations across the country, however, creates a maze of requirements for pipeline developers to navigate. To secure necessary permits, most states require pipeline companies to be “common carriers” that provide transport service to the public at uniform rates. However, the specific definition of that term varies. Some states require clear evidence that a pipeline services the public, while others automatically deem any pipeline company transporting energy products or hazardous materials to be a “common carrier”—with little consideration for accessibility to third parties. Other states have eschewed common-carrier terminology entirely, placing private and publicly accessible pipelines on equal footing. Much like the variation in common-carrier requirements, laws governing eminent domain authority to secure rights-of-way (ROW) to commence construction on a planned pipeline route differ by state. Several states have no laws or rules governing CO 2 pipelines. In addition to creating questions about whether long-standing rules for other pipelines (e.g., natural gas or petroleum products) apply to CO 2 , this policy vacuum leaves local governments as the sole authority over sections of pipe within their boundaries. With dozens of counties along a given route, the probability of inconsistent regulation of the same pipeline is significant. Even in states with CO 2 pipeline laws in place, local regulatory attempts to address rising concerns over pipeline routing and safety have triggered lawsuits by pipeline companies seeking to delimit areas of federal, state, and local government responsibility. Meanwhile, legislators across the country have introduced bills to restrict the application of eminent domain to CO 2 pipeline projects, which could threaten a key means of securing ROW that companies cannot secure through negotiation with landowners. Taken separately, any of these regulatory issues—the narrow federal definition of CO 2 , FERC’s and STB’s decisions that CO 2 pipelines are not within their jurisdiction, and the considerable variation in state and local governments’ laws regulating CO 2 pipeline technologies—are extremely difficult to resolve. Adding the required scale of CO 2 pipeline expansion and the currently identified narrow window of time in which to reach climate target goals, the task becomes even more difficult—and raises a host of urgent questions for regulators. How should CO 2 be defined in federal regulations to ensure consistent safety standards across the country? What is the potential impact radius of a CO 2 pipeline rupture, and how should that inform local emergency response? In the absence of centralized federal oversight, what should state legislatures do to increase alignment for interstate CO 2 pipeline projects? This paper intends to serve as a primer for regulators and stakeholders who seek to better understand the regulatory challenges and opportunities facing this critical infrastructure.

42 ENGINEERING↗

Use of Flooding Probabilistic Risk Assessment

General slide information on using flooding Probabilistic Risk Assessment (PRA) taken from published INL reports or public Nuclear Regulatory Commission (NRC) information. Topics covered are: SDP related to flooding in US Door integrity tests at Idaho State University Smoothed Particle Hydrodynamics for external flooding NRC-INL Flood Barrier project

99 GENERAL AND MISCELLANEOUS↗

The Role of State Utility Regulators in a Just and Reasonable Energy Transition: Examining Regulatory Approaches to the Economic Impacts of Coal Retirements

The ongoing trend of coal retirements has disproportionately affected the socioeconomic health of communities where power plants are located. For many public utility commissions, these impacts have led to important questions around the scope of PUCs’ statutory authority to analyze, consider and mitigate losses to host communities within their role as utility regulators. Due largely to variations in state legislative charges, commissions have taken different approaches to articulating what lies within the public interest.This report examines the authority of PUCs across the country to consider non-energy economic impacts beyond direct ratepayer effects, and summarizes approaches that PUCs, utilities and other stakeholders have used to mitigate the economic fallout of coal retirements, specifically.

01 COAL, LIGNITE, AND PEAT↗

Update on Radiochemical Assessment of High Burnup Commercially Irradiated Fuel

This work documents an effort to collect burnup measurements on a high burnup rod, designated 6XV, and first cycle accident tolerant fuel (ATF) rod, designated 47I, to enable benchmarking of fuel performance codes and neutronics codes. In addition to measurements, Virtual Environment for Reactor Applications (VERA) full-core-depletion analysis was also performed for the rods that were experimentally analyzed to provide an opportunity for code validation. This effort focuses on collecting data from rods irradiated at Byron Generating Station and shipped to the Oak Ridge National Laboratory (ORNL) hot-cells. This data will also anchor non-destructive examination evaluations of burnup of the various fuel rods undergoing postirradiation examination (PIE) at ORNL. Previous PIE of these fuel rods provides some guidance on the burnup trend across the fuel. Axial gamma spectroscopy scans provide a measure of relative changes in burnup across a fuel pin. Mass spectrometry based burnup measurements performed for this work at specific axial locations in the fuel are fully quantitative. By combining the mass spectrometry data with the gamma scans it is possible to more quantitatively evaluate axial variations in burnup across the entire fuel pin [1]. The combined set of burnup evaluations will be made available to other organizations that have an interest in high burnup radiochemistry data for validation of neutronic simulations and source term evaluation such as the Nuclear Regulatory Commission (NRC).

Harp, Jason [Oak Ridge National Laboratory (ORNL),↗

Transport Modeling of As-Run ATR Cycles to Support U-10Mo Research Reactor Fuel Qualification Experiment

The Department of Energy’s (DOE) Office of Materials Management and Minimization has been tasked with converting the five remaining United States High Performance Research Reactors (U.S. HPRR) from highly enriched uranium to low-enriched uranium. The Nuclear Regulatory Commission (NRC) regulates Massachusetts Institute of Technology Reactor (MITR), Missouri University Research Reactor (MURR), and National Bureau of Standards Reactor (NBSR); and DOE regulates the High Flux Isotope Reactor and Advanced Test Reactor (ATR). To meet the high demands of these reactors, the U.S. HPRR program has chosen to use 90% uranium - 10% molybdenum (U-10Mo) monolithic fuel. This plate-type fuel will undergo multiple irradiation experiment campaigns in ATR, from mini-plates to full element tests, over a large range of operating conditions. This will provide data in support of the fuel qualification of each reactor. This summary focuses on the as-run neutronic analysis of the first series of mini-plate (MP-1) experiments, which have been irradiated in the ATR. MP-1 experiment’s main goal is to demonstrate the fabrication process and meet the fuel irradiation performance requirements with primary focus on the fuel plates associated with the three NRC reactors, with a small focus on the low power requirements of the ATR fuel. The MP-1 experiments are planned to be the basis of the monolithic U-10Mo fuel for qualification through the NRC.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗