Search NASA⌕ Search

SEARCH · Search NASA

Results for “system thermal test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Integrated Heat Exchanger-Phase Change Material Thermal Energy Storage System

The purpose of this study is to experimentally investigate the thermal performance of an innovative thermal energy storage (TES) system that combines the advantages of the phase-change material (PCM)/graphite foam latent heat TES medium developed at Argonne National Laboratory (Argonne) and the internally supported plate-fin (ISPE) cell architecture heat transfer fluid (HTF) flow channels developed at Brayton Energy (Brayton). Several essential tasks were accomplished: (1) Thermal property characterization. Thermal properties of the graphite foam were characterized, providing necessary data for experimental result analysis and numerical simulation. (2) Design and optimization of lab-scale test module. Based on Brayton’s full-scale heat exchanger (HX)-TES system, the experimental test module was designed, optimized, and fabricated. (3) Thermal performance testing and data analysis. Five cycle tests were successfully conducted—including one with approximately 3.5 psig of pressure applied to the diaphragms—to investigate the thermal performance of the experimental test module for charging and discharging. Temperature profiles were generated for each charging test and discharging test as a function of time. The temperature profiles clearly show three TES stages: sensible heat (temperature increase), latent heat (melting), and sensible heat (temperature increase) for the charging process. Similarly, the temperature profiles clearly show three thermal energy release stages: sensible heat (temperature decrease), latent heat (solidification), and sensible heat (temperature decrease). Melting and solidification of the PCM generally occurred in relatively narrow temperature ranges, indicated by the flattened temperature regions in the temperature profiles. These phase changes ranged approximately 3°C for melting and 3.5°C for solidification. The charging and discharging temperature profiles were similar for similar experimental parameter tests whether or not pressure was applied to the diaphragm to eliminate the gap between the HX surface and the TES subsystem. This indicates that the effect of a small gap between the HX surface and the TES subsystem is insignificant for charging and discharging. (4) Comparison of experimental data and simulation results. We compared the experimental data to the numerical simulation results. Numerical simulations were conducted by using the ANSYS FLUENT 2019 R3 commercial computational fluid dynamics software. The predicted phase-change times agreed reasonably well with those from the experimental data. In most cases, the estimated time differences between the relative phase changes were within 16%. The predicted start and end times for the charging process agreed well with those from the experimental data. However, the simulation results showed earlier start and end times than the experimental data for the discharging process. Overall, the experimental data and its comparison with the simulation predictions verified the technical viability of the integrated ISPF HX-PCM/graphite foam latent-heat TES system.

25 ENERGY STORAGE↗

Characterization of compositional variation and solidification condition on rapid solidification behavior of beta stabilized titanium

Rapid solidification (RS) is a field of study that has increased in importance due to the rise of additive manufacturing (AM) techniques. The breakdown of equilibrium at the solid-liquid interface results in an inability to use traditional solidification models that have been applied to great success in casting. As such, there is a current need for a high-throughput testing method to screen alloys at rapid solidification conditions without the significant cost for powder atomization. In this work, twin hammer splat quenching (SQ) is utilized and theoretically developed as a technique uniquely placed to test alloy systems for AM applications. Using analytical thermal spray models and numerical heat transfer simulations, the cooling rate and solidification conditions of splat quenching are compared across several parameters to evaluate the key parameters for generating cooling rates relevant to AM process. Once a framework for the cooling rates and relevancy of SQ are developed, SQ was used to process alloy compositions in the Ti5553 alloy space (AMS 7026) to study the formation of detrimental secondary phases occurring upon rapid quenching from the melt. A martensitic phase is found to occur at the lower end of the standard, but the composition listed in the standard were found to be safe. Finally, the rapid solidification behavior of Ti-5553 is evaluated by comparing splat quenching, laser welding, and plasma atomization that offer a wide window of solidification conditions. The segregation and solidification structure are analyzed and compared to models to provide a deeper understanding of the solidification behavior of beta stabilized titanium alloys.

Williamson, Christopher J.↗

Nonnuclear Experimental Capabilities to Support Design, Development, and Demonstration of Microreactors

This work provides a summary of selected experimental capabilities being developed to support nonnuclear testing and demonstration of technology in support of microreactors under the U.S. Department of Energy’s (DOE’s) Microreactor Program. Major capabilities include the Single Primary Heat Extraction and Removal Emulator (SPHERE) and the Microreactor Agile Non-nuclear Experimental Test Bed (MAGNET). The SPHERE facility allows for controlled testing of the steady-state and transient heat rejection capabilities of a single heat pipe using electrical heaters that simulate nuclear heating. The facility is capable of monitoring axial temperature profiles along the heat pipe and surrounding test articles during startup, steady-state operation, and transients. Instrumentation includes noncontact infrared thermal imaging, surface thermocouples, spatially distributed fiber optic temperature and strain sensors, electrical power meters, and a water-cooled, gas-gap calorimeter for quantifying heat rejection from the heat pipe. The facility can be operated under both vacuum and inert-gas conditions. The MAGNET facility is a large-scale, 250-kW electrically heated microreactor test bed to enable nonnuclear experimental evaluation of a variety of microreactor concepts. It can be supplied to electrically heat a scaled section of a microreactor and further test the capabilities of heat rejection systems. The initial MAGNET experiments will support technology maturation and reduce uncertainty and risk associated with the design, operation, and deployment of monolithic heat pipe–based reactors. However, this test bed can broadly be applied to multiple microreactor concepts to evaluate a wide range of thermal-hydraulic and structural phenomena such as interface coupling with power conversion units and other collocated systems. MAGNET can evaluate integral thermomechanical effects during electrical heating of an array of heat pipes in a larger test article. Examples of initial testing will include thermal stresses in the monolith and the impact of debonding of a heat pipe from the core block and how that failure could impact surrounding heat pipes, i.e., understanding the potential for cascading failure. This work also discusses some modeling capabilities that can support experiment design, analysis, and interpretation, including the heat pipe code Sockeye and a comparison of thermal-structural simulations performed using ABAQUS and STAR-CCM+.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Improvement of Coal Power Plant Dry Cooling Technology through Application of Cold Thermal Energy Storage

The U.S. power infrastructure is currently heavily reliant on water cooling. The power plants in the U.S. account for approximately 40% of freshwater withdrawals, with 90% of it used in condenser cooling. The most used cooling technology in coal-fired power plants is a once-through condenser; however, this cooling method requires high water withdrawal rates and results in thermal pollution of the water source. Wet WCTs offer an alternative to once-through condensers due to much lower water withdrawals. However, these systems suffer from water consumption through evaporation making them undesirable options in areas subject to droughts and in arid areas. The direct dry cooled condensers (ACCs) and dry cooling towers (DCT) account for 1.8%, hybrid cooling (ACC + WCT) accounts for 0.5%, while other cooling technologies represent the rest (0.7%). The ACC/DCTs represent an attractive alternative for power plants; however, this technology has not been widely adopted in the US (less than 2% of power plants) due to its negative impact on plant performance. As a rule of thumb, dry cooling results in performance penalty equivalent to approximately 2%-point efficiency loss compared to wet cooling, although the actual magnitude varies with ambient dry bulb temperature, DBT which may vary considerably during the day. As DBT increases, the plant power output decreases, reaching a minimum at the hottest period of the day, which usually coincides with the highest electricity demand for air condition load. Therefore, performance of power plants using DCT/ACC cooling technology is the lowest during the summer mid-day when ambient temperature is the highest. For example, the decrease of the inlet air temperature to the DCT/ACC by 2 Deg C could generate up to 5% additional power at peak demand. It is, therefore, important to improve dry cooling technology to maintain the viability of coal-fired power plants in a carbon constrained future. The method for reducing the cooling air temperature and keeping it constant would mitigate this problem significantly. Objectives of this project were to develop, design, evaluate, and demonstrate a cost-effective system for improving performance of a DCT or ACC for thermal (coal-fired) power plant applications using a low-cost heat storage materials, such as pervious concrete (PC) and phase change material (PCM). Thus, the study focused on development of the system(s) that could be used to alleviate the difficulties in operating DCT/ACC during the summer months by storing cold energy during the nighttime in inexpensive materials PC and PCM and using it during the hottest period(s) of the day. Since very large quantities of cold energy need to be stored to make an impact on performance of a large power plant, it is essential that the storage materials and associated cold energy storage design(s) are inexpensive and the system is simple to build, maintain and operate. To achieve the project objectives, a comprehensive approach, including material development and characterization, component and system modeling, and laboratory- and prototype-scale experiments, was employed including modeling of the system components and of the entire system, development (engineering) of the materials for the heat storage modules of the Cold Thermal Energy Storage System (CTESS) and determination of their properties, design, manufacturing and setup of the laboratory- and prototype-scale test facility and testing, design, manufacturing and setup of the prototype-scale test facility. A modular design of CTESS was employed, where representative modules were designed as the integrated direct contact heat exchanger and thermal energy storage (TES) system. CTESS modules were manufactured and tested. Two prototype-scale designs of the CTESS modules were developed and tested. The use of CTESS increases plant generation increases since it lowers air temperature entering ACC/DCT and keeps it constant during the hottest time of the day. For a PCM-based CTESS, the ambient air temperature is lowered close to the PCM phase change temperature. The duration of the cooling effect depends on the latent heat and mass of PCM in the CTESS. For this project, commercial grade CaCl2 hexahydrate (CaCl2·6H2O or CC6) PCM with phase change temperature of 25 Deg. C was used due to its low cost. For practical reasons, the CTESS was designed to maintain the cooling effect for four hours. The low phase change temperature associated with the commercial grade PCM used in CTESS results in considerably higher improvement in net generation compared to the laboratory (pure) grade. The resistance to heat transfer results in lower net generation compared to the ideal case where resistance to heat transfer is zero. The results demonstrate that CTESS is effective in improving the performance of a dry cooling system. However, its effectiveness depends on the relationship between the ambient air conditions and PCM phase change temperature. As is the case with the heat rejection system, for the best performance, the PCM used in CTESS would need to be matched to the ambient air conditions. The results obtained in this report for selected geographical locations are valid for CC6 and demonstrate that the level of performance to be achieved by the technology will be location-dependent, as is the case with the air cooled condensers. The methodology for engineering of PC-PCM-based heat storage medium is applicable to other PCMs that may need to be used for other ambient air conditions and geographical locations.

01 COAL, LIGNITE, AND PEAT↗

Experimental Operation of a Prototype 750C Advanced Chloride Molten Salt Bellows Valve

To achieve DOE 2030 SunShot targets that reduce the cost of liquid-based solar by an additional 40% to 70% beyond 2018 costs, a more reliable, highly manufacturable flow valve, capable of achieving operational temperatures of >700°C is required [1]. This paper investigates the development of an innovative high-temperature chloride molten salt valve, with operation up to 750°C. This valve is intended to be employed within Gen 3 CSP liquid-based thermal energy storage (TES) systems as well as Gen 4 modular salt reactor (MSR) technologies. This work details the general design and flow testing of a bellows-seal flow control valve (FCV). This design includes an integrated closed-loop thermal control system to ensure robust design for freeze-thaw cycles. The self-contained thermal management STM system, is unique in the salt valve industry since it is an integrated solution to provide a consistent, repeatable alternative to typical heat tracing. Additionally, the design includes the employment of a novel heat pipe valve stem to facilitate enhanced passive thermal management into the valve assembly. This valve stem heat pipe is designed to facilitate natural circulation within the bonnet to ensure robust operation, during both nominal and transient thermal operation. The valve body and trim will be designed using SS316H, consistent with Flowserve Corporation’s existing product base and is code qualified but will utilize clad material for materials corrosion, manufacturing cost reduction and compatibility to ensure design flexibility. A test campaign was performed in this investigation utilizing a novel 750°C ternary chloride (20%NaCl/40%MgCl2/40%KCl by mol. wt. %) molten salt flow loop. A discussion about the design and installation of the valves within this test bed is provided for this investigation. Valve test results from this study assessed Cv curves as well as multiple actuator cycles, under varying thermodynamic and operational mode conditions, which would be characteristic within a commercial molten salt facility. The results indicate nominal operation for the baseline design, though improved performance and reliability is expected with the full designed FCV.

Armijo, Kenneth (ORCID:0000000346832147)↗

Concrete Thermal Energy Storage Enabling Flexible Operation without Coal Plant Cycling

The work described in this report is responsive to the Office of Fossil Energy program “Energy Storage for Fossil Power Generation.” The pilot plant built as a result of this project demonstrated the feasibility and performance of a concrete thermal energy storage (CTES) system integrated with a supercritical coal power plant. The 10 MWh electrical (>25 MWh thermal) CTES unit, developed by Storworks Power, was designed to enable flexible operation of coal plants without cycling damage. The project's key technical achievements showcase a significant advancement in energy storage technology. A modular CTES system using 42 “Bolderblocs” units was successfully designed and constructed at Alabama Power’s Plant Gaston Unit 5, with each block containing embedded stainless-steel coils in specialized, cost-effective high-temperature concrete. The system interfaced seamlessly with the plant's 3500 psig (241 barg), 1000°F (538°C) supercritical steam, demonstrating operational flexibility. Over 86 full cycles, the CTES exhibited rapid charging and discharging capabilities, effectively mimicking steam turbine feed conditions and handling varying load profiles and storage durations. Performance validation confirmed the system's ability to consistently meet design target steam conditions of 75 bar-a and ~400°C for nominal baseline discharge. The concrete material withstood repeated thermal cycling without degradation, validating earlier lab-scale tests. Integration of balance of plant components, including a condensate management system with storage tank and air-cooled condenser, minimized plant interfaces and water consumption. A robust control scheme ensured safe, automated operation across various scenarios. Key learnings from the project were invaluable: 1. Initial concrete drying and commissioning procedures were refined for future deployments, enhancing efficiency in subsequent installations. 2. System flexibility exceeded expectations, with rapid response to changing conditions. 3. Design improvements were identified including optimized insulation and piping that will enhance overall system efficiency in future deployments 4. Full cycle thermal roundtrip efficiencies exceeded 88%. While the roundtrip electrical efficiency was somewhat limited by known challenges using input steam, such constraints may be mitigated by swapping steam for hot air as thermal input. 5. A summary of key performance parameters for the pilot test and predicted performance of a full scale commercial system with specified improvements determined from the pilot are shown in Section 8. The project faced challenges, including COVID-19 delays and host plant availability constraints. However, these were overcome through adaptive planning and execution. The successful management of these obstacles demonstrated the resilience and adaptability of the project team and the robustness of the CTES technology. This successful pilot demonstrates the potential for CTES to enhance coal plant flexibility, supporting grid stability as renewable penetration increases. The validated design and operational data provide a solid foundation for scaling up to utility-scale implementations, potentially transforming how thermal plants operate in evolving energy landscapes. The system's ability to rapidly respond to changing grid conditions while maintaining high efficiency makes it a promising solution for balancing intermittent renewable energy sources. Furthermore, the project highlighted the potential for even greater efficiencies in future iterations. The use of air as an input medium could potentially eliminate the limitations observed with steam input, opening new possibilities for energy storage applications beyond coal plant integration. In conclusion, this pilot project not only achieved its primary goals but also uncovered additional benefits and potential applications of the CTES technology. It represents a significant step forward in addressing the challenges of grid stability and flexibility in an increasingly renewable-driven energy landscape.

01 COAL, LIGNITE, AND PEAT↗

Development of an ERT‐Based Framework for Bentonite Buffers Monitoring From Laboratory Tests: 1. Characterizing Thermal–Hydrological–Mechanical Processes

Abstract Bentonite clay is widely used in engineered barrier systems for the permanent disposal of high‐level radioactive waste due to its low permeability, high swelling capacity, and thermal stability. However, the complex thermal‐hydrological‐mechanical (THM) processes induced by heating from decaying radioactive waste and hydration from surrounding rock can lead to heterogeneous changes that are difficult to measure and predict. This study develops an Electrical Resistivity Tomography (ERT)‐based framework for monitoring THM processes, progressing from sample‐scale to bench‐scale tests, to inform field‐scale applications. Sample‐scale tests analyzed small bentonite samples under controlled variations in water content, temperature, and porosity to establish fundamental resistivity relationships. Bench‐scale tests involved larger bentonite columns subjected to heating (up to 200°C) and hydration under controlled pressure, simulating repository conditions. ERT measurements, complemented by X‐ray CT imaging, temperature monitoring, and tracing sensors, revealed coupled THM processes, such as hydration‐induced compression, swelling, and thermal gradients, leading to complex resistivity patterns. The results demonstrate the potential of ERT for capturing THM‐induced resistivity changes, though challenges remain in upscaling and quantitative analysis. This study evaluates laboratory test capabilities and proposes future improvements for understanding THM‐induced resistivity responses. A conceptual framework for ERT implementation in field‐scale monitoring is presented, synthesizing findings from both scales and exploring how ERT data can inform long‐term modeling and reduce prediction uncertainties. Overall, this ERT‐based framework offers a robust method for monitoring bentonite buffers, aiding in early issue detection and supporting the safe long‐term disposal of radioactive waste in geological repositories, while highlighting the need for future development. Plain Language Summary Bentonite clay is crucial in engineered barrier systems (EBS) for containing high‐level radioactive waste due to its ability to absorb water, swell, seal and remain stable under high temperatures. When bentonite absorbs water and heats up from radioactive decay, it experiences complex changes in its physical and mechanical properties. Understanding these changes is important for ensuring the long‐term safety and effectiveness of EBS. This study used Electrical Resistivity Tomography (ERT), a non‐invasive method that measures electrical conductivity to monitor these changes during laboratory experiments. The ERT data revealed significant variations in resistivity corresponding to changes in water content, temperature, and density, providing detailed spatial and temporal insights into the behavior of bentonite. These findings enhance our ability to predict the long‐term performance of bentonite barriers, ensuring the safe containment of radioactive waste. By improving our understanding of bentonite's behavior, this research supports the development of more reliable and effective barrier systems for radioactive waste disposal, protecting the environment and public health. Key Points ERT monitoring was employed to capture resistivity changes in bentonite during controlled heating and hydration experiments, providing insights into THM processes ERT data reveal significant resistivity changes correlated with water content, temperature, and mechanical effects, enhancing the understanding of THM dynamics in bentonite This study explores the potential of the framework for application in field‐scale EBS monitoring, emphasizing the need for integrating additional geophysical methods for comprehensive subsurface imaging

Chen, Hang↗

High speed ultraviolet digital image correlation (UV-DIC) for dynamic strains at extreme temperatures

Digital Image Correlation (DIC) is a camera-based method of measuring full-field displacements and strains from the surface of a deforming object. It can be applied at any length scale (determined by the lenses) and any time scale (determined by the camera), and because it is non-contacting, it can also be used at temperatures much higher than can be withstood by bonded strain gauges. At extreme temperatures, materials emit light in the form of blackbody radiation, which can saturate the camera sensor. It has previously been shown that the emitted light can be effectively screened by using ultraviolet (UV) cameras, lenses, and filters; however, commercially available UV cameras are relatively slow, which limits the speed of combined UV-DIC measurements. In this study, a UV intensifier was paired with a high-speed camera, and its ability to perform UV-DIC at high temperature and high speed was investigated. The system was compared over three different experiments: (A) a quasi-static thermal expansion test at high temperature, (B) a vibration test at room temperature, and (C) the same vibration test repeated at high temperature. The system successfully performed DIC up to at least 1600 °C at frame rates of 5000 fps, which is more than 100 times faster than other examples of UV-DIC in the literature. In all cases, measurements made using the UV intensifier were much noisier than those made without the intensifier, but the intensifier enabled measurements at temperatures well above those which an unfiltered high-speed camera otherwise saturates.

47 OTHER INSTRUMENTATION↗

COR-0011 Rev 6 MARVEL Project Code of Record

This Code of Record identifies the codes, standards, and procedures necessary to design, develop, construct, and startup the Microreactor Applications Research Validation and Evaluation (MARVEL) Project at the Materials and Fuel Complex (MFC) Transient Reactor Test (TREAT) Facility and the Idaho National Laboratory (INL). The MARVEL Project is an INL test microreactor funded by the United States Department of Energy (DOE) via the Microreactor Program (MRP). The goal of the project is to establish an operational nuclear applications test bed that can generate combined heat and power to enable integration and R&D with end-user technologies, as well as allow microreactor technologists to test next-generation control systems. The microreactor is a thermal reactor utilizing Uranium Zirconium Hydride (UZrH) fuel with review and authorization by the Department of Energy Idaho Operations Office (DOE-ID) for National Environmental Policy Act (NEPA) compliance, safety review, and supplemental readiness assessments for startup and operation. To enable rapid deployment, the MARVEL reactor will reside in the Transient Reactor Test (TREAT) Facility and utilize the existing operating Category B reactor facility, approved facility safety basis, operating crews, and recent re-start experience.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Evaluation of Multi-cell Failure Propagation

Failure propagation testing is of increasing interest to the designers and end users of battery systems. One of the chief difficulties, however, is choosing an appropriate initiation method to perform the test. Single cell abuse testing is typically used to initiate thermal runaway but this can involve a large amount of additional energy injected into the system. It is assumed that this will have some impact on the behavior of a propagating thermal runaway event, but there is little data available as to how significant this would be. Further, it is ultimately difficult to develop viable propagation tests for compliance and public safety activities without better knowledge of how test methods will impact the results. This work looks at propagating battery failure with a variety of chemistries, formats, configurations and initiation methods to determine the level of significance of the chosen initiation method on the test results. We have ultimately found while there is some impact on the detailed results of propagation testing, in most cases other factors, particularly the energy density of the system play a much greater role in the likelihood of a propagation event consuming an entire battery. We have also provided some guidelines for test design to support best practices in testing.

25 ENERGY STORAGE↗

THERMAL MODELING OF HANFORD CESIUM AND STRONTIUM CANISTERS DURING SIMULATED LOADING

A computational fluid dynamics (CFD) model was built to simulate planned testing of heater assemblies within a canister and overpack for the Hanford Lead Canister (HLC) project. The HLC is a canister storage system that will contain heaters to simulate the decay heat of nuclear material and provide the canister storage system with environmental conditions equivalent to the operating conditions on a dry storage pad. The HLC will be equipped with long-term data collection and monitoring systems to provide an early warning of corrosion, pitting, cracking, or other signs of canister degradation that might threaten the integrity of the containment boundary over the potentially long term of dry storage. An important part of the HLC development is to make pretest numerical predictions for the behavior of the heated canister during the simulated radiolytic decay heat testing, which simulates the dry storage system during loading operations. The simulated radiolytic decay heat test is planned for mid-2024 in a configuration that includes the heater assembly, overpack, and canister, but with the lids removed to allow loading cesium and strontium capsules into the canister. One of the goals of the test is to evaluate the thermal behavior of the canister and overpack assembly in the ambient air of the test facility, which will provide data critical to validating the thermal models and understanding how the HLC will perform as a system once deployed. To best approximate real-world conditions, the CFD model includes the full air volume of the mock-up truck bay the heated canister test will be performed in, enabling detailed investigation of how the heated canister affects airflow around it. Rigorous pre-deployment testing of the complete HLC cask and canister system is intended to be completed before the HLC is deployed in the 2028 timeframe. This study presents the pre-test temperature predictions of the simulated radiolytic decay heat test. A description of the heater assembly, canister, and overpack system is presented. The model was developed with the commercial CFD software STAR-CCM+. An uncertainty analysis was run with the CFD model to determine the uncertainty in the temperature predictions and provide a range over which the predicted temperatures are expected to vary. The uncertainty analysis was preformed by coupling STAR-CCM+ with the software Dakota, which provides advanced parametric analyses, including quantification of margins and uncertainty with computational models. This work is expected to provide insight into SNF canister behavior.

Carpenter-Graffy, Dina E.↗

Hawai‘i National Marine Renewable Energy Center (HINMREC)

The Hawaii National Marine Renewable Energy Center (HINMREC) was established to facilitate the commercialization of wave energy converter (WEC) devices, and to accelerate development and testing of Ocean Thermal Energy Conversion (OTEC) technologies. Housed at the Hawaii Natural Energy Institute (HNEI) of the University of Hawaii (UH), this program started with execution of the contract between the US Department of Energy (DOE) and UH in March 2009, and activities ran through the end of the project in September 2019. The DOE tasked HINMREC with facilitating and accelerating the build-out of the Navy’s Wave Energy Test Site (WETS), the nation’s first grid-connected open water wave energy conversion test facility, located off Marine Corps Base Hawaii (MCBH) in Kaneohe, on the island of Oahu. WETS was expanded from an existing test berth at 30m water depth to include test berths at 60m and 80m water depths. In recognition of the high costs associated with at-sea testing and evaluation of WEC devices, it was deemed imperative that HINMREC seek ways to reduce costs to developers by providing key research support to these early-stage technologies. WETS and HINMREC’s support allowed development of wave energy technology by providing a testing infrastructure that allows technology developers to test, demonstrate and evaluate their WEC devices, and generate data in order to advance WEC designs toward commercial readiness. HINMREC’s roles have included support in the establishment of the full site, including of wave resource characterization and site survey, followed by the essential roles of independent WEC device power performance assessment and environmental monitoring in support of deployed pre-commercial WECs. This DOE-funded work transitioned effectively to continue Navy-funded tasks for OTEC development, and activities at WETS, now under Naval Facilities Engineering Command (NAVFAC) funding. A secondary objective in the establishment of HINMREC was to assist the private sector in moving OTEC systems beyond proof-of-concept to pre-commercialization, primarily focused on system and component engineering, and local and global investigations into the potential environmental impacts of OTEC systems. HINMREC was tasked with maintaining high-resolution models of ocean thermal resources and the potential sustainable power output of OTEC systems. Ongoing tests begun previously under Navy funding at the OTEC Heat Exchangers (HXs) Test Facility at the Natural Energy Laboratory of Hawaii Authority (NELHA), in Kona on Hawaii Island, have been continued to identify cost-effective aluminum alloys for use in OTEC systems operating in the corrosive marine environment.

16 TIDAL AND WAVE POWER↗

Capacitor Design for Self-Resonant Coils for Long-Distance Wireless Power Transfer System

In this paper, an integrated capacitor design is proposed for higher-order resonant tank topologies for self-resonant coils, such as series, parallel, LCC, LLC, etc. The capacitor is one of the large, lossy, and thermally vulnerable components of a high-frequency resonant tank, and designing a high-voltage, thermally stable resonant capacitor can be highly challenging. Designing the extremely high-voltage capacitor as an integral part of the coil reduces the size and complexity of the coil assembly. This paper proposes a low-loss PCB-based high-voltage capacitor design to achieve that target, which can be implemented as an integral part of the coil. The proposed capacitor designs are simulated using Multiphysics FEA and tested experimentally. A 23 kV, 133 pF capacitor prototype was built and tested as part of a 1 kW long-distance wireless charging system. The test results verify the capacitor’s voltage, current, and thermal resiliency performance.

Mohammad, Mostak [ORNL] (ORCID:0000000256388783)↗

Thermal Stimulation and Injectivity Testing at Raft River, ID EGS Site

The Raft River geothermal field is the site of an innovative Department of Energy Enhanced Geothermal System (EGS) project to determine the viability of using combined thermal and hydraulic stimulation techniques to improve energy production. Well RRG-9 is currently undergoing a stimulation program using injectate from the US Geothermal Raft River Power Plant and cold water from a cooling tower make-up water well. The stimulation began on 13 June 2013 with injection from the power plant at a temperature of about 39 °C and a pressure of 275 psig. Next, two positive displacement plunger type pumps were used to increase the injection pressure and flow rate for about one month. The highest rate achieved was 258 gpm at a pressure of 741 psig. During this time, fluid from the cooler water well was injected for about 2 weeks at various pressures. Then, the pumps were removed and plant injection resumed on 25 September. Plant injection will continue until the spring of 2014, when a high pressure hydraulic stimulation will be conducted. A series of seismic monitoring stations deployed around the well are providing data on seismic events occurring at the site. Over the past year, 51 microseismic events have been recorded, all less than Magnitude 1. During injection, several diagnostic tests were conducted to gain a better understanding of the well and reservoir. A step-rate test was performed on 22 August to measure the in-situ stress and aid in modeling in-situ fractures. A tracer was injected into the well on 9 September. No tracer was detected in adjacent production wells after several months. A second borehole televiewer survey was conducted for comparison to pre-stimulation images. Here, a third borehole televiewer survey is planned after the high pressure stimulation. Injection test data is evaluated in real time. A modified Hall plot analysis indicates the effective permeability is increasing. The injectivity index supports the results of the modified Hall plot analysis. As the thermal stimulation has continued, the injectivity index has consistently followed an upward trend from 0.1 gpm/psi to 0.53 gpm/psi.

enhanced geothermal systems↗

Thermal Energy Distribution System (TEDS) Startup

The thermal energy distribution system was started to demonstrate preliminary system operability. Some construction and warranty repairs remain before the system can be fully tested and certified for operation.

25 ENERGY STORAGE↗

Predeployment progress of the Canister Deposition Field Demonstration

This report updates the high-level test plan for evaluating surface deposition on three commercial 32PTH2 spent nuclear fuel (SNF) canisters inside NUTECH Horizontal Modular Storage (NUHOMS) Advanced Horizontal Storage Modules (AHSMs) from Orano (formerly Transnuclear Inc.) and provides a summary of the surface sampling activities that have been conducted to date. The details contained in this report represent the best designs and approaches explored for testing as of this publication. Given the rapidly developing nature of this test program, some of these plans may change to accommodate new objectives or requirements. One goal of this testing is to collect defensible and detailed dust deposition measurements from the surface of dry storage canisters in a marine coastal environment to guide chloride-induced stress corrosion cracking (CISCC) research. Another goal is to provide data for the validation of computational fluid dynamics (CFD) based deposition modeling. To facilitate surface sampling, the otherwise highly prototypic dry storage systems will not contain SNF but rather will be electrically heated to mimic the decay heat and thermal hydraulic environment. Test and heater design is supported by detailed CFD modeling. Instrumentation throughout the canister, storage module, and environment will provide extensive information about the thermal-hydraulic behavior of horizontal dry cask storage systems. Manual sampling over a comprehensive portion of the canister surface at regular time intervals will offer detailed quantification and composition of the deposited particulates from a realistic storage environment. Discussions of a potential host site for the Canister Deposition Field Demonstration (CDFD) are ongoing. Until a host site is chosen, testing of key CDFD hardware components including the heater assemblies, power skid, and remote data acquisition system will continue. Functional testing of the finalized heater assemblies and test apparatus started this fiscal year. These initial heater tests have shown the assemblies are performing within design specifications. Staged surface sampling of a mockup of a canister outside the AHSM on a transfer skid was also performed. Refinements to the sampling procedures and techniques were captured from observation of these activities and lessons-learned debriefs. These updated sampling procedures and techniques are planned to be tested again in the field using the mockup in order to assure personnel are using the most accurate and repeatable methods possible prior to deployment for actual CDFD testing.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Investigation of Process Emissions during Thermal Cutting of Clad Metals from the Nuclear Sector - 20183

Typically, reactor pressure vessels as well as steam generators comprising low alloyed steel with a cladding of stainless steel. Recently the permissible values for Cr (VI) in the air of the working areas have been reduced in Germany from 100 μg/m{sup 3} to 1 μg/m{sup 3} air. This results in the danger that even with low-alloy steel with claddings these limit values would be exceeded when using flame cutting technologies. In order to ensure compliance with the permissible limit values, exhaust gas systems with gas cleaning measures are provided. The process emission test shall replace the assumptions required for the design of these systems with measured values. NUKEM Technologies Engineering Services GmbH (NUKEM) has chosen autogenous flame cutting as an example of a thermal cutting system for process emission testing, as there are no proven values in the literature for the Cr (VI) and NiOx emissions produced. The autogenous flame cutting can be used for a variety of cutting tasks within decommissioning projects. In order to simulate the material to be cut, mock ups were generated and cut from information about the material specification for the reactor pressure vessel from existing nuclear power plants including possible claddings. The cutting length needed for analysis in the test will be maximum 100 mm. The airborne emissions from the thermal cutting process will be captured and analyzed as follows: - Dust emission: The generated particles will be collected by a hood equipped with strong suction device and suitable filter elements. The resulting filter is gravimetrically measured before and after the tests. - Particle Size Distribution: The airborne particle size distribution measurement will result in figures for the size and number of particles arising from the thermal cutting process. - Gas Analysis: The gas analysis enables the determination of e.g. CO{sub 2}, CO, O{sub 3}, NO, NO{sub 2}. - Cr (VI) and NiOx Analysis: For the Cr (VI) and NiOx analysis, samples of the filter residue will be taken. As a result Cr (VI) in relation to total Cr as well as the Ni content will be determined by ICP-optically emission spectroscopy and put in relation to the total dust amount. The process emissions test itself as well as the necessary gas analyses and spectroscopic analyses were carried out at the Institute of Materials Science (IW) of Leibniz Universitaet Hannover (LUH). The results of the process emission tests are used to confirm the design of the gas cleaning systems. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗