Search NASA⌕ Search

SEARCH · Search NASA

Results for “technology procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Increasing Cognitive Ability/Reserve Using Software – Pilot (ICARUS-Pilot)

BACKGROUND This research study was competitively awarded under the 2022 JSC Innovation Charge Account (ICA) program administered by NASA Johnson Space Center’s Joint Technology Working Group. Study period of performance was May through September 2022, with a maximum allowed procurement budget of $10K. The study sought to quantify and assess the potential benefit of using commercial-off-the-shelf (COTS) cognitive training software to improve cognitive performance in an astronaut-like terrestrial population. METHODS Five volunteer research participants were recruited from the JSC employee population to mimic certain demographic characteristics of the NASA astronaut population (age, education/discipline). Participant cognitive performance was assessed before and after executing eighteen sessions of remote cognitive training executed nominally three times per week using six exercises within an adaptive app-based COTS software package (BrainHQ, Posit Science) on study-provided tablets. Pre- and post-training cognitive performance was measured using internal assessments in BrainHQ as well as Cognition Test Battery (CTB) version ISS B01 v3 (3.0.9-201710021500), an independent software test developed specifically for NASA and used currently in research studies on astronauts. BrainHQ exercises were posited to map well or partially to several CTB sub-tests. Participants provided feedback on their study experience formally via semi-structured interview at the conclusion of testing and informally throughout the study if they encountered issues. RESULTS The enrolled ICARUS-Pilot study participants generally matched Artemis crew demographic characteristics. Four of five participants have completed study training and assessment activities as of the writing of this abstract. These test participants complied well with desired training session frequency and duration yielding an average cumulative active training duration of 15 hours over an average of 45 days; participants showed 78% average improvement in metric performance for the six trained exercises, with an associated overall 33%ile ranking increase against performance of the entire BrainHQ subscribing population for internal pre/post assessment, agreeing with post-study survey self-reported performance increases. CTB overall feedback scoring, not corrected for learning effects, showed an average of 19% performance improvement across its 10 performance measures over the training period for the completed participants. Detailed analyses will be conducted once participant data collection for the study is complete and the resulting dataset is fully populated. DISCUSSION These preliminary results provide a positive trend for the effectiveness of the training approach, but further analysis will be needed to establish significance, investigate far transfer, and suggest the needed participant pool size for subsequent efforts to achieve statistically significant outcomes given similar results. The pilot study has already been helpful by allowing the study team to learn a great deal about the capabilities and limitations of the COTS software package that will be reflected in future proposals along with revised timelines for study execution and test participant management. From participant feedback, one common thread regarding the COTS training was that it felt overly repetitive – future proposals should reassess overall training duration, available levels for each trained exercise, and the behavior of the BrainHQ internal scheduler in determining which exercises should be trained and for how long. If the final analysis of this feasibility study ultimately supports it, the study team will recommend further investigation to fully evaluate this potential countermeasure and optimize its implementation. Future proposals would cite this feasibility study’s outcome and would seek to refine the training protocol and obtain statistically significant results for cognitive performance increases as well as retention data.

cognitive training↗

Increasing Cognitive Ability/Reserve Using Software – Pilot (ICARUS-Pilot)

Background: This research study was competitively awarded under the 2022 JSC Innovation Charge Account (ICA) program administered by NASA Johnson Space Center’s Joint Technology Working Group. Study period of performance was May through September 2022, with a maximum allowed procurement budget of $10K. The study sought to quantify and assess the potential benefit of using commercial-off-the-shelf (COTS) cognitive training software to improve cognitive performance in an astronaut-like terrestrial population. Methods: Five volunteer research participants were recruited from the JSC employee population to mimic certain demographic characteristics of the NASA astronaut population (age, education/discipline). Participant cognitive performance was assessed before and after executing eighteen sessions of remote cognitive training executed nominally three times per week using six exercises within an adaptive app-based COTS software package (BrainHQ, Posit Science) on study-provided tablets. Pre- and post-training cognitive performance was measured using internal assessments in BrainHQ as well as Cognition Test Battery (CTB) version ISS B01 v3 (3.0.9-201710021500), an independent software test developed specifically for NASA and used currently in research studies on astronauts. BrainHQ exercises were posited to map well or partially to several CTB sub-tests. Participants provided feedback on their study experience formally via semi-structured interview at the conclusion of testing and informally throughout the study if they encountered issues. Results: The enrolled ICARUS-Pilot study participants generally matched Artemis crew demographic characteristics. Four of five participants have completed study training and assessment activities as of the writing of this abstract. These test participants complied well with desired training session frequency and duration yielding an average cumulative active training duration of 15 hours over an average of 45 days; participants showed 78% average improvement in metric performance for the six trained exercises, with an associated overall 33%ile ranking increase against performance of the entire BrainHQ subscribing population for internal pre/post assessment, agreeing with post-study survey self-reported performance increases. CTB overall feedback scoring, not corrected for learning effects, showed an average of 19% performance improvement across its 10 performance measures over the training period for the completed participants. Detailed analyses will be conducted once participant data collection for the study is complete and the resulting dataset is fully populated. Discussion: These preliminary results provide a positive trend for the effectiveness of the training approach, but further analysis will be needed to establish significance, investigate far transfer, and suggest the needed participant pool size for subsequent efforts to achieve statistically significant outcomes given similar results. The pilot study has already been helpful by allowing the study team to learn a great deal about the capabilities and limitations of the COTS software package that will be reflected in future proposals along with revised timelines for study execution and test participant management. From participant feedback, one common thread regarding the COTS training was that it felt overly repetitive – future proposals should reassess overall training duration, available levels for each trained exercise, and the behavior of the BrainHQ internal scheduler in determining which exercises should be trained and for how long. If the final analysis of this feasibility study ultimately supports it, the study team will recommend further investigation to fully evaluate this potential countermeasure and optimize its implementation. Future proposals would cite this feasibility study’s outcome and would seek to refine the training protocol and obtain statistically significant results for cognitive performance increases as well as retention data.

cognitive training↗

NASA Aerospace Flight Battery Program: Recommendations for Technical Requirements for Inclusion in Aerospace Battery Procurements

This NASA Aerospace Flight Battery Systems Working Group was chartered within the NASA Engineering and Safety Center (NESC). The Battery Working Group was tasked to complete tasks and to propose proactive work to address battery related, agency-wide issues on an annual basis. In its first year of operation, this proactive program addressed various aspects of the validation and verification of aerospace battery systems for NASA missions. Studies were performed, issues were discussed and in many cases, test programs were executed to generate recommendations and guidelines to reduce risk associated with various aspects of implementing battery technology in the aerospace industry. This document contains Part 2 - Volume I: Recommendations for Technical Requirements for Inclusion in Aerospace Battery Procurements of the program's operations.

Jung, David S.↗

Benefits of Using a Mars Forward Strategy for Lunar Surface Systems

This paper identifies potential risk reduction, cost savings and programmatic procurement benefits of a Mars Forward Lunar Surface System architecture that provides commonality or evolutionary development paths for lunar surface system elements applicable to Mars surface systems. The objective of this paper is to identify the potential benefits for incorporating a Mars Forward development strategy into the planned Project Constellation Lunar Surface System Architecture. The benefits include cost savings, technology readiness, and design validation of systems that would be applicable to lunar and Mars surface systems. The paper presents a survey of previous lunar and Mars surface systems design concepts and provides an assessment of previous conclusions concerning those systems in light of the current Project Constellation Exploration Architectures. The operational requirements for current Project Constellation lunar and Mars surface system elements are compared and evaluated to identify the potential risk reduction strategies that build on lunar surface systems to reduce the technical and programmatic risks for Mars exploration. Risk reduction for rapidly evolving technologies is achieved through systematic evolution of technologies and components based on Moore's Law superimposed on the typical NASA systems engineering project development "V-cycle" described in NASA NPR 7120.5. Risk reduction for established or slowly evolving technologies is achieved through a process called the Mars-Ready Platform strategy in which incremental improvements lead from the initial lunar surface system components to Mars-Ready technologies. The potential programmatic benefits of the Mars Forward strategy are provided in terms of the transition from the lunar exploration campaign to the Mars exploration campaign. By utilizing a sequential combined procurement strategy for lunar and Mars exploration surface systems, the overall budget wedges for exploration systems are reduced and the costly technological development gap between the lunar and Mars programs can be eliminated. This provides a sustained level of technological competitiveness as well as maintaining a stable engineering and manufacturing capability throughout the entire duration of Project Constellation.

Mulqueen, Jack↗

Auxiliary Propulsion Activities in Support of NASA's Exploration Initiative

The Space Launch Initiative (SLI) procurement mechanism NRA8-30 initiated the Auxiliary Propulsion System/Main Propulsion System (APS/MPS) Project in 2001 to address technology gaps and development risks for non-toxic and cryogenic propellants for auxiliary propulsion applications. These applications include reaction control and orbital maneuvering engines, and storage, pressure control, and transfer technologies associated with on-orbit maintenance of cryogens. The project has successfully evolved over several years in response to changing requirements for re-usable launch vehicle technologies, general launch technology improvements, and, most recently, exploration technologies. Lessons learned based on actual hardware performance have also played a part in the project evolution to focus now on those technologies deemed specifically relevant to the Exploration Initiative. Formal relevance reviews held in the spring of 2004 resulted in authority for continuation of the Auxiliary Propulsion Project through Fiscal Year 2005 (FY05), and provided for a direct reporting path to the Exploration Systems Mission Directorate. The tasks determined to be relevant under the project were: continuation of the development, fabrication, and delivery of three 870 lbf thrust prototype LOX/ethanol reaction control engines; the fabrication, assembly, engine integration and testing of the Auxiliary Propulsion Test Bed at White Sands Test Facility; and the completion of FY04 cryogenic fluid management component and subsystem development tasks (mass gauging, pressure control, and liquid acquisition elements). This paper presents an overview of those tasks, their scope, expectations, and results to-date as carried forward into the Exploration Initiative.

Best, Philip J.↗

Mission Benefits of Gridded Ion and Hall Thruster Hybrid Propulsion Systems

The NASA In-Space Propulsion Technology (ISPT) Project Office has been developing the NEXT gridded ion thruster system and is planning to procure a low power Hall system. The new ion propulsion systems will join NSTAR as NASA's primary electric propulsion system options. Studies have been performed to show mission benefits of each of the stand alone systems. A hybrid ion propulsion system (IPS) can have the advantage of reduced cost, decreased flight time and greater science payload delivery over comparable homogeneous systems. This paper explores possible advantages of combining various thruster options for a single mission.

Dankanich, John W.↗

Nondestructive Evaluation of the J-2X Direct Metal Laser Sintered Gas Generator Discharge Duct

The J-2X program at NASA's Marshall Space Flight Center (MSFC) procured a direct metal laser sintered (DMLS) gas generator discharge duct from Pratt & Whitney Rocketdyne and Morris Technologies for a test program that would evaluate the material properties and durability of the duct in an engine-like environment. DMLS technology was pursued as a manufacturing alternative to traditional techniques, which used off nominal practices to manufacture the gas generator duct's 180 degree turn geometry. MSFC's Nondestructive Evaluation (NDE) Team performed radiographic, ultrasonic, computed tomographic, and fluorescent penetrant examinations of the duct. Results from the NDE examinations reveal some shallow porosity but no major defects in the as-manufactured material. NDE examinations were also performed after hot-fire testing the gas generator duct and yielded similar results pre and post-test and showed no flaw growth or development.

Esther, Elizabeth A.↗

Space Solar Power Exploratory Research and Technology (SERT) Technical Interchange Meeting 2 (SERT TIM 2)

The University of Alabama in Huntsville's (UAH) Propulsion Research Center hosted the Space Solar Power Exploratory Research & Technology (SERT) Technical Interchange Meeting TIM) 2 in Huntsville, Alabama December 7-10. 1999 with 126 people in attendance. The SERT program includes both competitively procured activities. which are being implemented through a portfolio of focused R&D investments--with the maximum leveraging of existing resources inside and outside NASA. and guided by these system studies. Axel Roth. Director of the Flight Projects Directorate NASA MSFC, welcomed the SERT TIM 2 participants and challenged them to develop the necessary technologies and demonstrations that will lead to Space Solar Power (SSP) International implementation. Joe Howell, NASA MSFC, reiterated the SERT TIM 2 objectives: 1) Refining and modeling systems approaches for the utilization of SSP concepts and technologies, ranging, from the near-term e.g. for space science, exploration and commercial space applications to the far-term (e. g. SSP for terrestrial markets), including systems concepts, technology, infrastructure (i.g., transportation), and economics. 2) Conducting technology research, development and demonstration activities to produce "proof- of-concept" validation of critical SSP elements for both the nearer and farther-term applications. 3) Initiating partnerships Nationality and Internationally that could be expanded, as appropriate, to pursue later SSP technology and applications (e.g., space science. colonization, etc.). Day one began with the NASA Centers presenting their SERT activities summary since SERT TIM 1 and wound up with a presentation by Masahiro Mori, NASDA titled "NASDA In-house Study for SSP". Demonstration for the Near-Term. Day two began with the SERT Systems Studies and Analysis reports resulting from NRA 8-23 followed by presentations of SERT Technology Demonstrations reports resulting from NRA 8-23. Day two closed with John Mankins presentation on "Technology Roadmapping" and the delivery of the charge to the Work Breakout Sessions. Day three began with the eleven Work Breakout Session which was the major function of this TIM 2 and day three ended with reports by the Chairs of the eleven Work Breakdown Sessions. Day four began with the six Integrated Product Team OPT) meetings and ended with closing plenary panel sessions.

Howell, Joe↗

The Evolution of CubeSat Spacecraft Platforms

The maturity of small spacecraft technology is indicated by the continued growth in the number of missions, mission complexity, and the expansion of smallsat subsystem capability. The inception of the CubeSat platform has incentivized the space industry to achieve a broad collection of science for less cost, and there is an evolving trend in the overall utilization of the CubeSat platform seen in the last decade. CubeSats’ initial purpose was to serve as a platform to demonstrate specific technologies while also serving as an educational platform for students and professional engineers alike. In the ten years since, CubeSats are being designed for more complex science missions around the Moon, Sun, or to deep space, and the projection for 10 years from now is that CubeSats will be performing more complex deep space missions. The progress of overall small spacecraft technology development is captured in the most recent 2020 Small Spacecraft Technology State-of-the-Art (SoA) report, the objective of which is to assess and provide an overview on the current development status across all subsystem architectures. The SoA report summarizes the results of a variety of surveys covering device performance, capabilities, and flight history, as presented in publicly available literature. The focus of these surveys is on devices or systems that can be commercially procured or appear on a path towards being commercial availability.

Small Spacecraft Technology↗

NASA Extravehicular Activity Technology Roadmaps for Exploration

The National Aeronautics and Space Administration (NASA) has developed and matured many technologies over the decades to advance extravehicular activity (EVA) systems. Over the last 15 years, major steps were taken to advance the technology with the Exploration Extravehicular Mobility Unit (xEMU) government reference design at the Johnson Space Center (JSC) in Houston, Texas. The xEMU builds on the lessons learned of the Apollo, Space Shuttle, and International Space Station (ISS) EMUs, evolving the technology to increase performance for extreme environments. As NASA sets its goals toward Earth’s Moon and Mars, a spacesuit design tolerable of gravity and dust will be needed for these adverse environments. NASA has used roadmaps as the means of documenting actionable plans for strategizing technology developments needed to meet NASA’s mission and goals. To help reach and create a sustained presence on the Moon, NASA procured EVA services from industry through the Exploration EVA Services (xEVAS) contract. These services include certified contractor-provided spacesuits, tools, equipment, vehicle interfaces, and support to training and real-time operations. NASA will now focus on a mission to Mars. NASA leadership has set goals and objectives related to the Agency’s vision and a Moon to Mars (M2M) strategy. This paper presents an organizational framework to provide insight into how NASA’s vision is realized. Additionally, this paper covers the maturation and development of the spacesuit technology and reveals the EVA technology roadmaps for the M2M Program. These EVA roadmaps visualize an actionable path to EVA capabilities needed for Mars exploration.

Cinda Chullen↗

NASA Extravehicular Activity Technology Roadmaps for Exploration

The National Aeronautics and Space Administration (NASA) has developed and matured many technologies over the decades to advance extravehicular activity (EVA) systems. Over the last 15 years, major steps were taken to advance the technology with the Exploration Extravehicular Mobility Unit (xEMU) government reference design at the Johnson Space Center (JSC) in Houston, Texas. The xEMU builds on the lessons learned of the Apollo, Space Shuttle, and International Space Station (ISS) EMUs, evolving the technology to increase performance for extreme environments. As NASA sets its goals toward Earth’s Moon and Mars, a spacesuit design tolerable of gravity and dust will be needed for these adverse environments. NASA has used roadmaps as the means of documenting actionable plans for strategizing technology developments needed to meet NASA’s mission and goals. To help reach and create a sustained presence on the Moon, NASA procured EVA services from industry through the Exploration EVA Services (xEVAS) contract. These services include certified contractor-provided spacesuits, tools, equipment, vehicle interfaces, and support to training and real-time operations. NASA will now focus on a mission to Mars. NASA leadership has set goals and objectives related to the Agency’s vision and a Moon to Mars (M2M) strategy. This paper presents an organizational framework to provide insight into how NASA’s vision is realized. Additionally, this paper covers the maturation and development of the spacesuit technology and reveals the EVA technology roadmaps for the M2M Program. These EVA roadmaps visualize an actionable path to EVA capabilities needed for Mars exploration.

Cinda Chullen↗

Development of standardized specifications for silicon solar cells

A space silicon solar cell assembly (cell and coverglass) specification aimed at standardizing the diverse requirements of current cell or assembly specifications was developed. This specification was designed to minimize both the procurement and manufacturing costs for space qualified silicon solar cell assembilies. In addition, an impact analysis estimating the technological and economic effects of employing a standardized space silicon solar cell assembly was performed.

Scott-Monck, J. A.↗

Sealed-cell nickel-cadmium battery applications manual

The design, procurement, testing, and application of aerospace quality, hermetically sealed nickel-cadmium cells and batteries are presented. Cell technology, cell and battery development, and spacecraft applications are emphasized. Long term performance is discussed in terms of the effect of initial design, process, and application variables. Design guidelines and practices are given.

Scott, W. R.↗

Thermal Power Systems (TPS); Point-Focusing Thermal and Electric Applications (PFTEA). Volume 2: Detailed report, fiscal year 1979

Progress in the development of systems which employ point focusing distributed receiver technology is reported. Emphasis is placed on the first engineering experiment, the Small Community Solar Thermal Power Experiment. Procurement activities for the Military Module Power Experiment the first of a series of experiments planned as part of the Isolated Load Series are included.

Source record↗

Assessment of historical and projected segments of US and world civil and military rotorcraft markets, 1960 - 1990

The geographic climatic, political, economic and demographic environment of 75 countries was analyzed with respect to helicopter procurement history and usage. Key environmental indicators which are variables were projected into strengths and weaknesses of U.S. technology are reviewed. The civil market sensitivity to new technology is forecast with selected premises as to vehicle life, noise standards, fuel costs, GNP expansion and traffic growth. The forecast is based on a scenario of helicopter technology improvements resulting in increased size and performance.

Yates, W. J.↗

Full Service

NASA is moving ahead with the sole-source procurement of a Canadian robot to service the Hubble Space Telescope, gaining confidence the International Space Station (ISS) technology can perform all of the tasks shuttle-launched astronauts were scheduled to do before the Columbia accident changed everything. The U.S. agency is negotiating with MD Robotics, a MacDonald Dettwiler unit located in Brampton, Ontario, for a version of the Special Purpose Dexterous Manipulator (SPDM) the company developed for the ISS. The SPDM would be the business end of a throwaway module designed to replace batteries and gyroscopes, pull old instruments and install new ones before plunging to a targeted reentry over the Pacific.

Morring, Frank, Jr.↗

Off-Earth Servicing Component Advancement (OESCA) Flight-like Coriolis Mass Flowmeter Development

With the completion of this initial technology development effort, additional work will be required for infusion and advancement through TRL 7. The remainder of the flight-level environmental testing (electromagnetic interference and compatibility or electromagnetic interference/electromagnetic compatibility (EMI/EMC), thermal vacuum or TVAC, along with vibration and shock testing) and post-test functional checkouts will need to be completed and are currently planned as part of an awarded STMD Early Career Initiative (ECI) Project called Advancement of Exploration Components for In-Space Servicing or AXCIS. The results and reports from these additional tests during the ECI effort will complete the technology development package, advancing the TRL to 5 or 6 while providing a vendor capable of manufacturing flight units and a flight-ready design as well as lessons-learned from the environmental testing. The Coriolis flowmeter development unit would then be incorporated into a demonstration testbed system for microgravity testing to further understand how it functions and performs in a space-like environment, advancing the developed technology to TRL 6 or 7. Following this infusion path will enable NASA program(s)/proposal(s) to procure a flight-rated high accuracy Coriolis mass flowmeter for incorporation into in-space and Lunar/Martian surface spacecraft propellant resupply systems which, after successful mission use, will bring the TRL to 7+.

Amy Felt↗

NASA's Exploration and In-Space Services (NExIS) Division OSAM-1 Propellant Transfer Subsystem Progress 2020

National Aeronautics and Space Administration (NASA)’s Exploration and In-Space Services (NExIS) Division of Goddard Space Flight Center has been developing technology for the On-orbit Servicing, Assembly and Manufacturing Mission 1 (OSAM-1) to robotically refuel heritage and new satellites on-orbit. OSAM-1, formerly known as Restore-L, successfully passed an important NASA milestone called Key Decision Point-C (KDP-C), receiving agency-level approval for its implementation. The decision point also establishes the mission’s official schedule and budget. The OSAM-1 spacecraft, Servicing Payload and the Space Infrastructure Dexterous Robot (SPIDER) payload will refuel a satellite in space, assemble a communications antenna and manufacture a beam. By demonstrating these capabilities, the mission is advancing never-before tested technologies for use in future missions (by NASA and other government organizations and private industry). The mission is funded by the Technology Demonstration Missions program within NASA’s Space Technology Mission Directorate. This paper covers a review of servicing extensibility and critical technologies that are being developed within NExIS with a focus on the fluid transfer refueling technology within the framework of the Propellant Transfer Subsystem (PTS). An overview of the planned initial technology demonstration servicing mission via the OSAM-1 Space Vehicle is provided as an extension of the technology development progress reported in 20181, and 20192. The general objectives, challenges, and key technologies are presented as an introduction to the context of the OSAM-1 mission, and a precursor to the OSAM-1 PTS specific development status. Development and progress of the Hose Management Assembly (HMA) and Propellant Transfer Assembly (PTA) are discussed. HMA risk reduction test results including those of thermal vacuum testing are presented. Important analytical results are discussed and progress of drawings and procedures developed for the fabrication and testing phase are shown. A summary of the PTS overall verification status and design activities prepared for the critical design peer review are presented. Procurement progress is shown with status on long, medium, and short term efforts to acquire the hardware required to support the mission objectives. Technology development, challenges, and testing status are discussed with particular regard to the OSAM-1 specific key assemblies including the PTA and HMA along with the overall integrated flight mockup of the spacecraft to client fluid transfer testing conducted in the servicing testbeds. The paper concludes with key milestones leading to the goal of on-orbit refueling to be demonstrated in 2024. The overall mission Launch Readiness Date (LRD) has been realigned to accommodate budget profiles and incorporation of additional on-orbit assembly and manufacturing demonstration efforts.

Propellant transfer, satellite servicing↗