Search NASA⌕ Search

SEARCH · Search NASA

Results for “testing facility”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Utilisation of real-scale renewable energy test facility for validation of generic wind turbine and wind power plant controller models

This article presents an example of application of a modern test facility conceived for experiments regarding the integration of renewable energy in the power system. The capabilities of the test facility are used to validate dynamic simulation models of wind power plants and their controllers. The models are based on standard and generic blocks. The successful validation of events related to the control of active power (control phenomena in <10 Hz range, including frequency control and power oscillation damping) is described, demonstrating the capabilities of the test facility and drawing the track for future work and improvements.

17 WIND ENERGY↗

Status of the Top Plate and Anticryostat for High Field Cable Test Facility at Fermilab

Fermi National Accelerator Laboratory (Fermilab) is currently constructing a new High Field Vertical Magnet Test Facility (HFVMTF) designed for testing High Temperature Superconducting (HTS) cables under high magnetic fields. This facility is expected to offer capabilities similar to those of EDIPO at PSI and FRESCA2 at CERN. The background magnetic field of 15 T will be generated by a magnet supplied by Lawrence Berkeley National Laboratory. The primary function of HFVMTF will be to serve as a superconducting cable test facility, facilitating tests under high magnetic fields and a broad spectrum of cryogenic temperatures. Additionally, the facility will be utilized for testing high-field superconducting magnet models and demonstrators, including hybrid magnets, developed by the US Magnet Development Program (MDP). This paper provides a comprehensive description of the current status of two pivotal components of the facility: the Top/Lambda Plates Assembly and the Anticryostat for the Test Sample Holder. The latter will serve as a principal interface component connecting cable test samples with the facility's cryostat.

43 PARTICLE ACCELERATORS↗

Instrumentation Plan for the OSU High Temperature Test Facility, Revision 4

This instrumentation plan describes the instrumentation requirements and design for the Oregon State University (OSU) High Temperature Test Facility (HTTF). This report outlines HTTF instrumentation design specifications, data acquisition and control system (DACS) design specifications as well as a brief description of the instrumentation to be used in the HTTF. The HTTF is an integral test facility, which has been designed to model the behavior of interest for a Very High Temperature Gas Reactor (VHTR) during the Depressurized Conduction Cooldown (DCC) event. It also has the potential to conduct limited explorations into the progression of the Pressurized Conduction Cooldown (PCC) event and phenomena during normal operations. The facility is scaled 1:4 by height and 1:64 by volume. The maximum core power for the facility is approximately 2.2MW. The core region is of a modular design to allow for both the prismatic block core and the pebble bed core designs to be tested. However, only the prismatic block design is discussed in this report. A correctly scaled integral facility modeling the VHTR that can be used to examine the thermal hydraulic system behavior of the design basis and beyond design basis transients is of significant value. The experimental results obtained in such a program could be used to validate analytical tools and methods being proposed for use with the VHTR. Therefore, it is of importance that the HTTF be instrumented in such a way that the required data is collected to meet its overall goals of phenomena examination and code validation. In addition to the instrumentation used to collect data to achieve the overall goals of the HTTF test program, there is instrumentation in the HTTF, which is primarily used to ensure the safe operation of the test facility. This type of instrumentation shall be termed “Control Instrumentation” and is discussed in this report. This report discusses the DACS, which is a personal computer controlled system that is used to control both the collection and storage of the test matrix and control system data as well as electrical and mechanical operation of the test facility.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Modeling of the High Temperature Test Facility Using RELAP-7

The High Temperature Test Facility (HTTF) at Oregon State University (OSU) is an electrically heated, helium cooled, experimental facility. The HTTF was modeled using RELAP-7 in both 1-D and 3-D for validation. Due to core symmetry, 1/6th of the HTTF core was modeled in 3-D using the coupled heat conduction and forced convection capabilities of RELAP-7. This served as a validation case for RELAP-7 and its capabilities to model advanced nuclear technologies such as high temperature gas-cooled reactors.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Recovery of Information from the Fast Flux Test Facility for the Advanced Fuel Cycle Initiative

The Fast Flux Test Facility is the most recent Liquid Metal Reactor to operate in the United States. Information from the design, construction, and operation of this reactor was at risk as the facilities associated with the reactor are being shut down. The Advanced Fuel Cycle Initiative is a program managed by the Office of Nuclear Energy of the U.S. Department of Energy with a mission to develop new fuel cycle technologies to support both current and advanced reactors. Securing and preserving the knowledge gained from operation and testing in the Fast Flux Test Facility is an important part of the Knowledge Preservation activity in this program.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Research, design and development activities on high power pulsed rf/microwave systems and test facilities for particle accelerators

Several high power S Band microwave systems in the peak power range from 2 MW to 6.5 MW and mean power upto 25 kW along with associated waveguide components, pulse power technology were developed in house at RRCAT. These systems have been used extensively in the development of particle accelerators in the country. Several test facilities were developed in house and supplied to tube R and D labs for development, conditioning and evaluation of microwave tubes indigenously under collaborative efforts. RRCAT has also taken up establishing high power test facilities for advanced accelerators. For such used design and development of 45 MW peak power S Band test facility as well as energy doubler scheme is underway. A 1.3 MW pulsed test stand at 352.2 MHz was also successfully designed and developed to qualify devices, subsystems and components developed in-house. The present paper will describe the research, design and development efforts towards the high power pulsed RF/Microwave systems, test facilities and components. The results and performance of these developments are reported. (author)

43 PARTICLE ACCELERATORS↗

Magnetic and Mechanical Analysis of a Large Aperture 15 T Cable Test Facility Dipole Magnet

The US Department of Energy (DOE) Office of Science (SC), is funding a large bore “Cable Test Facility Magnet” for testing advanced cables and inserts in high transverse field. This is a joint effort between the Office of High Energy Physics (HEP) and the Office of Fusion Energy Sciences (FES). The background field magnet for this facility is being developed at Lawrence Berkeley National Laboratory (LBNL) while the cryostat and test facility will be located and operated by Fermi National Accelerator Laboratory (FNAL). The Nb 3 Sn dipole magnet, which will provide the transverse background field, is designed to generate a field of 15 T in a 100 × 150 mm bore at 1.9 K. The conceptual design of a block-type dipole with flared ends and a structure based on key-and-bladder technology will be introduced. The results of the magnetic and mechanical analysis will be presented.

43 PARTICLE ACCELERATORS↗

Commissioning the JLab LERF Cryomodule Test Facility

The JLab Low Energy Recirculating Facility, LERF, has been modified to support concurrent testing of two LCLS-II cryomodules. The cryomodules are installed in a similar fashion as they would be in the L1 section of the LCLS-II linac, including the floor slope and using all of the LCLS-II hardware and controls for cryomodule cryogenics, vacuum, and RF (SSA and LLRF). From the start, it was intended to use LCLS-II electronics and EPICS software controls for cryomodule testing. In affect the LERF test facility becomes the first opportunity to commission and operate the LCLS-II LINAC hardware and software controls. Support for specific cryomodule high level test applications like Q0 and HOMs measurements, are being developed from the basic cryomodule control suite. To support the testing, 2 K He is supplied from the CEBAF south linac cryogenic system, where care must be taken when using the LERF test facility to not upset the CEBAF cryogenics plant. This paper discusses the commissioning of the hardware and software development for testing the first two LCLS-II cryomodules.

Hovater, C.↗

Test for Reconditioning RA Waste with Simulated Bitumen and Concrete in a 1,2 MW Plasma Test Facility - 20092

The operation and maintenance of nuclear power plants, the non nuclear fuel cycle, etc generate low-level radioactive waste which, along with the historical radioactive waste from past nuclear activities, needs to be treated and stored, awaiting final disposal. Plasma technology offers a very effective way of treating this waste with a high volume reduction factor (VRF), free from organics, liquids and moisture, and meets without a doubt the acceptance criteria for safe storage and disposal. By means of a plasma beam of approximately 5000 deg. C, the inorganic materials are melted into a glassy slag, containing most of the radioactive isotopes while the organic material is gasified, oxidized and purified in an off-gas cleaning system. First the paper describes the new full-scale Plasma Melting Facility (PMF) at the Kozloduy Nuclear Power Plant in Bulgaria which was taken in nuclear operation In May 2018. The plant has a capacity of 250 tons per year and the maximum contact dose rates of the incoming waste is 2 mSv/h. Different mixtures of radioactive waste packed in 200 l drums were successfully treated resulting in a glassy slag free from liquids and organic material with an important volume reduction factor (VRF). The Project was co-financed through a grant by Kozloduy International Decommissioning fund (KIDSF) administrated by the EBRD through Bulgarian national funding. Plasma is a suitable technology for treatment of problematic waste or even reconditioning waste so Belgoprocess was contracted to do plasma tests with simulated conditioned waste types. One can do tests on a laboratory scale on smaller samples and torch capacities of e.g. 50 kW but Belgoprocess wanted to do more realistic and reliable tests. So Belgoprocess contracted Phoenix Solutions Co who has a full-scope test facility equipped with a 1200 kW plasma torch for full-scope treatment of simulated conditioned waste. For a first confidential contract simulated 200 l (55 gallon) bitumen drums were treated. The drums contained different pucks of compacted waste such as rags, used filters, granulates, etc. The pucks were stacked in the 200 l drums and subsequently embedded with bitumen. A total of 6 drums were treated in the plasma facility. For a second contract simulated homogeneous 200 l (55 gallon) concrete drums with on the one hand concentrates and on the other hand spent resins were selected. A total of 6 drums with concrete and spent resins were treated and melted in the plasma testing facility. The paper describe the test facility, volume reduction factor (VRF) of different waste streams and most important parameters. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Status of the Top Plate and Anticryostat for High Field Cable Test Facility at Fermilab

Fermi National Accelerator Laboratory (FNAL) and Lawrence Berkeley National Laboratory (LBNL) are building a new High Field Vertical Magnet Test Facility (HFVMTF) for testing superconducting cables in high magnetic field. This facility will be located at Fermilab and will have a capability similar to EDIPO at PSI and FRESCA2 at CERN. The background magnetic field of 15T in HFVMTF will be produced by a magnet pro-vided by LBNL. The HFVMTF is jointly funded by the US DOE Offices of Science, High Energy Physics, and Fusion Energy Sciences. As a primary use it will be superconducting cable test facility, in high magnetic fields and wide range of temperatures. Complementary, this facility will be used to test high-field super-conducting magnet models and demonstrators, including hybrid magnets, produced by the US Magnet Development Program (MDP). The paper describes the status of Top Plates Assembly and Sample Insert Anticryostat, which will be a main interface component between cable test mode and magnet test mode at this facility.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Status and Plans for an SRF Accelerator Test Facility at Fermilab

A superconducting RF accelerator test facility is currently under construction at Fermilab. The accelerator will consist of an electron gun, 40 MeV injector, beam acceleration section consisting of 3 TTF-type or ILC-type cryomodules, and multiple downstream beam lines for testing diagnostics and performing beam experiments. With 3 cryomodules installed this facility will initially be capable of generating an 810 MeV electron beam with ILC beam intensity. The facility can accommodate up to 6 cryomodules for a total beam energy of 1.5 GeV. This facility will be used to test SRF cryomodules under high intensity beam conditions, RF power equipment, instrumentation, and LLRF and controls systems for future SRF accelerators such as the ILC and Project-X. This paper describes the current status and overall plans for this facility.

43 PARTICLE ACCELERATORS↗

PV High Wind User Test Facility

The creation of a PV high wind test facility at the NREL Flatirons Campus that will enable private and public research efforts aimed at storm hardening PV systems. The facility will be instrumented to monitor effects of high wind conditions on modules and other array components. These in-field tests will coordinate with flow models, wind tunnel testing, validation of PV aeroelastic design codes, and post-testing module and system component analysis.

14 SOLAR ENERGY↗

Lead Coolant Test Facility - Design Concept and Requirements

The Idaho National Laboratory prepared a preliminary technical and functional requirements (T&FR), thermal hydraulic design and cost estimate for a lead coolant test facility. The purpose of this small scale facility is to simulate lead coolant fast reactor (LFR) coolant flow in an open lattice geometry core using seven electrical rods and liquid lead or lead-bismuth eutectic. Based on review of current world lead or lead-bismuth test facilities and research need listed in the Generation IV Roadmap, five broad areas of requirements are identified in this paper: (1) Develop and Demonstrate Feasibility of Submerged Heat Exchanger; (2) Develop and Demonstrate Open-lattice Flow in Electrically Heated Core; (3) Develop and Demonstrate Chemistry Control; (4) Demonstrate Safe Operation; and (5) Provision for Future Testing Across these five broad areas are supported by twenty-one specific requirements. The purpose of this facility is to focus the lead fast reactor community domestically on the requirements for the next unique state of the art test facility. The facility thermal hydraulic design is based on the maximum simulated core power using seven electrical heater rods of 420 kW; average linear heat generation rate of 300 W/cm. The core inlet temperature for liquid lead or Pb/Bi eutectic is 4200C. The design includes approximately seventy-five data measurements such as pressure, temperature, and flow rates. The preliminary estimated cost of construction of the facility is $3.7M (in 2006 $). It is also estimated that the facility will require two years to be constructed and ready for operation.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Introduction of the PELICAN loop, a Full-Scale Pressure Drop Test Facility

The Versatile Test Reactor (VTR) is a test reactor currently under development by the US Department of Energy. This reactor will rely on fast neutrons enabling novel and wide-ranging experiment to support the development of the various advanced reactor technologies. With the high flux achievable, accelerated testing of fluid and materials will be made possible. To support VTR design efforts [1], an experimental facility has been designed and constructed at Argonne National Laboratory to recreate the hydraulic flow conditions within the VTR’s primary heat transport system (PHTS). This facility, the Pressure drop Experimental Loop for Investigations of Core Assemblies in advanced Nuclear reactors, PELICAN, measures the pressure drop across a full-scale fuel assembly containing prototypic axial reflectors, fuel, and plena components. Here, we first describe the design considerations required to recreate aspects of the VTR. Then we discuss the design and construction of PELICAN to address these design requirements, the design and construction of the test articles placed inside PELICAN’s test section, and finally present some of the first experimental results.

Grannan, A. M.↗

Upgrade of the BATMAN test facility for H{sup −} source development

The development of a radio frequency (RF) driven source for negative hydrogen ions for the neutral beam heating devices of fusion experiments has been successfully carried out at IPP since 1996 on the test facility BATMAN. The required ITER parameters have been achieved with the prototype source consisting of a cylindrical driver on the back side of a racetrack like expansion chamber. The extraction system, called “Large Area Grid” (LAG) was derived from a positive ion accelerator from ASDEX Upgrade (AUG) using its aperture size (ø 8 mm) and pattern but replacing the first two electrodes and masking down the extraction area to 70 cm2. BATMAN is a well diagnosed and highly flexible test facility which will be kept operational in parallel to the half size ITER source test facility ELISE for further developments to improve the RF efficiency and the beam properties. It is therefore planned to upgrade BATMAN with a new ITER-like grid system (ILG) representing almost one ITER beamlet group, namely 5 × 14 apertures (ø 14 mm). Additionally to the standard three grid extraction system a repeller electrode upstream of the grounded grid can optionally be installed which is positively charged against it by 2 kV. This is designated to affect the onset of the space charge compensation downstream of the grounded grid and to reduce the backstreaming of positive ions from the drift space backwards into the ion source. For magnetic filter field studies a plasma grid current up to 3 kA will be available as well as permanent magnets embedded into a diagnostic flange or in an external magnet frame. Furthermore different source vessels and source configurations are under discussion for BATMAN, e.g. using the AUG type racetrack RF source as driver instead of the circular one or modifying the expansion chamber for a more flexible position of the external magnet frame.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Measurements at peak operational beam current in the SNS beam test facility

Work at the SNS beam test facility has focused on high dimensional and high dynamic range measurements of the medium energy (2.5 Mev) beam distribution. This is motivated by the need to understand and predict beam losses down to one-part-per-million. The initial demonstration of full-and-direct 6D phase space measurement was done at a current of 40 mA transported through the RFQ. Since that demonstration, more detailed studies have been performed at lower transported currents (in the range 30 mA and below). This is due to a hardware change - recent runs utilize the original SNS RFQ, which after a decade of service in the SNS achieves transmission significantly below design (50-60%, vs >80%). A short run in 2023 with a newly-commissioned RFQ enables maximum transmission. Preliminary results from beam distribution measurements during this run are discussed.

Ruisard, Kiersten↗

Annual Site Environmental Report for Tonopah Test Range, Nevada and Kauai Test Facility, Hawaii (Calendar Year 2007)

Tonopah Test Range (TTR) in Nevada and Kauai Test Facility (KTF) in Hawaii are government-owned, contractor-operated facilities operated by Sandia Corporation (Sandia), a wholly owned subsidiary of Lockheed Martin Corporation. The U.S. Department of Energy (DOE)/National Nuclear Security Administration (NNSA), through the Sandia Site Offi ce (SSO), in Albuquerque, NM, administers the contract and oversees contractor operations at TTR and KTF. Sandia manages and conducts operations at TTR in support of the DOE/NNSA’s Weapons Ordnance Program and has operated the site since 1957. Washington Group International subcontracts to Sandia in administering most of the environmental programs at TTR. Sandia operates KTF as a rocket preparation launching and tracking facility. This Annual Site Environmental Report (ASER) summarizes data and the compliance status of the environmental protection and monitoring program at TTR and KTF through Calendar Year (CY) 2007. The compliance status of environmental regulations applicable at these sites include state and federal regulations governing air emissions, wastewater effluent, waste management, terrestrial surveillance, and Environmental Restoration (ER) cleanup activities. Sandia is responsible only for those environmental program activities related to its operations. The DOE/NNSA/Nevada Site Offi ce (NSO) retains responsibility for the cleanup and management of ER TTR sites. Currently, there are no ER Sites at KTF. Environmental monitoring and surveillance programs are required by DOE Order 450.1, Environmental Protection Program (DOE 2007a) and DOE Manual 231.1-1A, Environment, Safety, and Health Reporting Manual (DOE 2007).

54 ENVIRONMENTAL SCIENCES↗