Search NASA⌕ Search

SEARCH · Search NASA

Results for “total cost of driving”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Implementation and Assessment of Advanced Analog Vector-Matrix Processor

This paper discusses the design and implementation of an analog optical vecto-rmatrix coprocessor with a throughput of 128 Mops for a personal computer. Vector matrix calculations are inherently parallel, providing a promising domain for the use of optical calculators. However, to date, digital optical systems have proven too cumbersome to replace electronics, and analog processors have not demonstrated sufficient accuracy in large scale systems. The goal of the work described in this paper is to demonstrate a viable optical coprocessor for linear operations. The analog optical processor presented has been integrated with a personal computer to provide full functionality and is the first demonstration of an optical linear algebra processor with a throughput greater than 100 Mops. The optical vector matrix processor consists of a laser diode source, an acoustooptical modulator array to input the vector information, a liquid crystal spatial light modulator to input the matrix information, an avalanche photodiode array to read out the result vector of the vector matrix multiplication, as well as transport optics and the electronics necessary to drive the optical modulators and interface to the computer. The intent of this research is to provide a low cost, highly energy efficient coprocessor for linear operations. Measurements of the analog accuracy of the processor performing 128 Mops are presented along with an assessment of the implications for future systems. A range of noise sources, including cross-talk, source amplitude fluctuations, shot noise at the detector, and non-linearities of the optoelectronic components are measured and compared to determine the most significant source of error. The possibilities for reducing these sources of error are discussed. Also, the total error is compared with that expected from a statistical analysis of the individual components and their relation to the vector-matrix operation. The sufficiency of the measured accuracy of the processor is compared with that required for a range of typical problems. Calculations resolving alloy concentrations from spectral plume data of rocket engines are implemented on the optical processor, demonstrating its sufficiency for this problem. We also show how this technology can be easily extended to a 100 x 100 10 MHz (200 Cops) processor.

Gary, Charles K.↗

Propulsion System Design using a Dual 3-Phase PM Synchronous Reluctance Machine with X-Type Multi-Level GaN Inverter

— A propulsion system design is exhibited here that comprises of an X-type GaN power module based dual multi-level inverter and a PM Synchronous Reluctance motor. With the critical benefits of multi-level operation, namely low common mode EMI noise, low switching loss, low current Total Harmonic Distortion (THD), smoother torque and lower iron loss, this topology targets high system-level efficiency and high power density while using reduced rare earth (RE) elements in its motor. General Motors and Purdue University jointly designed and developed this 800V class, highly scalable traction drive that can deliver 200+ kW of power suitable for C-SUV to truck vehicle class. The 3-phase electric machine design utilizes dual winding with 6 terminals to work in line with the GaN X-type inverter, and results in a tractive solution that ensures higher machine efficiency while reducing cost and uncertainty related to use and availability of heavy rare earth/rare earth elements in its rotor.

MOMEN, FAIZUL [General Motors LLC, Detroit, MI (Un↗

Radiation Hardness Assurance (RHA): Challenges and New Considerations

Use of commercial-off-the-shelf (COTS) components and emerging technologies often require space flight missions to accept elevated risk. The Radiation Hardness Assurance (RHA) flow includes environment definition, hazard evaluation, requirements definition, evaluation of design, and design trades to accommodate and mitigate the risk a project or program takes. Depending on the mission profile and environment, different missions may not necessarily benefit from the same risk reduction efforts or cost reduction attempts. While this poses challenges for the radiation engineer, it also presents opportunities to tailor the RHA flow to minimize risk based on the environment or design criticality while remaining within budget. This presentation will focus on an approach to RHA amidst the present challenges, using the same RHA flow as in the past, with examples from recent radiation test results. The current challenges and the types of risk will be identified. How these risks drive requirements development and realization will be explained with examples of device results and data for single event effects (SEE) and in one case total ionizing dose (TID).

Radiation Hardness Assurance (RHA); Risk Managemen↗

Degradation of Poly- and Perfluoroalkyl Substances (PFAS) in Water via High Power, Energy-Efficient Electron Beam Accelerator

The goal of the 2-year workplan was to see if electron beam (EB) could be used to break down a sub-set of the larger chemical family of per and polyfluoroalkylated substances (PFAS) in an energy efficient and economical manner when compared to conventional water treatment technologies. Year one (Y1) work focused on sample EB treatment work in the Fermi National Accelerator Laboratory’s (FNALs) Accelerator Applications Demonstration and Development (A2D2) EB accelerator. While there are reportedly thousands of types of PFAS, for the point of most of the work herein, a small subset was examined, typically perfluorooctane sulfonate (PFOS) and perfluorooctanoate (PFOA). PFOA and PFOS are two of the most well studied PFAS and are studied for baseline evaluations and are considered most useful. The work from Y1 provided information about the optimal operating parameters and additives to use when treating PFOS and PFOA via EB. The data were then used to see where in a water treatment system an EB accelerator would be best suited to treat PFAS. A conventional water treatment technology, GAC, was then compared to e-beam treatment technology with respect to energy and costs for treatment. In year two (Y2), several conventional e-beam accelerator designs, and FNAL’s developmental compact SRF accelerator design, were evaluated for their suitability in PFAS treatment, from an energy efficiency and cost standpoint. Several EB parameters were evaluated and optimized for the removal of PFOA and PFOS from water at normal pressure and temperature, measured as total PFAS removal. Under the optimized test conditions both PFOA showed complete destruction to inorganic fluoride, and PFOS to inorganic fluoride and sulfate, with mass balance. The effect on PFAS removal relative to solution pH, total EB dose, EB dose rate, dissolved oxygen concentration (DO), temperature, and initial PFAS concentration were evaluated. In general, PFOA was easier to destroy than PFOS. Degradation products, typically observed under less-than-optimal EB conditions, provided insight to degradation mechanisms. Products were identified to rule out possible deleterious biproduct formation. The water radiolysis radical reaction kinetics with PFOS and PFOA were not dependent on the initial concentration over 5-orders of magnitude from 2 μg/L to 20 mg/L. This is thought to be because there was an overabundance of the reactive water radiolysis radicals relative to PFAS molecules and largely attributed to aqueous electrons. The reaction rates appeared to be diffusion limited. Testing at higher concentrations (100-200 mg/L) showed a decrease in removal efficiency, suggesting alternative kinetics, possibly second order rates, at higher concentrations. In all, we successfully defined a set of optimal EB parameters to treat PFOA and PFOS at concentrations of 20 mg/L in water with destruction efficiencies near 100%. We further tested the optimized EB parameters with other types of PFAS, including shorter and longer fluorocarbon chain homologs of PFOA and PFOS, and PFAS with alternative functional groups such as sulfonamides. Based on our results EB can be optimized as an effective destructive technology for removing PFAS from water. The conditions optimized for PFOA and PFOS were less effective with ultra-short fluorocarbon compounds like TFMS, PFES, PFPS and PFBS, and likely require re-optimization of parameters to them. In all, it was determined that from a cost and energy efficiency standpoint, EB would be best applied to waste streams with relatively high concentrations of PFOS and PFOA and is not as cost effective as GAC treatment for removing low concentrations of PFAS from water. Higher concentrations of PFAS can be found in the wastewater of conventional treatment processes such as RO and IE and therefore EB may be used to supplement such treatment technologies. Some real-world IE regeneration wash water and RO reject water containing higher concentrations of PFAS and obtained from pilot scale industrial wastewater treatment system at a fluorochemical manufacturing facility, showed that EB could remove PFAS from such types of wastewaters. The IE regenerant wash water appeared to be the most efficient of the two types of wastewaters tested. However, some further optimization of the EB parameters for the specific PFAS types present in those wastewaters may be required. Also, the effects of co-present TOC and mineral salts should be considered during such optimization efforts. From the experimental Y1 results it was seen that the aqueous electron drives degradation of the PFAS. In a hypothetical water treatment skid using EB for PFAS destruction the parameters of the system should be optimized to promote aqueous electron production. Before EB treatment, the PFAS should be preconcentrated when possible, the pH should be raised to pH 10 or higher to enhance aqueous electron production, and the water should be nitrogen purged to remove dissolved oxygen to minimize aqueous electron scavenging. An excel spreadsheet was created that calculates optimal conditions based on inlet PFAS concentration and desired outlet concentration, by optimizing the accelerator power, dose rate, water treatment rate, pH and dissolved oxygen levels to reach the desired endpoint. Given this information on accelerator operating conditions five different EB accelerator systems were compared. One EB system was a continuous-wave, linear superconducting accelerator being designed at Fermilab. Three other EB systems (IMPELA at 5% and 25% duty factor and the ILU-14) were normal conducting pulsed linear accelerators. The fifth system was an IBA Rhodotron which is a normal conducting, circular, continuous-wave accelerator. The accelerator efficiency (% of the incoming power that is used in water treatment) was the dominating factor in accelerator choice. The radio frequency (RF) power supply and the accelerator design (superconducting versus warm technology) drive the accelerator efficiency. The IBA Rhodotron was seen to be the most energy efficient commercially available technology with a wall-plug (total) power efficiency of 43% at 400 kW. The Fermilab design, with a prototype for a different application currently being fabricated, was the most energy efficient at 55% when driven by a Klystron RF power supply and as high as 77% when powered by a magnetron. As the Fermilab design was the most energy efficient by approximately 10-30%, further design work was done on the accelerator and beam delivery system specific to the destruction of PFAS in water. The Fermilab design is unique from industrial accelerators in that is superconducting. Superconducting technology allows for the acceleration of electrons without losses. The accelerator must be cooled to below the point where it is superconducting and is operated around 4 degrees Kelvin. The bulk of the design work for the accelerator is on making the accelerator as energy efficient as possible so that it does not require liquid helium and can be cooled with conduction cooling via cryocoolers. Final design work resulted in an EB accelerator that would operate at minimally 200 kW and 10 MeV. Prototype construction would cost $\$ $7.8 million dollars when driven by a Klystron power supply. A second version of the same accelerator would cost $\$ $5.5 million dollars when driven by a magnetron that is still under development. The commercially available 300 kW IBA Rhodotron cost was estimated at approximately $\$ $9 million. While it is hard to directly compare, an operational GAC system used by 3M for groundwater treatment capital cost (2022 dollars) was estimated to cost $\$ $3.3 million. While the capital expense of the EB accelerator systems was higher than GAC, the accelerator EB treatment would result in destruction of the PFAS and not just sequestration of PFAS to form a new waste stream that requires further treatment or disposal. The operating cost to destroy the PFAS via 400 kw EB system was less than $\$ $1000/kg of PFAS destroyed when treating at a 20 mg/L PFAS concentration, compared to GAC with operating costs that calculated at $\$ $27,530 per kg of PFAS sequestered when treating 100 μg/L PFOA and PFOS combined concentration.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Shooting the Moon

This story is about an unlikely NASA mission to the Moon. It was unlikely because it was started with far too little time and too-little money to complete. It was unlikely because it was able to take chances to accept risk of failure. It was unlikely because it was searching for the unthinkable: water-ice on the moon... Figure 1-1: LCROSS Mission. The mission of the Lunar CRater Observation and Sensing Satellite (LCROSS) was to investigate the possibility of water ice in craters on the Moon s poles. This is certainly an interesting scientific topic in itself, but I intend to focus on the compelling experience of managing the LCROSS Project in the context of this storied Agency. Perhaps most interesting are the implications this story has for managing any development effort, lunar or not, and working a balance to achieve success. NASA is by design a risk-taking agency within the US Government. It could be argued that NASA s purpose in the aerospace community is to take on the really big challenges that either the corporate world can t afford, are not yet profitable endeavors, or are just too risky for private corporations to entertain. However, expectations of the Agency have evolved. A combination of grim human tragedies and some very public cost and schedule overruns have challenged the public s and Congress s tolerance for risk-taking within the Agency. NASA, which is supposed to be in the business of taking risks to do bold, difficult things, has become less and less able to do so within its cost framework. Yet effectively replacing prudent risk management with attempts to "risk-eliminate" is completely unaffordable. So where does risk-taking fit within the Agency, or within private/corporate organizations for that matter? Where astronauts play there is clearly concern about risk. When an organization puts humans in harm s way, it is understandably going to take extra effort to assure nobody gets hurt. Doing so, of course, costs money - a lot of money to pay for labor and hardware which is attempting to assure nothing will go wrong. Sophisticated designs, with doubly- or triply-redundant systems, extensive testing to verify those systems, and numerous engineering test units built to learn and evolve a hardware design, all drive the cost and time required to implement. Human spaceflight is an expensive business because of the exceptional system complexity and levels of assurance required for human space travel. What about missions that do not involve human spaceflight? What about missions whose potential failure will not take a human life, whose costs are small and whose urgency and importance are limited by design? A portfolio consisting of this type of mission can be designed to be risk tolerant, not requiring large expenditures to guarantee against failure. With the money saved, the number of missions that can be executed within the portfolio grows, or the total cost of the portfolio can be reduced. The NASA LCROSS mission is a pathfinder example of a low-cost, quick turn-around mission which struck a balance on mission risk, while accomplishing big objectives, like defining how we understand the Moon.

Andrews, Daniel R.↗

Developing Fuel Cell Electric Powertrain Architectures for Commercial Vehicles

Here, this article addresses the architecture development for a commercial vehicle fuel cell electric powertrain by establishing a clear multi-step formalized workflow that employs a unique technoeconomic solution for architecture selection. The power capability of the fuel cell, the energy capacity and chemistry of the electrical energy storage (battery), the DC-DC converter (including the input current rating and isolation resistance requirements), the traction drive solution, the on-board hydrogen storage solution, and the real-time power-split management of the fuel cell and the battery are all considered and developed in this effort. The methods were used to select architecture for Class 8 urban, regional, and line haul applications. When compared to traditional load-following power-split controllers, an energy management power-split controller can increase system energy efficiency by up to 19.5%. The energy-efficient power-split controller may increase the required battery capacity for an equivalent life by up to 2.6 times. The impact on the total cost of ownership (TCO) for a variety of financial cases demonstrates that high C-rate capable batteries have the potential to provide better TCO solutions over a six-year vehicle life than low C-rate capable batteries. To achieve TCO parity with the 600 A non-isolated DC-DC converter case, the specific choice of the fuel cell DC-DC converter to achieve a target power output based on current levels (from 500 A to 2400 A) shows that efficiency decreases and cost increases due to the higher current, requiring fuel cell prices to decrease by $50–$100/kW, $60–$110/kW, and $100–$220/kW for urban, regional, and line haul applications, respectively. Key recommendations for powertrain system architectures are provided, with specifics based on vehicle dynamics, mission and application characteristics, end customer use-case profile, critical powertrain component costs, and architecture selection cost function. This study rigorously demonstrates the interplay of the above parameters, with a focus on TCO, and provides application decision-makers with a mechanism and well-defined set of impact factors to consider as part of their architecture selection process.

25 ENERGY STORAGE↗

Energy Analysis: Ways to Save Energy and Reduce the Emissions in Wastewater Treatment Plants

The key of this study is to explore the primary energy consumers in wastewater treatment plants, which is considered as one of the major energy consumers, and introduces the best solution to save energy and reduce emissions in these facilities. This study is based on the energy assessment and analyses of eleven wastewater treatment plants. Through the investigation, it was found that plants can save up to 44,158 MWh of the energy consumption which is 47% from the total electricity consumption with a 17% reduction in the total utility bills and that about 2.5 million dollars cost savings after reviewing the currently facilitated energy system. Additionally, an average of five years' payback period resulted in most energy-saving recommendations. A vast potential of greenhouse gas emissions can be reduced with a total range reduction between 13 to 35 million kg of CO 2 based on the speed reduction percentage.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A country-scale green energy-water-hydrogen nexus: Jordan as a case study

Many developing countries suffer from a shortage of clean energy-water production, causing significant dependency on imported fossil fuel to meet the local energy and freshwater demands. Furthermore, when planning a 100 % renewable energy system (RES) to match the energy demand on an hourly basis, the RES is usually oversized. Hence, unavoidable large amounts of excess energy would be generated during hours of high production, low demand, and fully charged energy storage systems (ESSs). Hence, using Jordan as a case study, this work proposes a novel integrated system of wind, solar photovoltaic (PV), and lithium-ion ESS to match 100 % of the country's energy demand while using the excess generated power to drive reverse osmosis water desalination plants to match the demand of freshwater as well. Furthermore, the remaining excess energy is used for producing green hydrogen. A techno-economic optimizer was developed to show that this concept is indeed feasible. Here, the model was used to scan Jordan for the fitting sites of the highest demand-supply matching and the lowest levelized cost of electricity (LCOE), simultaneously. Three different integration scenarios are presented, namely PV-ESS, wind-ESS, and hybrid PV-wind-ESS RESs. The hybrid system showed the best performance, especially compared to the wind-ESS RES, in terms of total installed capacity (33.37 GW), LCOE (0.0492 USD/kWh), specific water cost (0.3629 USD/m 3 ), and energy and water demand-supply fractions (99.47 and 96.16 %, respectively). Storing desalinated water in natural aquifers was found to be a favorable option to enhance the performance of the three systems, where stored water by the end of the year was sufficient to cover the freshwater requirements for several following years. Finally, the remaining excess energy is used to produce green hydrogen with an annual production of up to 1.37 million tons and a specific cost down to 1.08 USD/kg.

14 SOLAR ENERGY↗

TBIRD, a rapid prototyping approach for design, assembly, and test of a LEO-to-ground lasercom CubeSat

The TeraByte InfraRed Delivery (TBIRD) system is a 3U payload on a 6U CubeSat launched in May 2022 which has now demonstrated space to ground links of >1 Terabyte (TB) per pass at a max data rate of 200Gbps. As a CubeSat mission, the development of the TBIRD payload was focused on low SWaP and a “rapid prototyping” approach which accepted higher risks to accelerate the schedule and reduce costs. The optomechanical design process followed standard in-house processes to develop a system that would be robust to LEO environmental loads, with a focus on the stability of the transmit (Tx) and receive (Rx) channel performance metrics. The driving requirement of maintaining 20μrad pointing error between the TX and Rx channels forced specific attention to thermal and mechanical load changes over operational conditions, which drove major design decisions. This paper describes some of engineering challenges overcome and approaches used to make TBIRD a successful program, as well as some of the tradeoffs of rapid prototyping precision optical payloads. TBIRD successfully met and exceeded the total downlink requirements listed above, with a bandwidth of 200Gbps and a total downlink of 4.8TB of information in a single pass.

TBIRD↗

New Rover Conops with High-Performance Onboard Computing: Give Up Raw Data to Reduce Ops Cost and Do More Science

A major portion of time during the tactical operation of Mars rovers is spent for selecting, prioritizing, and coordinating sciences and engineering activities such that they fit within resource constraints, including the downlink data volume, energy, and time. In particular, the downlink data volume constraint is getting particularly tighter in recent missions because modern instruments produce increasingly high data volume while the communication bandwidth is essentially bounded by the law of physics. Tactical operation would be substantially simplified, hence the operation cost could be reduced, if the data volume constraint is relaxed or even removed. In this abstract, we propose a new operation paradigm for achieving this goal. The key observation is that, both in science and engineering applications, the bit size of raw data is typically much greater than the volume of processed information that is needed for scientific or engineering analysis. For example, a full-resolution image from Mastcam-Z, the main science camera on Perseverance, is about 700 kB in volume and we downlinked 29,685 images up to Sol 243, totaling ~20 GB of data. But of course, scientists do not use every pixel of these images; what they really look for in the images are geological features, typically represented by specific geometric configurations or textures. An end product after processing hundreds of Mascam-Z images could be a single geological map summarizing the spatial distribution of the features. For another example, a 100-meter drive of Perseverance produces 7-12 MB of drive telemetry, which records every detail of the rover's motion at 8 Hz, including position, attitude, steering angles, encoder readings, motor currents and many other information. But what the ground engineers eventually pay attention to is the signs of anomaly, such as excessive motor currents or high slip; if a drive is nominal, the vast majority of this data is unused. What if, then, we process the raw data onboard and only downlink the processed data that is relevant to scientific or engineering analyses, such as a list of detected science features (with cropped images) or a list of potential signs of anomaly while driving? A major roadblock for such onboard, high-level information processing has been the onboard computational resource. RAD750, the main onboard computer of Perseverance, is obviously not sufficient for performing complex image or signal processing such as object detection, semantic segmentation, or anomaly detection. Interestingly, RAD750 is not the best processor that Perseverance has; Qualcomm's Snapdragon 801, a modern mobile processor, is on her Heli Base Station, a device for communicating with Mars Helicopter Ingenuity; also, Intel's Atom E3845 processors are on engineering cameras. In the reminder of this paper, we will introduce two particular uses cases of these high-performance co-processors (meaning auxiliary CPU, GPU, or other types of processors that are separate from the main processor that runs the main flight software) for lowering operation cost and accommodating more science activities for a given communication constraint.

Didier, A.↗

A Tandem Electrolysis Process for Multi-Carbon Chemical Production from Carbon Dioxide (Final Technical Report)

a two-step CO 2 electroreduction process for selective production of acetate and ethylene was successfully developed at the kW-scale. The CO 2 and CO electrolyzers were first investigated individually on the Watt-scale to achieve high current densities and more durable operation by using a reinforced GDL. High CO 2 conversion was obtained in the first CO 2 electrolyzer to produce a CO-dominant gas stream with minimal CO 2 , and highly pure acetate stream was produced in the second CO electrolyzer by using NiFe anode, which promoted alcohol oxidation to carboxylates. The two-step process operated stably for 200 h with acetate and ethylene as the major C 2+ products. Degradation mechanism study revealed that the flooding and the salt formation in the GDL is likely the biggest contributor to the performance degradation for both CO 2 and CO electrolyzers. A 1,000 cm 2 CO electrolyzer stack was then designed, fabricated, and operated up to a total current of 300 A along with a 500 cm 2 CO 2 electrolyzer stack which was operated up to a total current of 100 A. The CO electrolyzer stack demonstrated good stability at 300 A for at least 125 h at a carbon selectivity >96%. The impact of CO 2 , O 2 , N 2 , SO x , and NO x gas impurities on the CO electrolyzer stack was studied and a relatively high resistance to these contaminants was demonstrated. Electroreduction of CO 2 into acetic acid was also demonstrated to be environmentally favorable when compared to the traditional production of acetic acid when powered by renewable electricity. Additionally, electricity cost was identified as the primary source of cost sensitivity indicating substantial economic improvements could be achieved by continuing to drive down the cost of renewable electricity. Overall, the presented approach demonstrates the feasibility of the two-step electrochemical CO 2 reduction process for the effective production of C 2+ products at the kW-scale which should inspire future scaling efforts accelerating commercialization.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Evaluating the current perceived cost of ownership for buses and trucks in China

Decarbonizing commercial vehicles, including buses, trucks, and special purpose vehicles, is essential for China to achieve its carbon neutrality target by 2060. However, understanding the adoption barriers of alternative fuel technologies for commercial vehicles has largely been limited to the total cost of ownership approach that mainly considers tangible costs. Additionally, this study proposes a perceived cost of ownership (PCO) model, which monetizes both tangible and implicit costs, including charging annoyance for buses and trucks by size and classification under different use scenarios. In the case study for China's current bus and truck market, the PCO of alternative fuel technologies, such as battery electric vehicles (BEVs) and fuel cell electric vehicles (FCEVs) are 27%–129% and 31%–86% higher than the most economically competitive powertrains – the compressed natural/liquefied petroleum gas technology and hybrid electric technology. BEVs could be cost-effective in the mini/midsize bus segment or in the daily short-distance driving scenario, and FCEVs could firstly be deployed in cities with a low hydrogen price. Though the implicit costs caused by range anxiety and charging annoyance account for at least 27% of BEV's PCO, making BEV uncompetitive, the battery swapping technique could reduce the implicit cost and overall cash outflow for BEV owners.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Structures Self-Assembled Through Directional Solidification

Nanotechnology has created a demand for new fabrication methods with an emphasis on simple, low-cost techniques. Directional solidification of eutectics (DSE) is an unconventional approach in comparison to low-temperature biomimetic approaches. A technical challenge for DSE is producing microstructural architectures on the nanometer scale. In both processes, the driving force is the minimization of Gibb's free energy. Selfassembly by biomimetic approaches depends on weak interaction forces between organic molecules to define the architectural structure. The architectural structure for solidification depends on strong chemical bonding between atoms. Constituents partition into atomic-level arrangements at the liquid-solid interface to form polyphase structures, and this atomic-level arrangement at the liquid-solid interface is controlled by atomic diffusion and total undercooling due to composition (diffusion), kinetics, and curvature of the boundary phases. Judicious selection of the materials system and control of the total undercooling are the keys to producing structures on the nanometer scale. The silicon-titanium silicide (Si-TiSi2) eutectic forms a rod structure under isothermal cooling conditions. At the NASA Glenn Research Center, directional solidification was employed along with a thermal gradient to promote uniform rods oriented with the thermal gradient. The preceding photomicrograph shows the typical transverse microstructure of a solidified Si-TiSi2 eutectic composition. The dark and light gray regions are Si and TiSi2, respectively. Preferred rod orientation along the thermal gradient was poor. The ordered TiSi2 rods have a narrow distribution in diameter of 2 to 3 m, as shown. The rod diameter showed a weak dependence on process conditions. Anisotropic etch behavior between different phases provides the opportunity to fabricate structures with high aspect ratios. The photomicrographs show the resulting microstructure after a wet chemical etch and a dry plasma etch. The wet chemical etches the silicon away, exposing the TiSi2 rods, whereas plasma etching preferentially etches the Si-TiSi2 interface to form a crater. The porous architectures are applicable to fabricating microdevices or creating templates for part fabrication. The porous rod structure can serve as a platform for fabricating microplasma devices for propulsion or microheat exchangers and for fabricating microfilters for miniatured chemical reactors. Although more work is required, self-assembly from DSE can have a role in microdevice fabrication.

Dynys, Frederick W.↗

1989 Seattle Household Travel Survey Wave 1

The Puget Sound Transportation Panel was initiated in the fall of 1989. The Seattle Household Travel Survey Wave 1, conducted in 1989, was the first wave in a ten-part longitudinal panel survey initiated by the Puget Sound Regional Council to assess the travel patterns of households in the Puget Sound region of Washington state. The panel intended to serve three basic objectives: 1) to be a metropolitan “current population survey” to track changes in employment, work characteristics, household composition, and vehicle availability; 2) to monitor changes in travel behavior and responses to changes in the transportation environment; and 3) to examine changes in attitudes and values as they affect mode choice and travel behavior. This collection contains the first set of panel data for households in King, Kitsap, Pierce, and Snohomish counties. A total of 1,687 households successfully completed a phone survey and returned completed travel diaries for household members age 15 and older. Respondents were instructed to record their mode of transportation, trip purpose, number of vehicle passengers, departure and arrival times, ride fare, and parking costs in a two-day trip diary. Demographic information for this study includes age, gender, education, employment status, and household income.

1Hz data↗

Adaptive Site Management Strategies for the Hanford Central Plateau Groundwater

Adaptive site management (ASM) is a systematic and iterative management approach that can be used to expedite the remediation of large and/or complex sites. ASM is defined as a formal and systematic project or site management approach centered on rigorous site planning and a firm understanding of site conditions and uncertainties, using science and technology to routinely re-evaluate and prioritize site remedial actions and characterization activities. The goal of the approach is to create a framework of structured and continuous planning, implementation, and assessment processes that accommodates new information and changing site conditions to develop effective and efficient cleanup approaches that achieves the required outcome(s) while optimizing costs, cleanup timeframe, and performance. Central to ASM is an evolving conceptual site model (CSM). Over time, incremental reductions in uncertainty associated with the CSM will occur, while supporting continued progress toward site cleanup and closure through remedy optimization and evaluation. ASM has the potential to expedite cleanup for the Central Plateau area at Hanford through a planned and systematic approach for reducing uncertainty with targeted characterization activities, while continuing remediation activities that advance cleanup for key risk-driving contaminants. A core component of cleanup within the Central Plateau is the 200 West Pump-and-Treat (P&T) system. Even with an active P&T remedy, uncertainty exists with respect to plume distributions, total mass in the aquifer, and currently known continuing sources. Additional uncertainty is associated with multiple contaminant source locations in the vadose zone, which have the potential to create new groundwater plumes in the absence of any source control measures, although not all contaminant fluxes to groundwater will result in contaminant concentrations above cleanup levels. Collectively, these uncertainties need to be addressed in the CSM to support effective and efficient site progress toward cleanup goal(s). Other nontechnical factors that may warrant an ASM approach at the Hanford Central Plateau are associated with the formation of operable units (OUs) used to manage cleanup. With the exception of the 200-ZP-1 OU, the three remaining groundwater OUs only have interim action records of decision. Nine vadose zone source area OUs are also in the early stages of the remedial investigation and feasibility study process, with pending characterization and technology identification activities. A set of proposed site objectives for the Central Plateau are provided in this document as an initial consideration/example and basis for discussion for ASM implementation. These example site objectives were selected with the goal of maintaining protectiveness at the Columbia River through confinement of contaminant plumes within an administratively controlled area below existing surface waste sites and waste disposal facilities. Although site decision makers and regulators need to provide concurrence, these site objectives are used in this document to describe the elements of an ASM approach, including selection of interim objectives and a long-term adaptive management plan. Interim objectives are also defined to yield measurable incremental progress toward the overall site goals. This document identifies initial technical considerations for developing an ASM framework for the Central Plateau cleanup decisions. These considerations are intended to facilitate more specific decisions, such as objectives, near- and long-term actions, and performance metrics, to develop an overall approach that maintains protectiveness but recognizes the uncertainty, long timeframe, and technical challenges that need to be considered in selecting, implementing, and managing remediation at the Hanford Central Plateau.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Utilization of waste heat from a commercial GT for freshwater production, cooling and additional power: Exergoeconomic analysis and optimization

In this work, a multigeneration system is proposed for power, cooling and freshwater production. The waste heat from a SIEMENS SGT6-2000E GT is utilized to drive a supercritical CO 2 recompression Brayton cycle (SCRBC) and multi-effect desalination (MED) with thermal vapor compressor (TVC), while the waste heat from the pre-cooler of the SCRBC is utilized to drive an absorption cooling cycle. Detailed thermodynamic, exergy and exergoeconomic analyses are performed for the proposed multigeneration system using Engineering Equation Solver (EES). A sensitivity study is also performed to study the effects of the main operational parameters on the proposed system performance. Finally, multi-objective optimization using a genetic algorithm approach in EES is carried out to reach the optimal design. The proposed system can consume 34.2% less energy input and reduce CO 2 emission by 39.3% compared to the stand-alone systems for power, cooling and freshwater production. The results show that the energy utilization factor and exergy efficiency of the proposed system are improved by 33.6% and 14.3%, respectively, while the total unit product cost is reduced by 11.3% compared to the stand-alone GT cycle. Further, from exergoeconomic optimization, the proposed system can produce 132.4 MW of power, 7.09 MW of cooling and 650 kg/s of freshwater at energy utilization factor of 57.5%, exergy efficiency of 39.7% and total unit product cost of 16.3 $/GJ.

42 ENGINEERING↗

Standards for Radiation Effects Testing: Ensuring Scientific Rigor in the Face of Budget Realities and Modern Device Challenges

An overview is presented of the space radiation environment and its effects on electrical, electronic, and electromechanical parts. Relevant test standards and guidelines are listed. Test standards and guidelines are necessary to ensure best practices, minimize and bound systematic and random errors, and to ensure comparable results from different testers and vendors. Test standards are by their nature static but exist in a dynamic environment of advancing technology and radiation effects research. New technologies, failure mechanisms, and advancement in our understanding of known failure mechanisms drive the revision or development of test standards. Changes to standards must be weighed against their impact on cost and existing part qualifications. There must be consensus on new best practices. The complexity of some new technologies exceeds the scope of existing test standards and may require development of a guideline specific to the technology. Examples are given to illuminate the value and limitations of key radiation test standards as well as the challenges in keeping these standards up to date.

Test Standard↗