Search NASASearch

SEARCH · Search NASA

Results for “uncertainty estimation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

278 records · Page 6

Artemis I Space Launch System Base Heat Shield Thermal Protection System Performance

The Space Launch System (SLS) Core Stage base heat shield experienced the highest external heating environments on the entire launch vehicle during Artemis I ascent flight. This result was consistent with design predictions. The base heat shield experiences P50 cork combustion dynamics at low altitudes, plume-induced recirculation at moderate altitudes and then in-space base flow physics out to Main Engine Cut-Off (MECO). The base heat shield thermal protection system (TPS) is composed of a P50 cork ablator which is bonded to a substrate. The heat shield protects the gimbal actuation system, RS-25 turbomachinery systems and other aft section sensitive components during ascent. This paper estimates the base heat shield TPS performance from Artemis I using flight data from the NASA Langley Research Center’s Scientifically Calibrated In-Flight Imagery (SCIFLI) Airborne Multispectral Imager (SAMI), development flight instrumentation (DFI) and other TPS recession flight measurements. Predictions from computational and ground test-derived engineering ablation models and observations are also applied. Since no base heat shield substrate thermocouple data were obtained for Artemis I, an estimate of the TPS performance data is derived here. This data assesses thermal margin of the SLS Core Stage base heat shield and best informs the Artemis II Crewed mission to the moon.

aerothermodynamics

A Unified Scaling Framework for Comparative Analysis of Major Electrical Machine Topologies

This paper presents a unified framework for comparing major electrical machine topologies under identical output and thermal constraints, with emphasis on supply-chain-aware selection among rare-earth-intensive, reduced-rare-earth, and rare-earth-free solutions. Using power factor and air-gap flux density as the principal descriptors, the framework links topology choice to relative size, copper demand, magnet dependence, cost sensitivity, and inertia. To support robust early-stage screening, the deterministic scaling model is combined with uncertainty representation, Monte Carlo scenario propagation, and hesitationaware ranking. The results show that rare-earth-rich machines remain compact and dense, whereas reduced-rare-earth and rare-earth-free alternatives become more attractive under specific material-risk and cost scenarios.

Kumar, Praveen [ORNL] (ORCID:0000000291877857)

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

A Comparison of Doppler Lidar Wind Sensors for Earth-Orbit Global Measurement Applications

Now, there are four Doppler lidar configurations which are being promoted for the measurement of tropospheric winds: (1) the coherent CO2 Lidar, operating in the 9 micrometer region using a pulsed, atmospheric pressure CO2 gas discharge laser transmitter, and heterodyne detection; (2) the coherent Neodymium doped YAG or Glass Lidar, operating at 1.06 micrometers, using flashlamp or diode laser optical pumping of the solid state laser medium, and heterodyne detection; (3) the Neodymium doped YAG/Glass Lidar, operating at the doubled frequency (at 530 nm wavelength), again using flashlamp or diode laser pumping of the laser transmitter, and using a high resolution tandem Fabry-Perot filter and direct detection; and (4) the Raman shifted Xenon Chloride Lidar, operating at 350 nm wavelength, using a pulsed, atmospheric pressure XeCl gas discharge laser transmitter at 308 nm, Raman shifted in a high pressure hydrogen cell to 350 nm in order to avoid strong stratospheric ozone absorption, also using a high resolution tandem Fabry-Perot filter and direct detection. Comparisons of these four systems can include many factors and tradeoffs. The major portion of this comparison is devoted to efficiency. Efficiency comparisons are made by estimating the number of transmitted photons required for a single pulse wind velocity estimate of + or - 1 m/s accuracy in the middle troposphere, from an altitude of 800 km, which is assured to be reasonable for a polar orbiting platform.

Robert T Menzies

Storing Affordability: Battery Storage as an Asset to Reduce Data Center Cost Shifts

This report examines how battery energy storage systems (BESS) can help utilities accommodate large load growth while protecting affordability for existing ratepayers. Rapid growth in electricity demand from artificial intelligence (AI) data centers is straining the U.S. grid. Furthermore, many new data centers are entering rural markets, which could offer economic benefits but may also pose implementation challenges for smaller utilities. At the same time, retail electricity prices are increasing faster than inflation, elevating customer affordability as a key challenge. While data centers have not been the primary driver of increases in residential prices to date, they have pushed wholesale energy and capacity prices higher in several markets. Fundamental utility cost-allocation principles show that data center growth can be rate-positive for existing customers only if new peak demand grows faster than the costs a utility must incur to serve it. Several factors, including a utility’s degree of wholesale market exposure, forecast uncertainty and stranded-asset risk, and tariff design can determine the outcome of load growth on retail rates. Energy storage can make several affordability contributions in the face of this landscape of uncertainty and market volatility, including deferral of higher-cost grid investments through improved utilization of existing assets and flexibility of new large loads, insulation from volatile wholesale prices through peak shaving, and reliability support to address grid risks stemming from the behavior of AI data center loads. Different potential BESS deployment pathways—utility-scale front-of-the-meter systems, aggregated small-scale storage installations, and data center-sited behind-the-meter storage—are compared against each other and against conventional capacity alternatives. This framework is intended as a conceptual resource to utilities, particularly smaller public utilities with rural service territories, who may be considering the role that energy storage can play in insulating existing ratepayers from data center cost shifts.

25 ENERGY STORAGE

Polynomial-time preparation of low-temperature Gibbs states for two-dimensional toric code

In this work, we propose a polynomial-time algorithm for preparing the Gibbs state of the two-dimensional toric code Hamiltonian at any temperature, starting from any initial state, significantly improving upon prior estimates that suggested exponential scaling with inverse temperature. We prove that fast mixing at low temperature for the two-dimensional toric code can be achieved by augmenting local jump operators with simple global jump operators, which enable efficient transitions between logical sectors. To establish tight lower bounds on the spectral gap, we introduce a new reduction method that eventually maps the problem to estimating the spectral gap of a perturbed graph Laplacian on a stair graph. Our proof also shows that the Lindblad dynamics with a digitally implemented low-temperature local Davies generator is able to efficiently drive the quantum state toward the ground state manifold.

97 MATHEMATICS AND COMPUTING

Quantum Filtering and Analysis of Multiplicities in Eigenvalue Spectra

Fine-grained spectral properties of quantum Hamiltonians, including both eigenvalues and their multiplicities, provide useful information for characterizing many-body quantum systems as well as for understanding phenomena such as topological order. Extracting such information with small additive error is #BQP-complete in the worst case. In this work, we introduce QFAMES (quantum filtering and analysis of multiplicities in eigenvalue spectra), a quantum algorithm that efficiently identifies clusters of closely spaced dominant eigenvalues and determines their multiplicities under physically motivated assumptions, which allows us to bypass worst-case complexity barriers. QFAMES also enables the estimation of observable expectation values within targeted energy clusters, providing a powerful tool for studying quantum phase transitions and other physical properties. We validate the effectiveness of QFAMES through numerical demonstrations, including its applications to characterizing quantum phases in the transverse-field Ising model and estimating the ground-state degeneracy of a topologically ordered phase in the two-dimensional toric code model. We also generalize QFAMES to the setting of mixed initial states. Our approach offers rigorous theoretical guarantees and significant advantages over existing subspace-based quantum spectral analysis methods, particularly in terms of the sample complexity and the ability to resolve degeneracies.

97 MATHEMATICS AND COMPUTING

Emergence of Complex Modes in Lightly Damped Structural Systems

In this short presentation format, we will provide a set of useful equations, relationships, and physical interpretations direct from the damped two-mode interaction problem. We will demonstrate that the results from the two-mode interaction problem are in direct agreement with observed test data. Practical methods for estimating the parameters driving the relations direct from modal test data are provided. We finalize with two examples demonstrating weak and strong interactions.

spaceflight hardware

Riddles About the Origin and Thermal History of the Moon

Analyses of lunar rocks have confirmed that the interior of the Moon has been subjected to magmatic differentiation, as has been determined by calculation of the thermal history of the Moon. However, it appears that differentiation occurred so early that it could not have been related to heating by long-lived radioactive elements, but rather indicates a high initial temperature of the Moon. The reasons for the high initial temperature remain unknown. The presence of a central, partially melted area revealed by seismic observations forces us to reject convective models of the Moon, while the dimensions of this area, together with the measured heat fluxes from the interior, serve as "boundary conditions" for any new calculations of the thermal history for a two-layered differentiated model of the Moon operative over the past 3.5 billion years. If we start with the early differentiation of the Moon and the high content of long-lived radioactive elements in it, explanation of its current thermal properties represents no difficulty. But these prerequisites themselves remain unexplained. Due to the continuing controversy concerning the true nature of the process of magmatic differentiation of the Moon, estimation of the composition of the entire Moon on the basis of analyses of surface rock remains unreliable, and use of these estimates to clarify the origin of the Moon is premature. Existing hypotheses concerning the origin of the Moon encounter dynamic difficulties, as well as difficulties with explanation of the high initial temperature, to say nothing of the difficulty involved in explaining the proposed differences in the composition of the Earth and Moon.

B Yu Levin

Electron Velocity Moments in the Solar Wind. I. Calibration of the Wind 3DP EESA Low Detector

Calibrated measurements of electron velocity distribution functions (VDFs) are necessary to characterize fluid and kinetic processes in weakly collisional and nearly collisionless plasmas such as the solar wind. Therefore, we analyzed 3,996,051 electron VDFs observed by the Wind 3DP thermal electron detector near 1 astronomical unit (au) between January 1, 2005 and November 25, 2017. The data were calibrated for each electron VDF to produce accurate velocity moments in the solar wind. This is the first full solar cycle coverage electron velocity moment dataset in the near-Earth solar wind. Herein (Paper I) we discuss the calibration process/algorithms and the velocity moment constraints, uncertainties, and resulting public dataset. In the second paper (Paper II), we statistically analyze the electron velocity moment dataset.

plasmas

The 20 kW battery study program

Six battery configurations were selected for detailed study and these are described. A computer program was modified for use in estimation of the weights, costs, and reliabilities of each of the configurations, as a function of several important independent variables, such as system voltage, battery voltage ratio (battery voltage/bus voltage), and the number of parallel units into which each of the components of the power subsystem was divided. The computer program was used to develop the relationship between the independent variables alone and in combination, and the dependent variables: weight, cost, and availability. Parametric data, including power loss curves, are given.

Source record

Purpose, Design, and Analysis of the NSTX-U Centerstack Casing Lateral Support Shims

The National Spherical Torus Experiment Upgrade (NSTX-U) centerstack casing surrounds the central magnet core of NSTXU. It provides the inner vacuum boundary of the plasma chamber and supports the radially inboard plasma facing components lining the plasma chamber. The casing is supported like a cantilever, fixed at the lower flange by a connection to the TF Bundle through a G-10 ring. It is flexibly supported at the top by bellows, and insulated shims intended to react the largest part of the inventory of the disruption loads at the upper support, thereby protecting the upper and lower connections from excessive loads. A large part of the qualification of the casing and tiles requires addressing and quantifying disruption loads. These have been estimated based on extensions of the behavior of NSTX during its run period roughly 15 years ago. Structural qualification of the Upgrade used these estimates of the loading as input to calculations to demonstrate adequacy for a “most probable” disruption. The estimates are included in a requirements document to guide conservative design of all components loaded by disruptions. However, the changes made for the upgrade made the extrapolation of disruption behavior uncertain. Disruptions include axisymmetric loading from axisymmetric currents induced in the vessel shells. In addition, more complex currents called Halo currents are a result of plasma poloidal currents impinging on the casing. The halo currents add another layer of uncertain behavior and net lateral loading to the casing. As a result, NSTX-U is equipped with a number of instruments intended to assess the nature and severity of disruptions. The casing shims are required for lateral support of the casing, but these have also been converted to load cells to provide another measure of the magnitude of symmetric and asymmetric loading. Some of the logic in the development of the requirements document are presented. Electromagnetic analysis of axisymmetric and halo loading is described. Global simulations of the casing transient dynamic response, and local analysis and testing of the shim/load cell are included. The shim load cells and other instrumentation will be an important guide in planning NSTX-U experiments beyond its next run period expected in late 2026 or early 2027.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY

A multi-region approach for the analysis of porous materials and gas-solid reactions using USAXS-SAXS-WAXS: application to CaO carbonation

The reaction rate of gas-solid non-catalytic reactions is typically investigated using reactant conversion data over time and ex-situ measurements of the porous solid reactant textural properties; these data enable the experimental estimation of the initial intrinsic reaction rate, whereas the evolution of the textural properties and the reaction rate over time are evaluated theoretically using reaction models. In this work, a different methodology is presented, based on: a) in-situ time-resolved USAXS-SAXS-WAXS measurements of the solid sample, and b) a multi-region modeling approach; this methodology allows for the estimation of the textural properties and the intrinsic reaction rate at any time during the reaction. Referring to a reaction in which a solid product is obtained from a solid reactant and a gaseous reactant, the porous particle is described as consisting of several distinct regions with different microstructural properties, and both a gas-solid reaction model and a SAXS model are derived and applied to the carbonation of porous CaO. The proposed reaction model highlights the role of the inaccessible reactant and accurately predicts the solid reactant conversion versus time profile. The SAXS model accurately predicts the measured linear trends of the Porod invariant and of the pre-factor of the power law scattering profile versus CaO mass fraction; in the absence of chemical reactions, the proposed equations extend classical SAXS theory to porous materials containing macropores and nonporous solid phases in addition to standard nanoscale inhomogeneous regions.

CO2 solid sorbents

Dark Energy Survey Year 6 results: Redshift calibration of the MagLim++ lens sample

In this work, we derive and calibrate the redshift distribution of the MagLim++ lens galaxy sample used in the Dark Energy Survey Year 6 (DES Y6) 3 x 2pt cosmology analysis. The 3 x 2pt analysis combines galaxy clustering from the lens galaxy sample and weak gravitational lensing. The redshift distributions are inferred using the SOMPZ method - a Self-Organizing Map framework that combines deep-field multi-band photometry, wide-field data, and a synthetic source injection ( B alrog) catalog. Key improvements over the DES Year 3 (Y3) calibration include a noise-weighted SOM metric, an expanded Balrog catalogue, and an improved scheme for propagating systematic uncertainties, which allows us to generate O(10 8 ) redshift realizations that collectively span the dominant sources of uncertainty. These realizations are then combined with independent clustering-redshift measurements via importance sampling. The resulting calibration achieves typical uncertainties on the mean redshift of 1-2%, corresponding to a 20-30% average reduction relative to DES Y3. We compress the n(z) uncertainties into a small number of orthogonal modes for use in cosmological inference. Marginalizing over these modes leads to only a minor degradation in cosmological constraints. Here, this analysis establishes the MagLim++ sample as a robust lens sample for precision cosmology with DES Y6 and provides a scalable framework for future surveys.

dark energy

Harness Thermal Heat Loss Measurement for a Lunar Surface-Deployed LEMS Artemis III Payload

The Lunar Environment Monitoring Station (LEMS) is an autonomous, survive-the-lunar-night seismic suite to be deployed on the Lunar surface by the Artemis III crew and designed to operate continuously for two years. It will see the extremes of the Lunar south pole thermal environment where surface temperatures range from -200°C to +20°C and where nighttime duration is at least 354 hours. Given power and mass constraints, the thermal system is limited to 2.5 Watts of heat during the lunar night. The electrical harnessing named the Signal and Power Passthrough (SAPP) was designed to minimize heat loss while meeting power and signal integrity requirements. To mitigate risk due to uncertainty associated with the harnessing materials, routing, and tie-downs, a flight-like thermal conductance test was performed to measure the heat loss. The test methodology, results, and model correlation are presented.

TVAC

Harness Thermal Heat Loss Measurement for A Lunar Surface-Deployed LEMS Artemis III Payload

The Lunar Environment Monitoring Station (LEMS) is an autonomous, survive-the-lunar-night seismic suite to be deployed on the Lunar surface by the Artemis III crew and designed to operate continuously for two years. It will see the extremes of the Lunar south pole thermal environment where surface temperatures range from -200°C to +20°C and where nighttime duration is at least 354 hours. Given power and mass constraints, the thermal system is limited to 2.5 Watts of heat during the lunar night. The electrical harnessing named the Signal and Power Passthrough (SAPP) was designed to minimize heat loss while meeting power and signal integrity requirements. To mitigate risk due to uncertainty associated with the harnessing materials, routing, and tie-downs, a flight-like thermal conductance test was performed to measure the heat loss. The test methodology, results, and model correlation are presented.

Thermal

Harness Thermal Heat Loss Measurement for A Lunar Surface-Deployed LEMS Artemis III Payload

The Lunar Environment Monitoring Station (LEMS) is an autonomous, survive-the-lunar-night seismic suite to be deployed on the Lunar surface by the Artemis III crew and designed to operate continuously for two years. It will see the extremes of the Lunar south pole thermal environment where surface temperatures range from -200°C to +20°C and where nighttime duration is at least 354 hours. Given power and mass constraints, the thermal system is limited to 2.5 Watts of heat during the lunar night. The electrical harnessing named the Signal and Power Passthrough (SAPP) was designed to minimize heat loss while meeting power and signal integrity requirements. To mitigate risk due to uncertainty associated with the harnessing materials, routing, and tie-downs, a flight-like thermal conductance test was performed to measure the heat loss. The test methodology, results, and model correlation are presented.

TVAC

Synchronized Eruptions on Io: Possible Evidence of Interconnected Subsurface Magma Reservoirs

On 27 December 2024, Juno's JIRAM (Jovian InfraRed Auroral Mapper) instrument observed an unprecedented volcanic event in Io's southern hemisphere, covering a vast region of ∼65,000 km2, near 73°S, 140°E. Within the imaged region, only one hot spot was previously known (Pfd454). This feature was earlier estimated to cover an area of 300 km2 with a total power output of 34 GW. JIRAM results show that the region produces a power output of 140–260 TW, over 1,000 times higher than earlier estimates and likely exceeding the brightest eruption ever recorded on Io, that of Surt in 2001 (∼80 TW). Three adjacent hot spots also exhibited dramatic power increases: P139, PV18, and an unnamed feature south of the main one that surged to ∼1 TW, placing all of them among the top 10 most powerful hot spots observed on Io. A temperature analysis of the features supports the simultaneous onset of these brightenings and suggests a single eruptive event propagating beneath the surface across hundreds of kilometers; this is the first time this has been observed on Io. This in turn would imply a connection among the hotspots' magma reservoirs, while other nearby hotspots that have been known to be active in the recent past, such as Kurdalagon Patera, appear unaffected. The simultaneity supports models of massive, interconnected magma reservoirs. The topology of these regional magma systems may resemble that of a large-scale sponge, in which the massive reservoirs are the pores, interconnected through a largely solid outer shell.

A Mura