Search NASA⌕ Search

SEARCH · Search NASA

Results for “uplink”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

A statistical model for evaluating GOPEX uplink performance

This article describes a statistical model to analyze the signal intensity received at the solid-state imaging (SSI) camera of the Galileo optical communications system from an Earth-based transmitter (GOPEX) demonstration. The analytical model assumes that the optical beam possesses a Gaussian profile and the communication channel has a log-normal scattering characteristic. The atmospheric-induced jitter is modelled as two independent zero mean Gaussian random variables. By modelling the system parameters as a set of independent and identically distributed (iid) random variables, the combined impact of uncertainties due to system parameters and the turbulent atmosphere can be approximated by a log-normal distributed signal intensity at the spacecraft. A Monte-Carlo software simulation package was also developed to compute the confidence interval probabilities for general optical beam profiles. Numerical results show that the approximation is valid for a wide range of operation scenarios.

Kiesaleh, K.↗

A quick uplink, expandable executable for the NSSC-1 of the Hubble Space Telescope

The Hubble Space Telescope, launched in April 1990, contains two primary on-board computers. In the past, modifications to the flight software have been accomplished via patches to the on-board executable image (performed while software is executing) or via halt and reload of the computer memory with a new flight software version. This paper describes a method of reloading flight software with a new software version while continuing the onboard execution of a reduced set of spacecraft payload functions.

Foley, Glenn T.↗

Voyager uplink planning in the interstellar mission era

The Voyager Project has entered its last phase of discovery--the Voyager Interstellar Mission (VIM). Because of the reduced scope of the project and a lower budget, new ways had to be developed to program two spacecraft with fewer people and to allow for some sequence development flexibility without additional risk. In the previous cruise era, it took a seven-person sequence team 12 weeks to develop a nominal eight week cruise sequence. Today it takes a three-person team six weeks to develop a 13 week sequence load. This paper will describe in detail the sequencing strategy which reduces the volume and frequency of sequence loads, and the new tools and processes developed which reduce the manual effort required to generate these sequences without adding risk.

Linick, Susan H.↗

Experimental evaluation of open-loop UpLink Power Control using ACTS

The present investigation deals with the implementation of open-loop up-link power control using a beacon signal in the down-link frequency band as the control parameter. A power control system was developed and tested using the ACTS satellite. ACTS carries beacon signals in both up- and down-link bands with which the relationship between the up- and down-link fading can be established. A power controlled carrier was transmitted to the ACTS satellite from a NASA operated ground station and the transponded signal was received at COMSAT Laboratories using a terminal that was routinely used to monitor the two ACTS beacon signals. The experiment ran for a period of approximately six months and the collected data were used to evaluate the performance of the power control system. A brief review of propagation factors involved in estimating the up-link fade using a beacon signal in the down-link band are presented. The power controller design and the experiment configuration are discussed. Results of the experiment are discussed.

Dissanayake, Asoka↗

Real Time Data/Video/Voice Uplink and Downlink for Kuiper Airborne Observatory

LFS was an educational outreach adventure which brought the excitement of astronomical exploration on NASA's Kuiper Airborne Observatory (KAO) to a nationwide audience of children, parents and children through live, interactive television, broadcast from the KAO at an altitude of 41,000 feet during an actual scientific observing mission. The project encompassed three KAO flights during the fall of 1995, including a short practice mission, a daytime observing flight between Moffett Field, California to Houston, Texas, and a nighttime mission from Houston back to Moffett Field. The University of Chicago infrared research team participated in planning the program, developing auxiliary materials including background information and lesson plans, developing software which allowed students on the ground to control the telescope and on-board cameras via the Internet from the Adler Planetarium in Chicago, and acting as on-camera correspondents to explain and answer questions about the scientific research conducted during the flights.

Harper, Doyal A.↗

Uplink-Downlink: A History of the Deep Space Network, 1957-1997

In these pages, the informed reader will discover a simple description of what the Deep Space Network (DSN) is about, and how it works an aspect of NASA's spectacular planetary program that seldom found its way into the popular media coverage of those major events. Future historical researchers will find a complete record of the origin and birth of the DSN, its subsequent development and expansion over the ensuing four decades, and a description of the way in which the DSN was used to fulfill the purpose for which it was created. At the same time, the specialist reader is provided with an abundant source of technical references that address every aspect of the advanced telecommunications technology on which the success of the DSN depended. And finally, archivists, educators, outreach managers, and article writers will have ready recourse to the inner workings of the DSN and how they related to the more publicly visible events of the planetary space program.

Mudgway, Douglas J.↗

From Prime to Extended Mission: Evolution of the MER Tactical Uplink Process

To support a 90-day surface mission for two robotic rovers, the Mars Exploration Rover mission designed and implemented an intensive tactical operations process, enabling daily commanding of each rover. Using a combination of new processes, custom software tools, a Mars-time staffing schedule, and seven-day-a-week operations, the MER team was able to compress the traditional weeks-long command-turnaround for a deep space robotic mission to about 18 hours. However, the pace of this process was never intended to be continued indefinitely. Even before the end of the three-month prime mission, MER operations began evolving towards greater sustainability. A combination of continued software tool development, increasing team experience, and availability of reusable sequences first reduced the mean process duration to approximately 11 hours. The number of workshifts required to perform the process dropped, and the team returned to a modified 'Earth-time' schedule. Additional process and tool adaptation eventually provided the option of planning multiple Martian days of activity within a single workshift, making 5-day-a-week operations possible. The vast majority of the science team returned to their home institutions, continuing to participate fully in the tactical operations process remotely. MER has continued to operate for over two Earth-years as many of its key personnel have moved on to other projects, the operations team and budget have shrunk, and the rovers have begun to exhibit symptoms of aging.

mission operations↗

From Prime to Extended Mission: Evolution of the MER Tactical Uplink Process

To support a 90-day surface mission for two robotic rovers, the Mars Exploration Rover mission designed and implemented an intensive tactical operations process, enabling daily commanding of each rover. Using a combination of new processes, custom software tools, a Mars-time staffing schedule, and seven-day-a-week operations, the MER team was able to compress the traditional weeks-long command-turnaround for a deep space robotic mission to about 18 hours. However, there was never an intention of maintaining the pace of this process indefinitely. Even before the end of the three-month prime mission, MER operations began evolving towards greater sustainability. A combination of continued software tool development, increasing team experience, and availability of reusable sequences first reduced the mean process duration to approximately 11 hours. The number of workshifts required to perform the process dropped, and the team returned to a modified 'Earth-time' schedule. Additional process and tool adaptation eventually provided the option of planning multiple Martian days of activity within a single workshift, making 5- day-a-week operations possible. The vast majority of the science team returned to their home institutions, continuing to participate fully in the tactical operations process remotely. MER has continued to operate for over two Earth-years as many of its key personnel have moved on to other projects, the operations team and budget have shrunk, and the rovers have begun to exhibit symptoms of aging.

Mars exploration↗

Estimating Transmitted-Signal Phase Variations for Uplink Array Antennas

A method of estimating phase drifts of microwave signals distributed to, and transmitted by, antennas in an array involves the use of the signals themselves as phase references. The method was conceived as part of the solution of the problem of maintaining precise phase calibration required for proper operation of an array of Deep Space Network (DSN) antennas on Earth used for communicating with distant spacecraft at frequencies between 7 and 8 GHz. The method could also be applied to purely terrestrial phased-array radar and other radio antenna array systems. In the DSN application, the electrical lengths (effective signal-propagation path lengths) of the various branches of the system for distributing the transmitted signals to the antennas are not precisely known, and they vary with time. The variations are attributable mostly to thermal expansion and contraction of fiber-optic and electrical signal cables and to a variety of causes associated with aging of signal-handling components. The variations are large enough to introduce large phase drifts at the signal frequency. It is necessary to measure and correct for these phase drifts in order to maintain phase calibration of the antennas. A prior method of measuring phase drifts involves the use of reference-frequency signals separate from the transmitted signals. A major impediment to accurate measurement of phase drifts over time by the prior method is the fact that although DSN reference-frequency sources separate from the transmitting signal sources are stable and accurate enough for most DSN purposes, they are not stable enough for use in maintaining phase calibrations, as required, to within a few degrees over times as long as days or possibly even weeks. By eliminating reliance on the reference-frequency subsystem, the present method overcomes this impediment. In a DSN array to which the present method applies (see figure), the microwave signals to be transmitted are generated by exciters in a signal-processing center, then distributed to the antennas via optical fibers. At each antenna, the signals are used to drive a microwave power-amplifier train, the output of which is coupled to the antenna for transmission. A small fraction of the power-amplifier-train output is sent back to the signal-processing center along another optical fiber that is part of the same fiber-optic cable used to distribute the transmitted signal to the antenna. In the signal-processing center, the signal thus returned from each antenna is detected and its phase is compared with the phase of the signal sampled directly from the corresponding exciter. It is known, from other measurements, that the signal-propagation path length from the power-amplifier-train output port to the phase center of each antenna is sufficiently stable and, hence, that sampling the signal at the power-amplifier-train output port suffices for the purpose of characterizing the phase drift of the transmitted signal at the phase center of the antenna

Paal, Leslie↗

Modeling C-Band Co-Channel Interference From AeroMACS Omni-Directional Antennas to Mobile Satellite Service Feeder Uplinks

A new C-band (5091 to 5150 MHz) airport communications system designated as Aeronautical Mobile Airport Communications System (AeroMACS) is being planned under the Federal Aviation Administration s NextGen program. An interference analysis software program, Visualyse Professional (Transfinite Systems Ltd), is being utilized to provide guidelines on limitations for AeroMACS transmitters to avoid interference with other systems. A scenario consisting of a single omni-directional transmitting antenna at each of the major contiguous United States airports is modeled and the steps required to build the model are reported. The results are shown to agree very well with a previous study.

Wilson, Jeffrey D.↗

Cyber Threat Assessment of Uplink and Commanding System for Mission Operation

Most of today's Mission Operations Systems (MOS) rely on Ground Data System (GDS) segment to mitigate cyber security risks. Unfortunately, IT security design is done separately from the design of GDS' mission operational capabilities. This incoherent practice leaves many security vulnerabilities in the system without any notice. This paper describes a new way to system engineering MOS, to include cyber threat risk assessments throughout the MOS development cycle, without this, it is impossible to design a dependable and reliable MOS to meet today's rapid changing cyber threat environment.

ground data↗

Using AUTORAD for Cassini File Uplinks: Incorporating Automated Commanding into Mission Operations

As the Cassini spacecraft embarked on the Solstice Mission in October 2010, the flight operations team faced a significant challenge in planning and executing the continuing tour of the Saturnian system. Faced with budget cuts that reduced the science and engineering staff by over a third in size, new and streamlined processes had to be developed to allow the Cassini mission to maintain a high level of science data return with a lower amount of available resources while still minimizing the risk. Automation was deemed an important key in enabling mission operations with reduced workforce and the Cassini flight team has made this goal a priority for the Solstice Mission. The operations team learned about a utility called AUTORAD which would give the flight operations team the ability to program selected command files for radiation up to seven days in advance and help minimize the need for off-shift support that could deplete available staffing during the prime shift hours. This paper will describe how AUTORAD is being utilized by the Cassini flight operations team and the processes that were developed or modified to ensure that proper oversight and verification is maintained in the generation and execution of radiated command files.

Goo, Sherwin↗