Search NASA⌕ Search

SEARCH · Search NASA

Results for “wind forecast error”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Analysis of Integrated Vapor Transport Biases

Abstract High-fidelity analyses and forecasts of integrated vapor transport (VT) are central to the study of Earth’s hydrological cycle as well as high-impact phenomena such as monsoons and atmospheric rivers. The impact of the in-line analysis correction-based additive inflation (ACAI) on IVT biases and forecast errors is examined within the Navy Earth System Prediction Capability (Navy ESPC) global coupled system. The ACAI technique uses atmospheric analysis corrections from the data assimilation system to approximate model bias and as a representation of stochastic model error to simultaneously reduce systematic and random errors and improve ensemble performance. ACAI reduces the global average magnitude of the 7- and 14-day IVT bias by 16%–17% during Northern Hemisphere summer, reaching 70% reductions in some tropical regions. The global average IVT bias reduction is similar to the bias reduction for low-level wind speed bias and considerably smaller than the bias reduction in total precipitable water. The localized regions where ACAI increases IVT bias occur where the control IVT biases change sign and structure with increasing forecast lead time, such as the South Asian monsoon region. Substituting analyzed wind or moisture fields for the forecast fields when calculating the forecast IVT confirms that, on average, wind errors dominate the IVT error calculation in the tropics, although wind and moisture error contributions are comparable in the extratropics. The existence of regions where using either analyzed winds or analyzed moisture increases IVT bias or mean absolute error reveals areas with compensating errors.

Reynolds, Carolyn A.↗

Review of the WECC EDT phase 2 EIM benefits analysis and results report.

A region-wide Energy Imbalance Market (EIM) was recently proposed by the Western Electricity Coordinating Council (WECC). In order for the Western Area Power Administration (Western) to make more informed decisions regarding its involvement in the EIM, Western asked Argonne National Laboratory (Argonne) to review the EIM benefits study (the October 2011 revision) performed by Energy and Environmental Economics, Inc. (E3). Key components of the E3 analysis made use of results from a study conducted by the National Renewable Energy Laboratory (NREL); therefore, we also reviewed the NREL work. This report examines E3 and NREL methods and models used in the EIM study. Estimating EIM benefits is very challenging because of the complex nature of the Western Interconnection (WI), the variability and uncertainty of renewable energy resources, and the complex decisions and potentially strategic bidding of market participants. Furthermore, methodologies used for some of the more challenging aspects of the EIM have not yet matured. This review is complimentary of several components of the EIM study. Analysts and modelers clearly took great care when conducting detailed simulations of the WI using well-established industry tools under stringent time and budget constraints. However, it is our opinion that the following aspects of the study and the interpretation of model results could be improved upon in future analyses. The hurdle rate methodology used to estimate current market inefficiencies does not directly model the underlying causes of sub-optimal dispatch and power flows. It assumes that differences between historical flows and modeled flows can be attributed solely to market inefficiencies. However, flow differences between model results and historical data can be attributed to numerous simplifying assumptions used in the model and in the input data. We suggest that alternative approaches be explored in order to better estimate the benefits of introducing market structures like the EIM. In addition to more efficient energy transactions in the WI, the EIM would reduce the amount of flexibility reserves needed to accommodate forecast errors associated with variable production from wind and solar energy resources. The modeling approach takes full advantage of variable resource diversity over the entire market footprint, but the projected reduction in flexibility reserves may be overly optimistic. While some reduction would undoubtedly occur, the EIM is only an energy market and would therefore not realize the same reduction in reserves as an ancillary services market. In our opinion the methodology does not adequately capture the impact of transmission constraints on the deployment of flexibility reserves. Estimates of flexibility reserves assume that forecast errors follow a normal distribution. Improved estimates could be obtained by using other probability distributions to estimate up and down reserves to capture the underlying uncertainty of these resources under specific operating conditions. Also, the use of a persistence forecast method for solar is questionable, because solar insolation follows a deterministic pattern dictated by the sun's path through the sky. We suggest a more rigorous method for forecasting solar insolation using the sun's relatively predictable daily pattern at specific locations. The EIM study considered only one scenario for hydropower resources. While this scenario is within the normal range over the WI footprint, it represents a severe drought condition in the Colorado River Basin from which Western schedules power. Given hydropower's prominent role in the WI, we recommend simulating a range of hydropower conditions since the relationship between water availability and WI dispatch costs is nonlinear. Also, the representation of specific operational constraints faced by hydropower operators in the WI needs improvements. The model used in the study cannot fully capture all of the EIM impacts and complexities of power system operations. In particular, a primary benefit of the EIM is a shorter dispatch interval; namely, 5 minutes. However, the model simulates the dispatch hourly. Therefore it cannot adequately measure the benefits of a more frequent dispatch. A tool with a finer time resolution would significantly improve simulation accuracy. When the study was conducted, the rules for the EIM were not clearly defined and it was appropriate to estimate societal benefits of the EIM assuming a perfect market without a detailed specification of the market design. However, incorporating a more complete description of market rules will allow for better estimates of EIM benefits. Furthermore, performing analyses using specific market rules can identify potential design flaws that may be difficult and expensive to correct after the market is established. Estimated cost savings from a more efficient dispatch are less than one percent of the total cost of electricity production.

14 SOLAR ENERGY↗

Tool for Forecasting Cool-Season Peak Winds Across Kennedy Space Center and Cape Canaveral Air Force Station

The expected peak wind speed for the day is an important element in the daily morning forecast for ground and space launch operations at Kennedy Space Center (KSC) and Cape Canaveral Air Force Station (CCAFS). The 45th Weather Squadron (45 WS) must issue forecast advisories for KSC/CCAFS when they expect peak gusts for >= 25, >= 35, and >= 50 kt thresholds at any level from the surface to 300 ft. In Phase I of this task, the 45 WS tasked the Applied Meteorology Unit (AMU) to develop a cool-season (October - April) tool to help forecast the non-convective peak wind from the surface to 300 ft at KSC/CCAFS. During the warm season, these wind speeds are rarely exceeded except during convective winds or under the influence of tropical cyclones, for which other techniques are already in use. The tool used single and multiple linear regression equations to predict the peak wind from the morning sounding. The forecaster manually entered several observed sounding parameters into a Microsoft Excel graphical user interface (GUI), and then the tool displayed the forecast peak wind speed, average wind speed at the time of the peak wind, the timing of the peak wind and the probability the peak wind will meet or exceed 35, 50 and 60 kt. The 45 WS customers later dropped the requirement for >= 60 kt wind warnings. During Phase II of this task, the AMU expanded the period of record (POR) by six years to increase the number of observations used to create the forecast equations. A large number of possible predictors were evaluated from archived soundings, including inversion depth and strength, low-level wind shear, mixing height, temperature lapse rate and winds from the surface to 3000 ft. Each day in the POR was stratified in a number of ways, such as by low-level wind direction, synoptic weather pattern, precipitation and Bulk Richardson number. The most accurate Phase II equations were then selected for an independent verification. The Phase I and II forecast methods were compared using an independent verification data set. The two methods were compared to climatology, wind warnings and advisories issued by the 45 WS, and North American Mesoscale (NAM) model (MesoNAM) forecast winds. The performance of the Phase I and II methods were similar with respect to mean absolute error. Since the Phase I data were not stratified by precipitation, this method's peak wind forecasts had a large negative bias on days with precipitation and a small positive bias on days with no precipitation. Overall, the climatology methods performed the worst while the MesoNAM performed the best. Since the MesoNAM winds were the most accurate in the comparison, the final version of the tool was based on the MesoNAM winds. The probability the peak wind will meet or exceed the warning thresholds were based on the one standard deviation error bars from the linear regression. For example, the linear regression might forecast the most likely peak speed to be 35 kt and the error bars used to calculate that the probability of >= 25 kt = 76%, the probability of >= 35 kt = 50%, and the probability of >= 50 kt = 19%. The authors have not seen this application of linear regression error bars in any other meteorological applications. Although probability forecast tools should usually be developed with logistic regression, this technique could be easily generalized to any linear regression forecast tool to estimate the probability of exceeding any desired threshold . This could be useful for previously developed linear regression forecast tools or new forecast applications where statistical analysis software to perform logistic regression is not available. The tool was delivered in two formats - a Microsoft Excel GUI and a Tool Command Language/Tool Kit (Tcl/Tk) GUI in the Meteorological Interactive Data Display System (MIDDS). The Microsoft Excel GUI reads a MesoNAM text file containing hourly forecasts from 0 to 84 hours, from one model run (00 or 12 UTC). The GUI then displays e peak wind speed, average wind speed, and the probability the peak wind will meet or exceed the 25-, 35- and 50-kt thresholds. The user can display the Day-1 through Day-3 peak wind forecasts, and separate forecasts are made for precipitation and non-precipitation days. The MIDDS GUI uses data from the NAM and Global Forecast System (GFS), instead of the MesoNAM. It can display Day-1 and Day-2 forecasts using NAM data, and Day-1 through Day-5 forecasts using GFS data. The timing of the peak wind is not displayed, since the independent verification showed that none of the forecast methods performed significantly better than climatology. The forecaster should use the climatological timing of the peak wind (2248 UTC) as a first guess and then adjust it based on the movement of weather features.

Barrett, Joe H., III↗

Hurricane wind field representation shapes storm surge and building-scale flood hazard estimates

Coastal flood hazard estimates rely on precise hurricane wind forecasts to assess damage and risk. Here, we demonstrate that errors in hurricane wind field representation can lead to significant biases in storm surge and property-level damage estimates. Using Hurricane Ian (2022) as a case study, we compare widely used parametric, reanalysis, and hybrid wind datasets. Improved wind field accuracy reduces storm surge and damage estimate bias by up to 70\%. Our results underscore the importance of accurately predicting hurricane wind structure in hazard assessments.

Coastal Flooding↗

Jet stream velocity errors in general circulation models

The longitude and time dependence of excessive wind speed errors above subtropical jets in current GCM forecasts is studied for 14 five-day winter forecasts using the NASA Goddard Laboratory for Atmospheres fourth-order GCM. Several distinct phenomena, which may be divided into four categories, are found to contribute to the excess winds. These categories are: (1) error growth above the jet near the Himalayas; (2) error growth above the jet initiated elsewhere followed by advection; (3) tropical moisture bursts appearing in equatorial regions and migrating northeastward to merge with and distort the jet; and (4) undulatory growth of waves in the meridional component of the jet stream velocity. The results of additional sensitivity studies of the Himalayan region error are also reported.

Tenenbaum, J.↗

Assessment of the 60 Km Rapid Update Cycle (RUC) with Near Real-Time Aircraft Reports

NASA is developing the Center-TBACON Advisory System (CTAS), a set of Air Traffic Management (ATM) Decision Support Tools (DST) to enable controllers to increase airspace capacity and flight efficiency. A crucial component of the CTAS, or any ATM DST, is the computation of the time-of-flight of aircraft along flight path segments which requires accurate knowledge of the wind through which the aircraft are flying. CTAS currently uses wind information from the Rapid Update Cycle (RUC), a numerical prediction model run operationally by the National Weather Service (NWS) National Center for Environmental Prediction (NCEP). There exists near real-time wind observations from commercial aircraft that can be used to increase the accuracy of the RUC wind forecasts via the FAA Integrated Terminal Weather System (ITWS) Terminal Winds (TW) algorithm. This report presents a study based on the application of the ITWS TW algorithm as an improvement to the baseline RUC product. Terminal Winds generally does not support the full Center airspace; the domain of the prototype MIT/LLITWS TW system was increased to cover the Denver Center airspace to support this study. This study has three goals: 1) determine the errors in the baseline 60-kilometer resolution RUC forecast wind fields relative to the needs of en route DSTs such as CTAS; 2) determine the benefit of using the TW algorithm to refine the RUC forecast wind fields with near real-tlme Meteorological Data Collection and Reporting System (MDCRS) aircraft reports, and 3) identify factors that influence wind field errors in order to improve accuracy and estimate errors in real time. The data for this study were collected over a one-year period for the Denver Center airspace and over one miIlion verification observations were used. This study is part of a larger effort funded by NASA which includes the NOAA/FSL.

Cole, R. E.↗

Analysis and Forecast of Two Storms Characterized by Extreme Deepening Rates

Between 25 and 27 December 1999 two very intense cyclones, named Lothar and Martin, swept across northern and western France causing substantial life and property loss. In this work, the finite volume general circulation model and data assimilation system (fvDAS) developed at the Data Assimilation Office of the NASA Goddard Space and Flight Center is being used to investigate these storms. In the first part of this article the dynamics of the storms is analyzed, and some important mechanisms are unveiled. The second part describes a set of eleven data assimilation experiments to study the impact of different data types on the automated analyses. Cloud-track winds provided by EUMETSAT and surface winds from QuikSCAT are being used. These data are assimilated with a range of different parameter settings of the forecast error covariance model. The results show that generally the additional wind data set have positive impacts on the analyses: particularly, the analysis of Lothar can be slightly improved by using the Eumetsat winds, and the analysis of Martin can be strongly improved by using the full-resolution QuikSCAT winds with a more localized influence. The third part of this article is focused on the forecast of Lothar which is very well predicted in the 1-5 day range by the fvDAS system.

Reale, Oreste↗

Impact of WRF Physics and Grid Resolution on Low-level Wind Prediction: Towards the Assessment of Climate Change Impact on Future Wind Power

The Weather Research and Forecast (WRF) model is used in short-range simulations to explore the sensitivity of model physics and horizontal grid resolution. We choose five events with the clear-sky conditions to study the impact of different planetary boundary layer (PBL), surface and soil-layer physics on low-level wind forecast for two wind farms; one in California (CA) and the other in Texas (TX). Short-range simulations are validated with field measurements. Results indicate that the forecast error of the CA case decreases with increasing grid resolution due to the improved representation of valley winds. Besides, the model physics configuration has a significant impact on the forecast error at this location. In contrast, the forecast error of the TX case exhibits little dependence on grid resolution and is relatively independent of physics configuration. Therefore, the occurrence frequency of lowest root mean square errors (RMSEs) at this location is used to determine an optimal model configuration for subsequent decade-scale regional climate model (RCM) simulations. In this study, we perform two sets of 20-year RCM simulations using the data from the NCAR Global Climate Model (GCM) simulations; one set models the present climate and the other simulates the future climate. These RCM simulations will be used to assess the impact of climate change on future wind energy.

54 ENVIRONMENTAL SCIENCES↗

Ensemble Solar Forecasting Statistical Quantification and Sensitivity Analysis: Preprint

Uncertainties associated with solar forecasts present challenges to maintain grid reliability, especially at high solar penetrations. This study aims to quantify the errors associated with the day-ahead solar forecast parameters and the theoretical solar power output for a 51-kW solar power plant in a utility area in the state of Vermont, U.S. Forecasts were generated by three numerical weather prediction (NWP) models, including the Rapid Refresh, the High Resolution Rapid Refresh, and the North American Model, and a machine-learning ensemble model. A photovoltaic (PV) performance model was adopted to calculate theoretical solar power generation using the forecast parameters (e.g., irradiance, cell temperature, and wind speed). Errors of the power outputs were quantified using statistical moments and a suite of metrics, such as the normalized root mean squared error (NRMSE). In addition, the PV model's sensitivity to different forecast parameters was quantified and analyzed. Results showed that the ensemble model yielded forecasts in all parameters with the smallest NRMSE. The NRMSE of solar irradiance forecasts of the ensemble NWP model was reduced by 28.10% compared to the best of the three NWP models. Further, the sensitivity analysis indicated that the errors of the forecasted cell temperature attributed only approximately 0.12% to the NRMSE of the power output as opposed to 7.44% from the forecasted solar irradiance.

14 SOLAR ENERGY↗

Ensemble Solar Forecasting Statistical Quantification and Sensitivity Analysis

Uncertainties associated with solar forecasts present challenges to maintain grid reliability, especially at high solar penetrations. This study aims to quantify the errors associated with the day-ahead solar forecast parameters and the theoretical solar power output for a 51-kW solar power plant in a utility area in the state of Vermont, U.S. Forecasts were generated by three numerical weather prediction (NWP) models, including the Rapid Refresh, the High Resolution Rapid Refresh, and the North American Model, and a machine-learning ensemble model. A photovoltaic (PV) performance model was adopted to calculate theoretical solar power generation using the forecast parameters (e.g., irradiance, cell temperature, and wind speed). Errors of the power outputs were quantified using statistical moments and a suite of metrics, such as the normalized root mean squared error (NRMSE). In addition, the PV model's sensitivity to different forecast parameters was quantified and analyzed. Results showed that the ensemble model yielded forecasts in all parameters with the smallest NRMSE. The NRMSE of solar irradiance forecasts of the ensemble NWP model was reduced by 28.10% compared to the best of the three NWP models. Further, the sensitivity analysis indicated that the errors of the forecasted cell temperature attributed only approximately 0.12% to the NRMSE of the power output as opposed to 7.44% from the forecasted solar irradiance.

14 SOLAR ENERGY↗

Assessment of Geo-Kompsat-2A Atmospheric Motion Vector Data and Its Assimilation Impact in the GEOS Atmospheric Data Assimilation System

Korea’s second geostationary meteorological satellite, Geo-Kompsat-2A (Geostationary-Korean Multi-Purpose Satellite-2A, GK2A), was successfully launched on 4 December 2018. GK2Agenerates Atmospheric Motion Vectors (AMVs) every 10 min in the full disk area. This data hasbeen disseminated via Global Telecommunication System (GTS) since 25 October 2019. This articleevaluates the quality of GK2A AMVs in the Goddard Earth Observing System (GEOS) atmosphericdata assimilation system (ADAS). The data show slow wind speed biases at 200–300 hPa and 600–800hPa in the northern and southern hemispheres. These biases are caused by observation heightassignment errors near jet streams. The Equivalent Blackbody Temperature (EBBT) method of GK2Atends to assign clouds at higher altitude, which mainly causes slow wind speed biases, especially inthe lower atmosphere. The IR/WV intercept method of GK2A assigns clouds slightly lower in theatmospheric layers below the altitude of 400 hPa, which causes positive biases. Quality control (QC)criteria to select the most suitable GK2A AMV data for assimilation are presented based on thesequality assessments. A new QC criterion utilizing height errors within the GEOS ADAS is introducedto exclude data with slow wind speed biases and large errors. GEOS forecast accuracy is slightlyimproved after assimilating GK2A AMVs along with other conventional, radiance, and satellitewinds which include AMVs made by the Himawari-8 satellite in nearly the same observational areaof GK2A. Additionally, the present work shows that GEOS forecasts can be significantly improved,especially in the tropics and southern hemisphere after assimilating GK2A data in the absence ofHimawari-8 AMVs. This study demonstrates that GK2A AMV data is a valuable data source toenhance the robustness of GEOS ADAS.

Atmospheric Motion Vectors↗

A New Objective Technique for Verifying Mesoscale Numerical Weather Prediction Models

This report presents a new objective technique to verify predictions of the sea-breeze phenomenon over east-central Florida by the Regional Atmospheric Modeling System (RAMS) mesoscale numerical weather prediction (NWP) model. The Contour Error Map (CEM) technique identifies sea-breeze transition times in objectively-analyzed grids of observed and forecast wind, verifies the forecast sea-breeze transition times against the observed times, and computes the mean post-sea breeze wind direction and speed to compare the observed and forecast winds behind the sea-breeze front. The CEM technique is superior to traditional objective verification techniques and previously-used subjective verification methodologies because: It is automated, requiring little manual intervention, It accounts for both spatial and temporal scales and variations, It accurately identifies and verifies the sea-breeze transition times, and It provides verification contour maps and simple statistical parameters for easy interpretation. The CEM uses a parallel lowpass boxcar filter and a high-order bandpass filter to identify the sea-breeze transition times in the observed and model grid points. Once the transition times are identified, CEM fits a Gaussian histogram function to the actual histogram of transition time differences between the model and observations. The fitted parameters of the Gaussian function subsequently explain the timing bias and variance of the timing differences across the valid comparison domain. Once the transition times are all identified at each grid point, the CEM computes the mean wind direction and speed during the remainder of the day for all times and grid points after the sea-breeze transition time. The CEM technique performed quite well when compared to independent meteorological assessments of the sea-breeze transition times and results from a previously published subjective evaluation. The algorithm correctly identified a forecast or observed sea-breeze occurrence or absence 93% of the time during the two- month evaluation period from July and August 2000. Nearly all failures in CEM were the result of complex precipitation features (observed or forecast) that contaminated the wind field, resulting in a false identification of a sea-breeze transition. A qualitative comparison between the CEM timing errors and the subjectively determined observed and forecast transition times indicate that the algorithm performed very well overall. Most discrepancies between the CEM results and the subjective analysis were again caused by observed or forecast areas of precipitation that led to complex wind patterns. The CEM also failed on a day when the observed sea- breeze transition affected only a very small portion of the verification domain. Based on the results of CEM, the RAMS tended to predict the onset and movement of the sea-breeze transition too early and/or quickly. The domain-wide timing biases provided by CEM indicated an early bias on 30 out of 37 days when both an observed and forecast sea breeze occurred over the same portions of the analysis domain. These results are consistent with previous subjective verifications of the RAMS sea breeze predictions. A comparison of the mean post-sea breeze winds indicate that RAMS has a positive wind-speed bias for .all days, which is also consistent with the early bias in the sea-breeze transition time since the higher wind speeds resulted in a faster inland penetration of the sea breeze compared to reality.

Case, Jonathan L.↗

Ground-based time-guidance algorithm for control of airplanes in a time-metered air traffic control environment: A piloted simulation study

The rapidly increasing costs of flight operations and the requirement for increased fuel conservation have made it necessary to develop more efficient ways to operate airplanes and to control air traffic for arrivals and departures to the terminal area. One concept of controlling arrival traffic through time metering has been jointly studied and evaluated by NASA and ONERA/CERT in piloted simulation tests. From time errors attained at checkpoints, airspeed and heading commands issued by air traffic control were computed by a time-guidance algorithm for the pilot to follow that would cause the airplane to cross a metering fix at a preassigned time. These tests resulted in the simulated airplane crossing a metering fix with a mean time error of 1.0 sec and a standard deviation of 16.7 sec when the time-metering algorithm was used. With mismodeled winds representing the unknown in wind-aloft forecasts and modeling form, the mean time error attained when crossing the metering fix was increased and the standard deviation remained approximately the same. The subject pilots reported that the airspeed and heading commands computed in the guidance concept were easy to follow and did not increase their work load above normal levels.

Knox, C. E.↗

Wind Information Uplink to Aircraft Performing Interval Management Operations

Interval Management (IM) is an ADS-B-enabled suite of applications that use ground and flight deck capabilities and procedures designed to support the relative spacing of aircraft (Barmore et al., 2004, Murdoch et al. 2009, Barmore 2009, Swieringa et al. 2011; Weitz et al. 2012). Relative spacing refers to managing the position of one aircraft to a time or distance relative to another aircraft, as opposed to a static reference point such as a point over the ground or clock time. This results in improved inter-aircraft spacing precision and is expected to allow aircraft to be spaced closer to the applicable separation standard than current operations. Consequently, if the reduced spacing is used in scheduling, IM can reduce the time interval between the first and last aircraft in an overall arrival flow, resulting in increased throughput. Because IM relies on speed changes to achieve precise spacing, it can reduce costly, low-altitude, vectoring, which increases both efficiency and throughput in capacity-constrained airspace without negatively impacting controller workload and task complexity. This is expected to increase overall system efficiency. The Flight Deck Interval Management (FIM) equipment provides speeds to the flight crew that will deliver them to the achieve-by point at the controller-specified time, i.e., assigned spacing goal, after the target aircraft crosses the achieve-by point (Figure 1.1). Since the IM and target aircraft may not be on the same arrival procedure, the FIM equipment predicts the estimated times of arrival (ETA) for both the IM and target aircraft to the achieve-by point. This involves generating an approximate four-dimensional trajectory for each aircraft. The accuracy of the wind data used to generate those trajectories is critical to the success of the IM operation. There are two main forms of uncertainty in the wind information used by the FIM equipment. The first is the accuracy of the forecast modeling done by the weather provider. This is generally a global environmental prediction obtained from a weather model such as the Rapid Refresh (RAP) from the National Centers for Environmental Prediction (NCEP). The weather forecast data will have errors relative to the actual, or truth, winds that the aircraft will encounter. The second source of uncertainty is that only a small subset of the forecast data can be uplinked to the aircraft for use by the FIM equipment. This results in loss of additional information. The Federal Aviation Administration (FAA) and RTCA are currently developing standards for the communication of wind and atmospheric data to the aircraft for use in NextGen operations. This study examines the impact of various wind forecast sampling methods on IM performance metrics to inform the standards development.

Ahmad, Nashat N.↗

Results of an observing system simulation experiment based on the proposed Windsat instrument

Two fraternal twin experiments were conducted as part of this study. A data impact experiment using real data (runs 1 and 2) was conducted to assess the impact that rawin wind observations have on both a 5-day assimilation and a single 5-day forecast generated at the end of each assimilation. An observing system simulation experiment (OSSE) using simulated observations (runs 3, 4, and 5) was conducted in order to first calibrate the OSSE results and second to use this calibration to estimate the 'real world' impact from the contribution of global 3-dimensional wind profiles generated from a space-based lidar system known as Windsat. Each of the three runs in the seond experiment were also 5-day assimilation runs with a 5-day forecast initialized from the last 6-hour update cycle of the assimilation. The data impact study revealed a consistent positive impact when rawin winds were added back into an otherwise complete FGGE data set. Both the 6-hour and 5-day forecasts were improved at all levels, in both hemispheres, and for both the wind and the geopotential height fields. Similar results were obtained from the two parallel simulation runs, 3 and 4. Together with the results from runs 1 and 2, calibration coefficients were generated so as to 'correct' the results determined from the addition of Windsat winds (run 5). The Windsat simulation showed a positive improvement in all cases studied. Even though only the tropics were enhanced with these wind observations, hemispheric rms errors were decreased in both the assimilation and 5-day forecast. The 6-hour forecasts of zonal wind from the assimilation run were improved by as much as 50 pct. on the average, and the single forecast showed an average improvement of near 30 pct. Even though these calibrated values are considered too optimistic, the skill of the forecast generated from this run extended the useful forecast period by 18-24 hours.

Arnold, Charles P., Jr.↗

Integrating Solar PV in Utility System Operations

This study develops a systematic framework for estimating the increase in operating costs due to uncertainty and variability in renewable resources, uses the framework to quantify the integration costs associated with sub-hourly solar power variability and uncertainty, and shows how changes in system operations may affect these costs. Toward this end, we present a statistical method for estimating the required balancing reserves to maintain system reliability along with a model for commitment and dispatch of the portfolio of thermal and renewable resources at different stages of system operations. We estimate the costs of sub-hourly solar variability, short-term forecast errors, and day-ahead (DA) forecast errors as the difference in production costs between a case with “realistic” PV (i.e., subhourly solar variability and uncertainty are fully included in the modeling) and a case with “well behaved” PV (i.e., PV is assumed to have no sub-hourly variability and can be perfectly forecasted). In addition, we highlight current practices that allow utilities to compensate for the issues encountered at the sub-hourly time frame with increased levels of PV penetration. In this analysis we use the analytical framework to simulate utility operations with increasing deployment of PV in a case study of Arizona Public Service Company (APS), a utility in the southwestern United States. In our analysis, we focus on three processes that are important in understanding the management of PV variability and uncertainty in power system operations. First, we represent the decisions made the day before the operating day through a DA commitment model that relies on imperfect DA forecasts of load and wind as well as PV generation. Second, we represent the decisions made by schedulers in the operating day through hour-ahead (HA) scheduling. Peaking units can be committed or decommitted in the HA schedules and online units can be redispatched using forecasts that are improved relative to DA forecasts, but still imperfect. Finally, we represent decisions within the operating hour by schedulers and transmission system operators as real-time (RT) balancing. We simulate the DA and HA scheduling processes with a detailed unit-commitment (UC) and economic dispatch (ED) optimization model. This model creates a least-cost dispatch and commitment plan for the conventional generating units using forecasts and reserve requirements as inputs. We consider only the generation units and load of the utility in this analysis; we do not consider opportunities to trade power with neighboring utilities. We also do not consider provision of reserves from renewables or from demand-side options. We estimate dynamic reserve requirements in order to meet reliability requirements in the RT operations, considering the uncertainty and variability in load, solar PV, and wind resources. Balancing reserve requirements are based on the 2.5th and 97.5th percentile of 1-min deviations from the HA schedule in a previous year. We then simulate RT deployment of balancing reserves using a separate minute-by-minute simulation of deviations from the HA schedules in the operating year. In the simulations we assume that balancing reserves can be fully deployed in 10 min. The minute-by-minute deviations account for HA forecasting errors and the actual variability of the load, wind, and solar generation. Using these minute-by-minute deviations and deployment of balancing reserves, we evaluate the impact of PV on system reliability through the calculation of the standard reliability metric called Control Performance Standard 2 (CPS2). Broadly speaking, the CPS2 score measures the percentage of 10-min periods in which a balancing area is able to balance supply and demand within a specific threshold. Compliance with the North American Electric Reliability Corporation (NERC) reliability standards requires that the CPS2 score must exceed 90% (i.e., the balancing area must maintain adequate balance for 90% of the 10-min periods). The combination of representing DA forecast errors in the DA commitments, using 1-min PV data to simulate RT balancing, and estimates of reliability performance through the CPS2 metric, all factors that are important to operating systems with increasing amounts of PV, makes this study unique in its scope.

14 SOLAR ENERGY↗

Biases and nonsystematic errors in NMC MRF predictions of momentum and zonal winds

The period of study considered by Rosen et al. (1987) for M forecasts is extended and the source of errors in these forecasts is examined. Time series of daily values of MRF forecasted minus the observed M are presented for forecast lead times of 2, 5, and 10 days from December 1985 through November 1988. A graph is presented of the covariance between errors in the angular momentum per unit mass forecasted at a 10-day lag, and those in the forecasted global angular momentum for the same period.

Rosen, Richard D.↗

Comparative analysis of operational forecasts versus actual weather conditions in airline flight planning, volume 4

The impact of more timely and accurate weather data on airline flight planning with the emphasis on fuel savings is studied. This volume of the report discusses the results of Task 4 of the four major tasks included in the study. Task 4 uses flight plan segment wind and temperature differences as indicators of dates and geographic areas for which significant forecast errors may have occurred. An in-depth analysis is then conducted for the days identified. The analysis show that significant errors occur in the operational forecast on 15 of the 33 arbitrarily selected days included in the study. Wind speeds in an area of maximum winds are underestimated by at least 20 to 25 kts. on 14 of these days. The analysis also show that there is a tendency to repeat the same forecast errors from prog to prog. Also, some perceived forecast errors from the flight plan comparisons could not be verified by visual inspection of the corresponding National Meteorological Center forecast and analyses charts, and it is likely that they are the result of weather data interpolation techniques or some other data processing procedure in the airlines' flight planning systems.

Keitz, J. F.↗