Search NASA⌕ Search

SEARCH · Search NASA

Results for “workforce of the future”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

98 records · Page 6

NASA's Space Launch System Takes Shape: Progress Toward Safe, Affordable Exploration

Development of NASA's Space Launch System exploration-class heavy lift rocket has moved from the formulation phase to implementation in 3 years and will make significant progress this year toward its first launch, slated for December 2017. In recognition of the current fiscal realities, SLS represents a safe, affordable, and evolutionary path to development of an unprecedented capability for future human and robotic exploration and use of space. Current development is focused on a configuration with a 70 metric ton (t) payload to low Earth orbit (LEO), more than double any operational vehicle. It is this version that will launch NASA's Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back, as well as the first crewed Orion flight. This configuration is also designed to evolve to 130 t lift capability that offers several benefits, such as reduced mission costs, simplified payload design, faster trip times, and lower overall risk for missions of national significance. The SLS Program formally transitioned from the formulation phase to implementation during the past year, passing its Preliminary Design Review in 2013 and completion of Key Decision Point C in early 2014. NASA has authorized the Program to move forward to Critical Design Review, scheduled for 2015. Among the Program's many accomplishments are manufacture of core stage test hardware, as well as preparations for testing the world's most powerful solid rocket boosters and the main engines that flew 135 successful Space Shuttle missions. The Program's success to date is due to prudent use of existing technology, infrastructure, and workforce; streamlined management approach; and judicious use of new technologies. The result is a launch vehicle that will carry human and robotic exploration on the history-making missions in the coming decades. This paper will discuss the program and technical successes over the past year and provide a look at the milestones and challenges ahead.

Askins, Bruce↗

NASA Crew Launch Vehicle Approach Builds on Lessons from Past and Present Missions

The United States Vision for Space Exploration, announced in January 2004, outlines the National Aeronautics and Space Administration's (NASA) strategic goals and objectives, including retiring the Space Shuttle and replacing it with a new human-rated system suitable for missions to the Moon and Mars. The Crew Exploration Vehicle (CEV) that the new Crew Launch Vehicle (CLV) lofts into space early next decade will initially ferry astronauts to the International Space Station and be capable of carrying crews back to lunar orbit and of supporting missions to Mars orbit. NASA is using its extensive experience gained from past and ongoing launch vehicle programs to maximize the CLV system design approach, with the objective of reducing total lifecycle costs through operational efficiencies. To provide in-depth data for selecting this follow-on launch vehicle, the Exploration Systems Architecture Study was conducted during the summer of 2005, following the confirmation of the new NASA Administrator. A team of aerospace subject matter experts used technical, budget, and schedule objectives to analyze a number of potential launch systems, with a focus on human rating for exploration missions. The results showed that a variant of the Space Shuttle, utilizing the reusable Solid Rocket Booster as the first stage, along with a new upper stage that uses a derivative of the RS-25 Space Shuttle Main Engine to deliver 25 metric tons to low-Earth orbit, was the best choice to reduce the risks associated with fielding a new system in a timely manner. The CLV Project, managed by the Exploration Launch Office located at NASA's Marshall Space Flight Center, is leading the design, development, testing, and operation of this new human-rated system. The CLV Project works closely with the Space Shuttle Program to transition hardware, infrastructure, and workforce assets to the new launch system . leveraging a wealth of lessons learned from Shuttle operations. The CL V is being designed to reduce costs through a number of methods, ranging from validating requirements to conducting trades studies against the concept design. Innovations such as automated processing will build on lessons learned from the Shuttle, other launch systems, Department of Defense operations experience, and subscale flight tests such as the Delta Clipper-Experimental Advanced (DCXA) vehicle operations that utilized minimal touch labor, automated cryogen ic propellant loading , and an 8-hour turnaround for a cryogenic propulsion system. For the CLV, the results of hazard analyses are contributing to an integrated vehicle health monitoring system that will troubleshoot anomalies and determine which ones can be solved without human intervention. Such advances will help streamline the mission operations process for pilots and ground controllers alike. In fiscal year 2005, NASA invested approximately $4.5 billion of its $16 bill ion budget on the Space Shuttle. The ultimate goal of the CLV Project is to deliver a safe, reliable system designed to minimize lifecycle costs so that NASA's budget can be invested in missions of scientific discovery. Lessons learned from developing the CLV will be applied to the growth path for future systems, including a heavy lift launch vehicle.

Dumbacher, Daniel L.↗

Integrated Vehicle Ground Vibration Testing of Manned Spacecraft: Historical Precedent

For the first time in nearly 30 years, NASA is developing a new manned space flight launch system. The Ares I will carry crew and cargo to not only the International Space Station, but onward for the future exploration of the Moon and Mars. The Ares I control system and structural designs use complex computer models for their development. An Integrated Vehicle Ground Vibration Test (IVGVT) will validate the efficacy of these computer models. The IVGVT will reduce the technical risk of unexpected conditions that could place the vehicle or crew in jeopardy. The Ares Project Office's Flight and Integrated Test Office commissioned a study to determine how historical programs, such as Saturn and Space Shuttle, validated the structural dynamics of an integrated flight vehicle. The study methodology was to examine the historical record and seek out members of the engineering community who recall the development of historic manned launch vehicles. These records and interviews provided insight into the best practices and lessons learned from these historic development programs. The information that was gathered allowed the creation of timelines of the historic development programs. The timelines trace the programs from the development of test articles through test preparation, test operations, and test data reduction efforts. These timelines also demonstrate how the historical tests fit within their overall vehicle development programs. Finally, the study was able to quantify approximate staffing levels during historic development programs. Using this study, the Flight and Integrated Test Office was able to evaluate the Ares I Integrated Vehicle Ground Vibration Test schedule and workforce budgets in light of the historical precedents to determine if the test had schedule or cost risks associated with it.

Lemke, Paul R.↗

Unleashing Lessons: Sharing Stories About the Fine Art of Systems Engineering

NASA leaders have a responsibility to share their unique oral histories with junior-level employees on whom NASA's future depends. This presentation will give a few examples of how the imaginative, flexible art of systems engineering is as necessary to mission success as is the rigorous, disciplined side of engineering. Engineering space systems involves many disciplines propulsion, loads, dynamics, and so forth that are based on the foundations of scientific principles and methodology and the application of the laws of physics. The term rocket scientist is an apt term, considering that the underlying chemical properties of propellants and the subatomic properties of materials must be understood to harness the powerful energy necessary to escape Earth's gravity in machines that can withstand the stresses and forces to which they are subjected, not to mention the harsh space environments in which they must work. This is a simplistic, yet illustrative, explanation of the scientific side of the engineer s challenge. Bringing together these individual parts into a solid system goes beyond the science of engineering to employ the art of systems engineering. Systems engineers are known for their ability to integrate various solutions to meet or exceed challenging requirements. As the old adage goes, measure twice and cut once. The act of measuring is balancing rigid, inflexible requirements with creative compromises to attain the optimum solution to the challenge of space flight. Then, we cut out those answers that are too risky, expensive, dangerous, and so forth. The process of sharing stories about the little-discussed art of engineering, also known as the art of compromise, will equip the workforce to subjectively judge the best right answer from among the many presented, while objectively integrating the various piece parts into a unified whole.

Singer, Christopher E.↗

ExMC Digital Engineering

Future missions beyond Artemis II will become increasingly complex as multiple vehicles (e.g., Gateway, Human Landing System (HLS), and Extravehicular Activity and Human Surface Mobility Program (EHP)), each having their own Program requirements and other associated documentation, which will need to be integrated into a single mission. Currently, the Human Health and Performance Directorate (HHPD)Program Support Teams mostly use documents to manage, perform, and archive their analyses. Identifying an opportunity for efficiency, ExMC demonstrated the ability to utilize MagicDraw, a Model-Based Systems Engineering (MBSE) tool, as a requirements database with traceability, dependencies, and relationships in one place. Rather than existing in documents, emails, and historical knowledge, ExMC pursued a Digital Engineering (DE) effort in coordination with HHPD by combining MBSE tools with other digital platforms to manage and develop user-defined databases and interfaces. This DE approach is aimed to simplify processes and reduce risk through the unification of requirements into a centralized digital network, improving collaboration, decision-making, and transparency compared to isolated documents and knowledge. However, manipulating data views and content in MagicDraw requires a steep learning curve not needed by all users and even the user-friendly web view comes with downsides due to the static views. To provide a more dynamic user interface, ExMC investigated the use of Microsoft Power Platform which does not require as steep of a learning curve to become proficient. This introduces analytics to the DE infrastructure, offering customizable and dynamic data dashboards. ExMC continues developing these dashboards and tailoring the DE infrastructure in alignment with HHPD workforce needs.

M Krihak↗

Investigating Laser Beam Welding as an In-Space Joining Technique via Thermal Vacuum and Microgravity and Vacuum Experiments

In-space joining technologies are crucial for stimulating an in-space economy and for enabling sustained space exploration by in-space manufacturing and repair of metallic structures. Compared to brazing or soldering, in-space welding (ISW) can provide highly hermetic, strong, and complex joints, potentially without introducing additional material. However, the influence of extreme temperatures, reduced pressure, and reduced gravity on ISW is not yet fully elucidated. Several efforts at NASA are investigating laser beam welding (LBW) as a joining and repair method in both thermal vacuum (TVAC) and combined vacuum & reduced gravity environments. NASA Marshall Space Flight Center (MSFC) shepherded several ISW projects in its past, including the 1973 electron beam welding on Skylab, the 1989 low-power LBW on parabolic flights, and the unflown 1990s-era In-Space Welding Experiment. Recent parabolic flights and 3 degree-of-freedom ground testing build upon this heritage. A collaboration with the Ohio State University using NASA Langley Research Center (LaRC) hardware retrofitted for LBW achieved the first high-powered laser welds under vacuum and low gravity and developed a workforce capable developing such experimental hardware. A ground testing campaign at the MSFC Flat Floor simulated fit-up and welding representative of ISW in 3 degrees of freedom to emulate microgravity effects on inertial systems. One ongoing effort is a NASA Early Career Initiative project – Lunar Assembly and Servicing by Autonomous Robotics (LASAR). Ruggedized LBW components were developed by an external partner for use in TVAC. A TVAC-rated robotic arm was procured by MSFC and used in the first known robotic laser weld where all components save the laser generator were under vacuum. NASA Johnson Space Center (JSC) is advancing supervised autonomy of ISW. NASA LaRC continues to adapt their unique snowflake joint geometry, suitable for connecting segments in trusses and other structures, to LBW. Upcoming TVAC campaigns will focus on testing extreme temperatures, proving out autonomous operations, and demonstrating weld repair. Weld inspection will occur via a non-contact nondestructive evaluation (NDE) technique – electromagnetic acoustic transduction (EMAT). Another ongoing effort based at MSFC is the DISCMAN -- DIsk-Shaped Configurable and Modular vAcuum uNit – which seeks to development a compact, modular payload that can provide a vacuum environment while in a reduced gravity condition. This payload could support multiple in-space manufacturing developmental efforts, with the first demonstration technology being LBW. Currently, the design is targeting operations in the pressurized volume of a space station, but the payload could readily be adapted to other flight platforms such as parabolic or even suborbital vehicles. LASAR elucidates the effects of temperature and vacuum on LBW while DISCMAN probes those of vacuum and gravity. Through these complementary efforts, NASA is addressing the primary challenges of ISW across the space environment while simultaneously developing and maturing technologies including robotic systems and inspection methodologies for future practical implementation on the Moon and beyond. This approach is timely, as upcoming missions requiring sustained human presence in space will depend on reliable ISW capabilities to create robust metallic joints currently unproven in the space environment and to perform repairs in situ .

hypogravity↗

NASA's Ares I and Ares V Launch Vehicles -- Effective Space Operations Through Efficient Ground Operations

The United States (U.S.) plans to return to the Moon by 2020, with the development of a new human-rated space transportation system to replace the Space Shuttle, which is due for retirement in 2010 after it completes its missions of building the International Space Station and servicing the Hubble Space Telescope. Powering the future of space-based scientific exploration will be the Ares I Crew Launch Vehicle, which will transport the Orion Crew Exploration Vehicle to orbit where it will rendezvous with the Lunar Lander. which will be delivered by the Ares V Cargo Launch Vehicle. This new transportation infrastructure, developed by the National Aeronautics and Space Administration (NASA), will allow astronauts to leave low-Earth orbit for extended lunar exploration and preparation for the first footprint on Mars. All space-based operations begin and are controlled from Earth. NASA's philosophy is to deliver safe, reliable, and cost-effective solutions to sustain a multi-billion-dollar program across several decades. Leveraging 50 years of lessons learned, NASA is partnering with private industry, while building on proven hardware experience. This paper will discuss how the Engineering Directorate at NASA's Marshall Space Flight Center is working with the Ares Projects Office to streamline ground operations concepts and reduce costs. Currently, NASA's budget is around $17 billion, which is less than 1 percent of the U.S. Federal budget. Of this amount, NASA invests approximately $4.5 billion each year in Space Shuttle operations, regardless of whether the spacecraft is flying or not. The affordability requirement is for the Ares I to reduce this expense by 50 percent, in order to allow NASA to invest more in space-based scientific operations. Focusing on this metric, the Engineering Directorate provides several solutions-oriented approaches, including Lean/Six Sigma practices and streamlined hardware testing and integration, such as assembling major hardware elements before shipping to the Kennedy Space Center for launch operations. This paper provides top-level details for several cost saving initiatives, including both process and product improvements that will result in space transportation systems that are designed with operations efficiencies in mind. The Engineering Directorate provides both the intellectual capital embodied in an experienced workforce and unique facilities in which to validate the information technology tools that allow a nationwide team to collaboratively connect across miles that separate them and the engineering disciplines that integrate various piece parts into a whole system. As NASA transforms ground-based operations, it also is transitioning its workforce from an era of intense hands-on labor to a new one of mechanized conveniences and robust hardware with simpler interfaces. Ensuring that space exploration is on sound footing requires that operations efficiencies be designed into the transportation system and implemented in the development stage. Applying experience gained through decades of ground and space op'erations, while using value-added processes and modern business and engineering tools, is the philosophy upon which a new era of exploration will be built to solve some of the most pressing exploration challenges today -- namely, safety, reliability, and affordability.

Dumbacher, Daniel L.↗

Operational Lessons Learned from the Ares I-X Flight Test

The Ares I-X flight test, launched in 2009, is the first test of the Ares I crew launch vehicle. This development flight test evaluated the flight dynamics, roll control, and separation events, but also provided early insights into logistical, stacking, launch, and recovery operations for Ares I. Operational lessons will be especially important for NASA as the agency makes the transition from the Space Shuttle to the Constellation Program, which is designed to be less labor-intensive. The mission team itself comprised only 700 individuals over the life of the project compared to the thousands involved in Shuttle and Apollo missions; while missions to and beyond low-Earth orbit obviously will require additional personnel, this lean approach will serve as a model for future Constellation missions. To prepare for Ares I-X, vehicle stacking and launch infrastructure had to be modified at Kennedy Space Center's Vehicle Assembly Building (VAB) as well as Launch Complex (LC) 39B. In the VAB, several platforms and other structures designed for the Shuttle s configuration had to be removed to accommodate the in-line, much taller Ares I-X. Vehicle preparation activities resulted in delays, but also in lessons learned for ground operations personnel, including hardware deliveries, cable routing, transferred work and custodial paperwork. Ares I-X also proved to be a resource challenge, as individuals and ground service equipment (GSE) supporting the mission also were required for Shuttle or Atlas V operations at LC 40/41 at Cape Canaveral Air Force Station. At LC 39B, several Shuttle-specific access arms were removed and others were added to accommodate the in-line Ares vehicle. Ground command, control, and communication (GC3) hardware was incorporated into the Mobile Launcher Platform (MLP). The lightning protection system at LC 39B was replaced by a trio of 600-foot-tall towers connected by a catenary wire to account for the much greater height of the vehicle. Like Shuttle, Ares I-X will be stacked on a MLP and rolled out to the pad on a Saturn-era crawler-transporter. While Ares I-X was only held in place by the four hold-down posts on its aft skirt during rollout, a new vehicle stabilization system (VSS) attached to the vertical service structure kept the vehicle from undue swaying prior to launch at the pad, LC 39B. Following the launch, the flight test vehicle first stage was recovered with the aid of new parachutes resized to accommodate the five-segment-long first stage, which had a much greater length and mass than the Shuttle s reusable solid rocket boosters. After splashdown, recovery divers exercised extra care when handling the first stage to ensure that the flight data recorders in the fifth segment simulator were not damaged by exposure to sea water. The data recovered from the Ares I-X flight test will be very valuable in verifying the predicted environments and models used to design the vehicle. Lessons learned from Ares I-X will be shared with the Ares Projects through written and verbal reports and through integration of mission team members into the Project workforce.

Davis, Stephan R.↗