Search NASA⌕ Search

SEARCH · Search NASA

Results for “CONTRACTS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,081 records · Page 60

Radiolytically-induced novel materials and their application to waste processing. Final report

In the present NEER project we investigated two different types of gel materials with respect to potential applications in environmental remediation, including mixed waste generated from the nuclear fuel cycles. The materials under study were: (1) silica-polymer based aerogel composites into which specific metallic cations diffuse into and remain, and (2) polymer gels made of thermo-sensitive polymer networks, whose functional groups can be ''tailored'' to have a preferred affinity for specific cations, again diffusing into and remaining in the network under a volumetrically, contractive phase-transition. The molecular, diffusion of specific cations, including those of concern in low-level waste streams, into the gel materials studied here indicates that a scaled, engineered system can be designed so that it is passive; that is, minimal (human) intervention and risk would be involved in encapsulating LLW species. In addition, the gel materials hold potential significance in environmental remediation of and recovery of metallic cations identified in respective domains and physico-chemical processes. In brief, silica gels start as aqueous/liquid solutions of base catalyzed silica hydrogels and metal ions (targeted species), such as silver. The metal ions are reduced radiolytically and migrate through the solution to form clusters. Upon post-irradiation processing, aerogel monoliths, extremely lightweight but mechanically strong, that encapsulate the metals are produced. Interestingly the radiolytic or photonic source can be gamma-rays and/or other rays from ''artificial sources'', such as reactors, or ''inherent sources'' like those characterizing mixed waste. Polymer gels, in contrast exhibit thermally-induced volumetric contraction at 20-50 C by expelling water from the gels physical state. Further, some functional groups that capture di- or tri-valent cations from aqueous solutions can be incorporated into the polymer networks on synthesis, including by radiolytic means. These polymer gels retain cations after volumetric contraction and have the ability to trap solid particulates in liquid waste streams. With both silica and polymer gels, functional design of a prototypic ''recovery'' systems, such as by natural convection in a rectangular cell, appears possible. Additional and specific details are provided in the rest of this Final Report.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RIVER PROTECTION PROJECT SYSTEM PLAN

The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, the ORP is responsible for the retrieval, treatment, and disposal of the approximately 57 million gallons of radioactive waste contained in the Hanford Site waste tanks and closure of all the tanks and associated facilities. The previous revision of the System Plan was issued in September 2003. ORP has approved a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. The ORP has established contracts to implement this strategy to establish a basic capability to complete the overall mission. The current strategy for completion of the mission uses a number of interrelated activities. The ORP will reduce risk to the environment posed by tank wastes by: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) for treatment and disposal; (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) and about half of the low-activity waste (LAW) contained in the tank farms, and maximizing its capability and capacity; (3) Developing and deploying supplemental treatment capability or a second WTP LAW Facility that can safely treat about half of the LAW contained in the tank farms; (4) Developing and deploying treatment and packaging capability for transuranic (TRU) tank waste for shipment to and disposal at the Waste Isolation Pilot Plant (WIPP); (5) Deploying interim storage capacity for the immobilized HLW and shipping that waste to Yucca Mountain for disposal; (6) Operating the Integrated Disposal Facility for the disposal of immobilized LAW, along with the associated secondary waste, (7) Closing the SST and DST tank farms, ancillary facilities, and al1 waste management and treatment facilities, (8) Developing and implementing technical solutions to mitigate the impact from substantial1y increased estimates of Na added during the pretreatment of the tank waste solids, This involves a combination of: (1) refining or modifying the flowsheet to reduce the required amount of additional sodium, (2) increasing the overall LAW vitrification capacity, (3) increasing the incorporation of sodium into the LAW glass, or (4) accepting an increase in mission duration, ORP has made and continues to make modifications to the WTP contract as needed to improve projected plant performance and address known or emerging risks, Key elements of the implementation of this strategy are included within the scope of the Tank Operations Contract, currently in procurement Since 2003, the ORP has conducted over 30 design oversight assessments of the Waste Treatment and Immobilization Plant (WTP). The estimated cost at completion has increased and the schedule for construction and commissioning of the WTP has extended, The DOE, Office of Environmental Management (EM), sanctioned a comprehensive review of the WTP flowsheet, focusing on throughput. In 2005, the TFC completed interim stabilization of the SSTs and as of March 2007, has completed the retrieval of seven selected SSTs. Demonstration of supplemental treatment technologies continues. The ongoing tank waste retrieval experience, progress with supplemental treatment technologies, and changes in WTP schedule led to the FY 2007 TFC baseline submittal in November 2006. The TFC baseline submittal was developed before the WTP schedule was fully understood and approved by ORP, and therefore reflects an earlier start date for the WTP facilities. This System Plan is aligned with the current WTP schedule with hot commissioning beginning in 2018 and full operations beginning in 2019. Major decisions regarding the use of supplemental treatment and the associated technology, the ultimate needed capacity, and its relationship to the WTP have not yet been finalized. This System Plan assumes that the outcome of this decision will be to provide a supplemental LAW treatment system using in-container vitrification (ICV{trademark}) as the enabling technology. No final implementation decisions regarding supplemental technology can be made until the Tank Closure and Waste Management Environmental Impact Statement is completed and a Record of Decision is issued by the DOE.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lawrence Livermore National Security Cost Model Functional Management Assessment

The scope of the Functional Management Assessment of the cost model included a review of the plan and progress of the Cost Model Review Team. The review focused on processes in place to ensure simplicity, compliance with cost accounting standards and indirect cost allocation methodology, and the change management plan. This was intended to be a high-level initial review in order to provide recommendations for a subsequent more comprehensive review. The single document reviewed by the team during the assessment was the Indirect Cost Recovery Model Review, which describes how the indirect rate restructure and new organizational structure have resulted in streamlined charging practices to better understand and strategically manage costs. ISSUE 1: The cost model focuses heavily on rate structure but not on cost management. Significant progress has been made to simplify the rate structure. The number of indirect rates has been reduced from 67 different indirect rates used under the prior contract to 32 rates in the first year of the LLNS contract, with a goal of further reduction to 16 for FY09. The reductions are being recommended by a broad-based Working Group driven by Lab leadership desiring a simplified rate structure that would make it easier to analyze the true cost of overhead, be viewed as equitable, and ensure appropriate use of Service, i.e., operations, Centers. This has been a real challenge due to the significant change in approach from one that previously involved a very complex rate structure. Under this prior approach, the goal was to manage the rates, and rates were established at very detailed levels that would 'shine the light' on pools of overhead costs. As long as rates stayed constant or declined, not as much attention tended to be given to them, particularly with so many pools to review (184 indirect rate pools in FY05). However, as difficult and important as simplifying the rate structure has been, the fundamental reason for the simplification is to make it easier to analyze the true cost of overhead so the costs can be effectively managed. For the current year, the overall the goal of keeping the total cost of an FTE to FY07 levels. This approach reflects the past practice of managing to rates rather than focusing on costs, although streamlined with the more simplified rate structure. Given all the challenges being faced with the contract transition, this was a reasonable interim tactic for dealing with the known cost increases such as fees and taxes. Nonetheless, in order to take full advantage of the opportunities that exist for making sound decisions for further reducing the rates themselves, the Laboratory needs to implement an ongoing and disciplined approach to understanding and managing overhead cost. ISSUE 2: The NIF has a significantly different rate structure than other Laboratory work. Because of its significant size and unique organizational structure as a major construction project, the National Ignition Facility (NIF) has indirect charges that vary from the norm. These variations were reviewed and approved by and disclosed to the NNSA in the Laboratory's past annual Disclosure Statements. In mid-FY 09, NIF will begin transition from a construction line item to an operational center. The reallocation of costs when this occurs could significantly impact the Laboratory's rates and rate structure planning for that transition from a cost- and rate- impact standpoint should begin soon. ISSUE 3: The new rate model must be finalized shortly in order to implement the model beginning in FY 09. As noted in Issue No.1, a Working Group has developed a simplified rate structure for the Lab to use for FY09. The Working Group has evaluated the cost impacts of the simplified rate structure at the major program level and identified a disparate impact in the Safeguards and Security area where a substantial increase in overhead cost allocation may need to be mitigated. The simplified rate structure will need to be approved by the Laboratory Director and issued within the Laboratory to formulate detailed budgets so that operations using the new rates can proceed beginning October 1, 2008. A number of activities should occur over the coming weeks and months to ensure a smooth implementation.

99 GENERAL AND MISCELLANEOUS↗

Audit Report, "Fire Protection Deficiencies at Los Alamos National Laboratory"

The Department of Energy's Los Alamos National Laboratory (Los Alamos) maintains some of the Nation's most important national security assets, including nuclear materials. Many of Los Alamos' facilities are located in close proximity to one another, are occupied by large numbers of contract and Federal employees, and support activities ranging from nuclear weapons design to science-related activities. Safeguarding against fires, regardless of origin, is essential to protecting employees, surrounding communities, and national security assets. On June 1, 2006, Los Alamos National Security, LLC (LANS), became the managing and operating contractor for Los Alamos, under contract with the Department's National Nuclear Security Administration (NNSA). In preparation for assuming its management responsibilities at Los Alamos, LANS conducted walk-downs of the Laboratory's facilities to identify pre-existing deficiencies that could give rise to liability, obligation, loss or damage. The walk-downs, which identified 812 pre-existing fire protection deficiencies, were conducted by subject matter professionals, including fire protection experts. While the Los Alamos Site Office has overall responsibility for the effectiveness of the fire protection program, LANS, as the Laboratory's operating contractor, has a major, day-to-day role in minimizing fire-related risks. The issue of fire protection at Los Alamos is more than theoretical. In May 2000, the 'Cerro Grande' fire burned about 43,000 acres, including 7,700 acres of Laboratory property. Due to the risk posed by fire to the Laboratory's facilities, workforce, and surrounding communities, we initiated this audit to determine whether pre-existing fire protection deficiencies had been addressed. Our review disclosed that LANS had not resolved many of the fire protection deficiencies that had been identified in early 2006: (1) Of the 296 pre-existing deficiencies we selected for audit, 174 (59 percent) had not been corrected; and, (2) A substantial portion of the uncorrected deficiencies, 86 (49 percent) were considered by the walk-down teams to be significant enough to warrant compensatory actions until the deficiency was corrected or was tracked to closure through implementation of corrective actions. Further, we found that 32 of the significant deficiencies had been closed by the previous Los Alamos contractor, prior to LANS assuming responsibility for operation of the Laboratory, even though the deficiencies had not been corrected. A fire protection expert provided technical support during the audit. As an example of uncorrected problems, LANS had not resolved, by performing periodic tests, a deficiency identified in 2006 regarding a kitchen hood fire suppression system in a facility located within the Los Alamos Neutron Science Center. Such systems are required to be tested twice a year by the National Fire Protection Association standard, a standard that had been adopted by Department of Energy under DOE Order 420.1B. Yet, in 2006, the LANS walk-down team recognized that this system had not been inspected since May 2004 and noted that deficient suppression systems could result in significantly high levels of property damage and loss. After we brought this issue to management's attention on February 6, 2009, LANS officials stated that the Laboratory would correct this deficiency. As with the problems involving the fire suppression system, we observed that LANS had not always corrected life safety deficiencies involving building exits at one of its primary facilities. This included providing a secondary emergency exit for a building with occupants on multiple floor levels. LANS had removed personnel from the third floor and improved the sprinkler system of the facility, but it had still not provided a secondary exit for personnel on the second floor by the time we completed our review. NNSA has since stated that this fire protection issue will be completely addressed by relocating personnel from the second floor. Perhaps most serious, our testing revealed that a number of deficiencies were formally closed even though actual corrective action had not been completed. Notably, we observed that action had not been taken to resolve a recommendation to replace a fire alarm panel found to be unreliable. After the walk-down was conducted but prior to contract transition, the former contractor closed the recommendation in its action tracking database even though the panel had not been replaced. The walk-down team had categorized the fire alarm system as requiring replacement since it had been modified many times, was old and obsolete, and had very limited available spare parts. In fact, the walk-down team concluded that the panel 'must be considered to be unreliable and should have a very high priority for replacement'.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Gilliam County Riparian Buffers 2007-2008 Annual Report.

During the contract year beginning July 1, 2007 and ending June 30, 2008, the CREP technician contacted 15 new landowners regarding an interest in either the CREP or the Continuous CRP programs. Most landowners requested a second meeting and most sites were visited to discuss possibilities of enrolling in a USDA riparian program. This year, a considerable amount of time was spent providing technical assistance to prior contracts as the practices are implemented. More time is being spent in planning site preparation so that NRCS and FSAs increasing concerns over plant survival are satisfied. A continued concern that the rate paid to the landowner for maintenance is not enough. Controlling competing vegetation is a major factor in increasing plant survival. Increasing costs in the methods used to control unwanted plants has made it difficult for contract holders to perform these methods as effectively as they would like. The projects that have continued maintenance are considerably more successful.

13 HYDRO ENERGY↗

Evaluation of Ultrasonic Measurement Variation in the Double-Shell Tank Integrity Project

Washington River Protection Solutions (WRPS) under contract from the U.S. Department of Energy (DOE) is responsible for assessing the condition of the double-shell tanks (DST) on the Hanford nuclear site. WRPS has contracted with AREVA Federal Services LLC (AFS) to perform ultrasonic testing (UT) inspections of the 28 DSTs to assess the condition of the tanks, judge the effects of past corrosion control practices, and satisfy a regulatory requirement to periodically assess the integrity of the tanks. Since measurement inception in 1997, nine waste tanks have been examined twice (at the time of this report) providing UT data that can now be compared over specific areas. During initial reviews of these two comparable data sets, average UT wall-thickness measurement reductions were noted in most of the tanks. This variation could be a result of actual wall thinning occurring on the waste-tanks walls, or some other unexplained anomaly resulting from measurement error due to causes such as the then-current measurement procedures, operator setup, or equipment differences. WRPS contracted with the Pacific Northwest National Laboratory (PNNL) to assist in understanding why this variation exists and where it stems from.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Treatment Plant Support Program: Summaries of Reports Produced During Fiscal Years 1999-2010

The Waste Treatment Plant (WTP) being built on the U.S. Department of Energy (DOE) Hanford Site will be the largest chemical processing plant in the United States. Bechtel National Inc. (BNI) is the designer and constructor for the WTP. The Pacific Northwest National Laboratory (PNNL) has provided significant research and testing support to the WTP. This report provides a summary of reports developed initially under PNNL’s “1831” use agreement and later PNNL’s “1830” prime contract with DOE in support of the WTP. In March 2001, PNNL under its “1831” use agreement entered into a contract with BNI to support their research and testing activities. However, PNNL support to the WTP predates BNI involvement. Prior to March 2001, PNNL supported British Nuclear Fuels Ltd. in its role as overall designer and constructor. In February 2007, execution of PNNL’s support to the WTP was moved under its “1830” prime contract with DOE.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Extended heat deposition in hot Jupiters: Application to ohmic heating

The observed radii of many giant exoplanets in close orbits exceed theoretical predictions. One suggested origin for this discrepancy is heat deposited deep inside the atmospheres of these “hot Jupiters”. Here, we study extended power sources that distribute heat from the photosphere to the deep interior of the planet. Our analytical treatment is a generalization of a previous analysis of localized “point sources”. We model the deposition profile as a power law in the optical depth and find that planetary cooling and contraction halt when the internal luminosity (i.e., cooling rate) of the planet drops below the heat deposited in the planet’s convective region. A slowdown in the evolutionary cooling prior to equilibrium is possible only for sources that do not extend to the planet’s center. We estimate the ohmic dissipation resulting from the interaction between the atmospheric winds and the planet’s magnetic field, and apply our analytical model to ohmically heated planets. Our model can account for the observed radii of most inflated planets, which have equilibrium temperatures of ≈1500–2500 K and are inflated to a radius of ≈1.6R{sub J}. However, some extremely inflated planets remain unexplained by our model. We also argue that ohmically inflated planets have already reached their equilibrium phase, and no longer contract. Following Wu and Lithwick, who argued that ohmic heating could only suspend and not reverse contraction, we calculate the time it takes ohmic heating to re-inflate a cold planet to its equilibrium configuration. We find that while it is possible to re-inflate a cold planet, the re-inflation timescales are longer by a factor of ≈30 than the cooling time.

79 ASTRONOMY AND ASTROPHYSICS↗

THE LAST MINUTES OF OXYGEN SHELL BURNING IN A MASSIVE STAR

We present the first 4 π– three-dimensional (3D) simulation of the last minutes of oxygen shell burning in an 18 M {sub ⊙} supernova progenitor up to the onset of core collapse. A moving inner boundary is used to accurately model the contraction of the silicon and iron core according to a one-dimensional stellar evolution model with a self-consistent treatment of core deleptonization and nuclear quasi-equilibrium. The simulation covers the full solid angle to allow the emergence of large-scale convective modes. Due to core contraction and the concomitant acceleration of nuclear burning, the convective Mach number increases to ∼0.1 at collapse, and an ℓ = 2 mode emerges shortly before the end of the simulation. Aside from a growth of the oxygen shell from 0.51 M {sub ⊙} to 0.56 M {sub ⊙} due to entrainment from the carbon shell, the convective flow is reasonably well described by mixing-length theory, and the dominant scales are compatible with estimates from linear stability analysis. We deduce that artificial changes in the physics, such as accelerated core contraction, can have precarious consequences for the state of convection at collapse. We argue that scaling laws for the convective velocities and eddy sizes furnish good estimates for the state of shell convection at collapse and develop a simple analytic theory for the impact of convective seed perturbations on shock revival in the ensuing supernova. We predict a reduction of the critical luminosity for explosion by 12% – 24% due to seed asphericities for our 3D progenitor model relative to the case without large seed perturbations.

79 ASTRONOMY AND ASTROPHYSICS↗

Body-fixed, Three-Axis Reference System Study: Phase II Final Report

This Phase II Body-Fixed, Three-Axis Reference System Study Final Report is the result of a follow-on contract awarded by NASAIMSFC to TRW Systems in April 1966, under Contract No, NASS-20209. of the Phase I1 Study was to refine and supplement the strapdown inertial ’ reference assembly (SIRA), software, airborne computer, and alignment analyses performed during Phase I of the same contract. The purpose Specifically, the Phase I results in many areas were those which could be achieved using simplifying assumptions (linearization) and hand analyses. It was the purpose of the Phase I1 studies to investigate the validity of the Phase I results by means of more sophisticated computer simulations, in which no simplifying assumptions were made, for each of the areas analyzed. The Phase 11 analyses were directed, therefore, at confirming the analytical feasibility asserted by the Phase I results.

Source record↗

Model development of supersonic trough wind with shocks

The time dependent one dimensional hydrodynamic equations describe the evolution of the thermal plasma flow along closed magnetic field lines outside of the plasmasphere. The convection of the supersonic polar wind onto a closed fieldline results in the assumed formation of collisionless plasma shocks. These shocks move earthward as the field line with its frozen-in plasma remains fixed or contracts with time to smaller L coordinates. The high equatorial plasma temperature (of the order of electron volts) produced by the shock process decreases with time if the flow is isothermal but it will increase if the contraction is under adiabatic conditions. Assuming adiabaticity a peak in the temperature forms at the equator in conjunction with a depression in the ion density. After an initial contraction, if the flux tube drifts to higher L coordinates the direction of the shock motion can be reversed so that the supersonic region will expand along the field line towards the state characterizing the supersonic polar wind. A rapid expansion will lower the equatorial density while the temperature decreases with time under adiabatic but not isothermal conditions.

Grebowsky, J. M.↗

Study of Spray Disintegration in Accelerating Flow Fields

An analytical and experimental investigation was conducted to perform "proof of principlem experiments to establish the effects of propellant combustion gas velocity on propella'nt atomization characteristics. The propellants were gaseous oxygen (GOX) and Shell Wax 270. The fuel was thus the same fluid used in earlier primary cold-flow atomization studies using the frozen wax method. Experiments were conducted over a range in L* (30 to 160 inches) at two contraction ratios (2 and 6). Characteristic exhaust velocity (c*) efficiencies varied from SO to 90 percent. The hot fire experimental performance characteristics at a contraction ratio of 6.0 in conjunction with analytical predictions from the drovlet heat-up version of the Distributed Energy Release (DER) combustion computer proDam showed that the apparent initial dropsize compared well with cold-flow predictions (if adjusted for the gas velocity effects). The results also compared very well with the trend in perfomnce as predicted with the model. significant propellant wall impingement at the contraction ratio of 2.0 precluded complete evaluation of the effect of gross changes in combustion gas velocity on spray dropsize.

Nurick, W. H.↗

State-of-technology for joining TD-NiCr sheet.

At the current state-of-technology there are many joining processes that can be used to make sound welds in TD-NiCr sheet. Some of these that are described in this report are electron beam welding (EBW), gas-tungsten arc welding (GTAW), diffusion welding (DFW), resistance spot welding (RSW), resistance seam welding (RSEW), and brazing. Roll welding (RW) and explosion welding (EXW) have not been developed to the point where they can be used to make sound welds in TD-NiCr. Joining work that has previously been done on TD-NiCr by various organizations, both privately supported and under Air Force and NASA contracts, is described in this summary. Current work is also described that is being done at General Dynamics/Convair (under NASA contract) and at NASA/Lewis to develop and evaluate DFW, RSW, RSEW, and brazing. Preliminary comparisons of joining processes are made for typical applications. A brief description of the manufacture of TD-NiCr sheet by a recently standardized process (under NASA contract) also is given.

Holko, K. H.↗

Model development of supersonic trough wind with shocks.

The time-dependent one dimensional hydrodynamic equations describe the evolution of the thermal plasma flow along closed magnetic field lines outside of the plasmasphere. The convection of the supersonic polar wind onto a closed field line results in the assumed formation of collisionless plasma shocks. These shocks move earthward as the field line with its 'frozen-in' plasma remains fixed or contracts with time to smaller L coordinates. The high equatorial plasma temperature (of the order of electron volts) produced by the shock process decreases with time if the flow is isothermal, but it will increase if the contraction is under adiabatic conditions. Assuming adiabaticity a peak in the temperature forms at the equator in conjunction with a depression in the ion density. After an initial contraction, if the flux tube drifts to higher L coordinates, the direction of the shock motion can be reversed so that the supersonic region will expand along the field line toward the state characterizing the supersonic polar wind.

Grebowsky, J. M.↗

An evaluation of contractor projected and actual costs

GSFC contractors with cost-plus contracts provide cost estimates for each of the next four quarters on a quarterly basis. Actual expenditures over a two-year period were compared to the estimates, and the data were sorted in different ways to answer several questions and give quantification to observations, such as how much does the accuracy of estimates degrade as they are made further into the future? Are estimates made for small dollar amounts more accurate than for large dollar estimates? Other government agencies and private companies with cost-plus contracts may be interested in this analysis as potential methods of contract management for their organizations. It provides them with the different methods one organization is beginning to use to control costs.

Kwiatkowski, K. A.↗

On the mechanism of formation of loop prominences

A mechanism is suggested for the formation of loop-type prominences in solar-active regions following flare events. The mechanism is based on the already existing idea of compression of a coronal plasma element resulting in enhanced radiation and consequent cooling of the element. A model is suggested for such a compression based on the concept of a contracting, force-free filamentary structure. If the current in a filament increases with time, then there is a radial contraction of the filament. Since the coronal plasma is frozen into the magnetic field lines of the filament, a contraction of the filament causes a compression of the filamentary plasma. This model of compression is shown to be in approximate qualitative and quantitative agreement with observations.

De, B. R.↗

Incidence angle bounds for lip flow separation of three 13.97-centimeter-diameter inlets

Low speed wind tunnel tests were conducted to establish a procedure for determining inlet-lip flow separation and to make preliminary examination of the incidence angle bounds for lip flow separation on inlets intended for the nacelles of STOL (short takeoff and landing) aircraft. Three inlets were tested. Two of the inlets had short centerbodies with lower lip area contraction ratios of 1.30 and 1.44. The third inlet had a cylindrical centerbody extended forward into the inlet throat with a lower lip area contraction ratio of 1.44. The inlets were sized to fit a 13.97 centimeter-diameter fan. For inlet throat Mach numbers less than about 0.43, the lip flow separation angle was increased by either increasing the ratio of throat velocity to freestream velocity (Vt/Vo) or by increasing the lower lip area contraction ratio. For throat Mach numbers greater than a certain value (ranging from 0.43 to 0.52), increasing throat Mach number in some cases resulted in a decrease in the lip flow separation angle. Extending a cylindrical centerbody into the inlet throat increased the flow separation angle for nearly all values of Vt/Vo.

Luidens, R. W.↗

Inlets for high angles of attack

Different inlet designs for high angle of attack STOL and VTOL applications were tested in a subsonic wind tunnel. Three removable entry lips having contraction ratios of 1.30, 1.34 and 1.38 were tested with a single diffuser. The internal contour of each entry lip was an ellipse with a major to minor axis of 2.0. Each lip and diffuser assembly was tested to determine its tolerance to angle of attack, first with a conventional centerbody and then with an extended centerbody. Results indicate that a large improvement in separation angle (determined as a function of lip contraction ratio and inlet flow) was obtained for the extended centerbody for all contraction ratios. Improved inlet tolerance to angle of attack was obtained by reducing the adverse pressure gradient downstream of the throat.

Miller, B. A.↗