A prediction model to forecast the cost impact from a break in the production schedule

The losses which are experienced after a break or stoppage in sequence of a production cycle portends an extremely complex situation and involves numerous variables, some of uncertain quantity and quality. There are no discrete formulas to define the losses during a gap in production. The techniques which are employed are therefore related to a prediction or forecast of the losses that take place, based on the conditions which exist in the production environment. Such parameters as learning curve slope, number of predecessor units, and length of time the production sequence is halted are utilized in formulating a prediction model. The pertinent current publications related to this subject are few in number, but are reviewed to provide an understanding of the problem. Example problems are illustrated together with appropriate trend curves to show the approach. Solved problems are also given to show the application of the models to actual cases or production breaks in the real world.

Delionback, L. M.↗

PlumeSeeker{sup TM}: A Model-Based Least-Cost Monitoring Network Design Technology for 3-D Contaminant Plume Boundary Delineation - 19582

Delineating the extent of contamination in an aquifer is a pre-requisite for designing remediation schemes as well as for satisfying regulators and stakeholders. Contaminant plumes are typically delineated using either monitoring well locations with observed concentrations below remedial goals or with computer-drawn contour maps based on available concentration measurements in the groundwater. Computer-generated plume information lacks ground truth resulting in uncertainty about the true limits of contamination. The location of groundwater delineation wells is usually chosen solely based on professional judgement and experience. Both approaches can be inefficient, risky and often unnecessarily expensive. PlumeSeeker{sup TM} is a software-based technology well-suited for the optimal delineation of radiological or emerging contaminant plumes with single or multiple source locations. The software is an enhancement of a university research code for plume delineation using geostatistical and stochastic modeling tools integrated with the widely used groundwater flow and transport modeling software MODFLOW-SURFACT{sup TM}. PlumeSeeker{sup TM} increases the overall confidence in the location and geometry of the plume boundary through the sequential (i.e. a rank-ordered listing) or batch (i.e. a suite of multiple wells) selection of existing or new monitoring wells based on the criteria of maximizing plume boundary uncertainty reduction and on new field information. Using PlumeSeeker{sup TM}, remediation managers can optimally locate new wells at sites where well installation costs are high or hydrogeology is complex. Applicable at sites with or without existing monitoring wells, PlumeSeeker{sup TM} is particularly powerful for optimally allocating project resources (labor, well installation, and laboratory costs) between existing wells and sampling at new locations. An application of PlumeSeeker{sup TM} at a DoD installation demonstrates how the cost of delineating a plume can be minimized. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modeling Electric Generation Capital Costs with Uncertain Future CO 2 Pricing

As new environmental regulations are reevaluated and various tax subsidies begin to expire, the outlook for investors in power generation may be more uncertain than ever. There are many electric power generation studies and forecasts published by a wide array of entities from private consulting firms to government agencies and national labs. These studies show which power generation technologies are favored to be constructed under the assumptions within each future scenario, and many people in businesses and government use these studies for planning purposes and decision-making. One common need for assumptions in these studies is the rate of return investors will require for constructing new generation. It is shown in this paper that for each one percent added to the cost of capital (CoC) above a base level, the levelized cost of electricity (LCOE) increases by 1-to-4 percent for generation with a 30-year life and debt term, a length commonly used for conventional generation. Therefore, if analysts make a distinction in the CoC for different technologies without quantitative support, it could result in misleading technologies being chosen as favored when facing regulatory uncertainty. The practice of adding a penalty (percentage adder) to the CoC was initially discovered in the Annual Energy Outlook, published by the U.S. Energy Information Administration (EIA). This paper presents the framework typically used in scenario analysis for selecting a CoC, consistent with the practice in long-range planning models that seek to identify the best future generation technologies for meeting electricity demand. Examples are provided on why full specification and consistency is necessary to obtain accurate results for any scenario. It is also shown in this paper how the mischaracterization of regulatory uncertainty to address the uncertainty about CO2 mitigation in a scenario can lead to a misleading outcome when applying a risk penalty to the CoC. The analysis presented shows that applying a 3-percentage penalty to the CoC for fossil generation implies a different price per ton for each generation technology, which suggests the uncertainty about CO2 regulations would best be addressed through pricing sensitivity analyses rather than penalties added to the CoC.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cost Breakeven Analysis of Lunar ISRU for Human Lunar Surface Architectures

The return of humans to the lunar surface encompasses a range of possible architectures from brief Apollo-like sorties to long-term sustainment of human presence. Any architecture in this span requires propellant for the crew’s ascent from the lunar surface, as well as consumables to support their presence on the Moon. Oxygen and hydrogen are candidates for the propellant for the ascent vehicle due to their high specific impulse and potential for production from lunar resources and also constitute important consumables for the crew. Thus, the production of oxygen and/or hydrogen from lunar resources could significantly reduce the mass that must be sent from Earth to enable future human lunar missions. To assess the merits of using lunar resources, the costs associated with developing, producing, launching, operating, and maintaining those systems must be considered relative to the costs of delivering the needed resources from Earth. The demand for those resources depends upon the nature of the lunar mission, while the costs of both Earth-derived and lunar-derived resources depend on the performance requirements and technology capabilities associated with each approach. Thus, determining which approach is more cost efficient requires modeling the performance and cost of the associated systems as well as the range of possible architectures over which such a determination might apply. This research proposes a model that parametrically captures the factors influencing the relevant costs of providing propellant and crew consumables on the lunar surface from Earth and from the Moon. Two ISRU system models are assessed relative to propellant delivery from Earth. In this model, lunar ISRU breaks even with propellant delivery from Earth at high propellant demands and mission durations with multi-year ISRU system lifetimes; however, the costs of developing the necessary technologies to support a highly reliable and autonomous lunar ISRU system were not included.

ISRU↗

Parallel Load Balancing for Adaptive Unstructured Meshes

Mesh adaption is a powerful tool for efficient unstructured-grid computations but causes load imbalance among processors on a parallel machine. We describe a novel method to dynamically balance the processor workloads with a global view. Mesh question, repartitioning, processor assignment, and remapping are critical components of the framework that must be accomplished rapidly and efficiently so as not to cause a significant overhead to the numerical simulation. A data redistribution model will also be presented that predicts the remapping cost. This model is required to determine whether the gain from a balanced workload distribution offsets the cost of data movement. Results presented will demonstrate that this is an effective dynamic load balancing strategy which remains viable on a large number of processors.

Biswas, Rupak↗

Optimal Design and Techno-Economic Analysis of 3D-Printed, Intensified Packings for Absorbers and Strippers in Solvent-Based CO 2 Capture

A potential technology for the CO 2 absorption process is utilizing intensified structured packing with embedded cooling/heating channels for continuous heat exchange, which can overcome limitations of discrete methods, such as discrete intercooling and centralized reboilers, to aid in reducing energy consumption and decreasing costs. This work investigates the modeling of intensified packing (IP) for the stripper tower, extending on previous work for the absorber, which distributes heat internally within the column, improving the thermodynamics for the solvent regeneration process. The model includes submodels for steam turbine extraction to produce steam at various qualities as well as a surrogate model for calculating steam enthalpy. A cost model for a plant-scale absorption capture process was developed, allowing for the design of the plant to be optimized, subject to minimizing capture cost using two different power plant flue gas sources. In this optimization, the placement of IP in both towers is optimized to balance the trade-off between enhanced heat transfer and reduced mass transfer volume. For natural gas combined cycle flue gas, the standard process configuration had a minimum cost of $\$$65.40/tonne CO 2 , and considering IP, the minimum capture cost is reduced to $\$$62.73/tonne, with utilization in the stripper column, which reduces yearly costs by up to $\$$2.67 MM/yr. Cooling the absorber through IP, or intercoolers, was only found to be beneficial at higher capture rates, with IP in both towers having a cost of capture of $\$$68.08/tonne at 99.9% capture, a reduction of $\$$12.64/tonne when using only intercoolers at the same capture rate. When capturing from pulverized-coal power plants, the minimum cost of capture when using IP in both towers is $\$$44.18/tonne (at 97% capture), while the standard configuration with and without intercoolers was $\$$45.69 and $\$$47.22 per tonne, respectively. This results in a reduction in yearly costs of $\$$16.98 MM/yr from the base-case configuration. At this higher CO 2 concentration, cooling in the absorber from the IP becomes extremely beneficial, reducing energy consumption by up to 6%.

20 FOSSIL-FUELED POWER PLANTS↗

Integrating O/S models during conceptual design, part 1

The University of Dayton is pleased to submit this report to the National Aeronautics and Space Administration (NASA), Langley Research Center, which integrates a set of models for determining operational capabilities and support requirements during the conceptual design of proposed space systems. This research provides for the integration of the reliability and maintainability (R&M) model, both new and existing simulation models, and existing operations and support (O&S) costing equations in arriving at a complete analysis methodology. Details concerning the R&M model and the O&S costing model may be found in previous reports accomplished under this grant (NASA Research Grant NAG1-1327). In the process of developing this comprehensive analysis approach, significant enhancements were made to the R&M model, updates to the O&S costing model were accomplished, and a new simulation model developed. This is the 1st part of a 3 part technical report.

Ebeling, Charles E.↗

Generation Plant Cost of Operations and Cycling Optimization Model (Final Technical Report)

Modern coal plants are a masterpiece of engineering, having been refined and improved over more than a century. As they evolved, they have grown more efficient and cleaner. At the same time, they have grown much larger and increasingly designed to operate on very specific fuels at or near the maximum capacity, providing baseload power. In recent decades, however, they have been called on to operate at reduced capacity (cycled) at a loss of efficiency and possibly accelerated wear and tear. The purpose of this project was to develop a model to accurately estimate the cost of cycling large coal plants so that they can be operated efficiently as part of a comprehensive strategy for generation planning and dispatch. The final goal is a model which is commercial-ready that can be “tuned” to different plants for widespread use.

20 FOSSIL-FUELED POWER PLANTS↗

Laboratory simulations of the mixed solvent extraction recovery of dominate polymers in electronic waste

Highlights: • Mixed plastics in e-waste are separated with a solvent extraction method. • Recovery procedure obtained an acceptable recovery rate with high purity. • The recovered plastics are greatly energy-saving compared with virgin polymers. • Cost-saving can be potentially achieved for specific composition of plastics. - Abstract: The recovery of four dominant plastics from electronic waste (e-waste) using mixed solvent extraction was studied. The target plastics included polycarbonate (PC), polystyrene (PS), acrylonitrile butadiene styrene (ABS), and styrene acrylonitrile (SAN). The extraction procedure for multi-polymers at room temperature yielded PC, PS, ABS, and SAN in acceptable recovery rates (64%, 86%, 127%, and 143%, respectively, where recovery rate is defined as the mass ratio of the recovered plastic to the added standard polymer). Fourier transform infrared spectroscopy (FTIR) was used to verify the recovered plastics’ purity using a similarity analysis. The similarities ranged from 0.98 to 0.99. Another similar process, which was denoted as an alternative method for plastic recovery, was examined as well. Nonetheless, the FTIR results showed degradation may occur over time. Additionally, the recovery cost estimation model of our method was established. The recovery cost estimation indicated that a certain range of proportion of plastics in e-waste, especially with a higher proportion of PC and PS, can achieve a lower cost than virgin polymer product. It also reduced 99.6%, 30.7% and 75.8% of energy consumptions and CO{sub 2} emissions during the recovery of PC, PS and ABS, and reduced the amount of plastic waste disposal via landfill or incineration and associated environmental impacts.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

EverBatt: A Closed-loop Battery Recycling Cost and Environmental Impacts Model

The cumulative global electric vehicle (EV) sales surpassed 3.1 million units in 2017, with 1.9 million units of battery electric vehicles (BEVs), and 1.2 million units of plug-in hybrid electric vehicles (PHEVs). Of the cumulative global EV sales, The U.S. accounted for 0.40 million BEV sales, and 0.36 million PHEV sales (IEA 2018). Assuming a lifespan of 10 years for EVs, an average battery pack weight of 300 kg for BEVs, and an average battery pack weight of 200 kg for PHEVs, by 2027, 0.2 million metric tons of EV batteries would reach their end-oflife (EOL) in the U.S. Globally, the volume of spent automotive batteries would amount to 0.8 million metric tons by 2027. As the annual global EV sales are expected to grow from 1.4 million in 2017 to 21.5 million in 2030 (IEA 2018), the volume of spent automotive batteries would increase markedly beyond 2027.

25 ENERGY STORAGE↗

Low cost tracking Navaids error model verification

Features and characteristics of the tracking navaids (Microwave Scanning Beam Landing System, Radar Altimeter, Tacan, rendezvous radar and one way Doppler extracter) were investigated. From the investigation, a set of specifications were developed for building equipment to verify the error model of the tracking navaids. Breadboard verification equipment (BVE) was built for the Microwave Scanning Beam Landing System and the radar altimeter. The breadboard verification equipment generates signals to the tracking navaids which simulate the space shuttles trajectory in the terminal area. The BVE simulates sources of navaids error by generating pseudorandom perturbations on the navaids signals. Differences between the trajectory value and the navaid derived values are taped and form the basis for the navaids error model.

Charych, A.↗

Space station WP-04 power system preliminary analysis and design document, volume 3

Rocketdyne plans to generate a system level specification for the Space Station Electric Power System (EPS) in order to facilitate the usage, accountability, and tracking of overall system level requirements. The origins and status of the verification planning effort are traced and an overview of the Space Station program interactions are provided. The work package level interfaces between the EPS and the other Space Station work packages are outlined. A trade study was performed to determine the peaking split between PV and SD, and specifically to compare the inherent total peaking capability with proportionally shared peaking. In order to determine EPS cost drivers for the previous submittal of DRO2, the life cycle cost (LCC) model was run to identify the more significant costs and the factors contributing to them.

Source record↗

Cost estimating methods for advanced space systems

NASA is responsible for developing much of the nation's future space technology. Cost estimates for new programs are required early in the planning process so that decisions can be made accurately. Because of the long lead times required to develop space hardware, the cost estimates are frequently required 10 to 15 years before the program delivers hardware. The system design in conceptual phases of a program is usually only vaguely defined and the technology used is so often state-of-the-art or beyond. These factors combine to make cost estimating for conceptual programs very challenging. This paper describes an effort to develop parametric cost estimating methods for space systems in the conceptual design phase. The approach is to identify variables that drive cost such as weight, quantity, development culture, design inheritance and time. The nature of the relationships between the driver variables and cost will be discussed. In particular, the relationship between weight and cost will be examined in detail. A theoretical model of cost will be developed and tested statistically against a historical database of major research and development projects.

Cyr, Kelley↗