Search NASA⌕ Search

SEARCH · Search NASA

Results for “DIPOLES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,081 records · Page 60

Improvement of Wire-Stretching Technique to the RF Measurements of E-Center and Multipole Field for the Dipole Cavities

After the first publication [1] of wire-stretching technique from its principle to measure the electrical center of a deflecting cavity, more refinements of this techniques including the review of its analytical and simulation results, RF circuit improvement the signal to noise ratio and its application to other cavities have been developed. These applications include the electrical center measurements for the LHC RFD and DQW crabbing cavity prototypes, multi-frequency harmonic kicker cavity for JLEIC electron cooler [2], TE011 cavity developed for the beam magnetization measurement [3], and a separator cavity at BNL [4].

Park, Gunn T.↗

Study of ultra-low emittance design for Spear3 using longitudinal gradient dipole

Since its 2003 construction, the SPEAR3 synchrotron light source at SLAC has continuously improved its performance by raising beam current, top-off injection, and smaller emittance. This makes SPEAR3 one of the most productive light sources in the world. Now to further enhance the performance of SPEAR3, we are looking into the possibility of converting SPEAR3 to an ultra-low emittance storage ring within its site constraint.

43 PARTICLE ACCELERATORS↗

Planning and Prototyping for a Storage Ring Measurement of the Proton Electric Dipole Moment

Electron and proton EDM's can be measured in "frozen spin" (with the beam polarization always parallel to the orbit, for example) storage rings. For electrons the "magic" kinetic energy at which the beam can be frozen is 14.5 MeV. For protons the magic kinetic energy is 230 MeV. The currently measured upper limit for the electron EDM is much smaller than the proton EDM upper limit, which is very poorly known. Nevertheless, because the storage ring will be an order of magnitude cheaper, a sensible plan is to first build an all-electric electron storage ring as a prototype. Such an electron ring was successfully built at Brookhaven, in 1954, as a prototype for their AGS ring. This leaves little uncertainty concerning the cost and performance of such a ring. (This is documentedin one of the Physical Review papers mentioned above.)

43 PARTICLE ACCELERATORS↗

A state of the art current-septum dipole magnet

The acceleration process of charged particle beam often required the use of few acceleration stages to provide the beam with the desired energy. The extraction of the beam from one acceleration stage and the injection to the next, both require a special type of magnet which comes under the name septum magnet. Such a magnet generates a strong field in one region of space an a very low field in another region with two regions separated by a very thin material (septum).

43 PARTICLE ACCELERATORS↗

First Field Quality Measurements of a 15 T Nb3Sn Dipole Demonstrator

Outline: Data collection; Magnetic Measurement System; Measurement sensitivity; Centering Corrections; Measurement discussion; Transfer Function (magnitude of the field); Loop (Dynamic effects, eddy current); Z-scan (behavior along magnet length); Harmonics from Stair Step (geometric harmonics); Comparison with Simulation; Decay and Snapback; Summary

43 PARTICLE ACCELERATORS↗

Development of a New Neutron Electric Dipole Moment Experiment at LANL [Slides]

Conclusion: New timing filter amps and power supplies for the PMTs have been procured. The second switcher is built and will be tested with UCN soon. The second simultaneous spin analyzer is being built at Indiana University and will be tested this year. We plan to start taking production data from next year

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Fabrication and test of COMB dipole magnet with STAR® wires

Fermilab is working on superconducting accelerator magnet R&D under the framework of the U.S. MagnetDevelopment Program (USMDP). An integral part of that program is High Temperature Superconducting (HTS)accelerator magnet development to- demonstrate HTS self‐fields of 5 T or greater- be compatible with operation in hybrid LTS/HTS configuration• to probe fields beyond 16 T for future High Energy Physics (HEP) experiments

43 PARTICLE ACCELERATORS↗

Modeling of Bi-2212 strand and Rutherford cable in a dipole coil insert

The U.S. Magnet Development Program (US-MDP) explores high-field accelerator magnets compatible with op- erational conditions beyond the limits of Nb3Sn technology. The ongoing R&D High-Temperature Superconductors (HTS) suggests using Bi2Sr2CaCu2O8−x (Bi-2212) as superconducting element. Bi-2212 Rutherford cables maintain a high critical current (IC ) when exposed to a large external magnetic field. However, Bi-2122 exhibits an oversensitive stress-strain response when subject to large Lorentz forces. This paper reports on the magnetic and mechanical analysis of the Bi-2212 cosine-theta insert being developed at Fermilab for a hybrid magnet composed of 2 external layers of Nb3Sn and 2 internal layers of Bi-2212. We performed a FEM analysis of the insert to estimate the HTS stress state in the coil s strands under magnetic and mechanical loads.

D'Agliano, A.↗

FEM Analysis of Hybrid LTS/HTS Cos-Theta Dipole Magnet

After the recent results on Bi-2212 superconductive magnets realized and tested in canted cosine-theta and solenoid designs, respectively, at Lawrence Berkeley National Laboratory (LBNL) and NHMFL, the first Bi-2212 stress-managed cosine-theta insert magnet is in the assembly phase at Fermilab. This insert will be part of the first hybrid cosine-theta magnet made of Nb3Sn outer layers within the US-MDP effort to reach 20 T bore field. This paper reports the analytical analysis of the cosine-theta Nb3Sn/Bi-2212 hybrid magnet. As an introduction, it shows the validation of the finalized HTS coils' design optimized using the ROXIE code. Subsequently, it reports the parameters, logic, and implementation method of the 2D electromagnetic and mechanical FEM analysis of the LTS/HTS hybrid magnet. Results from the ANSYS detailed model made with sub-modeling geometry are compared with the homogeneous model implemented in the past. Moreover, a Python code was implemented to simulate the current degradation due to stresses in the detail-modeled conductor areas. The current degradation is introduced in the simulation dynamics for both conductors as an iteration process during the energization load step only after applying pre-stress and thermal loads. The numerical and graphic results of the 2D cosine-theta LTS/HTS magnet cross-section will be described and analyzed.

D'Agliano, A.↗