Basic Data Report for Piezometers PZ-13, PZ-14, and PZ-15 and Shallow Subsurface Water
The Site and Preliminary Design Validation (SPDV) pile is located in the southwest corner of Section 21, Township 22 South, Range 31 East in Eddy County, New Mexico, adjacent to the Waste Isolation Pilot Plant (WIPP) operational area. During August 2007, piezometers (PZ)-13, PZ-14, and PZ-15 were drilled around the SPDV pile to determine if shallow subsurface water (SSW) existed around the SPDV pile and, if so, provide a means to monitor. These piezometers were drilled with a combination of hollow-stem auger and air-assisted hollow-stem auger drilling. Below the surficial dunes and Berino soil, piezometers PZ-13 and PZ-14 encountered in order, from shallowest to deepest, the Mescalero caliche, Gatuña Formation, Santa Rosa Formation, and Dewey Lake Formation. Piezometer PZ-15 was completed in the Gatuña Formation, having not encountered the lower formations by the time SSW was detected. Water was encountered in all wells. Piezometers were constructed of 2-inch polyvinyl chloride casing and 15 feet of 0.020-inch slot screen. Water samples were obtained and analyzed for each well. Based on the results of the installation of the piezometers, analysis of water levels, and geological analysis, it is concluded that the water levels identified in PZ-13 and PZ-14 are the result of the SPDV pile runoff or infiltration prior to being lined. Water in PZ-15 is much shallower and chemically different that water in the other two wells, indicating another source, such as recharge and infiltration from the east of the SPDV pile.