Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operational Concepts”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,081 records · Page 60

NASA Research on an Integrated Concept for Airport Surface Operations Management

Surface operations at airports in the US are based on tactical operations, where departure aircraft primarily queue up and wait at the departure runways. There have been attempts to address the resulting inefficiencies with both strategic and tactical tools for metering departure aircraft. This presentation gives an overview of Spot And Runway Departure Advisor with Collaborative Decision Making (SARDA-CDM): an integrated strategic and tactical system for improving surface operations by metering departure aircraft. SARDA-CDM is the augmentation of ground and local controller advisories through sharing of flight movement and related operations information between airport operators, flight operators and air traffic control at the airport. The goal is to enhance the efficiency of airport surface operations by exchanging information between air traffic control and airline operators, while minimizing adverse effects on stakeholders and passengers. The presentation motivates the need for departure metering, and provides a brief background on the previous work on SARDA. Then, the concept of operations for SARDA-CDM is described. Then the preliminary results from testing the concept in a real-time automated simulation environment are described. Results indicate benefits such as reduction in taxiing delay and fuel consumption. Further, the preliminary implementation of SARDA-CDM seems robust for two minutes delay in gate push-back times.

Gupta, Gautam↗

Evaluation of an Airborne Spacing Concept to Support Continuous Descent Arrival Operations

This paper describes a human-in-the-loop experiment of an airborne spacing concept designed to support Continuous Descent Arrival (CDA) operations. The use of CDAs with traditional air traffic control (ATC) techniques may actually reduce an airport's arrival throughput since ATC must provide more airspace around aircraft on CDAs due to the variances in the aircraft trajectories. The intent of airborne self-spacing, where ATC delegates the speed control to the aircraft, is to maintain or even enhance an airport s landing rate during CDA operations by precisely achieving the desired time interval between aircraft at the runway threshold. This paper describes the operational concept along with the supporting airborne spacing tool and the results of a piloted evaluation of this concept, with the focus of the evaluation on pilot acceptability of the concept during off-nominal events. The results of this evaluation show a pilot acceptance of this airborne spacing concept with little negative performance impact over conventional CDAs.

Murdoch, Jennifer L.↗

Human Mars Entry, Descent and Landing Architecture Study: Deployable Decelerators

NASA’s Entry, Descent and Landing Architecture Study uses a trajectory simulation framework to evaluate various technologies and concepts of operations for human scale EDL at Mars. The study results inform agency technology investments. This paper summarizes the design assumptions and analysis of two deployable entry concepts performed in Phase 2 of the study. The entry concepts include a rigid deployable called the Adaptable Deployable Entry Placement Technology and an inflatable concept called the Hypersonic Inflatable Aerodynamic Decelerator. This paper describes the concept operations of these vehicles to deliver a 20-metric ton payload to the surface of Mars. Details of vehicle design and flight performance are summarized along with results of analysis on the aft body heating and its effect on the payload. Finally, recommended technology investments based on the results are presented.

Dwyer Cianciolo, Alicia↗

Simulation evaluation of flight controls and display concepts for VTOL shipboard operations

A ground-based evaluation of several control-system concepts and display formats for use in shipboard landing operations of a V/STOL aircraft (AV-8A Harrier) is reported. The study was conducted in the Vertical Motion Simulator at Ames Research Center. The control systems ranged from a rate-damping SAS to a translational-velocity command system; displays ranged from a head-down presentation of attitude and altitude to two different head-up formats that provided position and velocity information. Results of pilot evaluations of the aircraft's handling qualities, as well as measures of task performance and control power use during landing on a moving deck in visual meteorological condtions, are presented.

Farris, G. G.↗

Generic Repository Concepts and Thermal Analysis for Advanced Fuel Cycles - 12477

A geologic disposal concept for spent nuclear fuel (SNF) or high-level waste (HLW) consists of three components: waste inventory, geologic setting, and concept of operations. A set of reference geologic disposal concepts has been developed by the U.S. Department of Energy (DOE), Used Fuel Disposition campaign. Reference concepts are identified for crystalline rock, clay/shale, bedded salt, and deep borehole (crystalline basement) geologic settings. These were analyzed for waste inventory cases representing a range of waste types that could be produced by advanced nuclear fuel cycles. Concepts of operation consisting of emplacement mode, repository layout, and engineered barrier descriptions, were selected based on international progress. All of these disposal concepts are enclosed emplacement modes, whereby waste packages are in direct contact with encapsulating engineered or natural materials. Enclosed modes have less capacity to dissipate heat than open modes such as that proposed for a repository at Yucca Mountain. Thermal analysis has identified important relationships between waste package size and capacity, and the duration of surface decay storage needed to meet temperature limits for different disposal concepts. For the crystalline rock and clay/shale repository concepts, a waste package surface temperature limit of 100 deg. C was assumed to prevent changes in clay-based buffer material or clay-rich host rock. Surface decay storage of 50 to 100 years is needed for disposal of high-burnup LWR SNF in 4-PWR packages, or disposal of HLW glass from reprocessing LWR uranium oxide (UOX) fuel. High-level waste (HLW) from reprocessing of metal fuel used in a fast reactor could be disposed after decay storage of 50 years or less. For disposal in salt the rock thermal conductivity is significantly greater, and higher temperatures (200 deg. C) can be tolerated at the waste package surface. Decay storage of 10 years or less is needed for high-burnup LWR SNF in 4-PWR packages, while 12-PWR packages could be emplaced after 40 years or less. HLW from reprocessing LWR UOX fuel or metal fuel from fast reactors, could be disposed of in salt after 10 to 50 years of decay storage depending on the specific composition and other factors. For the deep borehole disposal concept no near-field temperature limits are recognized because no performance credit is taken for waste form or waste package integrity, or containment by the near-field host rock. These results show the key differences in thermal management strategies available to the U.S. repository program, given the range of disposal concepts. A host medium such as salt with greater thermal conductivity and peak temperature tolerance could shorten decay storage by 50 years, or facilitate the use of larger waste packages. The LWR UOX SNF evaluated in this study represents that which could be produced in the coming decades. The existing, lower burnup used fuel that is presently in storage at many LWR locations across the U.S. is significantly cooler, and analyses of this type could be used to show that disposal is possible with less decay storage or larger waste packages. We note that while the temperature limits and waste package capacities used in this study are similar to those used internationally and in past U.S. studies, they might be increased as the result of ongoing research and development activities. This study selected enclosed emplacement modes to conform with disposal concepts developed internationally and previously in the U.S. Open modes (such as that proposed for a repository at Yucca Mountain) afford additional flexibility in waste management and the necessary investment, because the same facility serves both storage and disposal functions. Use of open modes, and combined analysis of storage, transportation, and disposal functions, are appropriate to consider in future studies of this type. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The In-time Aviation Safety Management System Concept for Part 135 Operators

Transformations of the National Airspace System, such as envisioned with Advanced Air Mobility, will enable improvements for managing and assuring safety for Part 135 transportation of passengers and cargo. The purpose of this paper is to describe the In-time Aviation Safety Management System (IASMS) Concept of Operations (ConOps) and how its innovations such as using predictive analytics could benefit operators for risk management and safety assurance. The National Academies recommended development of an IASMS ConOps to secure a safe future NAS. Part 135 operators are currently not required to have a formal safety management system.

Kyle K. Ellis↗

Dual-mode operation of a neutron source, a concept

Pulsed neutron source operates in conjunction with a photomultiplier tube coupled to a gamma ray scintillation crystal. This allows measurements of gamma radiation from both inelastic scattering and thermal neutron capture in a single experiment.

Givens, W. W.↗

VIPER Lunar Rover Agile Mission Systems

Agile development methods, which have gone from outlier to mainstream in software development, are poised to expand into all aspects of space mission development. Modern software development operates on a principle of continuous deployment, where progress is verified not with conventional metrics, but with a continuous build, available to key stakeholders, enabling direct examination of the state of the code base, and assessment of progress through demonstration of capability. Delivery times are measured in weeks, not months. Stakeholders are part of the process on an ongoing basis. The cost of change is comparatively low and requirements, which often are not precisely defined at the start of a project, may be iteratively refined in a series of agile development cycles. Agile methods are compatible with traditional system engineering methods and may be tailored to the space operations environment. The low cost of change and iterative development cycles of agile enable requirements to be defined as outcomes and constraints, with design details to be refined during the development cycle. We are now at a point where agile methods may be extended beyond software, to Mission Systems, including the Mission Operations System and the Ground Data System. For NASA’s VIPER Lunar Rover Mission, scheduled to land at a lunar pole in late 2023, we are developing the Mission System using agile methods. As in agile software, where the measure of progress is working code, in agile mission system development, the measure of capability is what we can demonstrate. Demonstrations over presentations. We demonstrate mission system capability using simulations. The concept of operations, from commanding, to driving the rover, to how we downlink images for evaluation for a near-real time command cycle, will be tested and proven in simulation, years before we begin the traditional simulation cycle for training. “Say it then simulate it.” We develop and refine our designs using simulations, with an emphasis on new components of the system that are not well known early. For example, the required duration of a mission planning cycle for a lunar surface asset such as VIPER, that operates twenty-four hours a day, seven days a week, with continuous communications and a unique set of constraints based on the physics of the lunar poles and the line of site to Earth, is a unique problem in mission planning that is unlikely to be solved in a series of meetings. A small number of requirements specifying the outcomes may serve as the jumping off point to an agile development cycle, with demonstration in simulations. We have already demonstrated this process with simulations of rover driver decision time. VIPER is driven using near-real time command and control to waypoints. The driver decision time between waypoints is a fundamental enabling unit of productivity to accomplish the mission timeline. We have validated driver decision time in simulations of rover driving at the lunar South Pole, using the prototype mission tools for driving, command and control. The capability to develop and refine designs using simulations as part of agile Mission System development cycle changes the nature of team interactions, creating a focus on doing, rather than analyzing and documenting. Waterfall development cycles were, in part, a product of the significant cost of change in the early days of spaceflight. When the cost of change is high, it is vital to get your requirements right at the outset, because the system will be built to those specifications, and, when change is expensive, you better get it right early. However, modern technology has greatly lowered the cost of change, enabling iterative, rapid development cycles, in which key operations concepts may be tested and refined during development. Extending agile development to the Mission System for VIPER is a significant step in moving agile development methods for space operations beyond software, to the Mission System.

Agile↗

Subsonic Ultra Green Aircraft Research: Phase IV Final Report – Volume I Mach 0.80 Transonic Truss-Braced Wing High-Speed Design Report

This design report summarizes work performed by the Boeing Subsonic Ultra-Green Aircraft Research (SUGAR) team from December 2016 through June 2018. In Phase IV of the SUGAR program, Boeing is working to improve the productivity of a TTBW configuration by updating the Mach 0.745 vehicle concept to operate efficiently at Mach 0.80. Due to the aerodynamic and structural design challenges associated with adapting the design to a higher speed, design tasks have been broken into several subtasks. The information in this report (Volume I) documents the development of a Mach 0.80 vehicle outer mold line, maturation of TTBW structural concepts, and presents a preliminary high-liftsystem assessment. Results from these studies were integrated into an aircraft-level performance code that estimates the benefits of TTBW technology, both on its own and as a part of the SUGAR integrated technology suite. The aerodynamic performance results presented herein detail the high cruise efficiency of the TTBW concept operating at M=0.80. Results from the RANS code OVERFLOW indicate that the TTBW is aerodynamically well suited for operation at the design M=0.80 transonic cruise Mach number. Aircraft-level performance predictions show that the TTBW offers a 7.2% improvement in fuel burn (per seat) for an economic mission of 900nm, and a 9.0% improvement in fuel burn (per seat) for a 3500nm mission with full passenger payload, relative to an aspect ratio 13 conventional tube and wing configuration of equivalent technology. Integration of the TTBW performance benefits into the SUGAR technology suite shows a 55.9% reduction in fuel burn (for the economic mission) relative to the reference (SUGAR Free) aircraft, which is a consistently sized traditional cantilever wing, single-aisle transport typical of the 2008 fleet. This benefit does not include the performance improvement potential of hybrid-electric systems studied in earlier phases of the SUGAR program Structural concept development work completed in Phase IV has identified several strut attachment concepts that are worth additional development activity – an inboard strut attachment swivel joint concept (which enables the strut to carry axial loads while avoiding strut bending induced by wing twist during flight) significantly simplifies the construction of the main strut. An outboard offset strut attachment concept holds significant potential for further reductions in wing-strut interference drag. Based on work performed to date on Phase IV and the previous phases of the SUGAR program, the TTBW concept continues to remain a viable concept for significantly improving the performance of future aircraft. High-fidelity aerodynamic analysis of the Mach 0.80 TTBW aircraft has shown fuel burn improvement that has exceeded initial expectations despite the increase in cruise Mach number. Structural concept maturation has continued to refine the TTBW structure, and has found no obvious ‘show-stoppers’ to date. Therefore, the potential benefit of improved performance through the use of a very high aspect ratio strut-braced wing continues to warrant additional study

SUGAR↗

Fe(3): An Evaluation Tool for Low-Altitude Air Traffic Operations

The concepts of unmanned aircraft system traffic management (UTM) and urban air mobility (UAM) are introducing high-density operations in low altitude airspace in closer proximity to populated areas than conventional high-altitude air traffic. The Flexible engine for Fast-time Evaluation of Flight Environments (Fe (sup 3)) provides the capability of statistically analyzing the high-density, high-fidelity, and low-altitude traffic system under numerous scenarios, such that stake holders can study impacts of factors in the low-altitude high-density traffic system and define requirements, policies, and protocols needed to support a safe yet efficient traffic system, and even assess operational risks and optimize flight schedules without conducting infeasible and cost-prohibitive flight tests that involve a large volume of aerial vehicles. This work provides an introduction to this simulation tool including its architecture and various models involved. Its performance and sample application in UAM and UTM are also presented.

Collision Avoidance↗

Fe3: An Evaluation Tool for Low-Altitude Air Traffic Operations

The concepts of unmanned aircraft system traffic management (UTM) and urban air mobility (UAM) are introducing high-density operations in low altitude airspace in closer proximity to populated areas than conventional high-altitude air traffic. The Flexible engine for Fast-time Evaluation of Flight Environments (Fe (sup 3)) provides the capability of statistically analyzing the high-density, high-fidelity, and low-altitude traffic system under numerous scenarios, such that stake holders can study impacts of factors in the low-altitude high-density traffic system and define requirements, policies, and protocols needed to support a safe yet efficient traffic system, and even assess operational risks and optimize flight schedules without conducting infeasible and cost-prohibitive flight tests that involve a large volume of aerial vehicles. This work provides an introduction to this simulation tool including its architecture and various models involved. Its performance and sample application in UAM and UTM are also presented.

Trajectory Modeling↗

Integrated Network Architecture for NASA's Orion Missions

NASA is planning a series of short and long duration human and robotic missions to explore the Moon and then Mars. The series of missions will begin with a new crew exploration vehicle (called Orion) that will initially provide crew exchange and cargo supply support to the International Space Station (ISS) and then become a human conveyance for travel to the Moon. The Orion vehicle will be mounted atop the Ares I launch vehicle for a series of pre-launch tests and then launched and inserted into low Earth orbit (LEO) for crew exchange missions to the ISS. The Orion and Ares I comprise the initial vehicles in the Constellation system of systems that later includes Ares V, Earth departure stage, lunar lander, and other lunar surface systems for the lunar exploration missions. These key systems will enable the lunar surface exploration missions to be initiated in 2018. The complexity of the Constellation system of systems and missions will require a communication and navigation infrastructure to provide low and high rate forward and return communication services, tracking services, and ground network services. The infrastructure must provide robust, reliable, safe, sustainable, and autonomous operations at minimum cost while maximizing the exploration capabilities and science return. The infrastructure will be based on a network of networks architecture that will integrate NASA legacy communication, modified elements, and navigation systems. New networks will be added to extend communication, navigation, and timing services for the Moon missions. Internet protocol (IP) and network management systems within the networks will enable interoperability throughout the Constellation system of systems. An integrated network architecture has developed based on the emerging Constellation requirements for Orion missions. The architecture, as presented in this paper, addresses the early Orion missions to the ISS with communication, navigation, and network services over five phases of a mission: pre-launch, launch from T0 to T+6.5 min, launch from T+6.5 min to 12 min, in LEO for rendezvous and docking with ISS, and return to Earth. The network of networks that supports the mission during each of these phases and the concepts of operations during those phases are developed as a high level operational concepts graphic called OV-1, an architecture diagram type described in the Department of Defense Architecture Framework (DoDAF). Additional operational views on organizational relationships (OV-4), operational activities (OV-5), and operational node connectivity (OV-2) are also discussed. The system interfaces view (SV-1) that provides the communication and navigation services to Orion is also included and described. The challenges of architecting integrated network architecture for the NASA Orion missions are highlighted.

Bhasin, Kul B.↗

Guidance concepts for time-based flight operations

Airport congestion and the associated delays are severe in today's airspace system and are expected to increase. NASA and the FAA is investigating various methods of alleviating this problem through new technology and operational procedures. One concept for improving airspace productivity is time-based control of aircraft. Research to date has focused primarily on the development of time-based flight management systems and Air Traffic Control operational procedures. Flight operations may, however, require special onboard guidance in order to satisfy the Air Traffic Control imposed time constraints. The results are presented of a simulation study aimed at evaluating several time-based guidance concepts in terms of tracking performance, pilot workload, and subjective preference. The guidance concepts tested varied in complexity from simple digital time-error feedback to an advanced time-referenced-energy guidance scheme.

Vicroy, Dan D.↗

Air Traffic Management Technology Demostration-1 (ATD-1) Avionics Phase 2 Flight Test and Results

NASA’s first Air Traffic Management Technology Demonstration (ATD-1) subproject successfully completed 19 days of flight test validation in January and February 2017 of an Interval Management (IM) avionics prototype and the procedures used to conduct IM arrival and approach operations. IM is one of the three elements integrated into NASA’s ATD-1 concept of operations with the subproject goal of improving aircraft efficiency and airport throughput during high-density arrival operations. The ATD-1 concept of operations combines advanced arrival scheduling, controller decision support tools, and interval management (IM) avionics to enable merging of multiple, time-based, efficient arrival streams. IM contributes to the operation by calculating speeds that enable an aircraft to precisely achieve a specific time or distance behind another aircraft. When precise spacing intervals can be calculated, achieved, and then maintained during high-density operations, aircraft efficiency should be improved by enabling the aircraft to remain closer to the optimum descent trajectory instead of using vectors and step-down altitudes, and airport throughput should be maintained or improved by each aircraft arriving at the runway threshold closer to the assigned spacing interval. This avionics development and flight test was conducted under a NASA contract by Boeing Research and Technology, with Boeing Commercial Aircraft, Honeywell, United Airlines, and Jeppesen as sub-contractors. The Honeywell built IM avionics were the first ever prototype built based on NASA requirements as well as developing and non-flight tested international IM standards, integrated into two test aircraft, and then flown in real-world conditions at the Grant County International Airport (KMWH). The IM prototype flown in the flight test used data from the Ownship and the assigned lead, or Target, aircraft to calculate the airspeed necessary for the Ownship to achieve the desired spacing. The flight test demonstrated that the IM avionics prototype generally met the IM requirement for spacing accuracy. However, the control laws implemented require further development to reduce the high IM speed command rate and the number of speed reversals observed during the test. Pilots assessed the IM procedure as acceptable, and issues requiring further attention were identified. In summary, the IM avionics prototype showed significant promise in contributing to the goals of improving aircraft efficiency and airport throughput. The flight test results also provided important data to the FAA and the working group developing the follow-on version of the international IM standards.

Baxley, Brian T.↗

Orbit Determination Strategy and Simulation Performance for OSIRIS-REx Proximity Operations

The Origins Spectral Interpretation Resource Identification Security Regolith Explorer (OSIRISREx)is a NASA New Frontiers mission to the near-earth asteroid Bennu that will rendez vousin 2018, create a comprehensive and detailed set of observations over several years, collect a regolith sample, and return the sample to Earth in 2023. The Orbit Determination (OD) team isa sub-section of the Flight Dynamics System responsible for generating precise reconstructions and predictions of the spacecraft trajectory. The OD team processes radiometric data, LIDAR, as well as center-finding and landmark-based Optical Navigation images throughout the proximity operations phase to estimate and predict the spacecraft location within several meters. Stringent knowledge requirements stress the OD teams concept of operations and procedures to produce verified and consistent high quality solutions for observation planning, maneuver planning, and onboard sequencing. This paper will provide insight into the OD concept of operations and summarize the OD performance expected during the approach and early proximity operation phases,based on our pre-encounter knowledge of Bennu. Strategies and methods used to compare and evaluate predicted and reconstructed solutions are detailed. The use of high fidelity operational tests during early 2017 will stress the teams concept of operations and ability to produce precise OD solutions with minimal turn-around delay.

Leonard, Jason M.↗

SARDA: An Integrated Concept for Airport Surface Operations Management

The Spot and Runway Departure Advisor (SARDA) is an integrated decision support tool for airlines and air traffic control tower enabling surface collaborative decision making (CDM) and departure metering in order to enhance efficiency of surface operations at congested airports. The presentation describes the concept and architecture of the SARDA as a CDM tool, and the results from a human-in-the-loop simulation of the tool conducted in 2012 at the FutureFlight Central, the tower simulation facility. Also, presented is the current activities and future plan for SARDA development. The presentation was given at the meeting with the FAA senior advisor of the Surface Operations Office.

surface collaborative decision making↗

Space station operations management

Space Station Freedom operations management concepts must be responsive to the unique challenges presented by the permanently manned international laboratory. Space Station Freedom will be assembled over a three year period where the operational environment will change as significant capability plateaus are reached. First Element Launch, Man-Tended Capability, and Permanent Manned Capability, represent milestones in operational capability that is increasing toward mature operations capability. Operations management concepts are being developed to accomodate the varying operational capabilities during assembly, as well as the mature operational environment. This paper describes operations management concepts designed to accomodate the uniqueness of Space Station Freedoom, utilizing tools and processes that seek to control operations costs.

Cannon, Kathleen V.↗

A Systems Approach to Developing an Affordable Space Ground Transportation Architecture using a Commonality Approach

This paper presents a structured approach for achieving a compatible Ground System (GS) and Flight System (FS) architecture that is affordable, productive and sustainable. This paper is an extension of the paper titled "Approach to an Affordable and Productive Space Transportation System" by McCleskey et al. This paper integrates systems engineering concepts and operationally efficient propulsion system concepts into a structured framework for achieving GS and FS compatibility in the mid-term and long-term time frames. It also presents a functional and quantitative relationship for assessing system compatibility called the Architecture Complexity Index (ACI). This paper: (1) focuses on systems engineering fundamentals as it applies to improving GS and FS compatibility; (2) establishes mid-term and long-term spaceport goals; (3) presents an overview of transitioning a spaceport to an airport model; (4) establishes a framework for defining a ground system architecture; (5) presents the ACI concept; (6) demonstrates the approach by presenting a comparison of different GS architectures; and (7) presents a discussion on the benefits of using this approach with a focus on commonality.

Garcia, Jerry L.↗