Search NASA⌕ Search

SEARCH · Search NASA

Results for “PROJECT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,081 records · Page 60

International Energy Agency (IEA) Greenhouse Gas (GHG) Weyburn-Midale CO₂ Monitoring and Storage Project

The IEAGHG Weyburn-Midale CO₂ Monitoring and Storage Project (WMP) began in 2000 with the first four years of research that confirmed the suitability of the containment complex of the Weyburn oil field in southeastern Saskatchewan as a storage location for CO₂ injected as part of enhanced oil recovery (EOR) operations. The first half of this report covers research conducted from 2010 to 2012, under the funding of the United States Department of Energy (contract DEFE0002697), the Government of Canada, and various other governmental and industry sponsors. The work includes more in-depth analysis of various components of a measurement, monitoring and verification (MMV) program through investigation of data on site characterization and geological integrity, wellbore integrity, storage monitoring (geophysical and geochemical), and performance/risk assessment. These results then led to the development of a Best Practices Manual (BPM) providing oilfield and project operators with guidance on CO₂ storage and CO₂-EOR. In 2013, the USDOE and Government of Saskatchewan exercised an optional phase of the same project to further develop and deploy applied research tools, technologies, and methodologies to the data and research at Weyburn with the aim of assisting regulators and operators in transitioning CO₂-EOR operations into permanent storage. This work, detailed in the second half of this report, involves seven targeted research projects – evaluating the minimum dataset for confirming secure storage; additional overburden monitoring; passive seismic monitoring; history-matched modelling; developing proper wellbore design; casing corrosion evaluation; and assessment of post CO₂-injected core samples. The results from the final and optional phases of the Weyburn-Midale Project confirm the suitability of CO₂-EOR fields for the injection of CO₂, and further, highlight the necessary MMV and follow-up monitoring required for these operations to be considered permanent storage.

01 COAL, LIGNITE, AND PEAT↗

Advanced Grid-Friendly Controls Demonstration Project for Utility-Scale PV Power Plants

A typical photovoltaic (PV) power plant consists of multiple power electronic inverters and can contribute to grid stability and reliability through sophisticated 'grid-friendly' controls. The availability and dissemination of actual test data showing the viability of advanced utility-scale PV controls among all industry stakeholders can leverage PV's value from being simply an energy resource to providing additional ancillary services that range from variability smoothing and frequency regulation to power quality. Strategically partnering with a selected utility and/or PV power plant operator is a key condition for a successful demonstration project. The U.S. Department of Energy's (DOE's) Solar Energy Technologies Office selected the National Renewable Energy Laboratory (NREL) to be a principal investigator in a two-year project with goals to (1) identify a potential partner(s), (2) develop a detailed scope of work and test plan for a field project to demonstrate the gird-friendly capabilities of utility-scale PV power plants, (3) facilitate conducting actual demonstration tests, and (4) disseminate test results among industry stakeholders via a joint NREL/DOE publication and participation in relevant technical conferences. The project implementation took place in FY 2014 and FY 2015. In FY14, NREL established collaborations with AES and First Solar Electric, LLC, to conduct demonstration testing on their utility-scale PV power plants in Puerto Rico and Texas, respectively, and developed test plans for each partner. Both Puerto Rico Electric Power Authority and the Electric Reliability Council of Texas expressed interest in this project because of the importance of such advanced controls for the reliable operation of their power systems under high penetration levels of variable renewable generation. During FY15, testing was completed on both plants, and a large amount of test data was produced and analyzed that demonstrates the ability of PV power plants to provide various types of new grid-friendly controls.

14 SOLAR ENERGY↗

Orange County Photovoltaic Project & Educational COmponent

The purpose of this report is to discuss the projects implemented, utilizing Department of Energy grant funds, to support the use and understanding of renewable energy in Orange County, Florida and the Greater Orlando Area. Orange County is located in the State of Florida and is most popularly referred to as Orlando. The greater Orlando area’s current population is 1,225,267 and in 2015 was the first destination to surpass 60 million visitors. Orange County utilized grant funds to add to the growing demand for access to charging stations by installing one level 2 dual NovaCharge CT4021 electric vehicle charging station at the Orange County/University of Florida Cooperative Extension Center. The charging station is considered a “smart” charger connected to a central network operated by a third party. Data collected includes the number of charging sessions, session start and end times, the electricity usage, greenhouse gases saved and other pertinent data used for reporting purposes. Orange County continues to support the use of electric vehicles in Metro Orlando and this project continues to bring awareness to our public regarding using alternative vehicles. Additionally, we offer all visitors to the Orange County/University of Florida Cooperative Extension Center free charges for their electric vehicles 24 hours a day. Since the operation of the charging station there have been 52 unique driver users, a total of 532.2258 kg of greenhouse gas savings and 159.03 gallons of gasoline savings. The installation of the additional electric vehicle charging station is part of a county-wide goal of promoting implementation of renewable energy technologies as well as supporting the use of electric vehicles including the Drive Electric Orlando & Florida programs. http://driveelectricorlando.com/ & ; http://www.driveelectricflorida.org/ . Grant funds were also used for Outreach and Educational efforts. Educational efforts about renewable energy were accomplished through the continued support as well as a proposed expansion and potential relocation of the Climate Change Education Center. The growth of the Climate Change Education Center focused on 2 educational subsectors. The first educational sector focused on an apprenticeship with university students. The second sector Orange County partnered with a hospitality college that held seminars to educate students in sustainability best practices that would influence the industry as a whole as students take jobs around the U.S. and other parts of the world. Orange County completed five of the originally proposed six educational seminars. The first seminar focused on community based social marketing techniques for driving sustainable behavior changes. The second seminar held was a green team workshop. The third seminar focused on urban sustainability planning. The fourth and fifth seminars held were Florida Energy Code workshops for building inspectors. A sixth transit oriented development seminar in partnership with Rollins College was explored, but was not conducted because the proposed on campus venue was not accessible for an extended period of time due to renovations. Additionally, an ENERGY STAR training program was conducted with students from the University of Central Florida; three of the five buildings assessed received ENERGY STAR ratings; one student completed the training and received their certification as an ENERGY STAR Specialist. Background: Location: Orange County is located in the central region of the State of Florida and is most popularly known for including the City of Orlando. The greater Orlando area’s current population is 1,225,267 and is home to large corporations such as Walt Disney World, Universal Studios Orlando, Ritz Carlton, Darden Restaurants, and the nation’s second largest convention center. Opportunities Identified: Encouraging Sustainability in Major Sectors: The Central Florida economy is largely dependent on the hospitality industry and in 2015 it was the first destination to surpass 60 million visitors. With over 60 million visitors each year, 120,000 hotel rooms, 4,000 restaurants, and 75 theme parks and attractions, the local hospitality industry provided a wealth of opportunity to reduce greenhouse gas emissions through building energy efficiency and renewable energy. Accordingly, Central Florida is an ideal training ground for teaching best practices for sustainability focused on the hospitality industry. Meeting the Growing Demand for Electric Vehicle Infrastructure: According to the 2014 U.S Clean Tech Leadership Index Report, nationwide electric vehicle ownership in the top 50 largest metro areas increased sharply in 2013; the Orlando Metro Area was ranked #5 in the nation in in terms of electric vehicle charging stations per one million people. Additionally, the Orange County 2014-2015 Annual Sustainable Orange County Report indicated there are 300 electric vehicle charging stations in Central Florida (roughly 300 charging stations within ~70 mile radius available to our residents of Orange County). By increasing and improving access to charging stations, Orange County supports the growing demand for renewable energy technologies. Project Achievements/Accomplishments: Installed an Electric Charging Station: Orange County utilized grant funds to install one level 2 dual NovaCharge CT4021 electric vehicle charging station at the Orange County/University of Florida Cooperative Extension Center. The charging station is considered a “smart” charger connected to a central network operated by a third party that monitors the number of charging sessions, session start and end times, the electricity usage, greenhouse gases saved and other pertinent data. During the six months of operation of the charging station there have been 52 unique driver users of the charging station; a total of 532.2258 kg of greenhouse gas savings and 159.03 gallons of gasoline savings. Operation and Potential Relocation of the Orange County Climate Change Education Center: The Climate Change Education Center, originally located within the Orange County Convention Center, served as a central place to inform and educate commercial and residential sectors of environmental, health, and economic benefits of renewable energy, energy efficiency, and greenhouse gas emission reductions. Grant funds were used to pay for the rent required to maintain a lease at the Convention Center, conduct five educational workshops, and for planned upgrades to the Center displays highlighting a number of energy efficiency and renewable energy projects implemented at the Orange County Convention Center and Downtown Orange County. An initial design concept for an upgraded Climate Change Education Center and educational displays was proposed. However, after the Convention Center determined the space occupied by the Climate Change Education Center; a feasibility study for relocation to the proposed area was conducted in October 2013. In December 2013, it was determined that the desired location of the for the Climate Change Education Center at the Orange County Extension Education Center provided too many construction challenges for relocation with too many building retrofits and access problems, including lack of access for loading and unloading exhibits as well as roof drainage relocations and sewer service connection issues. Another suitable location for relocating the Climate Change Education Center could not be located so the project was terminated. The Climate Change Education Center is no longer in existence in Orange County and has been eliminated. Grant funds were used to pay for marketing services for a state wide marketing program including solar & other renewable energy technologies for rebranding and developing marketing materials including web site design and updating. A website was maintained and updated the www.PowerUpGreenEnergy.com website (no longer in service). Sustainability Training for the Hospitality Industry and Major Sectors: To introduce energy efficiency and renewable energy concepts to the hospitality industry, Orange County partnered with a hospitality college that held seminars to educate students in sustainability best practices that would influence the industry as a whole as students take jobs around the U.S. and other parts of the world. Orange County completed five of the originally proposed six education seminars. Seminar topics included: driving sustainable behavior change through community based social marketing; green team programs; urban sustainability planning; and Florida Energy Code workshops for building inspectors. In partnership with Rollins College, a sixth seminar focused on transit-oriented development was explored, but was not conducted due to extended renovations at the proposed on-campus venue. Green Job Training Development: To promote green industry development and on-the-job training in occupations that encourage energy efficiency and resource reduction, Orange County piloted an ENERGY STAR training and apprenticeship program with students from the University of Central Florida; three students applied for the program; one student completed the training and received their certification as an ENERGY STAR specialist; three of the five buildings assessed received ENERGY STAR Ratings.

14 SOLAR ENERGY↗

Hiilangaay Hydroelectric Project – Final Report

The Hiilangaay Hydroelectric Project (“Hiilangaay” or the “Project”) is a 5-megawatt hydroelectric resource currently under construction on Prince of Wales Island (POW), Alaska, approximately ten miles east of Hydaburg. The objective of the Project is to interconnect with the existing transmission grid on Prince of Wales Island, increasing the hydroelectric generation capability by 5 MW, eliminating the need for diesel generation, increasing the reliability of the electrical system, and allowing the interconnected portion of the island to have 100 percent renewable energy generation. Pre-construction activities including construction planning, permit coordination and compliance, and final design have made it possible to move forward with construction of the Hiilangaay Project. Despite repeated delays to the schedule, persistence and long-term planning will culminate in the construction of the Project, and make Prince of Wales Island independent of diesel-fueled energy

13 HYDRO ENERGY↗

Gridley Biofuels Project Final Report for Budget Period II

The Gridley Biofuels Project was initiated in 2003 as a Congressionally Directed Project (CDP). The City of Gridley was chosen for this project since it is an ideal, agriculture based town that is representative of many U.S. towns in which a wide variety of agriculture products are produced locally. The harvesting and processing of these products in the Gridley area creates millions of tons of biomass residues each year. Although these biomass residues have little or no commercial value, they are ideal feedstocks for the production of liquid fuels, power and other renewable products which can provide a significant revenue source to local farming communities. The primary objective of the Gridley Biofuels project was to support research, development, demonstration, and commercial design of an integrated biorefinery (IBR) that could efficiently and economically convert a wide variety of agriculture-based biomass residues to high-quality fuels, electric power and other products which providing a positive impact on the environment. This report describes work carried out during the second phase (budget period two: PB2) of the Gridley project which included technology feasibility (BP2a), conceptual design of the commercial plant during 2007-10, and final design of the commercial plant (BP2b) during 2014-15. The Gridley commercial plant is planned for deployment during 2020.

09 BIOMASS FUELS↗

Connecticut Biodiesel Power Generation Project

Sabre will continue support of the emissions equipment and VARS issues to ensure all are resolved and the system is functioning as expected. The remote data collection to become more automated. Final project reports for data collection and system performance to be generated. Sabre continued to support the emissions equipment and VARS issues to ensure all are resolved and the system is functioning as expected. The remote data collection became more automated. Final project reports for data collection and system performance were generated and are part of this final report. Some Systems Sensors were replaced due to a lightning strike. Sample data charts are shown at the end of the report. During the project, Sabre Engineering provided support to the project team with regarding to troubleshooting technical issues and system integration with the local power utility company. The resulting lessons learned through Sabre’s participation in the project have been valuable to the integrity of the data collected as well as in providing BioPur Light & Power valuable insights into future operations and planning for possible expansion. The system monitoring and data collection system has been operating as designed and continues to provide relevant information to the system operators. The information routinely gathered automatically by the system also contributes to the REN and REC validations which are required to secure credit for these items. During the quarter, the remaining work on the operations and safety manual were completed and released for publication after screen shots were verified. The goal of this effort to provide an accurate set of precautions and procedures for the technology system that can be replicated to other similar system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

South Louisiana Enhanced Oil Recovery/Sequestration R&D Project Small Scale Field Tests of Geologic Reservoir Classes for Geologic Storage

The project site is located in Livingston Parish, Louisiana, approximately 26 miles due east of Baton Rouge. This project proposed to evaluate an early Eocene-aged Wilcox oil reservoir for permanent storage of CO 2 . Blackhorse Energy, LLC planned to conduct a parallel CO 2 oil recovery project in the First Wilcox Sand. The primary focus of this project was to examine and prove the suitability of South Louisiana geologic formations for large-scale geologic sequestration of CO 2 in association with enhanced oil recovery applications. This was to be accomplished through the focused demonstration of small-scale, permanent storage of CO 2 in the First Wilcox Sand. The project was terminated at the request of Blackhorse Energy LLC on October 22, 2014.

04 OIL SHALES AND TAR SANDS↗

Soboba Community Energy Solar Project – Phase 1

Since time immemorial the descendants of the Soboba people are those whom have lived on and occupied the land that is presently known as the cities of San Jacinto, Hemet, Valle Vista and Winchester. On June 19, 1883, President Chester Arthur by Executive Order established the Soboba Indian Reservation, a 3,172-acre tract which included the Soboba village and the adjacent hills. The President had limited authority as he was only able to set aside public land for the establishment of a reservation and had no authority to take private land. Thus the Soboba village; cultivated lands and major springs were part of Rancho San Jacinto Viejo and belonged to Matthew Byrne. Today the Soboba Indian Reservation lies in the lower reaches of the San Jacinto Mountains, across the San Jacinto River from the city of San Jacinto. The Soboba Band of Luiseño Indians was awarded a community solar grant through the U.S. Department of Energy. The incorporated cities of San Jacinto and Hemet, and the unincorporated community of Valle Vista border the Reservation. All three of these surrounding communities have experienced tremendous population growth over the past two decades, with slower growth during the recent economic downturn. The Tribal community that benefits from under this grant includes 1,161 enrolled members, the majority of which live on the reservation. Nearly 41% of the enrolled members are youth, age 18 and under. The elders and community leaders value preserving and maintaining the Luiseño and Cahuilla cultures and Tribal structure for future generations. The proposed project was administered from the Tribal Administration offices located on the reservation. The Soboba Tribal Government consists of five Tribal Members who are elected by the general membership to Tribal Council for a staggered two year term. The Chairman/Chairwoman is elected by a majority vote of the general membership but the positions for Vice-Chair, Tribal Secretary, Tribal Treasurer and Sergeant at Arms are decided by the elected council. The Soboba Tribal Administration encompasses several departments that serve the needs of the Tribe, the Reservation and the general public. They assist in day-to-day Tribal operations, public safety, Tribal family services, Native American assistance to needy families, cultural preservation, and Tribal environmental protection of natural resources, along with the monitoring of progress and needs of its Enterprises and the general public. The Tribe’s long term energy vision is to become self-sufficient and thereby attain greater control of its destiny, to control costs in view of rapidly rising electric utility expenses, and to maximize the use of renewable energy consistent with sustainable development practices. The project is a Renewable Energy System, specifically a ground mounted, fixed tilt, solar photovoltaic (PV) generating system with a rated capacity of 1.0MWac. The solar generated power serves the electric needs of the affected meters. It benefits every Tribal member since the cost of running the community Tribal facilities, including electric bills, comes out of the General Fund. The estimated 20 year project savings of $ 6,418,064 can be re-directed to other vital community needs, and the project will provide additional jobs for Tribal members. The project has been thoroughly researched and is ready to implement as soon as funding is approved.

14 SOLAR ENERGY↗

Bioenergy/Biotechnology projects

This report describes the progress of five different projects. The first is an enzyme immobilization study of cellulase to reduce costs of the cellulosic ethanol process. High reusability and use of substrates applicable to large scale production were focus areas for this study. The second project was the development of nanostructured catalysts for conversion of syngas to diesel. Cobalt nanowire catalyst was used in Fischer-Tropsch synthesis. The third project describes work on developing a microfluidic calorimeter to measure reaction rates of enzymes. The fourth project uses inorganic polymer binders that have the advantage of a lower carbon footprint than Portland cement while also providing excellent performance in elevated temperature, high corrosion resistance, high compressive and tensile strengths, and rapid strength gains. The fifth project investigates the potential of turbines in drop structures (such as sewer lines in tall buildings) to recover energy.

09 BIOMASS FUELS↗

Floodplain and Wetland Assessment for the Mortandad Wetland Enhancement and the DP Dissipater Projects at Los Alamos National Laboratory

This floodplain and wetland assessment was prepared in accordance with 10 Code of Federal Regulations (CFR) 1022 Compliance with Floodplain and Wetland Environmental Review Requirements, which was promulgated to implement the U.S. Department of Energy (DOE) requirements under Executive Order 11988 Floodplain Management and Executive Order 11990 Wetlands Protection. According to 10 CFR 1022, a 100-year floodplain is defined as “the lowlands adjoining inland and coastal waters and relatively flat areas and flood prone areas of offshore islands” and a wetland is defined as “an area that is inundated or saturated by surface or groundwater at a frequency and duration sufficient to support, and that under normal circumstances does support, a prevalence of vegetation typically adapted for life in saturated soil conditions, including swamps, marshes, bogs, and similar areas.” In this action, DOE is proposing two projects to improve wetland and floodplain function at Los Alamos National Laboratory (LANL). The proposed work will comply with corrective action requirements under the Settlement Agreement and Stipulated Final Compliance Order (Settlement Agreement)1 Number HWB-14-20. The first project is located in Technical Areas (TA)-03 in upper Mortandad Canyon. The upper Mortandad wetlands have existing stormwater controls that need to be rehabilitated. Head-cut formation is occurring at the downstream portion of the wetland. This project will repair damages to the wetland and reduce the future erosion potential. The second project is located in TA-21 in Delta Prime (DP) Canyon. The intent of the DP Dissipater Project in DP Canyon is to install stormwater control structures in DP Canyon to retain low channel flows and reduce downstream sediment transport as well as peak flows during low and moderate storm events. Due to increased erosion, the stream bank in this area has unstable vertical walls within the stream channel. The DOE prepared this floodplain and wetland assessment to evaluate the potential impacts of implementing the proposed actions within the wetland and floodplain, as required by 10 CFR 1022.

54 ENVIRONMENTAL SCIENCES↗

Brentwood Lessons Learned Project Report

The purpose of this report is to document lessons learned in the installation of the hydrogen fueling station at the National Park Service Brentwood site in Washington, D.C., to help further the deployment of hydrogen infrastructure required to support hydrogen and other fuel cell technologies. Hydrogen fueling is the most difficult infrastructure component to build and permit. Hydrogen fueling can include augmenting hydrogen fueling capability to existing conventional fuel fueling stations as well as building brand new hydrogen fueling stations. This report was produced as part of the Brentwood Lessons Learned project. The project consisted of transplanting an existing modular hydrogen fueling station from Connecticut to the National Park Service Brentwood site. This relocation required design and construction at the Brentwood site to accommodate the existing station design as well as installation and validation of the updated station. One of the most important lessons learned was that simply moving an existing modular station to an operating site was not necessarily straight-forward - performing the relocation required significant effort and cost. The station has to function at the selected operating site and this functionality requires a power supply, building supports connecting to an existing alarm system, electrical grounding and lighting, providing nitrogen for purging, and providing deionized water if an electrolyzer is part of the station package. Most importantly, the station has to fit into the existing site both spatially and operationally and not disrupt existing operations at the site. All of this coordination and integration requires logistical planning and project management. The idea that a hydrogen fueling station can be simply dropped onto a site and made immediately operational is generally not realistic. Other important lessons learned include that delineating the boundaries of the multiple jurisdictions that have authority over a project for all parties involved in the project are key to an efficient approval process; and site investigation is necessary when integrating a new station design onto an existing site, particularly an older existing site that may have limited documentation on the site history and operations. The lessons learned for permitting and subcontracting construction work can be applied to other similar sites and to commercial sites.

30 DIRECT ENERGY CONVERSION↗

Final Report for Project "A high-throughput pipeline for mapping inter-species interactions and metabolic synergy relevant to next-generation biofuel production"

The goal of our project was to implement a pipeline for the systematic, computationally-driven study and optimization of microbial interactions and their effect on lignocellulose degradation and biofuel production. We specifically sought to design and construct artificial microbial consortia that could collectively degrade lignocellulose from plant biomass, and produce precursors of energy-rich biofuels. This project fits into the bigger picture goal of helping identify a sustainable strategy for the production of energy-rich biofuels that would satisfy the existing energy constraints and demand of our society. Based on the observation that complex natural microbial communities tend to be metabolically efficient and ecologically robust, we pursued the study of a microbial system in which the desired engineering function is achieved through division of labor across multiple microbial species. Our approach was aimed at bypassing the complexity of natural communities by establishing a rational approach to design small synthetic microbial consortia. Towards this goal, we combined multiple approaches, including computer modeling of ecosystem-level microbial metabolism, mass spectrometry of metabolites, genetic engineering, and experimental evolution. The microbial production of biofuels from lignocellulose is a complex, multi-step process. Microbial consortia are an ideal approach to consolidated bioprocessing: a community of microorganisms performs a wide variety of functions more efficiently and is more resilient to environmental perturbations than a microbial monoculture. Each organism we chose for this project addresses a specific challenge: lignin degradation (Pseudomonas putida); (hemi)cellulose degradation (Cellulomonas fimi); lignin degradation product demethoxylation (Methylobacterium spp); generation of biofuel lipid precursors (Yarrowia lipolytica). These organisms are genetically tractable, aerobic, and have been used in biotechnological applications. Throughout the project, we have used mass spectrometry to characterize and measure the metabolic inputs and outputs of each of these consortium members, providing valuable information for model refinement, and enabling the establishment of metabolism-mediated interactions. In addition to lignocellulose degradation, we have started addressing the challenge of removing metabolites (e.g. formaldehyde) produced by the demethoxylation of lignin monomers, which can otherwise inhibit microbial growth due to their toxicity. On the computational side, we have implemented genome-scale models for all consortium members, based on KBase reconstructions and literature curation, and we studied small consortia and their properties. Overall, our project has identified a complex landscape of interactions types and metabolic processes relevant to community-level functions, illustrating the challenges and opportunities of microbial community engineering for the transformation of biomass into bioproducts.

59 BASIC BIOLOGICAL SCIENCES↗

A Survey of MPI Usage in the U.S. Exascale Computing Project

The Exascale Computing Project (ECP) is currently the primary effort in the United States focused on developing “exascale” levels of computing capability, including hardware, software and applications. In order to obtain a more thorough understanding of how the software projects under the ECP are using, and planning to use the Message Passing Interface (MPI), and help guide the work of our own project within the ECP, we created a survey. Of the 97 ECP projects active at the time the survey was distributed, we received 77 responses, 56 of which reported that their projects were using MPI. This paper reports the results of that survey for the benefit of the broader community of MPI developers.

97 MATHEMATICS AND COMPUTING↗

Light-Duty Vehicle Attribute Projections (Years 2015-2030)

This report describes the approach and results associated with projecting vehicle attributes for future light-duty vehicle classes and powertrains, from year 2015 to 2030. The focus is the California light-duty vehicle market and the projected attributes include fuel economy, acceleration, driving range (total and all-electric), and manufacturer suggested retail price from year 2015 to year 2030. Attributes are weighted by California vehicle sales, which are projected using a historically validated consumer choice model - the Automotive Deployment Option Projection Tool (ADOPT) - integrated with a modeling framework that simulates vehicle fuel economy, cost, and acceleration performance while optimizing vehicle components - the Future Automotive Systems Technology Simulator model (FASTSim). Both models were developed at the National Renewable Energy Laboratory and have been adapted to represent the future California light-duty vehicle market for the present report. The analysis includes several scenarios pertaining to electricity and, essentially, electric vehicle demand in California, as established by the Energy Commission. Results suggest that implementation of certain policies, such as the Corporate Average Fuel Economy standards, impacts vehicle attribute projections. The results also show that standards and policy targets are not exclusively met by changes in vehicle attributes, but also through shifts in market demand and sales for certain vehicle powertrains.

33 ADVANCED PROPULSION SYSTEMS↗

Diffusion of Innovations: Interplay of Social, Economic, Technological, and Policy Drivers in the Solar Industry. Summary of UT Austin Student Capstone Research Projects

The University of Texas at Austin’s Policy Research Project (PRP), a nine-month (two semesters) capstone, is a keystone of the core curriculum at the LBJ School of Public Affairs. In PRPs, small groups of students, under the mentorship of a faculty director, take on real-world problems that require special knowledge and skill sets. PRPs expose students to challenges in formulating and executing research, and in communicating academic research and related complex data to broader stakeholder communities and decision makers. The PRP structure is an innovative and effective approach for integrating research within the teaching and training of graduate students who are preparing themselves to address important real-world problems at the intersection of society, economics, technology, and policy. The project summaries below describe seven papers developed during September 2017 – May 2018 as part of a PRP on “Diffusion of Innovations: Interplay of Social, Economic, Technological, and Policy Drivers in the Solar Industry.” Twenty graduate students, drawn from the LBJ School’s Masters in Public Affairs and Masters in Global Policy Studies programs and the Jackson School Geoscience’s Energy and Earth Resources program, participated in this PRP. Dr. Varun Rai, Associate Professor and Associate Dean for Research at the LBJ School, directed the PRP, with support from his research team including: Dr. Ariane Beck, Dr. Ashok Sekar, D. Cale Reeves, and Erik Funkhouser. Clients for the project included the U.S. Department of Energy (Casey Canfield), Lawrence Berkeley National Laboratory (Ben Hoen, Galen Barbose Joachim Seel, Naïm Darghouth, Ryan Wiser), and National Renewable Energy Laboratory (Benjamin Sigrin, Eric O’Shaughnessy). The seven projects separately addressed one of the following topics: (1) low- and middle-income PV adoption, (2) modeling economic and information intervention design, (3) evaluation of DOE’s Solar in Your Community Challenge, (4) property value impacts near large-scale solar facilities, (5) solar market maturity and evolution of business models, (6) social media data for predicting PV adoption, and (7) individual-level variation in adoption of innovations. Many of the papers relied on data collected and curated by Lawrence Berkeley National Laboratory, including data embedded within the annual Tracking the Sun and Utility-Scale Solar reports. Each of the seven teams in the PRP prepared a research paper. The PRP culminated with a full-day conference at UT Austin in May 2018 to present findings from the seven projects in this PRP to a broad audience of about 75 experts from academia, national labs, industry, and government from across the country.

14 SOLAR ENERGY↗

Central Appalachian Basin CarbonSAFE Integrated Pre-Feasibility Project (Final Technical Report)

The Central Appalachian Basin-Carbon Storage Assurance Facility Enterprise (CarbonSAFE) (CAB-CS) Integrated Prefeasibility Project identified several “Selected Areas” in eastern Ohio where the Cambrian-Ordovician age sandstones and carbonates show the most promising reservoir potential for carbon capture and storage (CCS). These selected areas are located near depleted oil and gas fields where oil recovery could be improved with enhanced oil recovery. This region has many large carbon dioxide (CO 2 ) point sources that represent a diverse array of industries, including coal-fired power plants, natural gas processing, refineries, chemical plants, and natural gas power. In a carbon-constrained future, one of the most promising ways to make coal a viable fuel option for power generation or industrial processes is to capture and store CO 2 emissions. The project is a pre-feasibility study to mitigate the emissions from 1.67 million metric tons CO 2 per year by developing a storage complex capable of storing 50 million metric tons. The pre-feasibility study identified two candidate locations for a carbon storage hub in the Appalachian Basin, analyzed six source-sink scenarios in the CAB-CS study area with analysis of capture and transport, defined infrastructure needs for a CCS project in the area, conducted an economic, liability, and social assessment, and built a team to evaluate CCS options in the CAB-CS study area. The project was an important step in implementing CCS in the CAB-CS study area. Major accomplishments include experience in investigating CCS projects in the area (learning by doing), adding to National Energy Technology Laboratory (NETL) best practices tools and tool sets, and building the elements of the CCS road map for the region.

20 FOSSIL-FUELED POWER PLANTS↗

2014-2018 Summary of NCAR activities in the Earth Energy Exascale System Model (E3SM) project

NCAR participation in E3SM activities as part of this funded collaborative project has been successful in leveraging the existing atmosphere model development experience from CESM scientists and applying it to initial v1 atmosphere model (EAM) development and analysis. NCAR partners collectively had many decades of experience in parameterization development, running and tuning coupled models and building the required software infrastructure to support ongoing model developments. Furthermore, collaboration between E3SM and CESM developers was of mutual benefit to both modeling endeavors. In the earlier periods of the project, participation in E3SM both complemented core critical path DOE activities and advanced individual parameterization development; including orographic drag, convection parameterization, convective gustiness and cloud and microphysical processes. Significant progress has been made implementing model capabilities for separating out the physics and dynamics grids, and providing the infrastructure for including orographic elevation class communication between the land and atmosphere models. Our activities working with the E3SM workflow and software engineering teams have established efficient protocols and infrastructure for the sharing of CESM and E3SM model codes of interest to both modeling groups, a large component of which is the mutual communication of common code bugs. As well as these specific project tasks all NCAR project members have been regular participants in atmosphere and coupled group telecons, as well as PI meetings. We have been fully engaged with and contributed to decisions regarding v1 atmosphere model developments, coupled model simulations, model tunings, and software engineering infrastructure. NCAR’s contribution to more recent E3SM development activities has centered on analysis of v1 release and pre-release simulations in order to address outstanding systematic biases and communicate climate improvements. Of particularly note is the work in understanding clouds and cloud feedbacks, shortcomings in ENSO and sub-seasonal variability; in particular the Madden Julian Oscillation (MJO). Contributions have been made to a number of papers that are currently published or in preparation detailing model performance in CMIP6-protocal experiments. They outline the simulations of mean climate, clouds and convection processes, convective gustiness, atmospheric blocking coupled climates. The contributions of NCAR’s funded activities to the E3SM atmosphere in the initial years of the project have had a positive impact on many aspects of the model simulations described in these papers.

58 GEOSCIENCES↗

The Vineyard Wind Power Purchase Agreement: Insights for Estimating Costs of U.S. Offshore Wind Projects

This report analyzes the power purchase agreements (PPAs) between Massachusetts electric distribution utilities (EDC) and Vineyard Wind LLC filed on July 31, 2018, and derives insights for estimating cost of U.S. offshore wind systems and broader cost modeling activities. The documented price for delivery of offshore wind generation and renewable energy certificates under the Vineyard Wind/electric distribution utilities PPA is 74 $/megawatt-hour (MWh) (2022$) for facility 1 (400 MW) and 65 $/MWh (2023$) for facility 2 (400 MW). However, this PPA price does not comprise the complete set of expected revenue sources and tax benefits available to the Vineyard Wind LLC project. A comprehensive accounting of expected revenue sources inclusive of those that are exogenous to the reported PPA is conducted in this study to estimate the project's levelized revenue of energy (LROE). This allows for a more equivalent comparison of the PPA pricing with bottom-up modeled (unsubsidized) levelized cost of energy (LCOE) estimates. LROE from the Vineyard LLC/EDC PPA is estimated to be 98$/MWh (2018$). This LROE estimate for the first commercial-scale offshore wind project in the United States appears to be within the range of LROE estimated for offshore wind projects recently tendered in Northern Europe with a start of commercial operation by the early 2020s. This suggests that a cost and risk premium for the initial set of U.S. offshore wind projects may be less pronounced than anticipated by many industry observers and analysts.

17 WIND ENERGY↗