Search NASA⌕ Search

SEARCH · Search NASA

Results for “Reporting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,081 records · Page 60

Pacific Northwest National Laboratory Annual Site Environmental Report for Calendar Year 2023

Pacific Northwest National Laboratory (PNNL), one of the U.S. Department of Energy (DOE) Office of Science’s 10 national laboratories, provides innovative science and technology development in the areas of energy and the environment, fundamental and computational science, and national security. There are three DOE offices within the Richland area. Two are responsible for the Hanford Site, whereas the Pacific Northwest Site Office oversees PNNL. PNNL prepares an Annual Site Environmental Report to meet the requirements of DOE Order 231.1B, Environment, Safety and Health Reporting, and DOE Order 458.1, Radiation Protection of the Public and the Environment, thus assuring that the public is informed of any PNNL-Richland campus or PNNL-Sequim campus event that could adversely affect the health and safety of the public, site staff, or the environment. The report provides a synopsis of ongoing environmental management performance and compliance activities for operations that occur at the PNNL-Richland campus in Richland, Washington, and at the PNNL-Sequim campus near Sequim, Washington. It describes the location of and background for each facility; addresses compliance with applicable DOE, federal, state, and local regulations, and site-specific permits; documents environmental monitoring efforts and their status; presents potential radiation doses to staff and the public in the surrounding areas; and describes DOE-required data quality assurance methods used for data verification. The ASER report describes Compliance with Federal, State, and Local Laws and Regulations in 2023, Environmental Sustainability, Environmental monitoring and dose assessment, Natural and Cultural Resource Management, and Quality Assurance activities that took place during Calendar Year 2023.

40 CFR 61 Subpart H↗

Nevada Test Site Environmental Report 2007 Summary

The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) directs the management and operation of the Nevada Test Site (NTS). The NTS is the nation's historical testing site for nuclear weapons from 1951 through 1992 and is currently the nation's unique site for ongoing national-security related missions and high-risk operations. NNSA/NSO strives to provide to the public an understanding of the current activities on the NTS, including environmental monitoring and compliance activities aimed at protecting the public and the environment from radiation hazards and from nonradiological impacts. This document is a summary of the Nevada Test Site Environmental Report (NTSER) for calendar year 2007 (see attached compact disc on inside back cover). The NTSER is a comprehensive report of environmental activities performed at the NTS and offsite facilities over the previous calendar year. It is prepared annually to meet the requirements and guidelines of the U.S. Department of Energy (DOE) and the information needs of NNSA/NSO stakeholders. To provide an abbreviated and more readable version of the NTSER, this summary report is produced. This summary does not include detailed data tables, monitoring methods or design, a description of the NTS environment, or a discussion of all environmental program activities performed throughout the year. The reader may obtain a hard copy of the full NTSER as directed on the inside front cover of this summary report.

54 ENVIRONMENTAL SCIENCES↗

Annual Site Environmental Report, 2007(ASER)

This report provides information about environmental programs during the calendar year (CY) of 2007 at the Stanford Linear Accelerator Center (SLAC), Menlo Park, California. Activities that span the calendar year, i.e., stormwater monitoring covering the winter season of 2007/2008 (October 2007 through May 2008), are also included. Production of an annual site environmental report (ASER) is a requirement established by the United States Department of Energy (DOE) for all management and operating (M&O) contractors throughout the DOE complex. SLAC is a federally-funded research and development center with Stanford University as the M&O contractor. Under Executive Order (EO) 13423 and DOE Order 450.1, 'Environmental Protection Program', SLAC effectively implemented and integrated the key elements of an Environmental Management System (EMS) to achieve the site's integrated safety and environmental management system goals. For normal daily activities, SLAC managers and supervisors are responsible for ensuring that policies and procedures are understood and followed so that: (1) Worker safety and health are protected; (2) The environment is protected; and (3) Compliance is ensured. Throughout 2007, SLAC focused on development and implementation of SLAC management systems to ensure continual improvement. These systems provided a structured framework for SLAC to implement 'greening of the government' initiatives such as EO 13148. Overall, management systems at SLAC are effective, supporting compliance with all relevant statutory and regulatory requirements. SLAC continues to demonstrate significant progress in implementing and integrating EMS into day-to-day operations at SLAC. The annual management review and ranking of environmental aspects were completed this year by SLAC's EMS Steering Committee, the Environmental Safety Committee (ESC) and thirteen objectives and targets were established for 2007. For each objective and target, a work plan, or Environmental Management Program (EMP) was completed and progress reports were routinely provided to SLAC senior management. During 2007, there were no reportable releases to the environment from SLAC operations. In addition, many improvements in waste minimization, recycling, stormwater management, groundwater restoration, and SLAC's chemical management system (CMS) were continued during 2007. SLAC replaced two process tanks at the Plating Shop which previously contained chromium solutions with non-chromium containing solutions, reducing the overall use of hazardous chemicals. In addition, 346 polychlorinated biphenyl (PCB)-contaminated capacitors were replaced with non-PCB capacitors, reducing the potential of a release of oil with PCBs during an event such as a fire or an earthquake. SLAC operates its industrial and sanitary wastewater management program in compliance with established permit conditions. During 2007, SLAC obtained a new facility-wide wastewater discharge permit which replaced four separate permits that were previously issued to SLAC. In 2007, no radiological incidents occurred that increased radiation levels or released radioactivity to the environment. In addition to managing its radioactive wastes safely and responsibly, SLAC worked to reduce the amount of waste generated. SLAC has implemented programs and systems to ensure compliance with all radiological requirements related to the environment. Specifically, the Radiation Protection Radiological Waste Management (RPRWM) Group developed a training course to certify Radioactive Waste Generators, conducted a training pilot, and developed a list of potential radioactive waste generators to train. In 2007, the SLAC Environmental Restoration Program continued work on site characterization and evaluation of remedial alternatives at four sites with volatile organic compounds in groundwater and several areas with polychlorinated biphenyls and low concentrations of lead in soil. SLAC is regulated under a site cleanup requirements order (board order) issued by the California Regional Water Quality Control Board (RWQCB), San Francisco Bay Region in May 2005 for the investigation and remediation of impacted soil and groundwater at SLAC. The board order lists specific tasks and deadlines for completion of groundwater and soil characterization and other remediation activities. All 2007 submittals to the RWQCB were completed and submitted on time.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ODS Characterization Progress Report 06/27/08

This progress report is intended to help keep track of the work that has been performed in characterizing ODS steels for the LIFE project. This specific report details the current status of the characterization of a 24% Cr, 1% Y{sub 2}O{sub 3} ODS steel obtained from Wayne King via Geoff Campbell. Since no pedigree of the material could be obtained, a baseline characterization was necessary prior to studying processing, welding, and corrosion behavior. This document details the results obtained from analysis performed using scanning electron microscopy (SEM), electron backscatter diffraction (EBSD) and energy dispersive spectroscopy (EDS). At the time of writing, transmission electron microscopy (TEM) and microhardness measurements have not been completed, and will be included in a future report. The results are presented in two sections: microstructure, and phase identification. As the names suggest, the first section will report on the microstructure in the general sense and include details such as grain size and texture, and the second section will include the identification of the phases present in the baseline material.

42 ENGINEERING↗

A REPRINT of a July 1991 Report to Congress, Executive Summary of Verification of Nuclear Warhead Dismantlement and Special Nuclear Material Controls

With the renewed thinking and debate about deep reductions in nuclear weapons, including recent proposals about eliminating nuclear warheads altogether, republishing the general conclusions of the Robinson Committee Report of 1992 appears useful. The report is sometimes referred to as the 3151 Report, from Section 3151 of the National Defnse Authorization Act for FY1991, from where its requirement originated. This report contains the Executive Summary only and the forwarding letters from the Committee, the President of the United States, the Secretary of Energy, and C Paul Robinson, the head of the Advisory Committee.

3151 Report↗

DOE Joint Genome Institute 2008 Progress Report

While initially a virtual institute, the driving force behind the creation of the DOE Joint Genome Institute in Walnut Creek, California in the Fall of 1999 was the Department of Energy's commitment to sequencing the human genome. With the publication in 2004 of a trio of manuscripts describing the finished 'DOE Human Chromosomes', the Institute successfully completed its human genome mission. In the time between the creation of the Department of Energy Joint Genome Institute (DOE JGI) and completion of the Human Genome Project, sequencing and its role in biology spread to fields extending far beyond what could be imagined when the Human Genome Project first began. Accordingly, the targets of the DOE JGI's sequencing activities changed, moving from a single human genome to the genomes of large numbers of microbes, plants, and other organisms, and the community of users of DOE JGI data similarly expanded and diversified. Transitioning into operating as a user facility, the DOE JGI modeled itself after other DOE user facilities, such as synchrotron light sources and supercomputer facilities, empowering the science of large numbers of investigators working in areas of relevance to energy and the environment. The JGI's approach to being a user facility is based on the concept that by focusing state-of-the-art sequencing and analysis capabilities on the best peer-reviewed ideas drawn from a broad community of scientists, the DOE JGI will effectively encourage creative approaches to DOE mission areas and produce important science. This clearly has occurred, only partially reflected in the fact that the DOE JGI has played a major role in more than 45 papers published in just the past three years alone in Nature and Science. The involvement of a large and engaged community of users working on important problems has helped maximize the impact of JGI science. A seismic technological change is presently underway at the JGI. The Sanger capillary-based sequencing process that dominated how sequencing was done in the last decade is being replaced by a variety of new processes and sequencing instruments. The JGI, with an increasing number of next-generation sequencers, whose throughput is 100- to 1,000-fold greater than the Sanger capillary-based sequencers, is increasingly focused in new directions on projects of scale and complexity not previously attempted. These new directions for the JGI come, in part, from the 2008 National Research Council report on the goals of the National Plant Genome Initiative as well as the 2007 National Research Council report on the New Science of Metagenomics. Both reports outline a crucial need for systematic large-scale surveys of the plant and microbial components of the biosphere as well as an increasing need for large-scale analysis capabilities to meet the challenge of converting sequence data into knowledge. The JGI is extensively discussed in both reports as vital to progress in these fields of major national interest. JGI's future plan for plants and microbes includes a systematic approach for investigation of these organisms at a scale requiring the special capabilities of the JGI to generate, manage, and analyze the datasets. JGI will generate and provide not only community access to these plant and microbial datasets, but also the tools for analyzing them. These activities will produce essential knowledge that will be needed if we are to be able to respond to the world's energy and environmental challenges. As the JGI Plant and Microbial programs advance, the JGI as a user facility is also evolving. The Institute has been highly successful in bending its technical and analytical skills to help users solve large complex problems of major importance, and that effort will continue unabated. The JGI will increasingly move from a central focus on 'one-off' user projects coming from small user communities to much larger scale projects driven by systematic and problem-focused approaches to selection of sequencing targets. Entire communities of scientists working in a particular field, such as feedstock improvement or biomass degradation, will be users of this information. Despite this new emphasis, an investigator-initiated user program will remain. This program in the future will replace small projects that increasingly can be accomplished without the involvement of JGI, with imaginative large-scale 'Grand Challenge' projects of foundational relevance to energy and the environment that require a new scale of sequencing and analysis capabilities. Close interactions with the DOE Bioenergy Research Centers, and with other DOE institutions that may follow, will also play a major role in shaping aspects of how the JGI operates as a user facility. Based on increased availability of high-throughput sequencing, the JGI will increasingly provide to users, in addition to DNA sequencing, an array of both pre- and post-sequencing value-added capabilities to accelerate their science.

09 BIOMASS FUELS↗

Calendar Year 2007 Resource Conservation and Recovery Act Annual Monitoring Report for the U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee - RCRA Post-Closure Permit Nos. TNHW-113, TNHW-116, and TNHW-128

This report contains groundwater quality monitoring data obtained during calendar year (CY) 2007 at the following hazardous waste treatment, storage, and disposal (TSD) units located at the US Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) in Oak Ridge, Tennessee; this S-3 Site, Oil Landfarm, Bear Creek Burial Grounds/Walk-In Pits (BCBG/WIP), Eastern S-3 Site Plume, Chestnut Ridge Security Pits (CRSP), Chestnut Ridge Sediment Disposal Baste (CRSDB), few Hollow Quarry (KHQ), and East Chestnut Ridge Waste Pile (ECRWP). Hit monitoring data were obtained in accordance with the applicable Resource Conservation and Recovery Act of 1976 (RCRA) hazardous waste post-closure permit (PCP). The Tennessee Department of Environment and Conservation (TDEC) - Division of Solid Waste Management issued the PCPs to define the requirements for RCRA post-closure inspection, maintenance, and groundwater monitoring at the specified TSD units located within the Bear Creek Hydrogeologic Regime (PCP no. TNHW-116), Upper East Fork Poplar Creek Hydrogeologic Regime (PCP no. TNHW-113), and Chestnut Ridge Hydrogeologic Regime (PCP no. TNHW-128). Each PCP requires the Submittal of an annual RCRA groundwater monitoring report containing the groundwater sampling information and analytical results obtained at each applicable TSD unit during the preceding CY, along with an evaluation of groundwater low rates and directions and the analytical results for specified RCRA groundwater target compounds; this report is the RCRA annual groundwater monitoring report for CY 2007. The RCRA post-closure groundwater monitoring requirements specified in the above-referenced PCP for the Chestnut Ridge Regime replace those defined in the previous PCP (permit no. TNHW-088), which expired on September 18, 2005, but remained effective until the TDEC issued the new PCP in September 2006. The new PCP defines site-specific groundwater sampling and analysis requirements for the CRSDB, CRSP, and KHQ that differ from those established under the expired PCP, including modified suites of laboratory analytes (RCRA groundwater target compounds) for each site and annual rather than semiannual sampling frequencies for the CRSDB and KHQ. The new PCP also specifies the RCRA post-closure groundwater monitoring requirements for the ECRWP, a closed TSD unit that was not addressed in the expired PCP.

54 ENVIRONMENTAL SCIENCES↗

Annual Site Environmental Report: 2008 (ASER) for the SLAC National Accelerator Laboratory

This report provides information about environmental programs during the calendar year of 2008 at the SLAC National Accelerator Laboratory (SLAC), Menlo Park, California. Activities that span the calendar year, i.e., stormwater monitoring covering the winter season of 2008/2009 (October 2008 through May 2009), are also included. Production of an annual site environmental report (ASER) is a requirement established by the United States Department of Energy (DOE) for all management and operating (M&O) contractors throughout the DOE complex. SLAC is a federally-funded research and development center with Stanford University as the M&O contractor. Under Executive Order (EO) 13423, Strengthening Federal Environmental, Energy, and Transportation Management, and DOE Order 450.1A, Environmental Protection Program, SLAC effectively implements and integrates the key elements of an Environmental Management System (EMS) to achieve the site's integrated safety and environmental management system goals. For normal daily activities, SLAC managers and supervisors are responsible for ensuring that policies and procedures are understood and followed so that: (1) Worker safety and health are protected; (2) The environment is protected; and (3) Compliance is ensured. Throughout 2008, SLAC continued to improve its management systems. These systems provided a structured framework for SLAC to implement 'greening of the government' initiatives such as EO 13423 and DOE Orders 450.1A and 430.2B. Overall, management systems at SLAC are effective, supporting compliance with all relevant statutory and regulatory requirements. SLAC continues to demonstrate significant progress in implementing and integrating EMS into day-to-day operations and construction activities at SLAC. The annual management review and ranking of environmental aspects were completed this year by SLAC's EMS Steering Committee, the Environmental Safety Committee (ESC), and twelve objectives and targets were established for 2008. For each objective and target, a work plan, or Environmental Management Program (EMP) was completed and progress reports were routinely provided to SLAC senior management and the DOE SLAC Site Office (SSO). During 2008, there were no reportable releases to the environment from SLAC operations. In addition, many improvements in waste minimization, recycling, stormwater management, groundwater restoration, and SLAC's chemical management system (CMS) were continued during the year. The following are amongst SLAC's environmental accomplishments for 2008: a composting program at SLAC's onsite cafeteria was initiated, greater than 800 cubic feet of legacy radioactive waste were packaged and shipped from SLAC, a chemical redistribution program was developed, SLAC reduced the number of General Services Administration leased vehicles from 221 to 164, recycling of municipal waste was increased by approximately 140 tons during 2008, and site-wide releases of sulfur hexafluoride were reduced by 50 percent. In 2008, no radiological incidents occurred that increased radiation levels or released radioactivity to the environment. In addition to managing its radioactive wastes safely and responsibly, SLAC worked to reduce the amount of waste generated. SLAC has implemented programs and systems to ensure compliance with all radiological requirements related to the environment. Specifically, the Radiation Protection Radiological Waste Management Group developed a training course to certify Radioactive Waste Generators, conducted a training pilot, and developed a list of potential radioactive waste generators to train. Twenty eight generators were trained in 2008. As a best management practice, SLAC also reduced its tritium inventory by at least 95 percent by draining one of its accelerator cooling water systems; with the cooperation of the South Bayside System Authority, the West Bay Sanitary District and the DOE, SLAC discharged the cooling water to the sanitary sewer according to federal regulations and replenished the system with clean water. In 2008, the SLAC Environmental Restoration Program personnel continued work on site characterization and evaluation of remedial alternatives at four sites with volatile organic compounds in groundwater and several areas with polychlorinated biphenyls and low concentrations of lead in soil. SLAC is regulated under a site cleanup requirements order (board order) issued by the California Regional Water Quality Control Board (RWQCB), San Francisco Bay Region in May 2005 for the investigation and remediation of impacted soil and groundwater at SLAC. The board order lists specific tasks and deadlines for completion of groundwater and soil characterization and other remediation activities. All 2008 submittals to the RWQCB were completed and submitted on time.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Learning Demonstration Interim Progress Report -- July 2010

This report discusses key results based on data through December 2009 from the U.S. Department of Energy's (DOE) Controlled Hydrogen Fleet and Infrastructure Validation and Demonstration Project, also referred to as the National Fuel Cell Electric Vehicle (FCEV) Learning Demonstration. The report serves to help transfer knowledge and lessons learned within various parts of DOE's hydrogen program, as well as externally to other stakeholders. It is the fourth such report in a series, with previous reports being published in July 2007, November 2007, and April 2008.

08 HYDROGEN↗

2009 Toxic Chemical Release Inventory Report for the Emergency Planning and Community Right-to-Know Act of 1986, Title III, Section 313

For reporting year 2009, Los Alamos National Laboratory (LANL) submitted a Form R report for lead as required under the Emergency Planning and Community Right-to- Know Act (EPCRA) Section 313. No other EPCRA Section 313 chemicals were used in 2009 above the reportable thresholds. This document was prepared to provide a description of the evaluation of EPCRA Section 313 chemical use and threshold determinations for LANL for calendar year 2009, as well as to provide background information about data included on the Form R reports.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

SciDAC's Earth System Grid Center for Enabling Technologies Semi-Annual Progress Report for the Period October 1, 2009 through March 31, 2010

This report summarizes work carried out by the ESG-CET during the period October 1, 2009 through March 31, 2009. It includes discussion of highlights, overall progress, period goals, collaborations, papers, and presentations. To learn more about our project, and to find previous reports, please visit the Earth System Grid Center for Enabling Technologies (ESG-CET) website. This report will be forwarded to the DOE SciDAC program management, the Office of Biological and Environmental Research (OBER) program management, national and international collaborators and stakeholders (e.g., the Community Climate System Model (CCSM), the Intergovernmental Panel on Climate Change (IPCC) 5th Assessment Report (AR5), the Climate Science Computational End Station (CCES), the SciDAC II: A Scalable and Extensible Earth System Model for Climate Change Science, the North American Regional Climate Change Assessment Program (NARCCAP), and other wide-ranging climate model evaluation activities).

99 GENERAL AND MISCELLANEOUS↗

State Energy Efficient Appliance Rebate Program (SEEARP) Reports

The State Energy Efficient Appliance Rebate Program (SEEARP) reports database includes rebate reports (xls) and summary factsheets (pdf) from states and territories that participated in SEEARP. With funding provided by the American Recovery and Reinvestment Act of 2009 (ARRA), the U.S. Department of Energy (DOE) developed SEEARP to spur economic activity and invest in long-term energy savings by helping consumers replace older, inefficient appliances with new, efficient models. SEEARP provided almost $300 million to the 56 U.S. states and territories to support state-level consumer rebate programs for efficient appliances from December 1, 2009 to February 17, 2012. The successes and challenges of SEEARP provide valuable lessons for designing and running a consumer-focused appliance rebate program. In addition to the SEEARP reports database, the two reports included provide a results and program design lessons.

appliances↗

Sensor Chip Assembly (SCA) Test Report

This report summarizes the measured performance for the Sensor Chip Assembly (SCA), which is identified in Table 1. The SCA architecture is a substrate-removed HgCdTe detector with an area of 4096x4096 pixels (with a reference pixel area of four pixels deep around all four sides, available to substitute corresponding image pixels) and a pixel pitch of 10 μm. This SCA has been tested at the Goddard Space Flight Center (GSFC/NASA) Detector Characterization Laboratory (DCL). Teledyne (the vendor) classifies its detectors into different grades based on testing performed at its facility. The classification of this SCA and the tested dates are included in Table 1 below. The tests performed on this array are derived from the document WFIRST-PROC-09220_WFIRST-SCA-ATP_-.docx. A summary of the test parameters, requirements, and test results is presented in Table 2. The details of each test are subsequently described in the report. In the Summary (Table 2), SCA results are reported at an operating temperature of 95K, and 1.0 V bias voltage. In the detailed section of each test, the results for 90 K (1.0V bias voltage) and 95 K (0.5V bias voltage) are also reported. For all cases, the frame time used is 2.764 seconds. Reference pixel correction was applied to every raw frame.

WFIRST SCA TEST REPORT↗

2008 Geothermal Technologies Market Report

This report describes market-wide trends for the geothermal industry throughout 2008 and the beginning of 2009. It begins with an overview of the GTP’s involvement with the geothermal industry and recent investment trends for electric generation technologies. The report next describes the current state of geothermal power generation and activity within the United States, costs associated with development, financing trends, an analysis of the levelized cost of energy (LCOE), and a look at the current policy environment. The report also highlights trends regarding direct use of geothermal energy, including GHPs.† The final sections of the report focus on international perspectives, employment and economic benefits from geothermal energy development, and potential incentives in pending national legislation.

Geothermal, Market Report↗

Annual Report on the State of the DOE National Laboratories

This first Annual Report to Congress on the State of the DOE National Laboratories provides a comprehensive overview of the Lab system, covering S&T programs, management and strategic planning. The Department committed to prepare this report in response to recommendations from the Congressionally mandated Commission to Review the Effectiveness of the National Energy Laboratories (CRENEL) that the Department should better communicate the value that the Laboratories provide to the Nation. We expect that future annual reports will be much more compact, building on the extensive description of the Laboratories and of the governance structures that are part of this first report.

DOE, Annual, Report, Laboratories, Labs, National ↗

Analysis of Geothermal Reservoir and Well Operational Conditions using Monthly Production Reports from Nevada and California

When conducting techno-economic analysis of geothermal systems, assumptions are typically necessary for reservoir and wellbore parameters such as producer/injector well ratio, production temperature drawdown, and production/injection temperature, pressure and flow rate. To decrease uncertainty of several of these parameters, we analyzed field data reported by operators in monthly production reports. This paper presents results of a statistical analysis conducted on monthly production reports at 19 power plants in California and Nevada covering 196 production wells and 175 injection wells. The average production temperature was 304 degrees F (151 degrees C) for binary plants and 310 degrees F (154 degrees C) for flash plants. The average injection temperature was 169 degrees F (76 degrees C) for binary plants and 173 degrees F (78 degrees C) for flash plants. The average production temperature drawdown was 0.5% per year for binary plants and 0.8% per year for flash plants. The average production well flow rate was 112 L/s for binary plant wells and 62 L/s for flash plant wells. For all 19 plants combined, the median injectivity index value was 3.8 L/s/bar, and the average producer/injector well ratio was 1.6. As an additional example of analysis using data from monthly production reports, a coupled reservoir-wellbore model was developed to derive productivity curves at various pump horsepower settings. The workflow and model were applied to two example production wells.

15 GEOTHERMAL ENERGY↗

Utah FORGE: Daily Reports for the 2024 Stimulation of Wells 16A/16B(78)-32

The zip file below contains daily reports produced during the spring 2024 stimulation of wells 16A/16B(78)-32 at Utah FORGE . These reports cover a period from March 29th to April 28th, 2024. They discuss the activity on the rig each day, with each report containing information on general operations, management, safety, and weather.

15 GEOTHERMAL ENERGY↗

Utah FORGE: LBNL Reports on VEMP Electromagnetic Data Collection and Processing - 2024

This archive contains reports related to Vertical Electromagnetic Profiling (VEMP) tool data collection and processing at Utah FORGE in 2024. The first report describes LBNL's effort to collect electromagnetic geophysical data with the tool in well 78-32B and a downhole electrode in well 16A. The second report describes the final data acquisition and processing of the VEMP electromagnetic data collected at the Utah FORGE site in May of 2024. Also included are a noise analysis as well as a comparison of the data to numerical models. This was originally presented as a paper at the 2025 Stanford Geothermal Workshop.

15 GEOTHERMAL ENERGY↗