Search NASA⌕ Search

SEARCH · Search NASA

Results for “Storage Duration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,081 records · Page 60

A Flexible Reservation Algorithm for Advance Network Provisioning

Many scientific applications need support from a communication infrastructure that provides predictable performance, which requires effective algorithms for bandwidth reservations. Network reservation systems such as ESnet's OSCARS, establish guaranteed bandwidth of secure virtual circuits for a certain bandwidth and length of time. However, users currently cannot inquire about bandwidth availability, nor have alternative suggestions when reservation requests fail. In general, the number of reservation options is exponential with the number of nodes n, and current reservation commitments. We present a novel approach for path finding in time-dependent networks taking advantage of user-provided parameters of total volume and time constraints, which produces options for earliest completion and shortest duration. The theoretical complexity is only O(n2r2) in the worst-case, where r is the number of reservations in the desired time interval. We have implemented our algorithm and developed efficient methodologies for incorporation into network reservation frameworks. Performance measurements confirm the theoretical predictions.

97 MATHEMATICS AND COMPUTING↗

Zero-G life support for Space Station Freedom

Optimal design of spacecraft environmental control and life support systems (ECLSS) for long duration missions requires an understanding of microgravity and its long-term influence on ECLSS performance characteristics. This understanding will require examination of the fundamental processes associated with air revitalization and water recovery in a microgravity environment. Short term testing can be performed on NASA's reduced gravity aircraft (a KC-135), but longer tests will need to be conducted on the shuttle or Space Station Freedom. Conceptual designs have been prepared for ECLSS test beds that will allow extended testing of equipment under microgravity conditions. Separate designs have been formulated for air revitalization and water recovery test beds. In order to allow testing of a variety of hardware with minimal alteration of the beds themselves, the designs include storage tanks, plumbing, and limited instrumentation that would be expected to be common to all air (or water) treatment equipment of interest. In the interest of minimizing spacecraft/test bed interface requirements, the beds are designed to recycle process fluids to the greatest extent possible. In most cases, only cooling water and power interfaces are required. A volume equal to that of two SSF lockers was allowed for each design. These bed dimensions would limit testing to equipment with a 0.5- to 1.5-person-equivalent throughput. The mass, volume, and power requirements for the air revitalization test bed are estimated at 125-280 kg, 1.0- 1.4 cubic meters, and 170 min 1070 W. Corresponding ranges for the water recovery test bed are 325-375 kg, 1.0- 1.1 cubic meters, and 350-850 W. These figures include individual test articles and accompanying hardware as well as the tanks, plumbing, and instrumentation included in the bed designs. Process fluid weight (i.e., water weight) is also included.

Kolodney, Matthew↗

The Stability of Bioactive Compounds in Spaceflight Foods

The status and stability of bioactive compounds in the processed and shelf-stable spaceflight food system have not previously been investigated though the presence of such compounds in aged space foods could have health significance for crews on long duration exploration missions. Over forty foods - either existing International Space Station (ISS) food provisioning items, newly developed foods for spaceflight, or commercially-available ready-to-eat foods - that were predicted to have a relatively high concentrations of one or more bioactive compounds (lycopene, lutein, omega-3 fatty acids, phenolics, sterols, and/or flavonoids) were selected for the study. Food samples were sent overnight to the Food Composition Laboratory of the Linus Pauling Institute at Oregon State University (Corvallis, OR) for bioactive compound analysis. Three packages of each product were blended together for the analysis to reduce package-to-package variability. All ISS food items and commercial foods were analyzed initially and after 12 and 24 months of 21degC storage. Food development occurred in a staggered fashion, so data collection for the newly developed foods continues. Lastly, sensory evaluation and additional temperature storage data (4degC, 35degC) for select foods were collected to establish additional stability parameters. Efficacious concentrations of lycopene, lutein, and omega-3 fatty acids were measured in limited spaceflight foods; two grams of sterols a day may be difficult to achieve with the current space diet. Total polyphenol delivery appears stable and adequate, but individual phenolic compounds vary in stability and were not specifically evaluated in this study. The data suggests that some bioactive compounds, like lycopene and lutein, degrade and then plateau at some equilibrium concentration. The anthocyanin stability appears to be related to storage temperature and food matrix, and lutein stability in leafy vegetables may be impacted by storage temperature. Because of the limited number of foods with high concentrations of the bioactive compounds, additional menu variety, formulation optimization, and reduced temperature storage will be required to ensure delivery of several bioactive compounds in the space food system. Validation of stability to five years will enable provisioning of these functional foods within the space food system for a mission to Mars.

Cooper, M. R.↗

Hybridization Assessment of Trybrid Pumped Storage Hydropower System—Part 1: A Case Study of Corral Summit

This report is a part of the deliverables for technical assistance provided to Cat Creek Energy for the Coral Summit Trybrid (Triple Hybrid-Pumped Storage Hydropower, Battery Energy Storage System, and photovoltaic solar energy) energy project. This report explores the operational benefits and challenges of hybridizing an open loop PSH (200MW) located at Mackay, Custer County, Idaho with solar PV (Ground mount 300MW and floating 40MW) and battery (720MWhr). This document reports two activities performed as a part of the hybridization assessment task 1) optimal resource allocation and energy management strategy, and 2) power quality and reliability assessment. From optimal resource allocation and energy management strategy (activity 1), the following key findings can be observed: • Conventional PSH (CPSH) with two reversible pump turbines and separate penstocks can provide required flexibility equivalent to that from two ternary PSH with separate penstock. With single unit CPSH, upper reservoir head cannot be maintained accurately, the variation of water level is rapid and pump mode flexibility is not available. These disadvantages can be overcome by single unit TPSH. However, using two CPSH units with separate penstocks also overcome these disadvantages with the formation of the hydraulic short circuit between two conventional units. • Flooding of the lower reservoir is a severe concern when considering continuous operation for black start. This limits the duration of continuous operation from PSH alone to around 50 hours. Due to the complementary PV and battery action, the duration of continuous operation and smooth power output can be extended. • An optimization problem is framed that maximizes the power output on an hourly basis while minimizing constraint violations and respecting seasonal variations of solar PV and load profiles . Two value streams, arbitrage and baseload generation are served by this profile. It was uncovered that for smooth power output during regular operation, PV curtailment will be required, or the battery capacity needs to be increased above 90MW to accommodate additional PV. From power quality and reliability assessment (activity 2) the following takeaway points can be observed: • The Trybrid, when integrated at the Lost River bus, and limited to 250MW in generation mode and -150MW in the pump mode, causes no violation of voltage or flow.

13 - HYDRO ENERGY↗

STATUS OF THE DEVELOPMENT OF IN-TANK/AT-TANK SEPARATIONS TECHNOLOGIES FOR FOR HIGH-LEVEL WASTE PROCESSING FOR THE U.S. DEPARTMENT OF ENERGY

Within the U.S. Department of Energy's (DOE) Office of Technology Innovation and Development, the Office of Waste Processing manages a research and development program related to the treatment and disposition of radioactive waste. At the Savannah River (South Carolina) and Hanford (Washington) Sites, approximately 90 million gallons of waste are distributed among 226 storage tanks (grouped or collocated in 'tank farms'). This waste may be considered to contain mixed and stratified high activity and low activity constituent waste liquids, salts and sludges that are collectively managed as high level waste (HLW). A large majority of these wastes and associated facilities are unique to the DOE, meaning many of the programs to treat these materials are 'first-of-a-kind' and unprecedented in scope and complexity. As a result, the technologies required to disposition these wastes must be developed from basic principles, or require significant re-engineering to adapt to DOE's specific applications. Of particular interest recently, the development of In-tank or At-Tank separation processes have the potential to treat waste with high returns on financial investment. The primary objective associated with In-Tank or At-Tank separation processes is to accelerate waste processing. Insertion of the technologies will (1) maximize available tank space to efficiently support permanent waste disposition including vitrification; (2) treat problematic waste prior to transfer to the primary processing facilities at either site (i.e., Hanford's Waste Treatment and Immobilization Plant (WTP) or Savannah River's Salt Waste Processing Facility (SWPF)); and (3) create a parallel treatment process to shorten the overall treatment duration. This paper will review the status of several of the R&D projects being developed by the U.S. DOE including insertion of the ion exchange (IX) technologies, such as Small Column Ion Exchange (SCIX) at Savannah River. This has the potential to align the salt and sludge processing life cycle, thereby reducing the Defense Waste Processing Facility (DWPF) mission by 7 years. Additionally at the Hanford site, problematic waste streams, such as high boehmite and phosphate wastes, could be treated prior to receipt by WTP and thus dramatically improve the capacity of the facility to process HLW. Treatment of boehmite by continuous sludge leaching (CSL) before receipt by WTP will dramatically reduce the process cycle time for the WTP pretreatment facility, while treatment of phosphate will significantly reduce the number of HLW borosilicate glass canisters produced at the WTP. These and other promising technologies will be discussed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Port Hope Are Initiative Port Granby Project - Water Management in Extreme Weather Conditions - 19257

The Port Granby Project is part of the Port Hope Area Initiative (PHAI) through which Canadian Nuclear Laboratory (CNL) is managing long-term historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the urban setting of Port Hope, Ontario. Port Granby remediation scope includes 1) constructing a new, secure long-term waste management facility (LTWMF) and supporting infrastructure, and 2) excavating and relocating LLRW and marginally contaminated soil from the Port Granby Waste Management Facility (PGWMF), which accepted waste until the 1980's, to the newly constructed LTWMF. This paper provides an overview of the challenges of water management (control of storm and groundwater at the LTWMF and PGWMF) on a large-scale construction project with changing and unpredictable weather patterns. Consistent with increased observations of extreme weather events, over two consecutive construction seasons, weather changed from one of the driest on record (high temperatures, dry conditions and strong wind) to one of the wettest on record (short duration high-intensity rainfall that flooded the LTWMF, excavations and on-site PGWMF and LTWMF retention ponds). This paper describes the collaborative approach among Wood (Constructor), AECOM (Engineer of Record), and CNL to adjust to extremes in weather to control dust and excessive water during construction. The summer of 2016, one of the driest summers on record in southern Ontario, was followed by one of the wettest in 2017. In 2016, the project team used water from the uncontaminated on-site storm water ponds, applied a polymer product for dust control across the site to augment water applications, obtained a Permit to Take Water from the provincial government to pump water from Lake Ontario, procured large tanks for storage of Lake Ontario water to meet peak demand, and retained additional water trucks/operators for day to day site operations. In stark contrast, to accommodate heavy rains in 2017 the project team installed ∼6 million liter aboveground storage tanks with secondary containment for contaminated water storage; procured 100+ mobile water storage tanks to supplement the on-site storage, utilized LTWMF cells sumps, excavations and retention ponds to store and manage onsite water; and adjusted additional staff resources (more staff and longer shifts) during anticipated periods of high-intensity rainfall, at times managing water around the clock. Recognizing the need to minimize the release of contaminated soil and water from the construction site at all times, these efforts illustrate the importance of anticipating and reacting to extreme weather events on a more regular basis. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

MODEL 9975 LIFE EXTENSION PACKAGE 1 - FINAL REPORT

Life extension package LE1 (9975-03382) was instrumented and subjected to a temperature/humidity environment that bounds KAMS package storage conditions for 92 weeks. During this time, the maximum fiberboard temperature was {approx}180 F, and was established by a combination of internal heat (12 watts) and external heat ({approx}142 F). The relative humidity external to the package was maintained at 80 %RH. This package was removed from test in November 2010 after several degraded conditions were observed during a periodic examination. These conditions included degraded fiberboard (easily broken, bottom layer stuck to the drum), corrosion of the drum, and separation of the air shield from the upper fiberboard assembly. Several tests and parameters were used to characterize the package components. Results from these tests generally indicate agreement between this full-scale shipping package and small-scale laboratory tests on fiberboard and O-ring samples. These areas of agreement include the rate of fiberboard weight loss, change in fiberboard thermal conductivity, fiberboard compression strength, and O-ring compression set. In addition, this package provides an example of the extent to which moisture within the fiberboard can redistribute in the presence of a temperature gradient such as might be created by a 12 watt internal heat load. Much of the moisture near the fiberboard ID surface migrated towards the OD surface, but there was not a significant axial moisture gradient during most of the test duration. Only during the last inspection period (i.e. after 92 weeks exposure during the second phase) did enough moisture migrate to the bottom fiberboard layers to cause saturation. A side effect of moisture migration is the leaching of soluble compounds from the fiberboard. In particular, the corrosion observed on the drum appears related primarily to the leaching and concentration of chlorides. In most locations, this attack appears to be general corrosion, with shallow attack of the drum surface. The primary areas susceptible to corrosion are weld/heat-affected zones. However, one corrosion location not immediately associated with a weld was tested for, and confirmed as having, throughwall penetration. An increase in the axial gap at the top of the package is also related to the migration of moisture within the fiberboard. As moisture redistributes within the package, a majority of the fiberboard loses moisture (on average) and shrinks axially. In addition, an increased moisture content of the bottom fiberboard layers locally reduces its compression strength, leading to compaction of those layers under the weight of the package internal components. In addition to these moisture-driven phenomena, the fiberboard will shrink due to slow pyrolysis in an elevated temperature/humidity environment. Under the collective influence of these effects, the axial gap in the LE1 package increased from an initial value of 0.58 inch and exceeded the 1 inch (maximum) criterion after approximately 18 weeks conditioning. The axial gap eventually reached 1.86 inches. Despite the degradation seen in several of the package components (drum, fiberboard, shield and O-rings), the package appears to have retained sufficient integrity to meet the functional requirements for storage in KAMS. This demonstrates a degree of robustness in the package design relative to the storage environment.

42 ENGINEERING↗

Southeast Regional CO 2 Utilization and Storage Acceleration Partnership (SECARB-USA): Data Quality Methodology (4.2.1)

SECARB-USA Deliverable 4.2.1 utilizes the outputs from the Needs Assessment (Subtask 2.1) to develop a data quality methodology. Many types of data are needed to evaluate a site for technical and financial viability. Several inventories of data types have been produced (for example NETL, 2010). The objective here is to organize the data types so that the needs met are specified. From this cross index (Table 1 in the Appendix), it will be possible in future tasks to (1) determine, on a site-specific basis, how much of each data type is required at each stage of a project to meet the need, and conversely (2) to further specify and define the data collection methods applied such that the data are tailored to fit that need. Derivative tables can then be developed to semi-quantitively evaluate the extent to which need is critical for early go/no decision points, or if it is more important than average, requiring faster or larger capitalization and spend to meet the need. In an additional step, the current availability of data for a site can be semi-quantitively assessed. From the table of data criticality and the table of data availability, site-specific cost for meeting the data needs can be determined, and allow a pre-permit spend estimated for a portfolio of projects. All of the data needs to evaluate a site are somewhat interconnected. We used criterion (2) above to determine if the data collection design would have to be modified to meet the need; if this was commonly true a linkage was shown. The application of this cross index to sites in the subsequent tasks will demonstrate that the demand for data types varies site-to-site and project-to-project. Examples of factors to be considered are the complexity of the geology, the injection goals such as rate and duration of the injection, and the types of risk and risk tolerance of key stakeholders. In future tasks the team will compare the demand for data with existing data availability. This will, in turn, determine when data needs to be acquired to support project development. For example, in a project area with complex structure, 3-D seismic data may be needed earlier and more urgently than in an area with simple rock body geometries. In some locations, a 3-D seismic survey has already been collected and can be purchased. In other locations the project developer will need to collect these data. For another example, a project near an urban area or near to a park may generate earlier and more substantive public concern than a site that is developed in mined lands. A calculation using the derivative from table 1 will show the different investment needs. Project cost will vary corresponding to data criticality and data availability.

42 ENGINEERING↗

Compaction of Space Mission Wastes

The current solid waste management system employed on the International Space Station (ISS) consists of compaction, storage, and disposal. Wastes such plastic food packaging and trash are compacted manually and wrapped in duct tape footballs by the astronauts. Much of the waste is simply loaded either into the empty Russian Progress vehicle for destruction on reentry or into Shuttle for return to Earth. This manual method is wasteful of crew time and does not transition well to far term missions. Different wastes onboard spacecraft vary considerably in their characteristics and in the appropriate method of management. In advanced life support systems for far term missions, recovery of resources such as water from the wastes becomes important. However waste such as plastic food packaging, which constitutes a large fraction of solid waste (roughly 21% on ISS, more on long duration missions), contains minimal recoverable resource. The appropriate management of plastic waste is waste stabilization and volume minimization rather than resource recovery. This paper describes work that has begun at Ames Research Center on development of a heat melt compactor that can be used on near term and future missions, that can minimize crew interaction, and that can handle wastes with a significant plastic composition. The heat melt compactor takes advantage of the low melting point of plastics to compact plastic materials using a combination of heat and pressure. The US Navy has demonstrated successful development of a similar unit for shipboard application. Ames is building upon the basic approach demonstrated by the Navy to develop an advanced heat melt type compactor for space mission type wastes.

Fisher, John↗

Technical Performance of Refractory Liners for Molten Chloride Salt Thermal Energy Storage Systems

A chloride-based molten-salt system that uses a ternary blend of MgCl2/KCl/NaCl is investigated to provide higher temperature thermal energy storage capability. Despite higher thermal stability, molten chlorides present several unique challenges, including the design of internal refractory-ceramic liners to prevent the corrosion and thermal stress of alloy tank shells. This work discusses issues and potential solutions related to containment of molten chloride salt, specifically the optimization of the refractory material at the molten salt interface (hot face). The down-selected hot face candidate limits permeation of salt through the material and forms a highly stable secondary surface phase in equilibrium with the molten salt. A mortar is created using the corrosion resistant hot face brick. Brick and mortar composite are subjected to mechanical stress/strain analysis, in order to calculate composite material properties and better inform thermomechanical models. The U.S. Department of Energy Generation 3 (DOE Gen3) program seeks to develop higher efficiency CSP plants that can provide cost-competitive, flexible power in the U.S. electric grid. The proposed Gen3 Liquid Pathway CSP plant closely resembles the configuration of current nitrate salt power towers with two-tank storage (Gen2). The differences between Gen2 and Gen3 include the types of compatible materials used in salt storage tank construction. Stainless steel loses strength at Gen3 temperatures, and although nickel superalloys would be capable of withstanding sustained high temperatures, these materials are prohibitively expensive at scale. Uninsulated tank shells also pose a significant risk as common steels are highly susceptible to chemical attack from molten chloride salt. To address these concerns, refractory-ceramic based containment materials are proposed to line the inside of the hot and cold storage tanks. In doing so, stainless or carbon steel shells may be used in construction depending on the level of insulation provided. The composition of the internal liner requires careful consideration to maximize the efficacy of multiple parameters including corrosion resistance, strength at operating temperature, durability, and cost. This is particularly true for the material at the interface with the salt, known as the "hot face", which is responsible for protecting the insulating layers between the tank shell and the hot face brick layer. The molten salt in this system is superheated over 300 °C above its freeze temperature. Therefore, unlike other industrial processes which use refractory-lined vessels, it is not expected that a freeze plane will develop in the hot face. Therefore, the hot face must be designed to withstand chemical corrosion and inhibit permeation of molten salt into the insulating layers. A down selection was performed to identify a hot face candidate best equipped to maintain thermal, mechanical, and chemical integrity when exposed to molten salt over extended periods of time. Long-duration chemical capability experiments were conducted with the down selected hot face refractory fully immersed in molten chloride salt for up to 3000 hours. The average salt penetration does not exceed 100 microns. When extrapolated to 20 and 30 years of continuous exposure, the expected salt penetration depth is approximately 2.0 mm and 2.9 mm, respectively. A magnesium-rich secondary phases develops at the salt/refractory interface. X-ray diffraction identifies the material as forsterite (Mg2SiO4), which is reported to form synthetically in molten chloride salt solutions. These results suggest the selected hot face will adequately inhibit salt permeation. While there is optimism that the hot face brick will inhibit salt permeation, mortar joints are typically the weakest point of a refractory brick liner. From a thermochemical perspective, differing thermal expansion coefficients may result in the mortar and brick to grow independent of each other, creating gaps through which molten salt can penetrate. To address this issue, NREL has developed an in-house mortar composed of the down selected hot face brick that has been shown to be compatible with the salt. Compressive stress/strain analyses have been performed on the brick/ mortar composites to generate stress/strain curves. Modulus of elasticity and Poisson's ratio of the composite may be calculated from the stress/strain curves, in order to provide more representative data to finite element mechanical models for accurate approximation of stress on the tank shell and the amount of thermal expansion expected within the tank liner.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Test Plan to Assess Fire Effects on the Function of an Engineered Surface Barrier

Wildfire is a frequent perturbation in shrub steppe ecosystems, altering the flora, fauna, atmosphere, and soil of these systems. Research on the fire effects has focused mostly on natural ecosystems with essentially no attention on engineered systems like surface barriers. The scope of the project is to use a simulated wildfire to induce changes in an engineered surface barrier and document the effects on barrier performance. The main objective is to quantify the effects of burning and the resulting post-fire conditions on alterations in soil physical properties; hydrologic response, particularly the water balance; geochemical properties; and biological properties. A secondary objective is to use the lessons learned to maximize fire protection in the design of long-term monitoring systems based on electronic sensors. A simulated wildfire will be initiated, controlled and monitored at the 200-BP-1 barrier in collaboration with the Hanford Fire Department during the fall of 2008. The north half of the barrier will be divided into nine 12 x 12 m plots, each of which will be randomly assigned a fuel load of 2 kg m-2 or 4 kg m-2. Each plot will be ignited around the perimeter and flames allowed to carry to the centre. Any remaining unburned vegetation will be manually burned off using a drip torch. Progress of the fire and its effects will be monitored using point measurements of thermal, hydrologic, and biotic variables. Three measures of fire intensity will be used to characterize fire behavior: (1) flame height, (2) the maximum temperature at three vertical profile levels, and (3) total duration of elevated temperature at these levels. Pre-burn plant information, including species diversity, plant height, and canopy diameter will be measured on shrubs from the plots to be burned and from control plots at the McGee ranch. General assessments of shrub survival, recovery, and recruitment will be made after the fire. Near-surface soil samples will be collected pre- and post-burn to determine changes in the gravel content of the surface layer so as to quantify inflationary or deflationary responses to fire and to reveal the ability of the surface to resist post-fire erosive stresses. Measures of bulk density, water repellency, water retention, and hydraulic conductivity will be used to characterize changes in infiltration rates and water storage capacity following the fire. Samples will also be analyzed to quantify geochemical changes including changes in soil pH, cation exchange capacity, specific surface area, and the concentration of macro nutrients (e.g. N, P, K) and other elements such as Na, Mg, Ca, that are critical to the post-fire recovery revegetation. Soil CO2 emissions will be measured monthly for one year following the burn to document post-fire stimulation of carbon turnover and soil biogenic emissions. Surface and subsurface temperature measurements at and near monitoring installations will be used to document fire effects on electronic equipment. The results of this study will be used to bridge the gaps in knowledge on the effects of fire on engineered ecosystems (e.g. surface barriers), particularly the hydrologic and biotic characteristics that govern the water and energy balance. These results will also support the development of practical fire management techniques for barriers that are compatible with wildfire suppression strategies. Furthermore, lessons learned will be use to develop installation strategies needed to protect electronic monitoring equipment from the intense heat of fire and the potential damaging effects of smoke and fire extinguishing agents. Such information is needed to better understand long-term barrier performance under extreme conditions, especially if site maintenance and operational funding is lost for activities such as barrier revegetation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Assessing Electrolyte Fluorination Impact on Calendar Aging of Blended Silicon-Graphite Lithium-Ion Cells Using Potentiostatic Holds

Silicon-based lithium-ion batteries have started to meet cycle life metrics, but they exhibit poor calendar life. Here, electrolyte fluorination impact on calendar fade of blended silicon-graphite anodes is explored using a LiPF 6 in EC:EMC:FEC electrolyte vs LiBOB in EC:EMC electrolyte. We utilize a combined experimental-modeling approach applying potentiostatic voltage holds (V-hold) to evaluate electrolyte suitability for calendar life in a shortened testing timeframe (~2 months). Our theoretical framework deconvolutes the irreversible parasitic capacity losses (lithium lost to the solid electrolyte interphase) from the V-hold electrochemical data. Unfluorinated electrolyte (dominant LiBOB reduction) exhibits higher cell resistance as compared to fluorinated electrolyte (dominant FEC reduction). Both systems have similar irreversible capacities during the voltage hold duration with slower rate of parasitic capacity loss for the LiBOB system. Extrapolation of the parasitic losses to end of life capacity fade of 20% shows LiBOB electrolyte outperforming LiPF 6 electrolyte in calendar life. The results demonstrate the applicability of the V-hold protocol as a rapid material screening tool providing semi-quantitative calendar lifetime estimates.

25 ENERGY STORAGE↗

IMPACTS OF INTERACTING ELEVATED ATMOSPHERIC CO2 AND O3 ON THE STRUCTURE AND FUNCTIONING OF A NORTHERN FOREST ECOSYSTEM: OPERATING AND DECOMMISSIONING THE ASPEN FACE PROJECT

Two of the most important and pervasive greenhouse gases driving global change and impacting forests in the U.S. and around the world are atmospheric CO2 and tropospheric O3. As the only free air, large-scale manipulative experiment studying the interaction of elevated CO2 and O3 on forests, the Aspen FACE experiment was uniquely designed to address the long-term ecosystem level impacts of these two greenhouse gases on aspen-birch-maple forests, which dominate the richly forested Lake States region. The project was established in 1997 to address the overarching scientific question: “What are the effects of elevated [CO2] and [O3], alone and in combination, on the structure and functioning of northern hardwood forest ecosystems?” From 1998 through the middle of the 2009 growing season, we examined the interacting effects of elevated CO2 and O3 on ecosystem processes in an aggrading northern forest ecosystem to compare the responses of early-successional, rapid-growing shade intolerant trembling aspen and paper birch to those of a late successional, slower growing shade tolerant sugar maple. Fumigations with elevated CO2 (560 ppm during daylight hours) and O3 (approximately 1.5 x ambient) were conducted during the growing season from 1998 to 2008, and in 2009 through harvest date. Response variables quantified during the experiment included growth, competitive interactions and stand dynamics, physiological processes, plant nutrient status and uptake, tissue biochemistry, litter quality and decomposition rates, hydrology, soil respiration, microbial community composition and respiration, VOC production, treatment-pest interactions, and treatment-phenology interactions. In 2009, we conducted a detailed harvest of the site. The harvest included detailed sampling of a subset of trees by component (leaves and buds, fine branches, coarse branches and stem, coarse roots, fine roots) and excavation of soil to a depth of 1 m. Throughout the experiment, aspen and birch photosynthesis increased with elevated CO2 and tended to decrease with elevated O3, compared to the control. In contrast to aspen and birch, maple photosynthesis was not enhanced by elevated CO2. Elevated O3 did not cause significant reductions in maximum photosynthesis in birch or maple. In addition, photosynthesis in ozone sensitive clones was affected to a much greater degree than that in ozone tolerant aspen clones. Treatment effects on photosynthesis contributed to CO2 stimulation of aboveground and belowground growth that was species and genotype dependent, with birch and aspen being most responsive and maple being least responsive. The positive effects of elevated CO2 on net primary productivity NPP were sustained through the end of the experiment, but negative effects of elevated O3 on NPP had dissipated during the final three years of treatments. The declining response to O3 over time resulted from the compensatory growth of O3-tolerant genotypes and species as the growth of O3-sensitive individuals declined over time. Cumulative NPP over the entire experiment was 39% greater under elevated CO2 and 10% lower under elevated O3. Enhanced NPP under elevated CO2 was sustained by greater root exploration of soil for growth-limiting N, as well as more rapid rates of litter decomposition and microbial N release during decay. Results from Aspen FACE clearly indicate that plants growing under elevated carbon dioxide, regardless of community type or ozone level, obtained significantly greater amounts of soil N. These results indicate that greater plant growth under elevated carbon dioxide has not led to “progressive N limitation”. If similar forests growing throughout northeastern North America respond in the same manner, then enhanced forest NPP under elevated CO2 may be sustained for a longer duration than previously thought, and the negative effect of elevated O3 may be diminished by compensatory growth of O3-tolerant plants as they begin to dominate forest communities. By the end of the experiment, elevated CO2 increased ecosystem C content by 11%, whereas elevated O3 decreased ecosystem C content by 9%. Total ecosystem C content in the interaction treatment (elevated CO2 and O3) did not significantly differ from that of the control. Total ecosystem C content responded similarly to the treatments across the three forest communities. The treatment effects on ecosystem C content resulted from differences in tree biomass, particularly woody tissues (branches, stem, and coarse roots), and lower C content in the near-surface mineral soil. During its duration, the Aspen FACE project involved collaboration between scientists from 9 countries, and over the course of the experiment there were over 120 Aspen FACE scientific users. These scientists helped produce 75 publications during the most recent funding period (2008-2014) and 207 peer-reviewed publications (169 in refereed journals) since the beginning of the project.

54 ENVIRONMENTAL SCIENCES↗

The Bess-Polar II Long Duration Flight Above Antarctica

The Balloon-borne Experiment with a Superconducting Spectrometer, BESS, has been developed to study elementary particle phenomena in the early universe through measurements of low energy antiprotons to investigate their origin and through a search for antihelium. The BESS collaboration carried out nine northern latitude flights between 1993 and 2002. BESS-Polar is an advanced program of the BESS collaboration to study these topics with much greater precision using long duration flights above Antarctica. The BESS-Polar spectrometer was successfully developed to accumulate much larger numbers of events during long duration flights around the South Pole. Approximately a factor of four reductions in the amount of material in the particle beam enables measurement of much lower energy antiprotons down to 100 MeV (at top of atmosphere). The first BESS-Polar flight (BESS-Polar I) of 8.5 days was carried out above Antarctica in December 2004. recording 900 million cosmic-ray events. The second BESS-Polar flight (BESS-Polar 11) was successfully carried out in the austral summer season of 2007-2008. Based on experience with BESS-Polar I, the spectrometer was improved in performance and achieved long term stability during the flight. A newly constructed magnet with a larger liquid He capacity and improved thermal insulation and an upgraded data storage system with larger capacity of hard disk drives (HDDs) enabled longer observation time. BESS-Polar II was launched on December 22, 2007 from Williams Field, McMurdo Station, in Antarctica. The spectrometer worked properly and observed cosmic rays for about 24.5 days at float altitude, recording 4.6 billion events on the HDDs until the limit of the magnet operation was reached on January 16, 2008. The flight was terminated and the spectrometer was safely landed on the West Antarctic ice sheet (1000 km from the South Pole) on January 21, 2008. Here, the BESS-Polar instrument is discussed, highlighting improvements made for BESS-Polar II, and overviews of the flight and performance are reported.

Sasaki, Makoto↗

Summary of Plutonium-238 Production Alternatives Analysis (Final Report)

The Team implemented a two-phase evaluation process. During the first phase, a wide variety of past and new candidate facilities and processing methods were assessed against the criteria established by DOE for this assessment. Any system or system element selected for consideration as an alternative within the project to reestablish domestic production of Pu-238 must meet the following minimum criteria: Any required source material must be readily available in the United States, without requiring the development of reprocessing technologies or investments in systems to separate material from identified sources. It must be cost, schedule, and risk competitive with existing baseline technology. Any identified facilities required to support the concept must be available to the program for the entire project life cycle (notionally 35 years, unless the concept is so novel as to require a shorter duration). It must present a solution that can generate at least 1.5 Kg of Pu-238 oxide per year, for at least 35 years. It must present a low-risk, near-term solution to the National Aeronautics and Space Administration’s urgent mission need. DOE has implemented this requirement by eliminating from project consideration any alternative with key technologies at less than Technology Readiness Level 5. The Team evaluated the options meeting these criteria using a more detailed assessment of the reasonable facility variations and compared them to the preferred option, which consists of target irradiation at the Advanced Test Reactor (ATR) and the High Flux Isotope Reactor (HFIR), target fabrication and chemical separations processing at the ORNL Radiochemical Engineering Development Center, and neptunium 237 storage at the Materials and Fuels Complex at INL. This preferred option is consistent with the Records of Decision from the earlier National Environmental Policy Act (NEPA) documentation

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

U.S. Department of Energy Free-Air CO 2 Enrichment Experiments: FACE Results, Lessons, and Legacy

In the 1970s, growing concern about potential long-range consequences of carbon dioxide (CO 2 ) emissions from the combustion of fossil fuels prompted the U.S. Department of Energy (DOE) to begin developing a CO 2 research program. The goal was to obtain the scientific information needed to reduce uncertainty and develop a knowledgebase for decision-making. At its start in 1980, this program had three components: the global carbon cycle, climate effects, and vegetation effects. The vegetation effects component recognized that increased atmospheric CO 2 could be a potential benefit to vegetation and crops because CO 2 is an essential resource for plant growth. In addition to increasing crop yield, program developers and researchers recognized that this fertilizer effect could also result in greater storage of fossil fuel CO 2 by forests. Initial experiments were small in scale and scope and focused on the photosynthesis, physiology, and water use of crop plants, but the focus shifted toward responses of plants in natural systems, as needed for connections to the global carbon cycle. Program research investigated CO 2 interactions with other environmental variables, emphasizing field research whenever possible and recognizing that exposure to elevated CO 2 concentrations under realistic field conditions should lead to better predictions of plant response. Whole-ecosystem field experiments were instituted in low-stature ecosystems, but experiments to address forest responses necessarily relied on tree seedlings or saplings in open-top chambers (OTCs) and not within intact forest ecosystems. The need for larger-scale, longer-duration experiments in each of the world’s six major biomes (tundra, boreal forest, temperate forest, tropical forest, grassland, and desert) became clear, and for these experiments, free-air CO 2 exposure facilities were necessary. This report summarizes the objectives and main results of DOE-sponsored experiments employing such facilities, along with the outcomes from research on ecosystem responses using field chambers (see Fig. ES.1, p. x). Additionally, this report highlights the many successes of DOE CO 2 enrichment studies and considers the lessons learned that can be used to guide future initiatives.

54 ENVIRONMENTAL SCIENCES↗

Performance Testing of Yardney Li-Ion Cells and Batteries in Support of Future NASA Missions

NASA requires lightweight rechargeable batteries for future missions to Mars and the outer planets that are capable of operating over a wide range of temperatures, with high specific energy and energy densities. Due to the attractive performance characteristics, Li-ion batteries have been identified as the battery chemistry of choice for a number of future applications. For example, JPL is planning to launch another unmanned rover mission to the planet Mars. This mission, referred to as the Mars Science Laboratory (MSL), will involve the use of a rover that is much larger than the previously developed Spirit and Opportunity Rovers for the 2003 Mars Exploration Rover (MER) mission, that are currently still in operation on the surface of the planet after more than five years. Part of the reason that the MER rovers have operated so successfully, far exceeding the required mission duration of 90 sols, is that they possess robust Li-ion batteries, manufactured by Yardney Technical Products, which have demonstrated excellent life characteristics. Given the excellent performance characteristics displayed, similar Li-ion batteries have been projected to successfully meet the mission requirements of the up-coming MSL mission. In addition to future missions to Mars, Li-ion technology is attractive for a number of other future NASA applications which require high specific energy, rechargeable batteries. To ascertain the viability of using Li-ion batteries for these applications, a number of performance validation tests have been performed on both Yardney cells and batteries of various sizes. These tests include mission simulation tests, charge and discharge rate characterization testing, cycle life testing under various conditions, and storage testing.

Smart, M. C.↗

A Review of Existing Policies Affecting the Jettison of Waste in Low Earth Orbit and Deep Space

The management of waste generated onboard spacecraft during future long-duration deep-space missions will require different solutions from those currently implemented on the International Space Station which consist exclusively of collecting, storing, and returning the waste to Earth. Alternative options for managing spacecraft waste are to process it for recycling and recovery of resources, and to jettison it overboard in a solid form (such as a compacted tile) or in a gaseous form after torrefaction or other trash-to-gas technologies. The waste generated during a deep-space mission is derived mainly from spacecraft logistics supplies, food and beverage residues, personal or scientific items used by the crew, human metabolic waste, and unused spare components. Uncontained and unprocessed trash is a potential health hazard and a habitat volume liability, which makes onboard long-term storage an inefficient and non-optimal option. However, the jettison of solid, processed waste appears to be an effective solution for crewed deep-space missions, leading not only to volume reduction and habitat safening, but also to considerable mass savings in the spacecraft’s propulsion system. However, the disposal of trash overboard also creates a navigation hazard for spacecraft and the potential risk of contamination of planetary bodies, interfering with the search for life. This paper investigates the requirements covered by existing policies that could affect the jettison concept of operations and system design.

Jettison↗