Search NASA⌕ Search

SEARCH · Search NASA

Results for “robust parameter design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

1,064 records · Page 60

Commercial Building Technology Demonstration (Final Scientific/Technical Report)

The background for this project was a unique and innovative concept that had been proposed and demonstrated by enVerid Systems, reducing the energy consumption in HVAC systems in commercial and public buildings by up to 50% at peak loads. The concept involves selective scrubbing of gas contaminants from indoor air as a practical substitute for outside air ventilation, the latter being the conventional practice today. This scrubbing enables recycling of most of the indoor air and significantly decreasing the amount of outside air, resulting in a reduced HVAC load and commensurate energy savings for the facility. Key to our approach is low cost scrubbing of all gas contaminants from indoor air using novel, efficient and regenerable sorbent materials. The total solution, labeled HLR (HVAC Load Reduction) is implemented by means of compact modules that can be retrofitted onto virtually any building, and utilizes novel sorbents that have been developed and brought to scale production by enVerid. Although the technology had been deployed and demonstrated, the US commercial building and HVAC markets, famously conservative with respect to innovation and new technologies, had yet to embrace the idea or the product. The overarching goal of the project was to help overcome market hesitancy and enable widespread adoption, by creating a critical mass of success stories across different regions and building types, all under oversight and verification of the DOE and NREL, to ensure credibility and accuracy. The project, overall, was a resounding success. Several installations were deployed and tested comprehensively for the impact on both energy consumption and indoor air quality, and results were not only excellent, but quantitatively in line with expectations. A total number of eight (8) installations were attempted, with 2 aborted due to building issues. Of the six successful installations, however, complete M&V was performed by NREL on 2 (Miami and NYC) and partial analysis on a third site (ArcBest), and these three, along with their results, were therefore presented from a financial and reporting standpoint. Although the number of case studies fell short of the original target of 10, we nevertheless had excellent demonstrations in vastly different climate zones: Southeast, Northeast and Midwest, and in very different building types. This included a modern high-rise office building in New York City and a University Campus health center in Miami, and a mid-rise high-density office in Arkansas. The cooling load reduction was shown to be significant, averaging 37% during the final cooling season in the Miami site. In the NYC site, the cooling energy savings were generally less, at around 12%, as expected. While this is a lower number for average/total savings, two comments are important to note: (i) the outside airflow (OA) reduction was not consistent during the data collection period, at least in part understating the attainable savings through incorrect measurement of the “high energy” reference state; and (ii) the peak impact in NYC is almost certainly as high as Miami, with critical ramifications for peak load reduction and equipment downsizing ability. Importantly, the measured energy savings in all locations were related to the outdoor climate conditions and the actual achievable reduction in outside air, very much in line with models and calculations; this leaves us with increased confidence in our understanding of the interaction between the technology and the building, and our ability to project the impact of this innovation in the future, through broad adoption. Simply put: the energy savings and load reduction impact of the HLR solution has been confirmed quantitatively. The results also confirmed the air quality objective. This may be even more significant, in that air quality is more complex and harder to measure and quantify, and the performance of the HLR as an air scrubber is the linchpin of the entire solution. In all sites, indoor air quality met or exceeded the required parameters, in terms of achieving the target (low) levels of indoor pollutants. Furthermore, the concentrations of outdoor sourced pollutants were markedly lower, as expected, mostly due to the reduction in outside air intake although in part also due to the scrubbing. The success was not immediate nor easy, and early challenges with the systems, especially (but not only) around controls and communication, caused delays in commissioning and undermined some of our M&V schedules. The good news is no fundamental issues were encountered and the number of such glitches was declining quickly by the end of the project. Other challenges had to do with coordinating the control of the building OA dampers, which the HLR needs to have in order to deliver the load reduction, but which the facility manager controls regularly and independently. This is not necessarily a problem for normal HLR operation but interferes with accurate M&V, where switching OA settings back and forth on a precise timetable is essential for clean data. The project provided valuable experience in retrofitting buildings that had been originally designed to operate with less recirculation and more outside air, and some key learnings related to the cyclical regeneration of the sorbents in the operational environment of the building. Some of these learnings gave already been incorporated into ongoing improvements in the design of the HLR module as well as the software that is used to control its operation. The cost and time of retrofit installations is much better understood; so is the test and balance procedure of the building that determines the available range of outside air reduction, which in turn determines the amount of load reduced. We had also implemented at least one annual cycle of sorbent cartridge replacement in the field, after which we tested the used sorbent to assess the rate of degradation of sorbent potency – an important factor affecting the long-term economics of HLR deployments. A notable shortfall of the project, other than the fact that the number of sites was below target, was that we had not (yet) completed testing to measure and verify (M&V) the winter energy savings. This is primarily due to late start on the NYC sites (Miami does not portend any heating savings associated with reduced outside air), combined with the issues of OA damper control. It is by no means suggested that such savings cannot be captured, only that the M&V with respect to winter in NYC has been incomplete. The value of this project and its interest to the general public are hard to overstate. The case studies created from Miami and especially from NYC have, without a doubt, opened up the interest of the broad HVAC industry to HLR in the past year. Major manufacturer reps have signed up to represent and promote the product, and dozens of top tier engineering consultants have introduced HLR as a base of design in upcoming construction and renovation projects – precisely the overarching goal of this project. These would not have happened without the highly visible installation in NYC and its ultimately satisfied customer. Furthermore, the DOE itself issued a report in late 2017 analyzing hundreds of candidate technologies for reducing energy consumption in HVAC; remarkably, the budding HLR solution ranked among the top 3(!); no doubt, its status as a viable and significant contender on this list is informed by the success of these demonstrations. And furthermore, in the wake of these demos, several major energy utilities, led by ConEdison in NYC, have endorsed the HLR solution and now routinely provide substantial cash rebates for customers choosing to incorporate the HLR in their buildings and reap the benefit of the reduced peak load as well as reduced cumulative energy demand. Last but not least, in January of 2019, as this report was being written, the HLR module won the AHR Expo Innovation Award for Green Buildings and, remarkably, the prestigious and only Product of the Year 2019, being selected by an independent professional panel of judges from AHR and ASHRAE. Given the confirmation of the enormous energy saving potential of HLR in widescale deployment, as well as ancillary but significant benefits in terms of equipment downsizing and indoor air quality, the benefit of this effort to the public speaks for itself. Accelerating adoption of HLR, without dependence on subsidies and driven by the private sector, is well under way. There is still much work to be done in terms of educating the HVAC and construction ecosystems and improving the product’s robustness and simplicity, to further facilitate the adoption of this technology and the capture of its potential value. But the American public will greatly benefit both directly and indirectly in the immediate future and beyond.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Solar Dynamics Observatory Guidance, Navigation, and Control System Overview

The Solar Dynamics Observatory (SDO) was designed and built at the Goddard Space Flight Center, launched from Cape Canaveral on February 11, 2010, and reached its final geosynchronous science orbit on March 16, 2010. The purpose of SDO is to observe the Sun and continuously relay data to a dedicated ground station. SDO remains Sun-pointing throughout most of its mission for the instruments to take measurements of the Sun. The SDO attitude control system (ACS) is a single-fault tolerant design. Its fully redundant attitude sensor complement includes sixteen coarse Sun sensors (CSSs), a digital Sun sensor (DSS), three two-axis inertial reference units (IRUs), and two star trackers (STs). The ACS also makes use of the four guide telescopes included as a part of one of the science instruments. Attitude actuation is performed using four reaction wheels assemblies (RWAs) and eight thrusters, with a single main engine used to provide velocity-change thrust for orbit raising. The attitude control software has five nominal control modes, three wheel-based modes and two thruster-based modes. A wheel-based Safehold running in the attitude control electronics box improves the robustness of the system as a whole. All six modes are designed on the same basic proportional-integral-derivative attitude error structure, with more robust modes setting their integral gains to zero. This paper details the final overall design of the SDO guidance, navigation, and control (GN&C) system and how it was used in practice during SDO launch, commissioning, and nominal operations. This overview will include the ACS control modes, attitude determination and sensor calibration, the high gain antenna (HGA) calibration, and jitter mitigation operation. The Solar Dynamics Observatory mission is part of the NASA Living With a Star program, which seeks to understand the changing Sun and its effects on the Solar System, life, and society. To this end, the SDO spacecraft carries three Sun-observing instruments: Helioseismic and Magnetic Imager (HMI), led by Stanford University; Atmospheric Imaging Assembly (AIA), led by Lockheed Martin Space and Astrophysics Laboratory; and Extreme Ultraviolet Variability Experiment (EVE), led by the University of Colorado. The basic mission is to observe the Sun for a very high percentage of the 5-year mission (10-year goal) with long stretches of uninterrupted observations and with constant, high-data-rate transmission to a dedicated ground station to be located in White Sands, New Mexico. These goals guided the design of the spacecraft bus that will carry and service the three-instrument payload. Overarching design goals for the bus are geosynchronous orbit, near-constant Sun observations with the ability to fly through eclipses, and constant HGA contact with the dedicated ground station. A three-axis stabilized ACS is needed both to point at the Sun accurately and to keep the roll about the Sun vector correctly positioned with respect to the solar north pole. This roll control is especially important for the magnetic field imaging of HM I. The mission requirements have several general impacts on the ACS design. Both the AIA and HMI instruments are very sensitive to the blurring caused by jitter. Each has an image stabilization system (ISS) with some ability to filter out high frequency motion, but below the bandwidth of the ISS the control system must compensate for disturbances within the ACS bandwidth or avoid exciting jitter at higher frequencies. Within the ACS bandwidth, the control requirement imposed by AIA is to place the center of the solar disk no more than 2 arc sec, 3 , from a body-defined target based on one of the GTs that accompany the instrument. This body-defined target, called the science reference boresight (SRB), was determined from the postlaunch orientation of the GTs by averaging the bounding telescope boresights for pitch to get a pitch SRB coordinate, and by averaging the bounding boresights for yaw toet the yaw SRB coordinate. The location of this SRB in the 0.5-deg field-of-view for each GT then becomes the central target for each telescope; one GT is selected for use as the ACS controlling guide telescope (CGT) at any given time. Fine Sun-pointing is effected based on this SRB for all three instruments when the Sun is within the linear range of the CGT. In addition to limiting jitter, HMI science requires averaging several observations, making the instrument sensitive to low frequency motion that induces differential motion between each observation. This requires the spacecraft attitude to be stable about the roll axis to approximately 10 arcsec over a ten-minute period. Instrument calibrations require that the spacecraft point the SRB up to 2.5 degrees in pitch and yaw away from the center of the Sun, placing the Sun outside the field-of-view of the guide telescopes. In such instances, when the GTs cannot provide the definitive target for the ACS, on-board attitude determination combined with ephemeris prediction of the Sun direction must provide the definitive target. EVE is capable of observing the Sun with less dependence on attitude control. However, the ground data processing needs for calibrations result in the most strict attitude knowledge requirements for the mission: [35,70,70] arcsec, 3 , of knowledge with respect to the center of the solar disk. In addition to driving the ACS sensor selection, the knowledge requirements, which have their effect primarily during Inertial mode calibrations, drive the accuracy requirements for the solar ephemeris. The need to achieve and maintain geosynchronous orbit (GEO) drove the need for high-efficiency propulsive systems and appropriate attitude control. The main engine provided high specific impulse for the maneuvers to attain GEO, while the smaller ACS thrusters managed the disturbance torques of the larger engine and provided the capability for much smaller adjustment burns on orbit. SDO s large solar profile means that solar radiation pressure is a large torque disturbance, and the momentum buildup from this disturbance and the GEO altitude drives the ACS to use thrusters to manage vehicle momentum. The demanding data capture budget for the mission, however, requires SDO to avoid frequent thruster maneuvers, while concerns about on-orbit jitter restrict the maximum desired wheel speeds desired from the RWAs. The plan for on-orbit wheel speed and momentum management will be discussed as well as what is now being done in operation after the jitter environment was characterized. The SDO ACS hardware complement is single-fault tolerant. Two main processors carry virtually identical copies of the command and data handling and ACS software, and two identical attitude control electronics (ACE) boxes carry Coldfire processors with contingency ACS software and other hardware interface cards; the ACE structure allows reaction wheels to be commanded by the Sun-pointing Safehold independent of the Mil Std 1553 data bus. The sixteen Adcole CSSs are grouped into primary and backup sets of eight sensors, each set providing the ability to calculate a sun vector. Each set of eight eyes provides full 4 -steradian coverage. The Adcole DSS comprises an optics head and a separate electronics box providing a 1553 data interface. The electronics box is mounted inside the Faraday cage created by the spacecraft bus module. The DSS head with its 32- deg square FOV is mounted on the instrument module with its boresight along the spacecraft X axis, nearly aligned with the Sun during observations. Adcole has designed the DSS calibration parameters so that the accuracy is 0.24 arcminutes within 10 deg of the boresight, and diminishes to 3 arcminutes as the Sun moves towards the edges of its FOV . This DSS calibration scheme provides higher accuracy attitude determination over the range of the instrument calibration maneuvers.

Morgenstern, Wendy M.↗