Search NASA⌕ Search

SEARCH · Search NASA

Results for “source term estimation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,081 records · Page 60

Optimal Model-Based Fault Estimation and Correction for Particle Accelerators and Industrial Plants Using Combined Support Vector Machines and First Principles Models

Timely estimation of deviations from optimal performance in complex systems and the ability to identify corrective measures in response to the estimated parameter deviations has been the subject of extensive research over the past four decades. The implications in terms of lost revenue from costly industrial processes, operation of large-scale public works projects and the volume of the published literature on this topic clearly indicates the significance of the problem. Applications range from manufacturing industries (integrated circuits, automotive, etc.), to large-scale chemical plants, pharmaceutical production, power distribution grids, and avionics. In this project we investigated a new framework for building parsimonious models that are suited for diagnosis and fault estimation of complex technical systems. We used Support Vector Machines (SVMs) to model potentially time-varying parameters of a First-Principles (FP) description of the process. The combined SVM & FP model was built (i.e. model parameters were trained) using constrained optimization techniques. We used the trained models to estimate faults affecting simulated beam lifetime. In the case where a large number of process inputs are required for model-based fault estimation, the proposed framework performs an optimal nonlinear principal component analysis of the large-scale input space, and creates a lower dimension feature space in which fault estimation results can be effectively presented to the operation personnel. To fulfill the main technical objectives of the Phase I research, our Phase I efforts have focused on: (1) SVM Training in a Combined Model Structure - We developed the software for the constrained training of the SVMs in a combined model structure, and successfully modeled the parameters of a first-principles model for beam lifetime with support vectors. (2) Higher-order Fidelity of the Combined Model - We used constrained training to ensure that the output of the SVM (i.e. the parameters of the beam lifetime model) are physically meaningful. (3) Numerical Efficiency of the Training - We investigated the numerical efficiency of the SVM training. More specifically, for the primal formulation of the training, we have developed a problem formulation that avoids the linear increase in the number of the constraints as a function of the number of data points. (4) Flexibility of Software Architecture - The software framework for the training of the support vector machines was designed to enable experimentation with different solvers. We experimented with two commonly used nonlinear solvers for our simulations. The primary application of interest for this project has been the sustained optimal operation of particle accelerators at the Stanford Linear Accelerator Center (SLAC). Particle storage rings are used for a variety of applications ranging from 'colliding beam' systems for high-energy physics research to highly collimated x-ray generators for synchrotron radiation science. Linear accelerators are also used for collider research such as International Linear Collider (ILC), as well as for free electron lasers, such as the Linear Coherent Light Source (LCLS) at SLAC. One common theme in the operation of storage rings and linear accelerators is the need to precisely control the particle beams over long periods of time with minimum beam loss and stable, yet challenging, beam parameters. We strongly believe that beyond applications in particle accelerators, the high fidelity and cost benefits of a combined model-based fault estimation/correction system will attract customers from a wide variety of commercial and scientific industries. Even though the acquisition of Pavilion Technologies, Inc. by Rockwell Automation Inc. in 2007 has altered the small business status of the Pavilion and it no longer qualifies for a Phase II funding, our findings in the course of the Phase I research have convinced us that further research will render a workable model-based fault estimation and correction for particle accelerators and industrial plants feasible.

43 PARTICLE ACCELERATORS↗

Development of A High Performance Cold Climate Heat Pump

The primary goals of the proposed project were to develop, test, and evaluate a high performance and cost-effective vapor compression air-source heat pump for use in cold climate regions. Vapor compression heat pumps are a proven technology, and have been used for many years to meet heating requirements for buildings in residential, commercial, and industrial applications. However, in climate regions that experience very low outdoor ambient temperatures both the heating capacity and coefficient of performance (COP) of traditional air-source vapor compression heat pumps drops dramatically with a decrease in the outdoor air temperature. The efficiency of heat pumping equipment has improved substantially over the past 20 years; however, the efficiencies of the highest rated equipment on the market are approaching practical limits that cannot be surpassed without modifications to the basic cycle and possibly the use of additional hardware. In this report, three technologies to improve the efficiency of vapor compression systems are described. These are a) vapor injected compression, b) oil flooded compression and c) hybrid flow control of the evaporator. Compressor prototypes for both, oil flooded and vapor injected compression were developed by Emerson Climate Technologies. For the oil flooded compressor, the oil injection port location was optimized and an internal oil separator was added using several design iterations. After initial testing at Emerson Climate Technologies, further testing was done at Purdue University, and compressor models were developed. These models were then integrated into a system model to determine the achievable improvement of seasonal energy efficiency (SEER) for Minneapolis (Minnesota) climate. For the oil flooded compression, a 34% improvement in seasonal energy efficiency was found while a 21% improvement in seasonal energy efficiency ratio was found for the vapor injected compression. It was found that one benefit of both tested compression technologies is a lower discharge temperature, which allows for continued operation at lower ambient temperatures. A bin analysis of the vapor injected prototype cold climate heat pump predicts a 6% improvement in HSPF for Minneapolis. This improvement is mainly a result of the increased capacity of the system for active vapor injection. For the oil flooded system, a slightly larger performance improvement is predicted, in this case mostly caused by an increase in heating COP. Based on an economic analysis of these results, the maximum additional cost of the system changes, for the Minneapolis location, are $\$430$ for the vapor injected system and $\$391$ for the oil flooded system. These estimates assume that a 3-year simple payback period is accepted by the customer. For the hybrid flow control of evaporators, a new type of balancing valve was developed together with Emerson Climate technologies to reduce the cost of the control scheme. In contrast to conventional stepper motor valves, this valve requires less cables and can be driven by a cheaper output circuit on the control board. The correct valve size was determined in a dedicated test stand in several design iterations. The performance benefits of the hybrid control of the evaporator coil were determined for clean coil conditions as well as with partial blockage of the air inlet grille and under frosting conditions. For clean coil conditions, the benefits in terms of COP and capacity are negligible. However, significant benefits were noted for severely air-maldistributed operating conditions. For the H2-test, the maximum COP improvement of 17% along with a capacity improvement of nearly 40% was observed. Overall, the hybrid control scheme leads to a significant amount of performance improvement, if the air inlet conditions to the evaporator are maldistributed.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Brief Review of the Application of 14C in Terrestrial Carbon Cycle Studies

An over-arching goal of the DOE TCP program is to understand the mechanistic controls over the fate, transport, and residence time of carbon in the terrestrial biosphere. Many of the modern process and modeling studies focus on seasonal to interannual variability. However, much of the carbon on the landscape and in soils is in separate reservoirs with turnover times that are multi-decadal to millennial. It is the controls on these longer term pools or reservoirs that is a critical unknown in the face of rising GHGs and climate change and uncertainties of the terrestrial biosphere as a future global sink or source of atmospheric CO{sub 2} [eg., Friedlingstein et al., 2006; Govindasamy et al., 2005; Thompson et al., 2004]. Radiocarbon measurements, in combination with other data, can provide insight into, and constraints on, terrestrial carbon cycling. Radiocarbon (t{sub 1/2} 5730yrs) is produced naturally in the stratosphere when secondary neutrons generated by cosmic rays collide with {sup 14}N atoms [Libby 1946; Arnold and Libby, 1949]. Upon formation, {sup 14}C is rapidly oxidized to CO and then to CO{sub 2}, and is incorporated into the carbon cycle. Due to anthropogenic activities, the amount of {sup 14}C in the atmosphere doubled in the mid/late 1950s and early 1960s from its preindustrial value of {sup 14}C/{sup 12}C ratio of 1.18 x 10{sup -12} [eg., Nydal and Lovseth, 1983]. Following the atmospheric weapons test ban in 1963, the {sup 14}C/{sup 12}C ratio, has decreased due to the net isotopic exchange between the ocean and terrestrial biosphere [eg., Levin and Hessheimer, 2000] and a dilution effect due to the burning of {sup 14}C-free fossil fuel carbon, the 'Suess Effect' [Suess, 1955]. In the carbon cycle literature, radiocarbon measurements are generally reported as {Delta}{sup 14}C, which includes a correction for mass dependent fractionation [Stuiver and Polach, 1977]. In the context of carbon cycle studies radiocarbon measurements can be used to determine the 'age' and rate of change of carbon stocks or as a biogeochemical tracer to elucidate processes and pathways. It is this dual nature that can be exploited across scales in space (individual plant, plot or research site, ecosystem, regional, and global) and time (days to millennia). For example, across regional scales, {Delta}{sup 14}C measurements of atmosphere CO{sub 2} can be used to attribute carbon dioxide to sources (e.g., respiration vs. fossil fuel emissions) or sinks ( e.g,. photosynthesis), which cannot be readily inferred from concentration, net flux measurements, or {delta}{sup 13}CO{sub 2} [eg. Graven et al., 2009; Levin and Hessheimer, 2000; Turnbull et al., 2007]. At smaller scales, similar analyses can be used to elucidate the source, and 'age' of the below ground component undergoing heterotrophic respiration. Net (biome or ecosystem) uptake of carbon is the difference of two large fluxes: photosynthesis and respiration. Carbon fixation by photosynthesis is, to a large extent, a single process with theoretical underpinnings. On the other-hand, net ecosystem or biome respiration integrates microbial (heterotrophic) and plant (autotrophic) respiration. Eddy covariance methods can be used to estimate bulk CO{sub 2} fluxes but they cannot discriminate the process nor the source of the respired CO{sub 2}. It is these processes that are parameterized in predictive models and contribute to the uncertainty in the climate forcing effect of the carbon cycle in the future [Friedlingstein et al., 2006; Heimann and Reichstein, 2008].

54 ENVIRONMENTAL SCIENCES↗

WISP: Watching grid Infrastructure Stealthily through Proxies (Final Technical Report)

The complex interdependencies of cyber systems (sensors and communications), physical grids and associated electricity market operations make protecting electric power grids a significant challenge. The energy sector is constantly under new, targeted, advanced and dangerous cyber-attacks that have the potential to result in the loss of human life. These threats are further exacerbated by our need to modernize the grid. One focus of cyber security research in smart grids is the securing of the SCADA system through advanced intrusion detection systems (IDS) and bad data detection algorithms in state estimation. These methods either require full knowledge of the system topology and parameters or fail to understand the physical behaviors under attack. WISP (Watching grid Infrastructure Stealthily through Proxies) is designed to provide additional protection to the power grid using only publicly available data. In particular, WISP exploits the spatio-temporal nature of the real time locational marginal prices (LMPs), in conjunction with other information such as bids, weather, outages and load data to analyze anomalous power pricing behaviors and then correlate those observations to localize regions of interest and identify potential cyber events. WISP is non-intrusive as the tool is deployed as a service in the Cloud or on premise and provides reliable information to system operators for enhanced situational awareness, without impeding energy delivery functions. The WISP technology comprises three modules: the data-driven anomaly detection core, the vulnerability and risk analysis and the root cause analysis. The data-driven anomaly detection core performs the tasks of feature selection, anomaly detection and attack region localization. The vulnerability and risk analysis module provides system level information of the vulnerable variables and times, assisting the operators in selecting monitoring and protection nodes. The root cause analysis module takes the detection results and identifies potential operational conditions that contribute to the detected anomalies. In Phase I, we have demonstrated the feasibility and effectiveness of WISP. We developed a realistic electricity market simulator capable of generating normal and attack market data under various operational conditions. We developed a series of cyber-attack detection and analysis algorithms and evaluated them under multiple data sources. Finally, we integrated all modules into an end-to-end software, providing functions for data management, data analytics and visualization. Specifically, we have achieved: (i) real-time data acceptance from external utility interfaces with >99% acceptance rate; (ii) high performance anomaly detection algorithms with >98% detection accuracy and <0.1% false alarm rate; and (iii) ultra-low computing delay <50 milliseconds. Additionally, our team developed algorithms to identify the vulnerable variables in electricity market operations and root cause analysis functions to identify major contributors to the price spikes. These ancillary modules are necessary when deploying WISP in real world industry environment. In Phase II, we have demonstrated the effectiveness of WISP software on realistic largescale power systems. We performed red team testing for the Phase I WISP software and identified software vulnerabilities and implemented corresponding mitigation solutions. We adapted the electricity market simulator for the Texas synthetic 2000-bus system and generated datasets for the false data injection attacks. We created database and visualization interfaces for the Texas system and the ISO New England system. We performed software optimization in terms of operation efficiency, computing speed and detection accuracy. Finally, we tested the software on the Texas system and the ISO New England system and evaluated the detection performance. Overall, we achieved above 89% detection rate, below 3% false alarm rate and below 37 seconds of end-to-end detection delay.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Analysis of Drought Impacts on Electricity Production in the Western and Texas Interconnections of the United States

Electricity generation relies heavily on water resources and their availability. To examine the interdependence of energy and water in the electricity context, the impacts of a severe drought to assess the risk posed by drought to electricity generation within the western and Texas interconnections has been examined. The historical drought patterns in the western United States were analyzed, and the risk posed by drought to electricity generation within the region was evaluated. The results of this effort will be used to develop scenarios for medium- and long-term transmission modeling and planning efforts by the Western Electricity Coordination Council (WECC) and the Electric Reliability Council of Texas (ERCOT). The study was performed in response to a request developed by the Western Governors Association in conjunction with the transmission modeling teams at the participating interconnections. It is part of a U.S. Department of Energy-sponsored, national laboratory-led research effort to develop tools related to the interdependency of energy and water as part of a larger interconnection-wide transmission planning project funded under the American Recovery and Reinvestment Act. This study accomplished three main objectives. It provided a thorough literature review of recent studies of drought and the potential implications for electricity generation. It analyzed historical drought patterns in the western United States and used the results to develop three design drought scenarios. Finally, it quantified the risk to electricity generation for each of eight basins for each of the three drought scenarios and considered the implications for transmission planning. Literature on drought impacts on electricity generation describes a number of examples where hydroelectric generation capacity has been limited because of drought but only a few examples of impact on thermoelectric generation. In all documented cases, shortfalls of generation were met by purchasing power from the market, albeit at higher prices. However, sufficient excess generation and transmission must be available for this strategy to work. Although power purchase was the most commonly discussed drought mitigation strategy, a total of 12 response strategies were identified in the literature, falling into four main categories: electricity supply, electricity demand response, alternative water supplies, and water demand response. Three hydrological drought scenarios were developed based on a literature review and historical data analysis. The literature review helped to identify key drought parameters and data on drought frequency and severity. Historical hydrological drought data were analyzed for the western United States to identify potential drought correlations and estimate drought parameters. The first scenario was a West-wide drought occurring in 1977; it represented a severe drought in five of the eight basins in the study area. A second drought scenario was artificially defined by selecting the conditions from the 10th-percentile drought year for each individual basin; this drought was defined in this way to allow more consistent analysis of risk to electricity generation in each basin. The final scenario was based upon the current low-flow hydro modeling scenario defined by WECC, which uses conditions from the year 2001. These scenarios were then used to quantify the risk to electricity generation in each basin. The risk calculations represent a first-order estimate of the maximum amount of electricity generation that might be lost from both hydroelectric and thermoelectric sources under a worst-case scenario. Even with the conservative methodology used, the majority of basins showed a limited amount of risk under most scenarios. The level of risk in these basins is likely to be amenable to mitigation by known strategies, combined with existing reserve generation and transmission capacity. However, the risks to the Pacific Northwest and Texas Basins require further study. The Pacific Northwest is vulnerable because of its heavy reliance on hydroelectric generation. Texas, conversely, is vulnerable because of its heavy dependence on thermoelectric generation, which relies on surface water for cooling, along with the fact that this basin seems to experience more severe drought events on average. Further modeling analysis will be performed in conjunction with the modeling teams at the participating interconnections (WECC and ERCOT) to explore the transmission implications of the drought scenarios in more detail. Given the first-order nature of this analysis, more detailed study of the potential impacts of drought on electricity generation is recommended. Future analyses should attempt to model the potential impacts of drought at the power-plant level, including potential mitigation strategies; include the effects of drought duration; understand the impacts of climate change; and consider economic impacts.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Non-Fouling, Low Cost Electrolytic Coagulation & Disinfection for Treating Flowback and Produced Water for Reuse

Executive Summary This Final Report is composed of two major sections. The first section presents experimental results obtained in the laboratory during Budget Period 1. The second section presents results from the field test conducted during Budget Period 2. Laboratory Results This research investigated a novel electrochemical process for producing a ferric iron coagulant for use in treating flowback and produced water from hydraulic fracturing and oil production operations. The treatment system improves the effectiveness and lowers the cost of coagulation processes using Fe3+ as the coagulant. The electrolytic coagulant generation (ECG) system uses an electrochemical cell to produce acid and base from oilfield brine solutions. The acid is used to dissolve scrap iron to provide a Fe3+ coagulating agent. The base is used to neutralize the treated water. Compared to conventional electrocoagulation (EC), the main advantage of the ECG system is an order of magnitude lower cost for the source of iron. The second advantage over conventional EC is that it can deliver Fe3+ doses greater than 1 mM, since it is not limited by the amount of dissolved oxygen in the water required to oxidize ferrous to ferric iron. The capital costs for conventional EC and the ECG system are similar, but the operational costs for the ECG system are an order of magnitude lower than conventional EC. The combined costs for iron and electrical energy for treating 1 m3 of FPW with 1 mM Fe3+ is estimated to be $0.87 for conventional EC, and $0.087 for the ECG system. The estimated all-in cost for treating FPW with a 2 mM Fe3+ dose is $0.73/m3 ($0.12/bbl). Field Test Results The field test was conducted at the Paul Foster Central Tank Battery (CTB) in Lea County, New Mexico from November 10, 2022 through December 15, 2022. The feed water to the system was produced water from the Tatanka 1H formation. After approximately two weeks of testing, the initial batch of produced water had been treated and no untreated produced water was available. Thus, after this time, the feed water to the system consisted of previously treated water (i.e., recycled water). The recycled water had nearly all colloidal particles removed, and had a much lower alkalinity due to precipitation of carbonate minerals during the first pass through the system. Although the recycled water was not an ideal test solution due to its low particulate concentrations, its lower alkalinity did allow us to identify the main problem with the treatment system. The main problem with the treatment system was caused by the high alkalinity of the initial feed water (5.4 meq/L) that consumed a significant fraction of the electrochemically generated acid. This resulted in pH values exiting the iron contact tank that were too high to dissolve enough iron to effectively treat the produced water. Tests performed with recycled water with lower alkalinity did not have this issue, and dissolved iron concentrations greater than 20 mM could be achieved. One consistent observation was that effluent water from the iron contact tank was always free of particulates, even when fed with circumneutral solutions. This suggests that there is no need to dissolve high concentrations of iron if all the water to be treated is passed through the scrap iron canister. In this case, dissolved O2 and hypochlorous acid can promote sufficient iron corrosion to provide an effective coagulating agent – even in neutral pH water. This solves the problem resulting from highly alkaline produced water. Modifications to the design of the treatment system were made based on the field test results. These modifications will add minimal additional cost, and were tested in bench-scale laboratory experiments. In short-term testing, the modified treatment process was able to remove colloidal FeS particulates to levels below detection. Long-term, steady state testing will be required to determine whether the modified process is suitable for commercial treatment systems.

54 ENVIRONMENTAL SCIENCES↗

Uranium from Seawater Cost Analysis: Recent Updates

While it is not meant to be a direct competitor with conventionally mined uranium, seawater uranium has significant potential to sway policy makers and the public toward the long term viability of nuclear power. Given the large mass of uranium contained within the ocean and its continual replenishment by freshwater run-off and the ocean floor, seawater uranium can be considered for all practical purposes a renewable resource. In addition to this assurance of supply security placing nuclear power on equal footing with other renewable energy generation technologies, seawater uranium removes a key uncertainty by establishing a cost ceiling on uranium based fuels. Given the evolving nature of this technology, this paper aims to provide an update of the economic model to reflect recent progress. This analysis will reference a passive collection system currently under development by Oak Ridge and Pacific Northwest National Labs. This system consists of a polymer modified to contain amidoxime functional groups, a ligand with high uranium affinity. The adsorbing material is then braided into long segments so it may be moored to the bottom of the ocean where it passively collects uranium for a period on the order of weeks to months. Upon completion of its soaking campaign adsorbent is winched to the surface by work boats so the uranium may be eluted off the braids. After a chemical rinse the braids may then be redeployed for another soaking campaign and uranium elution. The adsorbent can be redeployed as many times as is economically feasible, which is a function of the degradation the material suffers upon each reuse. Noteworthy experimental progress has tightened the gap separating estimates of the optimistic and pessimistic case uranium production cost relative to the most recent analysis. It has been demonstrated before that significant uncertainty in adsorbent performance, and thus recovery cost, arises primarily from variability in adsorbent degradation upon reuse and the effects of marine biofouling on uptake. While the underlying recovery mechanism remains, significant changes have been made regarding the method of adsorbent synthesis, propagating to improvements in adsorbent durability. Additionally, further experimentation regarding the area of marine biofouling has tightened the range of expected adsorbent performance when placed in true marine conditions.

07 ISOTOPE AND RADIATION SOURCES↗

Can a Nuclear-Assisted Biofuels System Enable Liquid Biofuels as the Economic Low-carbon Replacement for All Liquid Fossil Fuels and Hydrocarbon Feedstocks and Enable Negative Carbon Emissions?

This report integrates the results of a series of studies and workshops to address the question: Can a nuclear-assisted biofuels system enable liquid biofuels as the economic low-carbon replacement for all liquid fossil fuels and hydrocarbon feedstocks and simultaneously enable negative carbon emissions? “Economic” is defined as economically competitive relative to other low-carbon replacement options for crude oil. “All” refers to the capability to replace the 18 million barrels of oil per day used by the United States. “Nuclear-assisted” refers to the provision of massive quantities of low-carbon heat and hydrogen at the refinery to fully utilize the carbon content of the cellulosic biomass feedstocks for liquid hydrocarbon production. A system is proposed that decarbonizes about half of the U.S. economy while improving long-term soil productivity and sequestering carbon from the atmosphere. In the U.S. almost half the energy consumed by the final customer is in the form of liquid hydrocarbons produced from crude oil. Liquid hydrocarbons are used as (1) an energy source, (2) a method for daily-to-seasonal energy storage, (3) a chemical feedstock, (4) a chemical reducing agent, (5) a method to enhance high-temperature heat transfer in many furnaces and industrial processes and (6) other purposes. As a consequence, the U.S. consumes ~18 million barrels of crude oil per day to produce liquid hydrocarbons. While there are substitutes for liquid hydrocarbons for some applications, our assessment is that the costs and difficulty will dramatically increase if liquid hydrocarbon use goes much below the equivalent of 10 million barrels per day of crude oil. New uses of liquid hydrocarbons to partly replace coal and natural gas could increase demand beyond the equivalent of 10 million barrels of oil per day. One can produce and burn liquid hydrocarbons from biomass without any net addition of carbon dioxide to the atmosphere. Plants grow by removing carbon dioxide from the atmosphere; thus, burning biomass does not result in any net addition of carbon dioxide to the atmosphere. Biomass is typically 40% oxygen. To remove this oxygen to create hydrocarbon liquids, there are two options. The first option is to use biomass as (1) a feedstock, (2) an energy source to operate the process and (3) a supply of carbon to remove the biomass oxygen as carbon dioxide. The second option is to use external heat and hydrogen to remove the oxygen as water and produce liquid hydrocarbons. The use of massive quantities of external heat and hydrogen for hydrocarbon liquid fuels production reduces the biomass feedstock per unit of liquid hydrocarbon product by more than a factor of two reducing land use by more than a factor of two. Many cellulosic feedstocks unsuitable for liquid hydrocarbon production are viable feedstocks with external heat and hydrogen inputs. As a result, there is sufficient cellulosic feedstocks to meet U.S. and global liquid fuels hydrocarbon demand without significant impacts on food and fiber prices. The heat and hydrogen (heat plus electricity) are produced using base-load nuclear power plants—the most economic form of nuclear energy. If low-price natural gas, there is also the option of producing hydrogen from natural gas with sequestration of the carbon dioxide. The biomass is locally processed in depots to produce commodity feedstocks that can be shipped long distances to large biorefineries (250,000 barrels per day, oil equivalent) similar to existing refineries except modifications of front-end processes. The depot system enables local recycle of nutrients back to the soil. The biorefinery can produce variable quantities of liquid hydrocarbon fuels and carbon dioxide for sequestration enabling removal of carbon dioxide from the atmosphere. Preliminary estimates are that the liquid hydrocarbon costs are equivalent to crude oil at between $60 and $70 per barrel. The largest cost is for hydrogen with biomass feedstocks and refinery costs a smaller fraction of the total cost.

09 BIOMASS FUELS↗

Life Cycle Water Consumption and Water Resource Assessment for Utility-Scale Geothermal Systems: An In-Depth Analysis of Historical and Forthcoming EGS Projects

This report is the third in a series of reports sponsored by the U.S. Department of Energy Geothermal Technologies Program in which a range of water-related issues surrounding geothermal power production are evaluated. The first report made an initial attempt at quantifying the life cycle fresh water requirements of geothermal power-generating systems and explored operational and environmental concerns related to the geochemical composition of geothermal fluids. The initial analysis of life cycle fresh water consumption of geothermal power-generating systems identified that operational water requirements consumed the vast majority of water across the life cycle. However, it relied upon limited operational water consumption data and did not account for belowground operational losses for enhanced geothermal systems (EGSs). A second report presented an initial assessment of fresh water demand for future growth in utility-scale geothermal power generation. The current analysis builds upon this work to improve life cycle fresh water consumption estimates and incorporates regional water availability into the resource assessment to improve the identification of areas where future growth in geothermal electricity generation may encounter water challenges. This report is divided into nine chapters. Chapter 1 gives the background of the project and its purpose, which is to assess the water consumption of geothermal technologies and identify areas where water availability may present a challenge to utility-scale geothermal development. Water consumption refers to the water that is withdrawn from a resource such as a river, lake, or nongeothermal aquifer that is not returned to that resource. The geothermal electricity generation technologies evaluated in this study include conventional hydrothermal flash and binary systems, as well as EGSs that rely on engineering a productive reservoir where heat exists, but where water availability or permeability may be limited. Chapter 2 describes the approach and methods for this work and identifies the four power plant scenarios evaluated: a 20-MW EGS binary plant, a 50-MW EGS binary plant, a 10-MW hydrothermal binary plant, and a 50-MW hydrothermal flash plant. The methods focus on (1) the collection of data to improve estimation of EGS stimulation volumes, aboveground operational consumption for all geothermal technologies, and belowground operational consumption for EGS; and (2) the mapping of the geothermal and water resources of the western United States to assist in the identification of potential water challenges to geothermal growth. Chapters 3 and 4 present the water requirements for the power plant life cycle. Chapter 3 presents the results of the current data collection effort, and Chapter 4 presents the normalized volume of fresh water consumed at each life cycle stage per lifetime energy output for the power plant scenarios evaluated. Over the life cycle of a geothermal power plant, from construction through 30 years of operation, the majority of water is consumed by plant operations. For the EGS binary scenarios, where dry cooling was assumed, belowground operational water loss is the greatest contributor depending upon the physical and operational conditions of the reservoir. Total life cycle water consumption requirements for air-cooled EGS binary scenarios vary between 0.22 and 1.85 gal/kWh, depending upon the extent of belowground operational water consumption. The air-cooled hydrothermal binary and flash plants experience far less fresh water consumption over the life cycle, at 0.04 gal/kWh. Fresh water requirements associated with air- cooled binary operations are primarily from aboveground water needs, including dust control, maintenance, and domestic use. Although wet-cooled hydrothermal flash systems require water for cooling, these plants generally rely upon the geofluid, fluid from the geothermal reservoir, which typically has high salinity and total dissolved solids concentration and is much warmer than normal groundwater sources, for their cooling water needs; thus, while there is considerable geofluid loss at 2.7 gal/kWh, fresh water consumption during operations is similar to that of aircooled binary systems. Chapter 5 presents the assessment of water demand for future growth in deployment of utility-scale geothermal power generation. The approach combines the life cycle analysis of geothermal water consumption with a geothermal supply curve according to resource type, levelized cost of electricity (LCOE), and potential growth scenarios. A total of 17 growth scenarios were evaluated. In general, the scenarios that assumed lower costs for EGSs as a result of learning and technological improvements resulted in greater geothermal potential, but also significantly greater water demand due to the higher water consumption by EGSs. It was shown, however, that this effect could be largely mitigated if nonpotable water sources were used for belowground operational water demands. The geographical areas that showed the highest water demand for most growth scenarios were southern and northern California, as well as most of Nevada. In addition to water demand by geothermal power production, Chapter 5 includes data on water availability for geothermal development areas. A qualitative analysis is included that identifies some of the basins where the limited availability of water is most likely to affect the development of geothermal resources. The data indicate that water availability is fairly limited, especially under drought conditions, in most of the areas with significant near- and medium-term geothermal potential. Southern California was found to have the greatest potential for water-related challenges with its combination of high geothermal potential and limited water availability. The results of this work are summarized in Chapter 6. Overall, this work highlights the importance of utilizing dry cooling systems for binary and EGS systems and minimizing fresh water consumption throughout the life cycle of geothermal power development. The large resource base for EGSs represents a major opportunity for the geothermal industry; however, depending upon geology, these systems can require large quantities of makeup water due to belowground reservoir losses. Identifying potential sources of compatible degraded or low-quality water for use for makeup injection for EGS and flash systems represents an important opportunity to reduce the impacts of geothermal development on fresh water resources. The importance of identifying alternative water sources for geothermal systems is heightened by the fact that a large fraction of the geothermal resource is located in areas already experiencing water stress. Chapter 7 is a glossary of the technical terms used in the report, and Chapters 8 and 9 provide references and a bibliography, respectively.

15 GEOTHERMAL ENERGY↗

Operator Action Time Evaluation of Emergency Water Injection Strategy for Extreme SGTR Accidents

In terms of severe accidents caused by earthquakes or tsunamis that are beyond expectation, a special safety inspection for operating plants, following the Fukushima accident, has been conducted by the government of Korea to verify that nation's nuclear power plants have been adequately designed to respond to extreme accidents. The inspection results show that Korean nuclear power plants in operation have no imminent risk for an expected maximum potential earthquake or coastal flooding based on the up-to-date investigation. However, there is a need to implement long- and short-term safety improvements in order to secure the level of safety for natural beyond-design-basis events. One of the measures to increase the mitigation capability during extreme accidents is installing the injection flow paths to provide emergency cooling water of extemal sources using fire engines to the steam generators (SGs) or reactor cooling system (RCS). An emergency cooling water system consists of a fixed pipe connected from the RCS or SGs to the outside of the containment. A standby valve is installed on the pipe. Following the occurrence of an extreme accident, movable equipment (for example, a fire truck hose) can be connected to the pipe hole at the opening of the isolation valve. The emergency cooling water injection strategy was not taken into account for the steam generator tube rupture (SGTR) accident management strategy of the OPR-1000. Therefore, it is necessary to develop some guidelines or strategies to cope with an extreme SGTR scenarios using the newly installed injection flow paths and fire engines. As long as the fission products released from the core during severe accidents are kept inside the containment, there may be several ways to reduce the radionuclide release into the environment, for example, by using plant safety features. The containment bypass sequences, however, allow the fission products to be released into the environment or directly to the auxiliary building. The SGTR accidents, which are one of the containment bypass sequences, have shown during various probabilistic safety assessments (PSAs) to be contributors to plant risk, mainly because of their potential for causing a release outside containment. This paper is intended to be an investigation of the characteristics of accident progressions and assessments for the mitigative effectiveness of the external cooling water injection strategies during extreme SGTR accidents in a typical OPR-1000 plant. Analyses were performed using a MAAP computer code version 5.03. The MAAP code is a system-level computer code capable of conducting integral analyses of potential severe accident progressions in nuclear power plants, whose main purpose is to support a level 2 PSA or severe accident management strategy developments.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Self-Navigating Robotic Assistant for Long-term Wide Area Floor Contamination Monitoring - 18213

For Routine Contamination Testing (RCT) of an operational nuclear facility or one undergoing Decontamination and Decommissioning (D and D), workers utilize specified travel corridors (enclosed hallways or areas designated with tape or rope in open spaces) to minimize the risk of spreading contamination. Radiation health technicians must continually monitor these areas for contamination to minimize worker dose and prevent its spread to uncontrolled areas. For many sites, it is impractical for the technician to adequately survey such areas. The Nuclear Robotics Group (NRG) at UT Austin has developed a self-navigating robotic platform equipped with radiation detectors to augment the technician to improve both survey coverage and frequency. While maintaining a controlled velocity and floor-to-sensor distance, the system takes radiation measurements to identify and/or localize contamination sources. Readings above background levels are reported to a remote workstation to allow technicians to then respond accordingly. The completion of these mundane tasks by a robot allows the trained technicians to focus instead on operational tasks, D and D, or responding to alarms. The robot generates a map using a Lidar range sensor with established Simultaneous Localization and Mapping (SLAM) techniques. Range data is then compared to previously generated maps for robot localization and autonomous navigation. To maximize coverage, the robot executes a Complete Coverage Path Planning (CCPP) algorithm using a static map that is discretized into cells to assure comprehensive yet efficient coverage. As the system executes the generated plan, it builds a radiation map of the area for the technician to validate and verify the results. If contamination is detected, the robot will minimize the spread of contamination by stopping, sounding an alarm, and alerting the remote technician. The proposed system allows for long-term deployment with minimal human intervention. It is robust to both highly dynamic obstacles (i.e. personnel) and low dynamic changes (i.e. temporally stored cart) in the environment. This is accomplished through continuous spatiotemporal updating of the static map, and the utilization of a supervisory controller that allows the system to reliably respond to unexpected events or states (i.e. low battery, closed door, etc.). While the supervisory controller can respond to temporary complications, the system also recognizes the environment can change slowly over time necessitating that the CCPP automatically be updated to account for observed 'permanent' changes to the environment. To do this, the robot uses intermediate probabilistic data to make intelligent planning decisions offline while still maintaining local reactive obstacle avoidance and safety features. The self-updating of the map allows the robot to run longer without the need to remake the map, leading to more consistent monitoring data and less maintenance from the human technician. This paper will review the current system hardware, the CCPP algorithm, the supervisory controller, the probabilistic algorithm for identifying permanent changes, and recent experiments at UT Austin to experimentally validate the reported sensor coverage. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Research Reactors Division Infrastructure Investment Plan for the High Flux Isotope Reactor

The High Flux Isotope Reactor (HFIR) is a unique national asset. Operational for nearly 60 years, continued investment into the aging infrastructure is necessary to ensure operation for another 6 decades. Additionally, growing missions require HFIR as well as important upgrades. Consequently, carefully integrated planning is required to ensure that infrastructure investments are timely executed to ensure long-term, reliable operation of HFIR. Concerns about challenges to the operational reliability of HFIR resulted in a recommendation from the 2023 Operations Review by the US Department of Energy (DOE) Office of Basic Energy Sciences that a HFIR management strategy be developed to address the infrastructure needs. This report defines the investment needs, which are evolving as new upgrade efforts are better defined. HFIR is part of the three-source strategy within the Neutron Sciences Directorate (NScD) and contributes to the five strategic science areas outlined in the NScD 10 Year Strategic Science Plan: quantum materials, soft matter, materials and engineering, chemistry, and biosciences. Fundamental to this strategy are three core values: operational excellence, responsible stewardship, and servant leadership. These values guide our mission of safe and reliable operation of the reactor and require a strong and just nuclear safety culture, a solemn respect for responsible care of the facility, good workforce development, robust procedures and processes, an effective communication strategy, world-class asset management, a determined customer focus, and a commitment to protecting the environment, the safety and health of the public and our people, and the quality of work performed within our facility. These principles are all essential to operate HFIR at a world-class level. The Research Reactors Division (RRD) will lead a new era of neutron science and isotope production at HFIR through responsible and purposeful leadership and unwavering support of the science community. The approach outlined in this plan highlights the direction leadership is taking to ensure that HFIR is ready to support the science challenges and national needs of the future and that the United States maintains world leadership in neutron sciences. The plan is in alignment with the DOE’s desire to continue operating HFIR and with the NScD strategic science goals for the future. HFIR is an aging facility with numerous infrastructure challenges and needs. It has an aging workforce in relation to the general population of Oak Ridge National Laboratory (ORNL), with many expected retirements over the next 5–10 years. With an increase in work scope caused by changing national priorities and science goals, several critical hires have been identified. To manage HFIR’s infrastructure needs, a prioritized list of equipment upgrades has been identified along with an analysis of future staffing requirements. A desire to operate HFIR at eight cycles per year will necessarily require some significant changes to procedures and processes currently in place as well as targeted staffing additions. Many of the equipment upgrades identified in this plan will significantly increase the reliability of the plant, thus contributing to the effort to reach the goal of safely operating eight cycles per year. A plan to attain eight-cycle operation is being prepared in parallel with the activities identified in this plan, although the actions identified to satisfy both plans will overlap. This plan identifies new infrastructure needs—for both plant equipment and staffing—thus necessitating formulation of future budget requests to fund the increased work scope and improvement activities. Some activities are currently being scheduled with the expectation that funding will be received. Any delays to funding or reductions of funding from the identified cost estimations will directly and negatively affect the plan’s implementation.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Final report for grant number DE-FG02-06ER64244 to the University of Idaho (RW Smith)-coupling between flow and precipitation in heterogeneous subsurface environments and effects on contaminant fate and transport

Engineered remediation strategies for inducing mineral precipitation in the subsurface typically involve the introduction of at least one reactant either by direct injection or by in situ generation. The localization of reactant sources means a wide range of saturation states and ion ratios will be created as reactants are mixed: These conditions together can result in a wide range of precipitation rates, as well as impact which mineral phase precipitates. This is potentially important for the capacity of the precipitates to take up of trace metal contaminants, for their long term stability. Aragonite, for example, is able to sequester a larger amount of Sr than calcite. However, aragonite is less stable under typical groundwater conditions, and so may release sequestered Sr over time as the aragonite transforms to a more stable phase. In addition, previous experimental studies have indicated that other system constituents may influence calcium carbonate precipitation and consequently the Sr uptake potential of a system. For example, dissolved organic carbon (at levels typical of groundwaters) can suppress crystal growth. As a result, the continuous nucleation of small crystals, rather than growth of existing crystals, may be the dominant mode of precipitation. This has the potential for greater uptake of Sr because the smaller crystal sizes associated with nucleated calcite may more readily accommodate the distortion resulting from substitution of the larger Sr ion for Ca ions than can larger crystals. However, these smaller crystals may also be less stable and over the long term release Sr as a result of Ostwald ripening. To better understand the formation and composition of relevant calcium carbonate mineral phases two related series of mineral precipitation experiments were conducted. The first series of experiments, conducted using a Continuously Stirred Tank Reactor (CSTR) operated at steady state rates of precipitation was focused on understanding the influence of pH and ammonium carbonate (the hydrolysis product of urea: ureolytically driven calcium carbonate precipitation has been demonstrated to be a promising method of inducing mineral precipitation in the field) on calcium carbonate polymorph and Sr co-precipitation. The second series of experiments, conducted at constant pH and saturation state, was focused on understanding the influence of aqueous carbonate to calcium ratios on the precipitation rate of calcite. In 12 CSTR experiments (three pH levels, two ammonium carbonate levels, and two strontium levels) we found that lower pH values and ammonium carbonate concentration promoted the precipitation of calcite and the higher pH values and ammonium carbonate concentration promoted the precipitation of aragonite (as determined by X-ray diffraction). Overall, the rate of calcium carbonate precipitation increased with increasing pH and ammonium carbonate concentration, consistent with increasing values of Q/K. Intermediate conditions resulted in the precipitation of a mixture of calcite and aragonite. There was no discernible effect of strontium on the rate of precipitation or the phase precipitated. In our experiments we precipitated rhombohedral calcite, lath-shaped aragonite and inter-grown calcite-aragonite mixtures. Using Laser Ablation-Inductively Coupled Plasma-Mass Spectrometer we characterized the composition of solids from an experiment in which both calcite and aragonite precipitates were identified by X-ray diffraction. We found a range in composition from a high Sr and low Mg phase (inferred to be aragonite) to a coexisting lower Sr and higher but variable Mg phase (inferred to be calcite). Values of the distribution coefficient for strontium of 1.1 and 0.2 for aragonite and calcite, respectively were estimated from the data. These values compare to values of 1.1 and 0.1 for aragonite and calcite, respectively, determined from bulk analysis of precipitates from experiments in which only calcite or only aragonite were detected. In our experiments to assess the influence of solution composition on precipitation rate (at a constant value of Q/K), we found that the precipitation rate varied by approximately a factor of 2 over the range of conditions considered, with a maximum rate observed at a carbonate to calcium ion molar ratio of approximately 0.2. Precipitation kinetics at the extremes tested in this study exhibited interesting behavior. At the lowest ion ratio (carbonate to calcium ion molar ratio of 0.004), a metastable solution was not achievable. At the highest ion ratio (carbonate to calcium ion molar ratio of 4), the solution was indefinitely metastable: no amount of seed material added initiated a drop in pH that would indicate the onset of precipitation. Under conditions considered to date, we cannot definitively quantify the influence (if any) of Sr at 0.1 mM on the measured precipitation rates (work continues in this area through the INL SFA).

54 ENVIRONMENTAL SCIENCES↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Acoustic sensors for fission gas characterization: R and D skills devoted to innovative instrumentation in MTR, non-destructive devices in hot lab facilities and specific transducers for measurements of LWR rods in nuclear plants

First of all, we will present the main principle of the method. A piezoelectric transducer, driven by a pulse generator, generates the acoustic waves in a cavity that may be the fuel rod or a chamber connected to an instrumented rod. The composition determination consists in measuring the time of flight of the acoustic signal emitted. The pressure can be estimated by a calibration process, above the measurement of the amplitude of the signal. Two projects will then be detailed. The first project consists in the development of advanced instrumentation for in-pile experiments in Material Testing Reactor. It constitutes a main goal for the improvement of the nuclear fuel behavior knowledge. This acoustic method was tested with success during a first experiment called REMORA 3, and the results were used to differentiate helium and fission gas release kinetics under transient operating conditions. This experiment was lead at OSIRIS reactor (CEA Saclay, France). As a first step of the development program, we performed in-pile tests on the most sensitive component, i.e., the piezoelectric transducer. For this purpose, the active part of this sensor has been qualified on gamma and neutron radiations and at high temperature. Various industrial piezo-ceramics were exposed to a high activity Cobalt source for few days. The cumulated dose was ranged from 50 kGy up to 2 MGy. Next, these devices were placed inside a Material Test Reactor to investigate their reliability towards neutron fluence. The final fluence after 150 days of irradiation was up to 1.6.10{sup 21}n/cm{sup 2} (for thermal neutron). Irreversible variations have been measured. Next, a specific sensor has been implemented on an instrumented fuel rod and tested in the frame of a REMORA 3 Irradiation test. It was the first experiment under high mixed, temperature neutron and gamma flux. A first irradiation phase took place in March 2010 in the OSIRIS reactor and in November 2010 for the second step of the irradiation. The instrumented fuel rod incorporating the ultrasonic gas composition sensor was finally irradiated during 2 weeks in nominal conditions. Neutronics calculation will be performed in order to calculate the thermal and fast neutron fluence and the gamma dose absorbed by acoustic sensor. A first evaluation gives a thermal fluence about 4,5.10{sup 19} n/cm{sup 2}, a fast neutrons fluence about 4,5.1018 n/cm{sup 2} and a total gamma dose up to 0,25 MGy The maximal temperature during the irradiation test was about 150 C. Although the ultrasonic sensor appears to be damaged, the optimization of the electrical attack parameters and the development of a new signal processing maintain the measurement feasibility up the end of the irradiation campaign. It was the first time that the composition of fission gas has been monitored all along an irradiation experiment in a MTR, giving access to the gas release kinetics. New researches involve thick film transducers produced by screen-printing process in order to propose piezoelectric structures for harsh temperature and irradiation measurements. The second project consists in the development of a non-destructive device that can be directly applied on a LWR fuel rod. The problem to be solved relates to the measurement of the fission gas pressure and composition in a fuel rod using a non-destructive method. Fuel rod internal pressure is one of the safety criteria applied in nuclear power analyses. This criterion must be verified in order to avoid any fuel-cladding gap reopening risk and therefore any local clad ballooning. Apart from the safety implications, this parameter is also a fuel behaviour indicator and reflects the overall fuel performance in operation, but also during shipping and long-term storage. Rod internal pressure is one criterion amongst others, like cladding corrosion, against which the acceptable fuel burn-up limit is set. A sensor has been achieved in 2007. A full-scale hot cell test of the internal gas pressure and composition measurement by an acoustic sensor was conducted successfully between 2008 and 2010 on 5 high burn-up MOX fuel rods and 2 very high burn-up UO{sub 2} fuel rods in LECA Facility at Cadarache Centre. An improvement of this sensor has been proposed, allowing us to divide by two the uncertainty on the pressure measurement. In the case of hot-cell measurements, viscous liquid can be used to couple the sensor with the rod. For gas content with a pressure exceeding 15 bars and a 10% Xe/Kr ratio, such coupling may reduce relative acoustic method accuracy by ±7% for pressure measurement result and ±0.25 % for the assessment of gas composition. These results make it possible to demonstrate the feasibility of the technique on LWR fuel rods. The transducer and the associated methodology are now operational for non-destructive measurements in hot lab facilities and allow characterising the fission gas without puncturing the fuel rods. Up to now, any other non-destructive method can be proposed. A next step will be the development of an industrial application in a fuel storage pool in order to perform a large number of measurements on a fuel assembly in nuclear plants.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Gasification of Coal and Biomass: The Route to Net-Negative-Carbon Power and Hydrogen

One promising process that is a candidate for meeting the goals of the US Department of Energy’s 21st Century Power Plant initiative is to gasify a mixture of coal and biomass to yield a syngas, which can have CO2 removed and then be used to produce hydrogen as well as an off-gas that can be used to flexibly produce power. This concept would overall be carbon net-negative and readily meet the 21st Century Power Plant initiative targets of smaller scale MW generation, high ramp rates and turndown, feedstock flexibility, and high efficiency—at a reasonable cost. Moreover, adding the large-scale production of “ultra-green” hydrogen yields a system tailored for the coming hydrogen economy, providing long-term energy storage and an attractive co-product for sale. The objective of the work being led by the Electric Power Research Institute, Inc. (EPRI), with support by Bechtel Corporation (Bechtel), Gas Technology Institute (GTI), Hamilton Mauer International, Inc. (HMI), Nebraska Public Power District (NPPD), NexantECA, Inc. (Nexant), and Wärtsilä, is to perform a front-end design and engineering (FEED) study on an oxygen-blown gasification system coupled with water-gas shift, pre-combustion CO2 capture, and pressure-swing adsorption working off a coal/biomass mix to yield high-purity hydrogen and a fuel off-gas that can generate power. Several designs are being considered that will be capable of producing 50 MW net from a flexible generator, over 8500 kg/hr of hydrogen, and net-negative CO2 emissions, at an efficiency of 50% net HHV. The plant would be hosted at an NPPD site, where opportunities for enhanced oil recovery and sequestration have been investigated and the need for low-carbon power and hydrogen is imminent. The principal biomass to be used is corn stover—prevalent in Nebraska where the plant will be located—mixed with Powder River Basin (PRB) coal, necessitating a gasifier that can use this feedstock and be flexible to allow other types. Waste plastics will also be reviewed for use. Two oxygen-blown gasifiers have been identified as candidates that have done testing with biomass including corn stover: the GTI gasifier—a high-pressure, fluidized-bed type—and HMI’s, a lower pressure moving-bed type. Both have relative advantages that were investigated in the Phase I design study, with a resultant down select of one system for which the FEED will be performed in Phase II. The technical tasks for the project are: • Design Development: Completion of design activities necessary to provide inputs for the FEED study. Multiple design cases will be assessed with the selection of the optimal one for the FEED. • Investment Case Preparation: Development of the draft investment case for the proposed process with business cases performed for the proposed host site and two other locations. • Host Site Selection: Evaluation of the two potential host sites within NPPD’s portfolio to select the preferred candidate based on technical, economic, and environmental considerations. • Environmental Information Volume (EIV) Development: Completion of the EIV for the host site. • FEED Study: Completion of a FEED study based on the design selected in Phase I. A Greenhouse Gas Life Cycle Analysis will also be performed for the process. • Update Investment Case: Finalization of the investment case based on findings from the FEED. The advantages of the proposed project are significant. Having an engaged U.S. power utility willing to provide a host site that will produce energy from coal plus a deep and experienced team is critical; the process meets all the goals of DOE’s 21st Century Power Plant initiative at an estimated total plant cost of ~$880M and a production cost of hydrogen of ~$2/kg-H2 while producing net-negative carbon power. If developed, this process has real commercial potential in the United States—supported by EPRI’s initial review of the considerable interest from selected U.S. utilities—and elsewhere around the globe. The process has fewer environmental hurdles compared to other concepts, lowering regulatory and protest risks—providing a pathway to preserving the viability of a critical indigenous energy source by transforming its use to match a changing world. This presentation outlines the motivation for the effort, summarizes project plans, work completed to date, results of the Phase I effort and, and detailed work scope for the remainder of the project in the Phase II FEED effort.

01 COAL, LIGNITE, AND PEAT↗

Gasification of Coal and Biomass: The Route to Net-Negative-Carbon Power and Hydrogen

One promising process that is a candidate for meeting the goals of the US Department of Energy’s 21st Century Power Plant initiative is to gasify a mixture of coal and biomass to yield a syngas, which can have CO2 removed and then be used to produce hydrogen as well as an off-gas that can be used to flexibly produce power. This concept would overall be carbon net-negative and readily meet the 21st Century Power Plant initiative targets of smaller scale MW generation, high ramp rates and turndown, feedstock flexibility, and high efficiency—at a reasonable cost. Moreover, adding the large-scale production of “ultra-green” hydrogen yields a system tailored for the coming hydrogen economy, providing long-term energy storage and an attractive co-product for sale. The objective of the work being led by the Electric Power Research Institute, Inc. (EPRI), with support by Bechtel Corporation (Bechtel), Gas Technology Institute (GTI), Hamilton Mauer International, Inc. (HMI), Nebraska Public Power District (NPPD), NexantECA, Inc. (Nexant), and Wärtsilä, is to perform a front-end design and engineering (FEED) study on an oxygen-blown gasification system coupled with water-gas shift, pre-combustion CO2 capture, and pressure-swing adsorption working off a coal/biomass mix to yield high-purity hydrogen and a fuel off-gas that can generate power. Several designs are being considered that will be capable of producing 50 MW net from a flexible generator, over 8500 kg/hr of hydrogen, and net-negative CO2 emissions, at an efficiency of 50% net HHV. The plant would be hosted at an NPPD site, where opportunities for enhanced oil recovery and sequestration have been investigated and the need for low-carbon power and hydrogen is imminent. The principal biomass to be used is corn stover—prevalent in Nebraska where the plant will be located—mixed with Powder River Basin (PRB) coal, necessitating a gasifier that can use this feedstock and be flexible to allow other types. Waste plastics will also be reviewed for use. Two oxygen-blown gasifiers have been identified as candidates that have done testing with biomass including corn stover: the GTI gasifier—a high-pressure, fluidized-bed type—and HMI’s, a lower pressure moving-bed type. Both have relative advantages that are being investigated in the Phase I design study, with a resultant down select of one system for which the FEED will be performed in Phase II. The technical tasks for the proposed project are: • Design Development: Completion of design activities necessary to provide inputs for the FEED study. Multiple design cases will be assessed with the selection of the optimal one for the FEED. • Investment Case Preparation: Development of the draft investment case for the proposed process with business cases performed for the proposed host site and two other locations. • Host Site Selection: Evaluation of the two potential host sites within NPPD’s portfolio to select the preferred candidate based on technical, economic, and environmental considerations. • Environmental Information Volume (EIV) Development: Completion of the EIV for the host site. • FEED Study: Completion of a FEED study based on the design selected in Phase I. A Greenhouse Gas Life Cycle Analysis will also be performed for the process. • Update Investment Case: Finalization of the investment case based on findings from the FEED. The advantages of the proposed project are significant. Having an engaged U.S. power utility willing to provide a host site that will produce energy from coal plus a deep and experienced team is critical; the process meets all the goals of DOE’s 21st Century Power Plant initiative at an estimated total plant cost of ~$880M and a production cost of hydrogen of ~$2/kg-H2 while producing net-negative carbon power. If developed, this process has real commercial potential in the United States—supported by EPRI’s initial review of the considerable interest from selected U.S. utilities—and elsewhere around the globe. The process has fewer environmental hurdles compared to other concepts, lowering regulatory and protest risks—providing a pathway to preserving the viability of a critical indigenous energy source by transforming its use to match a changing world. This presentation will outline the motivation for the effort, summarize project plans, work completed to date, results of the Design Development task, and detailed work scope for the remainder of the project.

01 COAL, LIGNITE, AND PEAT↗

A Higher Fidelity Cost Analysis of Wind and Uranium from Seawater Acquisition symbiotic Infrastructure

The vastness of the worlds oceans makes the low concentration of naturally existing uranium, 3.3 ppb, appealing as a recoverable natural resource. Although ample uranium is available currently through conventional means, uranium from seawater is a widely studied topic due to the long term security it can assure the nuclear fuel cycle. It is important to mention that seawater uranium is not meant to act as a direct competitor to terrestrial uranium, but instead create a cost ceiling that provides economic stability and potential savings. Additionally, seawater uranium could circumvent some of the environmental impacts associated with recovery of any land based resource. The system currently studied by a nation-wide consortium of national lab and university partners involves the passive recovery of uranium using polymer based adsorbents. High Density Polyethylene fibers undergo a radiation induced graft co-polymerization process involving amidoxime, to attract uranium, and a polar co-monomer to increase hydrophilicity. After further chemical conditioning adsorbent fibers are braided into 60 meter strands for marine deployment. Braids are moored to the ocean floor for the duration of their soaking campaign. After sufficient seawater exposure they are winched up so the adsorbed uranium may be eluted off the braids. This deployment and elution process is repeated multiple times before the adsorbent's ultimate disposal, where its lifetime is dictated by the degradation it suffers with each re-cycle. Previous economic analyses have identified the adsorbent production and mooring as the most expensive components of the recovery process. Therefore, a later publication by Picard et al. proposed an alternative deployment method in an effort to reduce seawater uranium production cost. The Wind and Uranium from Seawater Acquisition symbiotic Infrastructure (WUSABI) couples uranium recovery with off shore wind to reduce mooring capital cost. The uranium harvesting structure attached to the underwater base of the wind turbine supports elution tanks and an adsorbent pulley system. This allows for a nearly autonomous mooring and elution procedure as adsorbent is in constant motion, reaching the elution tanks at the end of its soaking campaign. Although the original publication did include a short economic section, further analysis was carried out to provide a higher fidelity production cost estimate for uranium recovered by this system. Sufficient detail was provided regarding the capital and operating costs of the novel uranium harvesting units. The adsorbent production and uranium elution and purification steps however were estimated by simpler methods, for example applying a previously reported cost for producing a unit mass of adsorbent. This methodology, although satisfactory for the zeroth-order approximation desired in the original publication, overlooks many of the complexities and feedbacks embedded in the full cost model, which are necessary to provide a more accurate estimate. Perhaps more importantly, given the constant updates regarding adsorbent synthesis and performance this value quickly become outdated. Syncing an improved estimate for the WUSABI harvesting units with the existing economic analysis for adsorbent production and elution, which evolves in tandem with the technology, provides a more robust production cost estimate that will remain current over time. In addition to the updates and higher level of detail provided in this independent analysis, consistency in methodology allows for accurate comparison of uranium production costs across recovery methods. (authors)

07 ISOTOPE AND RADIATION SOURCES↗