Search NASA⌕ Search

SEARCH · Search NASA

Results for “task programming”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,081 records · Page 60

Support to NASA's Advanced Space Technology Program

During the period of May through September 2000, Lee & Associates, LLC completed the following tasks as specified in the purchase order SOW: Assessment of current processes and structure and recommended improvements; Reviewed and commented on restructure options; Participated in closure of the Fastrac Delta Critical Design Review actions; Participated in the Fastrac Test readiness review (TRR) process for test planned at SSC and Rocketdyne; and Participated in the investigation of any anomalies identified during the Fastrac engine test data reviews.

Goetz, Otto↗

Validation of ADAR System 5500 Digital Imagery: Delivery Task Order #1, Task Request #857 - Brookings, SD

This work was performed under NASA's Verification and Validation Program as an independent check of data supplied by Positive Systems, Inc. through the Earth Science Enterprise's Scientific Data Purchase (SDP) Program. This document serves as the basis for reporting results associated with validation of multispectral imagery according to the specifications of contract NAS 13-98049. The validation was performed under the Positive Systems Imaging System Validation Work Instruction CRSP-WI-28: Spectral registration, spatial resolution, endlaps, sidelaps, and image quality were evaluated. The validation was proceded by Shipment Verification, as described in the Work Instruction CRSP-WI-22: Every image was passed through an automatic ingest verification and thumbnail review process to identify omissions, problems with media integrity, and gross errors in data quality. Validation of metadata files is not within the scope of this report, but it was performed separately.

Blonski, Slawomir↗

Formal methods in the design of Ada 1995

Formal, mathematical methods are most useful when applied early in the design and implementation of a software system--that, at least, is the familiar refrain. I will report on a modest effort to apply formal methods at the earliest possible stage, namely, in the design of the Ada 95 programming language itself. This talk is an 'experience report' that provides brief case studies illustrating the kinds of problems we worked on, how we approached them, and the extent (if any) to which the results proved useful. It also derives some lessons and suggestions for those undertaking future projects of this kind. Ada 95 is the first revision of the standard for the Ada programming language. The revision began in 1988, when the Ada Joint Programming Office first asked the Ada Board to recommend a plan for revising the Ada standard. The first step in the revision was to solicit criticisms of Ada 83. A set of requirements for the new language standard, based on those criticisms, was published in 1990. A small design team, the Mapping Revision Team (MRT), became exclusively responsible for revising the language standard to satisfy those requirements. The MRT, from Intermetrics, is led by S. Tucker Taft. The work of the MRT was regularly subject to independent review and criticism by a committee of distinguished Reviewers and by several advisory teams--for example, the two User/Implementor teams, each consisting of an industrial user (attempting to make significant use of the new language on a realistic application) and a compiler vendor (undertaking, experimentally, to modify its current implementation in order to provide the necessary new features). One novel decision established the Language Precision Team (LPT), which investigated language proposals from a mathematical point of view. The LPT applied formal mathematical analysis to help improve the design of Ada 95 (e.g., by clarifying the language proposals) and to help promote its acceptance (e.g., by identifying a verifiable subset that would meet the needs of safety-critical applications). The first LPT project, which ran from the fall of 1990 unti the end of 1992, produced studies of several language issues: optimization, sharing and storage, tasking and protected records, overload resolution, the floating point model, distribution, program erros, and object-oriented programming. The second LPT project, in 1994, formally modeled the dynamic semantics of a large part of the (almost) final language definition, looking especially for interactions between language features.

Guaspari, David↗

Design, Development, and Use of a Lunar Lander Simulation for NASA's Artemis Program

This paper describes the design, development, and initial use of a generalized and configurable lunar lander simulation to support NASA’s Artemis Program. This simulation is being developed for the Crew Compartment Office (CrewCo) in the Human Landing Systems (HLS) program and is called the HLS CrewCo Lander Simulation (HCLS). The HCLS provides insight into the challenges associated with returning humans to the Moon and the particular difficulties of operating at the Lunar South Pole. The simulation models a generalized integrated lunar landing spacecraft based on a government reference design but can and has been adapted to model vendor specific designs as well. The simulation architecture and tool sets provide a flexible framework that allows for quickly prototyping and evaluating various aspects of a piloted lunar landing system. This includes the modeling of all principal human controlled flight phases: rendezvous and docking with crew transfer systems; docked orbital outpost operations; undocking and lunar transfer; lunar orbital operations; lunar deorbit, descent, and landing (DDL); lunar surface operations; lunar ascent; and return to the orbital outpost. The flexibility of the simulation allows for the integrated evaluation of potential vehicle subsystems, crew displays, guidance and control modes, and trajectory designs. The purpose of the HCLS is not to design the ideal lunar lander, but rather to understand and the strengths and weaknesses of vehicle design choices. This paper describes the basic simulation architecture and discusses the tool sets used to develop the HCLS. This includes a number of open source tool sets and publicly available data sets. This paper also describes some of the early use cases and findings. The primary focus of early HCLS use has been on the manual piloting task to safely get the crew to the desired landing site in case of a failure in the automated guidance system. Several guidance modes and cues have been implemented which allow a pilot to manually fly the vehicle to the targeted landing site starting anywhere from powered descent initiation. It has been a valuable tool for understanding what is required to manually fly a lunar lander as well as giving a sense of the vehicle dynamics, which are much different than anything that is flown on Earth. A number of experienced test pilots have participated in manual piloting evaluations using the HCLS and provided valuable feedback on the piloting task which has been very beneficial to NASA and the HLS program.

James Michael Gentile↗

IGDS/TRAP Interface Program (ITIP). Software User Manual (SUM)

This specification establishes the requirements, concepts, and preliminary design for a set of software known as the IGDS/TRAP Interface Program (ITIP). This software provides the capability to develop at an Interactive Graphics Design System (IGDS) design station process flow diagrams for use by the NASA Coal Gasification Task Team. In addition, ITIP will use the Data Management and Retrieval System (DMRS) to maintain a data base from which a properly formatted input file to the Time-Line and Resources Analysis Program (TRAP) can be extracted. This set of software will reside on the PDP-11/70 and will become the primary interface between the Coal Gasification Task Team and IGDS, DMRS, and TRAP. The user manual for the computer program is presented.

Jefferys, S.↗

Parallel solution of sparse one-dimensional dynamic programming problems

Parallel computation offers the potential for quickly solving large computational problems. However, it is often a non-trivial task to effectively use parallel computers. Solution methods must sometimes be reformulated to exploit parallelism; the reformulations are often more complex than their slower serial counterparts. We illustrate these points by studying the parallelization of sparse one-dimensional dynamic programming problems, those which do not obviously admit substantial parallelization. We propose a new method for parallelizing such problems, develop analytic models which help us to identify problems which parallelize well, and compare the performance of our algorithm with existing algorithms on a multiprocessor.

Nicol, David M.↗

Exploration Mission Tasks: A Technical Manual

This technical manual is an abridgement of the Generalizable Skills and Knowledge for Exploration Missions (NASA/CR-2018-22045) report (Stuster et al., 2019), describing research conducted under Cooperative Agreement 80NSSC18K0042 for the Human Factors and Behavioral Performance Element, Human Research Program, located at the National Aeronautics and Space Administration’s (NASA) Johnson Space Center. The research identified tasks that will be conducted by human crew during an expedition to Mars, and the abilities, skills, and knowledge that will be required of crew members. The 3-year study uses research methods that were developed to analyze the work performed by a variety of civilian and military occupational specialties and is consistent with Human Factors methods. The work began by developing a comprehensive inventory of 1,125 tasks that are likely to be performed during the 12 phases of the first human expeditions to Mars, from launch to landing 30 months later. Sixty subject matter experts (SMEs) rated expedition tasks in terms of (likely) frequency of performance, difficulty to learn, and importance to mission success; a fourth metric (criticality), was derived by summing the mean ratings of the three dimensions. Seventy-two SMEs placed the physical, cognitive, and social abilities necessary to perform the tasks in order of importance for specialist domains identified by the task analysis. The research team then identified: 1) Abilities, skills, and knowledge that can be retained and generalized across tasks and 2) Implications for crew size and composition. Study results also led to recommendations concerning equipment, habitats, and procedures for exploration-class space missions. Note: The full-mission task inventory was developed during a comprehensive review of documentation and concepts of operations. It was understood by the study team that the tasks were based on currently available information, and that the tools, equipment, propulsion methods, and/or other aspects of actual human expeditions to Mars might be different from those described here, as a consequence of technological development and evolving Mars Design Reference Missions. The purpose and scope of this technical manual is to present the core, actionable information that resulted from this research. The abridged format is intended to address the needs of development and research teams to quickly access, discern, and use the information in the course of their exploration-related work.

Brandin Munson↗

Structural Verification of the Space Shuttle's External Tank Super LightWeight Design: A Lesson in Innovation

The Super LightWeight Tank (SLWT) team was tasked with a daunting challenge from the outset: boost the payload capability of the Shuttle System by safely removing 7500 lbs. from the existing 65,400 lb. External Tank (ET). Tools they had to work with included a promising new Aluminum Lithium alloy, the concept of a more efficient structural configuration for the Liquid Hydrogen (LH2) tank, and a highly successful, mature Light Weight Tank (LWT) program. The 44 month schedule which the SLWT team was given for the task was ambitious by any measure. During this time the team had to not only design, build, and verify the new tank, but they also had to move a material from the early stages of development to maturity. The aluminum lithium alloy showed great promise, with an approximately 29% increase in yield strength, 15% increase in ultimate strength, 5 deg/O increase in modulus and 5 deg/O decrease in density when compared to the current 2219 alloy. But processes had to be developed and brought under control, manufacturing techniques perfected, properties characterized, and design allowable generated. Because of the schedule constraint, this material development activity had to occur in parallel with design and manufacturing. Initial design was performed using design allowable believed to be achievable with the Aluminum Lithium alloy system, but based on limited test data. Preliminary structural development tests were performed with material still in the process of iteration. This parallel path approach posed obvious challenges and risks, but also allowed a unique opportunity for interaction between the structures and materials disciplines in the formulation of the material.

Otte, Neil↗

The SIMRAND 1 computer program: Simulation of research and development projects

The SIMRAND I Computer Program (Version 5.0 x 0.3) written in Microsoft FORTRAN for the IBM PC microcomputer and its compatibles is described. The SIMRAND I Computer Program comprises eleven modules-a main routine and ten subroutines. Two additional files are used at compile time; one inserts the system or task equations into the source code, while the other inserts the dimension statements and common blocks. The SIMRAND I Computer Program can be run on most microcomputers or mainframe computers with only minor modifications to the computer code.

Miles, R. F., Jr.↗

Experimental Results for Titan Aerobot Thermo-Mechanical Subsystem Development

This paper presents experimental results on a set of 4 thermo-mechanical research tasks aimed at Titan and Venus aerobots: 1. A cryogenic balloon materials development program culminating in the fabrication and testing of a 4.6 m long blimp prototype at 93K. 2. A combined computational and experimental thermal analysis of the effect of radioisotope power system (RPS) waste heat on the behavior of a helium filled blimp hull. 3. Aerial deployment and inflation testing using a blimp 4. A proof of concept experiment with an aerobot-mounted steerable high gain antenna These tasks were supported with JPL internal R&D funds and executed by JPL engineers with substantial industry collaboration for Task #1, the cryogenic balloon materials

blimps↗

Design principles of a cooperative robot controller

The paper describes the design of a controller for cooperative robots being designed at McGill University in a collaborative effort with the Jet Propulsion Laboratory. The first part of the paper discusses the background and motivation for multiple arm control. Then, a set of programming primitives, which are based on the RCCL system and which permit a programmer to specify cooperative tasks are described. The first group of primitives are motion primitives which specify asynchronous motions, master/slave motions, and cooperative motions. In the context of cooperative robots, trajectory generation issues will be discussed and the implementation described. A second set of primitives provides for the specification of spatial relationships. The relations between programming and control in the case of multiple robot are examined. Finally, the paper describes the allocation of various tasks among a set of microprocessors sharing a common bus.

Hayward, Vincent↗

Spacelab simulation using a Lear Jet aircraft: Mission no. 4 (ASSESS program)

The fourth ASSESS Spacelab simulation mission utilizing a Lear Jet aircraft featured trained experiment operators (EOs) in place of the participating scientists, to simulate the role and functions of payload specialists in Spacelab who may conduct experiments developed by other scientists. The experiment was a broadband infrared photometer coupled to a 30-cm, open port, IR telescope. No compromises in equipment design or target selection were made to simplify operator tasks; the science goals of the mission were selected to advance the mainline research program of the principle investigator (PI). Training of the EOs was the responsibility of the PI team and consisted of laboratory sessions, on-site training during experiment integration, and integrated mission training using the aircraft as a high-fidelity simulator. The EO permission experience in these several disciplines proved adequate for normal experiment operations, but marginal for the identification and remedy of equipment malfunctions. During the mission, the PI utilized a TV communication system to assist the EOs to overcome equipment difficulties; both science and operations were successfully implemented.

Reller, J. O., Jr.↗

Statistical Short-Range Guidance for Peak Wind Speed Forecasts on Kennedy Space Center/Cape Canaveral Air Force Station: Phase I Results

This report describes the results of the ANU's (Applied Meteorology Unit) Short-Range Statistical Forecasting task for peak winds. The peak wind speeds are an important forecast element for the Space Shuttle and Expendable Launch Vehicle programs. The Keith Weather Squadron and the Spaceflight Meteorology Group indicate that peak winds are challenging to forecast. The Applied Meteorology Unit was tasked to develop tools that aid in short-range forecasts of peak winds at tower sites of operational interest. A 7 year record of wind tower data was used in the analysis. Hourly and directional climatologies by tower and month were developed to determine the seasonal behavior of the average and peak winds. In all climatologies, the average and peak wind speeds were highly variable in time. This indicated that the development of a peak wind forecasting tool would be difficult. Probability density functions (PDF) of peak wind speed were calculated to determine the distribution of peak speed with average speed. These provide forecasters with a means of determining the probability of meeting or exceeding a certain peak wind given an observed or forecast average speed. The climatologies and PDFs provide tools with which to make peak wind forecasts that are critical to safe operations.

Lambert, Winifred C.↗

A remote sensing applications update: Results of interviews with Earth Observations Commercialization Program (EOCAP) participants

Earth remote sensing is a uniquely valuable tool for large-scale resource management, a task whose importance will likely increase world-wide through the foreseeable future. NASA research and engineering have virtually created the existing U.S. system, and will continue to push the frontiers, primarily through Earth Observing System (EOS) instruments, research, and data and information systems. It is the researchers' view that the near-term health of remote sensing applications also deserves attention; it seems important not to abandon the system or its clients. The researchers suggest that, like its Landsat predecessor, a successful Earth Observing System program is likely to reinforce pressure to 'manage' natural resources, and consequently, to create more pressure for Earth Observations Commercialization (EOCAP) type applications. The current applications programs, though small, are valuable because of their technical and commercial results, and also because they support a community whose contributions will increase along with our ability to observe the Earth from space.

Mcvey, Sally↗

Image Display And Manipulation System (IDAMS), user's guide

A combination operator's guide and user's handbook for the Image Display and Manipulation System (IDAMS) is reported. Information is presented to define how to operate the computer equipment, how to structure a run deck, and how to select parameters necessary for executing a sequence of IDAMS task routines. If more detailed information is needed on any IDAMS program, see the IDAMS program documentation.

Cecil, R. W.↗

Low cost program practices for future NASA space programs, volume 1

The progress and outcomes of a NASA/HQ indepth analysis of NASA program practices are documented. Included is a survey of NASA and industry reaction to the utility and application of a Program Effects Relationship Handbook. The results and outcomes of all study tasks are presented as engineering memoranda as the appendix.

Source record↗

Software techniques for a distributed real-time processing system

The paper describes software techniques developed for the Unified Data System (UDS), a distributed processor network for control and data handling onboard a planetary spacecraft. These techniques include a structured language for specifying the programs contained in each module, and a small executive program in each module which performs scheduling and implements the module task.

Lesh, F.↗

One Way of Testing a Distributed Processor

Launch processing for Space Shuttle is checked out, controlled, and monitored with new system. Entire system can be exercised by two computer programs--one in master console and other in each of operations consoles. Control program in each operations console detects change in status and begins task initiation. All of front-end processors are exercised from consoles through common data buffer, and all data are logged to processed-data recorder for posttest analysis.

Edstrom, R.↗