Results of availability imposed configuration details developed for K-DEMO
We completed a two year study using the Korean fusion demonstration reactor (K-DEMO) where we looked at key Tokamak components and configuration options in preparation of a conceptual design phase. A key part of a device configuration centers on defining an arrangement that enhances the ability to reach high availability values by defining design solutions that foster simplified maintenance operations. In order to maximize the size and minimize the number of in-vessel components enlarged TF coils were defined that incorporate a pair of windings within each coil to mitigate pressure drop issues and to reduce the cost of the coils. Furthermore, we defined a semi-permanent shield structure in order to develop labyrinth interfaces between double-null plasma contoured shield modules, provide an entity to align blanket components and provide support against disruption loads—with a load path that equilibrates blanket, TF and PF loads through a base structure. Blanket piping services and auxiliary systems that interface with in-vessel components have played a major role in defining the overall device arrangement—concept details will be presented along with general arrangement features and preliminary results obtained from disruption analysis.