Search NASA⌕ Search

SEARCH · Search NASA

Results for “Distribution System State Estimation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

1,087 records · Page 61

Generator Interconnection Costs to the Transmission System in non-ISO Balancing Authorities [Slides]

Electric transmission system operators—including Independent System Operators (ISOs), Regional Transmission Organizations (RTOs), and utilities—require proposed power plants to undergo a series of interconnection studies before connecting to the grid. These studies assess what transmission upgrades or new infrastructure may be necessary and assign the associated costs to the project. Lawrence Berkeley National Laboratory has compiled, aggregated, and cleaned interconnection cost data, originally for ISOs/RTOs, and now for five non-ISO Balancing Authorities: PacifiCorp, Bonneville Power Authority, Duke Energy Progress, Duke Energy Carolinas and Duke Energy Florida. Insufficient transparency in interconnection cost data may contribute to rapidly expanding interconnection queues, with active queue capacities tripling between 2020 and 2024 in the studied BAs. Most projects withdraw after receiving high interconnection cost estimates. Interconnection costs have increased since the early 2000s, with average costs for "complete" projects reaching $194/kW between 2018 and 2024. Active queue projects and withdrawn projects incur substantially higher costs, primarily due to rising network upgrade costs. Recent interconnection costs in non-ISO balancing authorities are higher than in ISO regions, potentially due to a greater willingness to pay among developers. Utility-scale solar, wind, and storage projects have interconnection costs that exceed those for natural gas. However, when focusing on projects that do not withdraw from the queue, the interconnection costs for these technologies are more similar to natural gas projects. Other key findings include: (1) Larger generation projects benefit from lower proportional interconnection costs, (2) capacity transmission service (NRIS) often requires additional network investments, and (3) projects with high network upgrade costs are often clustered geographically. The dataset includes results from 2,104 interconnection studies conducted between 2000 and 2024, covering projects that are operational, withdrawn, or still progressing through the study process. The Excel file contains (a) the complete project-level interconnection cost dataset, and (b) seven additional tabs summarizing cost metrics across dimensions such as time, market structure, cost category (point of interconnection vs. broader network upgrades), fuel type, service type (ERIS vs. NRIS), generator size, and geography.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Final Scientific/Technical Report: Characterizing the Response of the Cascadia Margin Gas Hydrate Reservoir to Bottom Water Warming Along the Upper Continental Slope

The objective of this project is to understand the response of the WA margin gas hydrate system to contemporary warming of bottom water along the upper continental slope. Through pre-cruise analysis and modeling of archive and recent geophysical and oceanographic data, we (1) inventoried bottom simulating reflectors along the WA margin and defined the upper limit of gas hydrate stability, (2) refined margin-wide estimates of heat flow and geothermal gradients, (3) characterized decadal scale temporal variations of bottom water temperatures at the upper continental slope of the Washington margin, and (4) used numerical simulations to provide quantitative estimates of how the shallow boundary of methane hydrate stability responds to modern environmental change. These pre-cruise results provided the context for a systematic geophysical and geochemical survey of methane seepage along the upper continental slope from 48° to 46°N during a 10-day field program on the R/V Thompson from October 10-19, 2014. This systematic inventory of methane emissions along this climate-sensitive margin corridor and comprehensive sediment and water column sampling program provided data and samples for Phase 3 of this project that focused on determining fluid and methane sources (deep-source vs. shallow; microbial, thermogenic, gas hydrate dissociation) within the sediment, and how they relate to contemporary intermediate water warming. During the 2014 research expedition, we sampled nine seep sites between ~470 and 520 m water depth, within the zone of predicted methane hydrate retreat over the past 40 years. We imaged 22 bubble plumes with heights commonly rising to ~300 meters below sea level with one reaching near the sea surface. We collected 22 gravity cores and 20 CTD/hydrocasts from the 9 seeps and at background locations (no acoustic evidence of seepage) within the depth interval of predicted downslope retreat of the methane hydrate stability zone. Approximately 300 pore water samples were extracted from the gravity cores, and the pore water was analyzed for a comprehensive suite of solutes, gases, and stable isotope ratios. This comprehensive geochemical dataset was used to characterize the fluid and gas source(s) at each of the seep sites surveyed. The primary results of this project are: 1) Bottom simulating reflector-derived heat flow values decrease from 95 mW/m2 10 km east of the deformation front to ~60 mW/m2 60 km landward of the deformation front, with anomalously low values of ~25 mW/m2 on a prominent mid-margin terrace off central Washington. 2) The temperature of the incoming sediment/ocean crust interface at the deformation front ranges between 164-179 oC off central Washington, and the 350 oC isotherm at the top of the subducting ocean crust occurs 95 km landward of the deformation front. Differences between BSR-derived heat flow and modeled conductive heat flow suggest mean upward fluid flow rates of 0.4 cm/yr across the margin, with local regions (e.g. fault zones) exhibiting fluid flow rates up to 3.5 cm/yr. 3) A compilation of 2122 high-resolution CTD, glider, and Argo float temperature profiles spanning the upper continental slope of the Washington margin from the years 1968 to 2013 show a long-term warming trend that ranges from 0.006-0.008 oC/yr. Based on this long-term bottom water warming, we developed a 2-D thermal model to simulate the change in sediment temperature distribution over this period, along with the downslope retreat of the methane hydrate stability field. Over the 43 years of the simulation, the thermal disturbance propagated 30 m into the sediment column, causing the base of the methane hydrate stability field to shoal ~13 m and to move ~1 km downslope. 4) A preliminary analysis of seafloor observations and mid-water column acoustic data to detect bubble plumes was used to characterize the depth distribution of seeps along the Cascadia margin. These results indicate high bubble plume densities along the continental shelf at water depths <180 m and at the upper limit of methane hydrate stability along the Washington margin. 5) The majority of the seeps cored during the 2014 research expedition on the R/V Thompson contained abundant authigenic carbonate indicating that they are locations of long-lived seepage rather than emergent seep systems related to methane hydrate dissociation. Despite the evidence for enhanced methane seepage at the upper limit of methane hydrate stability along the Washington margin, we found no unequivocal evidence for active methane hydrate dissociation as a source of fluid and gas at the seeps surveyed. The pore fluid and bottom water chemistry shows that the seeps are fed by a variety of fluid and methane sources, but that methane hydrate dissociation, if occurring, is not widespread and is only a minor source (below the detection limit of our methods). Collectively, these results provide a significant advance in our understanding of the thermal structure of the Cascadia subduction zone and the fluid and methane sources feeding seeps along the upper continental slope of the Washington-sector of the Cascadia margin. Though we did not find unequivocal evidence for methane hydrate dissociation as a source of water and methane at the upper pressure-temperature limit of methane hydrate stability at present, continued warming of North Pacific Intermediate Water in the future has the potential to impact the methane hydrate reservoir in sediments at greater depths along the slope. Thus, this study provides a strong foundation and the necessary characterization of the background state of seepage at the upper limit of methane hydrate stability for future investigations of this important process.

54 ENVIRONMENTAL SCIENCES↗

WE-A-16A-01: International Medical Physics Symposium: Increasing Access to Medical Physics Education/Training and Research Excellence

In response to a world in which cancer is a growing global health challenge, there is now a greater need for US Medical Physicists and other Radiation Oncology professionals across institutions to work together and be more globally engaged in the fight against cancer. There are currently many opportunities for Medical Physicists to contribute to alleviating this pressing need, especially in helping enhance access to Medical Physics Education/training and Research Excellence across international boundaries, particularly for low and middle-income countries (LMIC), which suffer from a drastic shortage of accessible knowledge and quality training programs in radiotherapy. Many Medical Physicists are not aware of the range of opportunities that even with small effort could have a high impact. Faculty at the two CAMPEP-accredited Medical Physics Programs in New England: the University of Massachusetts Lowell and Harvard Medical School have developed a growing alliance to increase Access to Medical Physics Education/training and Research Excellence (AMPERE), and facilitate greater active involvement of U.S. Medical Physicists in helping the global fight against cancer and cancer disparities. In this symposium, AMPERE Alliance members and partners from Europe and Africa will present and discuss the growing global cancer challenge, the dearth of knowledge, research, and other barriers to providing life-saving radiotherapy in LMIC, mechanisms for meeting these challenges, the different opportunities for participation by Medical Physicists, including students and residents, and how participation can be facilitated to increase AMPERE for global health. Learning Objectives: To learn about the growing global cancer challenge, areas of greatest need and limitations to accessing knowledge and quality radiotherapy training programs, especially in LMIC; To learn about the range of opportunities for Medical Physicists, including students and residents, to work together in global health to help increase AMPERE and alleviate the growing global burden of cancer; To present and discuss a new model for harmonizing Medical Physics Training across countries and how this model (UMass and Heidelberg) could be extended to LMIC in collaboration with the IAEA; To highlight a new platform and program for facilitating contributions by Medical Physicists to increase AMPERE towards the elimination of global cancer disparities. Challenges in Cancer Control in Africa Twalib A. Ngoma, MD, Professor, Executive Director, Ocean Road Cancer Institute, Dar Es Salaam, Tanzania Cancer care in Africa is beset by lack of attention, political will, cancer registries, cancer plans, human resources, financial resources and treatment facilities.. As a result of this, cancer patients in Africa are far more likely to die of their disease than those in developed countries. According to data from the WHO 750,000 new cancer cases occur in Africa every year and this number is predicted to rise by 70% by 2020. To make matters worse, an estimated 75% of cancer patients in Africa have advanced or incurable cancers at diagnosis making palliative care the most realistic approach to their management. Furthermore, Cancer prevention is nearly nonexistent, cancer detection is rare and treatment usually comes too late and is inefficient. The overall mortality-to-incidence ratio for men with cancer in the Africa is 0.75 compared with 0.54 in the developed world while the ratios for women in Africa, is 0.65 compared with 0.45 for women in the developed world. There is also limited access to radiotherapy. According to the International Atomic Energy Agency (IAEA), whilst developed countries usually have one radiotherapy machine per 250,000 people, most African nations have only one machine per ten million people. The above numbers are alarming and speak for themselves. The only solution to improve this alarming situation is to address the major challenges which African countries face in provision of cancer services which include but not limited to lack of cancer registries, lack of funding, lack of human resources, lack of radiotherapy machines, lack of cancer drugs and lack of accessible and affordable cancer screening, early diagnosis, treatment or palliative care services. Since there are considerable differences among African countries, in my presentation I will share with the audience how we address cancer control challenges in Tanzania in general and specifically in radiation oncology. The African continent cancer plan 2013 2017 Folakemi Odedina, PhD, Professor and Director of Health Disparities, UF Health Cancer Center, University of Florida The burden of cancer is rising in Africa, in addition to current heavy burden of communicable, and other non-cancer related non—communicable diseases. Conquering cancer in Africa will require a comprehensive collaborative approach with cancer clinicians, scientists, patients, advocates, policy makers and community leaders working hand-in-hand at the local, state, national, and continent levels with the primary mission: To reduce the number of deaths from cancer and improve the quality of life of cancer patients, survivors and caregivers. Unfortunately, less than 40% of African countries have a credible cancer control policy and program. The African Organization for Research and Training in Cancer (AORTIC) decided to create an African Cancer Plan to provide cost-effective strategies that can be employed throughout the continent to fight cancer. Based on the African proverb that “It takes a village to raise a child”, the Cancer Plan provides specific strategies that can be used by individuals, employers, organizations and policy-makers to fight cancer. In addition, we have provided overarching strategies to address cancer in Africa and targeted 5-year plan for prostate, breast, cervix, lung and liver cancers. In developing this Cancer Plan, our primary goal is to decrease cancer incidence and mortality in Africa. This goal can only be achieved by stakeholders and dedicated individuals to lead and implement the strategies outlined in this plan. If you are interested in partnering with AORTIC to reduce the burden of cancer in Africa, please send an email to info@aortic-africa.org. Synergies in research and clinical care through international collaboration Thomas Bortfeld and David Gierga, Massachusetts General Hospital, Harvard Medical School, MA Medical Physics relies on high technology that is not distributed equally. The whole spectrum of Medical Physics technologies is not available at every hospital or research institute, and not even in every high income country. One example is heavy ion therapy equipment which is currently only available in Japan, Germany and Italy. There is also a large global variation in terms of research infrastructure and focus. A student of Medical physics cannot gain broad experience, certainly not hands-on experience, by staying at one place only. While it is debatable what a good trade-off between breadth and depth in Medical Physics education is, it is generally agreed upon that some breadth is necessary. Researchers in Medical Physics have to cross borders if they need specific technologies for their projects. Therefore it is self-evident that international programs in Medical Physics education and research make sense. Yet, very few programs of this type exist. In this presentation we will report on our own experience of pursuing an international career in Medical Physics, with international student programs, and with the international exchange of researchers. We will present new or planned opportunities such as the medical beamline at CERN in Geneva. We will also report on the synergies in clinical care through international collaborations between partners in high and low income countries. One example is the partnership of the MGH/Harvard Medical School community with the oncology community and government of Botswana to form the BOTSOGO (BOTSwana Oncology Global Outreach) initiative. This collaborative effort in oncology care was spurred by existing relationships in HIV/AIDS research and care delivery developed within the Botswana-Harvard AIDS Institute Partnership (BHP). The initial efforts of the BOTSOGO initiative have been organized as follows: 1) on-site visits to share expertise in clinical cancer care for capacity building purposes (e.g. cervical brachytherapy), 2) developing a forum for multi-disciplinary case discussions and education and 3) relationship building with local stakeholders for long-term sustainability and growth. An international system for the certification of medical physicists Raymond K. Wu, Chairman, IOMP Professional Relations Committee; Chairman, AAPM Exchange Scientist Program Subcommittee An international system for the certification of medical physicists is an important issue. The International Organization for Medical Physicists (IOMP) has in collaboration with a number of member countries established the International Medical Physics Certification Board (IMPCB) to address this issue, and to provide a mechanism to mark the milestone for the professional development of clinical medical physicists. Raymond Wu, PhD, is the CEO of IMPCB and the Chairman of the IOMP Professional Relations Committee. He is the invited speaker recommended by IOMP to give a talk on this important subject. He will give the latest update of the work of IMPCB, its near term goals, and pathways to the goals. He will also discuss the importance of such an International System of certification in the training/education of next generation Medical Physicists, including those in low and middle income countries (LMIC) where such training is crucial in the fight against cancer. Learning Objectives: Understand the certification program as described in the IOMP Policy Statements. Understand the plan of the IMPCB to establish the accreditation process of national certification programs. Understand the goals of this international collaborative effort and the potential impacts to the quality of clinical medical physics practice. Medical Physics Education Across Continents: The UMass Lowell and Heidelberg University Joint Coordination Effort Erno Sajo, Director of Medical Physics, University of Massachusetts at Lowell Medical Physics education has unique flavors across institutions within the US and shows significant differences across continents. In the latter, even the definition of Medical Physics may differ. Not only is there a difference in topical coverage, but often what is considered a cohesive topic in one institution, and taught as a single course, is fragmented among several other courses in the other institution due to a different philosophy. Because of the regulatory and certification requirements, these differences impact the mobility of medical physicists across continents. As a result, physicists who wish to practice in the US or Canada but have completed their education elsewhere often find that they have to take remedial courses or even obtain a new degree in Medical Physics despite the fact that they already have one. Outreach to developing countries, therefore, is even more difficult. The University of Massachusetts Lowell and Heidelberg University recently completed a joint coordination effort, in which they identified topics that are common versus complementary in their medical physics curricula. A student exchange program was developed that permits students to take any of the common topics at the other institution while taking complementary courses as electives, which count towards their degree requirements at their home institution. Thesis research is also mutually accepted. When properly documented, in this way CAMPEP recommendations can be met across the institutions. Therefore, students participating in this program satisfy both the American Board of Radiology (ABR) requirements and the European regulatory requirements. The framework on which this collaboration rests and the cross-comparison methods developed therein may be implemented in other exchange programs and thus a similar approach can be adopted in outreach programs with developing countries. IAEA PACT Program and opportunities for support and collaboration Susan Morgan, Program Coordinator, International Atomic Energy Agency, Vienna, Austria In response to the developing world's cancer crisis, the International Atomic Energy Agency (IAEA) established the Program of Action for Cancer Therapy (PACT) in 2004 to fully realize the public health impact obtained through global partnerships in cancer control and technology transfer in radiation medicine. PACT's vision strives for global partnerships to confront the cancer crisis in developing countries, notably with our sister United Nations agency, the World Health Organization (WHO), and our Joint Programme on Cancer Control established in 2009. The IAEA, through PACT, the WHO, the International Agency for Research on Cancer (IARC) and other cancer-related organizations work together to make a coordinated global response in supporting low and middle income (LMI) IAEA Member States in the implementation of comprehensive national cancer control programmes. PACT's goals are: To build global partnerships of cancer-related organizations committed to addressing the challenge of cancer in LMI Member States in all its aspects; To mobilize resources from charitable trusts, foundations, and others in public and private sectors sources to assist LMI Member States to develop and implement their radiation medicine capacities within a national cancer control programme (NCCP); and, To ensure the effective and sustainable transfer of radiation medicine technologies or knowledge to all LMI Member States where unmet needs exist. PACT work focuses on: imPACT: Assessing Cancer Burden PMDS: Developing Global Partnerships VUCCnet: Promoting Cancer Control Training AGaRT: Making Radiotherapy Accessible Facilitating increased participation and professional development of Medical Physicists and other Radiation Oncology professionals in global health Wilfred Ngwa, Harvard Medical School, University of Massachusetts Lowell, MA The 2014 World Health Organization (WHO) Cancer report highlights an alarming increase in the global burden of cancer. It also highlights what it terms “the cancer divide”, or disparities, evinced by a substantially higher cancer burden in low and middle income countries (LMIC) in Asia, Central/South America and Africa. The WHO even predicts a potential African cancer epidemic by 2020 if significant progress is not made in global cancer control efforts. Evidence that collaborative global health approaches have led to major progress in controlling infectious diseases including in LMIC suggests that similar approaches will be useful for non-communicable diseases like cancer. In consonance with this, leaders in cancer policy from the USA and 14 economically diverse countries recently concluded that successful campaigns to control cancers with existing methods and to improve current strategies will increasingly depend onconcerted multinational collaborations (Sci Transl Med 5, p. 175, 2013). Hence there is growing urgency for increasing collaborative global cancer Care Research and Education (CaRE), as well as support for greater effectiveness of already existing initiatives involving partners from different nations, diverse economic and cultural backgrounds. The good news is that there is a growing awareness of the importance of global health and growing interest including amongst Medical Physicists and other Radiation oncology (RadOnc) professionals to participate in global health. However, many are unaware of currently existing opportunities for participation that even with small effort could have a high impact. Over 50% of cancer patients in the developed world depend on RadOnc professionals for their treatment, and hence participation of RadOnc professionals in global health efforts in the global fight against cancer is crucial. It is also important that the next generation of RadOnc professionals (students, and residents) be trained with a global perspective, to be global health leaders in cancer CaRE. This presentation will highlight a novel platform for enhancing participation and professional development of Medical Physicists and other RadOnc professionals in global health. Ways in which this platform can facilitate contributions by Medical Physicists and other RadOnc Professionals, students and residents in global health towards the elimination of global cancer disparities will be discussed. This will be followed by a panel discussion by some of the pioneers/leaders in collaborative global cancer CaRE on the growing cancer burden, challenges and opportunities for greater active involvement and professional development.

60 APPLIED LIFE SCIENCES↗

Findings on Subtask 3.1 - Bakken Rich Gas Enhanced Oil Recovery Project

Total in-place oil for the Bakken petroleum system (BPS) (which includes the Bakken and Three Forks Formations) has been estimated to be 600 billion barrels (bbl). However, BPS wells have decline rates as high as 85% over the first 3 years of their lives, and primary recovery factors typically range from 3% to 10% of original oil in place. Given the low initial recovery rates, even small incremental productivity improvements could dramatically increase technically recoverable oil in the BPS. One potential solution is enhanced oil recovery (EOR) using gas injection, such as carbon dioxide (CO2) or hydrocarbon (HC) gases. While commonly used in conventional reservoirs, CO2 EOR in unconventional tight oil reservoirs has been limited to pilot tests. EOR using rich gas (mixture of methane, ethane, and propane) has also been employed in numerous pilots in several unconventional plays and has recently been successfully applied in the Eagle Ford play. If successful, large-scale gas-based EOR in the BPS could dramatically increase oil productivity and recovery factors and extend the life of the play for decades. While CO2 may be a technically suitable working fluid for EOR in the BPS, supplies are limited and costs for using CO2 in EOR pilots are prohibitively high. Meanwhile, produced gas flaring has presented challenges for BPS operators in North Dakota. Analysis conducted by the North Dakota Pipeline Authority indicates that the current gas-gathering infrastructure in North Dakota is insufficient to accommodate all of the associated gas that is produced from the BPS. The geographically isolated location of North Dakota relative to large natural gas markets, combined with suppressed natural gas prices, has made it economically challenging for industry to invest capital in expanding gas-gathering infrastructure in the state. These circumstances led to a research program conducted by the Energy & Environmental Research Center (EERC) in partnership with Liberty Resources Management Company LLC (LR) to examine the potential to use rich gas injection for EOR and mitigate flaring. A rich gas EOR pilot test was designed and executed by LR at its Stomping Horse development area in Williams County, North Dakota. From July 2018 through May 2019, a total of 160 million standard cubic feet (MMscf) of rich produced gas was injected into the BPS using five different wells in a sequential injection strategy. LR’s Leon–Gohrick drill spacing unit (DSU) was used as the test site. Regulatory oversight was provided by the North Dakota Industrial Commission (NDIC). Technical support was provided by the EERC through a series of laboratory, modeling, and field-based activities, and additional post-pilot research activities incorporated learnings from the test, developed new laboratory data, improved fracture modeling methods, and developed machine learning and big data analytics. The results from the Stomping Horse rich gas EOR pilot activities indicate that developing an effective, economical EOR approach for the BPS will require more field tests. Another key lesson learned from the Stomping Horse tests is that detailed pre- and posttest data on reservoir conditions and fluids production are essential. Robust reservoir characterization provides information that is crucial to creating realistic geomodels and conducting valid dynamic simulations of potential EOR scenarios. A detailed understanding of the completions and production history of offset wells is also necessary for valid test result interpretations. This knowledge is essential to designing the operational parameters of injectivity tests and interpreting the results. A conformance control strategy is also essential to success. Laboratory-based examinations of rich gas interactions with reservoir fluids and rocks were conducted, with an emphasis on determining the ability to mobilize oil in the tight reservoir rocks and shales of the BPS. Injection fluid composition was shown to have a positive impact on reducing reservoir oil minimum miscibility pressure (MMP), reducing interfacial tension (IFT), and altering wettability. IFT and contact angle measurements demonstrated that wettability can be altered in the presence of rich gas, suggesting the potential to improve oil recovery. Iterative modeling of surface infrastructure and reservoir performance using data generated by the various project activities was conducted. A geologic model of the Stomping Horse area was built; history-matched oil, gas, and water production was used in simulations of various EOR scenarios. Early programmatic modeling results were used to support LR’s design and operation of the EOR pilot and to provide insight regarding optimization of future commercial-scale BPS EOR design and operations. Post-pilot modeling focused on alternative methods of understanding complex fracture networks and accelerating simulation time. These led to improved simulation run times and provide excellent history-matching results. Several of these iterative models were used as the bases for developing algorithms into machine learning and big data analytics. History matching in reservoir simulation is time-consuming and computer processing-intensive. Machine learning algorithms were created, and an automated history-matching tool was developed. A large set of synthetic reservoir simulations were created to generate well responses (oil, gas, and water production, well bottomhole pressure [BHP], and tracer or propane breakthrough) for a set of EOR operating parameters that included offset well status (open or closed), injectate (rich gas or propane), injection rate, and injection well BHP. A user interface was developed to provide real-time visualization. Machine learning-based models were developed to provide rapid forecasting of well performance given a set of user-defined EOR operating parameters. These predictive models allow the user to modify the offset well status, injection rate, and injection well BHP and rapidly forecast future production performance. The combination of real-time visualization tools with real-time forecasting tools provides a framework for real-time control—operational changes that the EOR site operator can enact (e.g., changing gas injection rates) to affect the observed performance and potentially improve the EOR outcome. There is great reason to be optimistic about the future of EOR in the Bakken. The results of the laboratory studies suggest significant potential for high rates of oil mobilization using produced field gas injection under the right conditions. The results of the lab studies, combined with rigorous statistical analysis of well production data and associated modeling efforts, confirm the notion that fluid mobility within the reservoir is controlled by fractures. As more knowledge is gained about the nature and distribution of fracture networks in the Bakken, the industry will be in a better position to predict and, ultimately, influence fluid mobility. New field tests are necessary to develop a more complete understanding of those conditions. Thoughtful and creatively engineered field tests within a well-characterized geologic setting will yield the fundamental knowledge needed to take Bakken oil production to the next level. This subtask was cofunded through the EERC–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission’s Oil and Gas Research Program and Computer Modelling Group.

04 OIL SHALES AND TAR SANDS↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗

Field evaluation of remote wind sensing technologies: Shore-based and buoy mounted LIDAR systems

In developing a national energy strategy, the United States has a number of objectives, including increasing economic growth, improving environmental quality, and enhancing national energy security. Wind power contributes to these objectives through the deployment of clean, affordable and reliable domestic energy. To achieve U.S. wind generation objectives, the Wind and Water Power Program within the Department of Energy’s (DOE) Office of Energy Efficiency and Renewable Energy (EERE) instituted the U.S. Offshore Wind: Removing Market Barriers Program in FY 2011. Accurate and comprehensive information on offshore wind resource characteristics across a range of spatial and temporal scales is one market barrier that needs to be addressed through advanced research in remote sensing technologies. There is a pressing need for reliable offshore wind-speed measurements to assess the availability of the potential wind energy resource in terms of power production and to identify any frequently occurring spatial variability in the offshore wind resource that may impact the operational reliability and lifetime of wind turbines and their components and to provide a verification program to validate the “bankability” of the output of these alternative technologies for use by finance institutions for the financing of offshore wind farm construction. The application of emerging remote sensing technologies is viewed as a means to cost-effectively meet the data needs of the offshore wind industry. In particular, scanning and buoy mounted LIDAR have been proposed as a means to obtain accurate offshore wind data at multiple locations without the high cost and regulatory hurdles associated with the construction of offshore meteorological towers. However; before these remote sensing technologies can be accepted the validity of the measured data must be evaluated to ensure their accuracy. The proposed research will establish a unique coastal ocean test-bed in the Mid-Atlantic for the evaluation of LIDAR-based wind measurement systems to validate the accuracy of remotely measured wind data in marine applications. Specifically, the test-bed will be utilized to systematically evaluate the capability of emerging scanning LIDAR and buoy mounted vertically profiling LIDAR by: (1) Evaluating a fixed scanning LIDAR against land-based 50 and 60 meter high meteorological masts fitted with research quality cup-vane and/or sonic anemometers; (2) Evaluating a buoy mounted vertically profiling LIDAR fixed on land and floating in a sheltered bay against a co-located 60 meter high meteorological mast fitted with a research quality cup-vane and/or sonic anemometers and the fixed scanning LIDAR; and (3) Offshore field evaluation of both LIDAR platforms through a comparison of the fixed scanning LIDAR data and data obtained by the buoy mounted LIDAR located 10 miles offshore. The proposed research will systematically validate Light Detection and Ranging (LIDAR) based wind measurement systems and assess the temporal and spatial variability of the offshore wind resource in the Mid-Atlantic east of New Jersey. The goal of the proposed project is to address the technical and commercial challenges of the offshore wind energy industry by validating and assessing cost-effective, over ocean wind resource characterization technologies. The objective is to systematically evaluate the capability of both scanning and vertically profiling LIDARs to accurately measure 3D wind fields through comparison with fixed met masts and intercomparison among LIDAR platforms. Once validated, data collected by both buoy mounted vertically profiling LIDARs and shore-based, pulsed horizontally scanning LIDARs can be used to accurately assess offshore wind resources and to quantify the spatial and temporal variability in the offshore wind fields. One of the fundamental research questions to be addressed in phase 1 is the assessment of various measurement and data processing schemes to retrieve accurate wind vectors in the marine environment over large sampling ranges (10 to 12 km) and varying atmospheric aerosol levels. Atmospheric conditions and aerosol content within the coastal ocean region of the Mid-Atlantic seaboard of the US can vary significantly over short time periods in response to frontal passages and extratropical and tropical low pressure system passage offshore of the coast. Since aerosols provide the scattering medium for the determination of LIDAR Doppler shifts in the atmosphere the accuracy and range of LIDAR derived velocity measurements as a function of variation in aerosol content in the marine environment is a key research question to be addressed. In phase 1, it is desired to capture as much variation in atmospheric conditions and aerosol content as possible. To this end, collocated measurements of LIDAR and standard anemometer wind fields will be captured by the project PIs over all four seasons and during specific events (e.g., coastal low pressure system passage) in year 1. Additionally, since the meteorological masts are permanent structures, additional events can be captured over the three year duration of the field research project. All research instruments are owned by Fishermen’s Energy and made available to the PIs though a lease agreement as part of the DOE grant. Energy Fishermen’s Energy will be responsible for the operation and maintenance of the scanning LIDAR and met mast anemometers. On a daily basis, environmental data and systems performance indicators will be transmitted from each measurement station to the Fishermen’s project team consisting of both in-house personnel and equipment manufacturer engineers. Data sets include compiled LIDAR files as well as data sets from ancillary sensors. Diagnostic parameters to be monitored include standard deviations of measured values, battery levels and charging systems output, and the operational status. Once data have been confirmed as complete and reliable, files will be transferred to the Garrad Hassan (a subcontractor to Fishermen’s Energy) for incorporation in to the validation database, which is accessible to other scientific team members. Data collection times and durations will be determined by the PI and Co-PIs in consultation with instrument engineers to ensure the capture of data representative of the expected range of mid-Atlantic atmospheric conditions (e.g., temperature, moisture, coastal low pressure systems, tropical systems, rain, snow, fog). The collection and processing of the data is a function of site specific measurement requirements (Kelley et.al. 2007; Hannon et.al. 2008). To determine the optimal profiles of wind speed and direction from the LIDAR radial velocities as a function of azimuth angle, rigorous estimates of the bias and random error of each radial velocity estimate are required. Lockheed Martin Coherent Technologies, Inc., under contract with Fishermen’s Energy, will provide analyses of raw and processed data using various scan patterns to determine optimal performance settings for the pulsed scanning LIDAR. Once optimized, appropriate processing and analyses techniques will be evaluated by Garrad Hassan for use in validating the accuracy of the LIDAR wind field measurements against the standard anemometer measurements from the meteorological masts. The most attractive capability of the scanning LIDAR is the ability to provide high spatial resolution observations in a three-dimensional volume which provides superior statistical accuracy due to the large number of samples obtained. Each radial scan provides measurements in 100 range gates over a distance of 10 to 12 km at an update rate of 5 to 10 Hz and rotation of 2.5° per second. Each rotation at a fixed azimuth requires 2.4 minutes. Depending on the number of azimuths desired a complete scan can take up to 10 minutes or longer to complete. Once collected the radial velocities are processed to produce vector wind velocity estimates based on a set of data distributed in angle and range around points of interest, typically a standard grid within the radial wind map. To calculate wind vectors over a limited spatial area of interest for the comparison of data with other measurement platforms a localized least-squares approach has been applied by Hannon et.al. (2008) and a Variation Assimilation (VAR) processing technique has been applied by Chan and al Assimilation (VAR) processing technique has been applied by Chan and Shao (2006). Additionally, Kelley et.al. (2007) applied a “stare” technique that fixed a scanning LIDAR in both azimuth and elevation angles to measure over collocated sampling volumes of the LIDAR and a 3D sonic anemometer mounted to a fixed mast. Although the stare technique is limited to wind directions aligned with the sampling radial of the LIDAR, it does provide a direct comparison of sampling volumes. Each of the processing techniques described above (and possibly others) will be evaluated to determine the validity of the LIDAR derived wind fields in the marine environment. Numerical methods such as linear regression and comparison of probability density functions of wind fields measured by each instrument platform will be used to assess the processing techniques. Linear regression has the advantage of directly evaluating corresponding pairs of wind data measured by each instrument and can lend insight into deviations and bias between instruments as a function of wind speed. Assessment of the coherency between the probability density function of the wind measured by each instrument provides insight into processes that may not be accurately resolved by each instrument at specific frequencies. Once processed and assessed the most appropriate technique will be utilized to provide valid wind measurements from the pulsed scanning LIDAR. A detailed analysis of the measurement data from the LIDAR and the three meteorological towers and comparison of the coastal wind characteristics from the different systems will be performed by the CO_PI at NREL. This analysis will evaluate how the WT LIDAR performance and measurement of the wind characteristics vary with distance from the LIDAR and by atmospheric conditions; using the tower measurements at different distances (4.8, 9.6, and 19 km) from the LIDAR as a reference. The comparative analysis will include, to the extent possible, evaluation of parameters such as wind speed and direction distributions, wind shear, turbulence intensity and their variations by atmospheric conditions, month or season, and time of day.

17 WIND ENERGY↗