Search NASA⌕ Search

SEARCH · Search NASA

Results for “Generation scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,099 records · Page 61

Poster — Thur Eve — 52: A Web-based Platform for Collaborative Document Management in Radiotherapy

We describe DepDocs, a web-based platform that we have developed to manage the committee meetings, policies, procedures and other documents within our otherwise paperless radiotherapy clinic. DepDocs is essentially a document management system based on the popular Drupal content management software. For security and confidentiality, it is hosted on a linux server internal to our hospital network such that documents are never sent to the cloud or outside of the hospital firewall. We used Drupal's in-built role-based user rights management system to assign a role, and associated document editing rights, to each user. Documents are accessed for viewing using either a simple Google-like search or by generating a list of related documents from a taxonomy of categorization terms. Our system provides document revision tracking and an document review and approval mechanism for all official policies and procedures. Committee meeting schedules, agendas and minutes are maintained by committee chairs and are restricted to committee members. DepDocs has been operational within our department for over six months and has already 45 unique users and an archive of over 1000 documents, mostly policies and procedures. Documents are easily retrievable from the system using any web browser within our hospital's network.

07 ISOTOPE AND RADIATION SOURCES↗

Hiilangaay Hydroelectric Project – Final Report

The Hiilangaay Hydroelectric Project (“Hiilangaay” or the “Project”) is a 5-megawatt hydroelectric resource currently under construction on Prince of Wales Island (POW), Alaska, approximately ten miles east of Hydaburg. The objective of the Project is to interconnect with the existing transmission grid on Prince of Wales Island, increasing the hydroelectric generation capability by 5 MW, eliminating the need for diesel generation, increasing the reliability of the electrical system, and allowing the interconnected portion of the island to have 100 percent renewable energy generation. Pre-construction activities including construction planning, permit coordination and compliance, and final design have made it possible to move forward with construction of the Hiilangaay Project. Despite repeated delays to the schedule, persistence and long-term planning will culminate in the construction of the Project, and make Prince of Wales Island independent of diesel-fueled energy

13 HYDRO ENERGY↗

Radiation Hardened Engineered Substrates for Time and Space Resolution

Low Gain Avalanche Diodes (LGADs) have become sensors of choice for fast timing of minimum ionizing particles. The current generation of these devices suffer from only moderate radiation hardness, low fill factor, and limited design options. Cactus Materials Inc. proposes to develop sensors with gain layer implants buried beneath the surface which will, with AC coupling developed by Brookhaven National Laboratory (BNL) and University of California Santa Cruz (UC Santa Cruz) solve these problems. Fermilab has a major role in the CMS timing upgrade using the current generation of LGADs and development of AC-coupled, buried layer LGADs will solve some of the central problems inherent in this technology. Annex B included a two-year work plan, deliverables, schedule and funding for the project’s SBIR Phase II award to develop and test prototype LGADs utilizing wafer bonding technology and epitaxial growth, that will allow for fabrication of radiation hard AC coupled devices with 100% fill factor and adjustable operating point.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Informed Feature Selection for Data Clustering of CSP Plant Production

To make concentrating solar power (CSP) more cost competitive, rigourous optimizations must be run to improve plant design and operations. However, these optimizaitons rely on time consuming annual simulations that solve an electricity dispatch scheduling problem to maximize plant revenue. To reduce the runtime of annual dispatch simulations of CSP plants, a data clustering approach is utilized. This approach assumes that like days of revenue and electricity generation can be identified using weather and price data. Although weather and price are important factors for electricity production, this work investigates how thermal energy storage (TES) inventory at the beginning of a day, denoted as Si, can be used as a supplemental feature to group like days. A framework for creating and training a deep neural network to predict Si is proposed. This model is validated and assessed using eleven sets of testing data that were not used during training. Then, the data clustering approach is performed three seperate times with features of weather and price along with either Si from the neural network, Si from the full annual simulation, or no Si. Ultimately, the results suggest that using Si as an additional clustering feature improves the data clustering simulation accuracy by 1.4%.

Tuman, Matthew J. (ORCID:000900038772051X)↗

Micro-rollback and self-recovery synthesis

A new approach to high level synthesis with micro-rollback and self-recovery method is presented. The objective of this approach is to generate a reliable system from the behavioral descriptions. The approach is formulated as a rollback point insertion problem based on the probability function of being inserted rollback points after the given CDFG is scheduled. This function allows us not only to search the problem space efficiently but also to avoid the exhaustive search.

Jeon, Byung Wook↗

Study and Demonstration of Planning and Scheduling Concepts for the Earth Observing System Data and Information System

The University of Colorado's Laboratory for Atmospheric and Space Physics (CU/LASP) along with the Goddard Space Flight Center (GSFC) and the Jet Propulsion Laboratory (JPL) designed, implemented, tested, and demonstrated a prototype of the distributed, hierarchical planning and scheduling system comtemplated for the Earth Observing System (EOS) project. The planning and scheduling prototype made use of existing systems: CU/LASP's Operations and Science Instrument Support Planning and Scheduling (OASIS-PS) software package; GSFC's Request Oriented Scheduling Engine (ROSE); and JPL's Plan Integrated Timeliner 2 (Plan-It-2). Using these tools, four scheduling nodes were implemented and tied together using a new communications protocol for scheduling applications called the Scheduling Applications Interface Language (SAIL). An extensive and realistic scenario of EOS satellite operations was then developed and the prototype scheduling system was tested and demonstrated using the scenario. Two demonstrations of the system were given to NASA personnel and EOS core system (ECS) contractor personnel. A comprehensive volume of lessons learned was generated and a meeting was held with NASA and ECS representatives to review these lessons learned. A paper and presentation on the project's final results was given at the American Institute of Aeronautics and Astronautics Computing in Aerospace 9 conference.

Davis, Randal↗

Development of Gravity Sensitive Plant Cells (Ceratodon) in Microgravity

Protonemata of the moss Ceratodon are tip-growing cells that grow up in the dark. This cell type is unique compared to cells in almost any other organism, since the growth of the plant cell itself is completely oriented by gravity. Thus, both the processes of gravity sensing and the gravity response occur in the same cell. Gravity sensing appears to rely upon amyloplasts (starch-filled plastids) that sediment. This sedimentation occurs in specific zones and plastid zonation is complex with respect to plastid morphology, distribution, and gravity. Microtubules restrict the extent of plastid sedimentation (i.e., they are load-bearing). Light also is important since apical cells have a phytochrome-based positive phototropism, light quality influences plastid zonation and sedimentation (photomorphogenesis), and red light suppresses gravitropism at higher but not lower light intensities. Many of these processes were examined in a 16 day spaceflight experiment, "SPM-A" space moss" or "SPAM)) on STS-87 that landed in December, 1997. The work described here involves the definition of a second flight experiment that builds upon the data and questions arising from STS-87. Effort was directed towards further definition of an experiment for the Shuttle (dubbed "SOS" for "Son of SPAM"). Our current target is STS 107 that is scheduled to fly in January 2001. This definition addressed two goals of the STS107 experiment. The goals of the current experiment were to determine whether the cytoskeleton plays a role in maintaining and generating an apical (non-random) plastid distribution in microgravity and to determine the development and extent of clockwise spiral tip-growth in microgravity.

Sack, Fred D.↗

Managing Risk on a Technology Development Project/Advanced Mirror System Demonstrator

The risk management study applied to the Advanced Mirror System Demonstrator (AMSD), a precursor mirror technology development for the Next Generation Space Telescope (NGST) is documented. The AMSD will be developed as a segment of a lightweight primary mirror system that can be produced at a low cost and with a short manufacturing schedule. The technology gained from the program will support the risk mitigation strategy for the NGST, as well as other government agency space mirror programs.

Byberg, Alicia↗

Meteorological Satellites and Their Data

This paper presents an overview of the meteorological satellite programs that have been evolving from 1958 to the present and reviews plans for the future meteorological and environmental satellite systems that are scheduled to be placed into service in the early 1980's. The development of the TIROS family of weather satellites, including TIROS, ESSA, ITOS/NOAA, and the present TIROS-N (the third-generation operational system) is summarized. The contribution of the Nimbus and ATS technology satellites to the development of the operational polar-orbiting and geostationary satellites is discussed. Included are descriptions of both the TIROS-N and the DMSP payloads currently under development to assure a continued and orderly growth of these systems into the 1980's.

Vaughn, W.↗

Astrobee: A Free Flying Robot Enabling Technology Demonstrations

The Astrobee Project has developed next-generation free-flying robots to operate inside the ISS. Three Astrobee Free Flyers reached the ISS in April 2019and are currently hosting a variety of users while completing the commissioning phase.Commissioning is scheduled to complete in July 2020.

Astrobee Free-Flyer Robotics↗

Calibration Inter-Comparison of MODIS and VIIRS Reflective Solar Bands Using Lunar Observations

Multispectral band observations from Terra and Aqua MODIS, launched in December 1999 and May 2002, respectively, and from SNPP and NOAA-20 VIIRS, launched in November 2011 and October 2017, respectively, have continuously enabled a broad range of applications and studies of the Earth system and its changes via a set of geophysical and environmental parameters. The quality of MODIS and VIIRS science and environmental data products relies strongly on the calibration accuracy and stability of individual sensors, as well as their calibration consistency, especially for the data products generated using observations from sensors across different platforms. Both MODIS and VIIRS instruments carry a similar set of on-board calibrators for their on-orbit calibration. Besides, lunar observations are regularly scheduled and implemented in support of their reflective solar bands (RSB) calibration, especially their long-term stability monitoring. In this paper, we provide an overview of MODIS and VIIRS solar and lunar calibration methodologies applied for the RSB on-orbit calibration, and describe the approach developed for their calibration inter-comparisons using lunar observations, including corrections for the effects caused by differences in the relative spectral response and adopted solar spectra between individual sensors. The MODIS and VIIRS calibration inter-comparison results derived from their regularly scheduled lunar observations are presented and discussed, including associated uncertainties and a comparison with those derived using the Earth-view targets. Also discussed are remaining challenges in lunar calibration and inter-comparison for the Earth-observing sensors, as well as on-going efforts for future improvements.

Multispectral band↗

Optimization of Energy Storage System Economics and Controls by Incorporating Battery Degradation Costs in REopt

The use of stationary electrochemical energy storage systems utilizing lithium-ion batteries has increased rapidly as the production scale and price for lithium-ion batteries has decreased. These energy storage systems are crucial for maintaining grid resiliency, especially for grids operating with high penetration of renewable energy generation assets or for with a variety of distributed energy generation and storage systems. One challenging factor for the development of battery energy storage systems is estimating the proper sizing, in terms of both power and energy, that minimizes total costs over the lifetime of the systems; this calculation is difficult in simple cases, where a battery is costed independently, but is extremely challenging when building loads and electrical generation by photovoltaic resources are also considered. REopt is a techoeconomic optimization tool developed by NREL to address these challenges. Previously, battery degradation has been priced by simply assuming a 10-year replacement schedule for battery systems. However, this does not account for varying degradation trends observed across real-world batteries, or allow for batteries to be operated in a degradation-aware manner that optimizes battery dispatch based on operating costs. This work incorporates a battery life model into REopt. This battery life model is simple, so that it may be solvable within the constrains of a mixed-integer linear optimization problem, but is fit to accelerated aging data recorded in the lab. To achieve the best possible accuracy for lifetime estimates given these constraints, parameters for the battery life model in REopt are estimated by fitting 20-year simulations of battery life after identifying state-space battery degradation model from accelerated aging data. Comparisons of battery life predicted in REopt and from the state-space battery degradation model to ensure validity of lifetime estimates made by REopt. Battery life and cost is optimized by controlling three decision to minimize system life cost: battery sizing, daily state-of-charge, and daily energy-throughput. The cost of battery degradation as a function of these control variables is then estimated assuming two possible maintenance strategies: replacement, where the entire battery system is replaced if cell reach an end-of-life capacity threshold; and augmentation, which establishes a fund to pay for continual purchase of new batteries to maintain the initial energy capacity of the system. These two strategies offer conservative (for replacement) and optimistic (for augmentation) bounds for total system cost. The degradation cost incurred by these strategies is then used to control battery dispatch decisions, operating the battery in a degradation-aware manner that maximizes battery lifetime while also providing energy when favorable. Because the mixed-integer linear program has perfect foresight of future energy needs, batteries with degradation costs are always operated using 'just-in-time' charging, which is unrealistic, as no energy is left in the storage system to perform other energy services or to serve as emergency back-up power. To combat this, an inequality constraint on the average annual state-of-charge is imposed, and the sensitivity of system cost to average stored energy, e.g., the cost of system resiliency, can be quantified. Analysis of results has several conclusions, for instance, oversizing of battery storage systems is not a cost burden when battery storage is an optimal solution, as any additional battery capacity can simply be utilized to avoid costs of purchasing energy from a utility.

battery↗

The Revised WIPP Passive Institutional Controls Program - A Conceptual Plan - 13145

The Department of Energy/Carlsbad Field Office (DOE/CBFO) is responsible for managing all activities related to the disposal of TRU and TRU-mixed waste in the geologic repository, 650 m below the land surface, at WIPP, near Carlsbad, New Mexico. The main function of the Passive Institutional Controls (PIC's) program is to inform future generations of the long-lived radioactive wastes buried beneath their feet in the desert. For the first 100 years after cessation of disposal operations, the rooms are closed and the shafts leading underground sealed, WIPP is mandated by law to institute Active Institutional Controls (AIC's) with fences, gates, and armed guards on patrol. At this same time a plan must be in place of how to warn/inform the future, after the AIC's are gone, of the consequences of intrusion into the geologic repository disposal area. A plan was put into place during the 1990's with records management and storage, awareness triggers, permanent marker design concepts and testing schedules. This work included the thoughts of expert panels and individuals. The plan held up under peer review and met the requirements of the U.S. Environmental Protection Agency (EPA). Today the NEA is coordinating a study called the 'Preservation of Records, Knowledge and Memory (RK and M) Across Generations' to provide the international nuclear waste repository community with a guide on how a nuclear record archive programs should be approached and developed. CBFO is cooperating and participating in this project and will take what knowledge is gained and apply that to the WIPP program. At the same time CBFO is well aware that the EPA and others are expecting DOE to move forward with planning for the future WIPP PIC's program; so a plan will be in place in time for WIPP's closure slated for the early 2030's. The DOE/CBFO WIPP PIC's program in place today meets the regulatory criteria, but complete feasibility of implementation is questionable, and may not be in conformance with the international guidance being developed. International guidance currently under development may suggest that the inter-generational equity principle strives to warn the future, however, in doing so not to unduly burden present generations. Building markers and monuments that are out of proportion to the risk being presented to the future is not in keeping with generational equity. With this in mind the DOE/CBFO is developing conceptual plans for re-evaluating and revising the current WIPP PIC's program. These conceptual plans will suggest scientific and technical work that must be completed to develop a 'new' PICs program that takes the best ideas of the present plan, blended with new ideas from the RK and M project, and proposed alternative permanent markers designs and materials in consideration. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in the utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS realtime operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art media wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project.

Marsh, Angela L.↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.

Dudley, Stephanie R. B.↗

Reactions of DGEBA epoxy cured with diethanolamine: Isoconversional kinetics and implications to network structure

The curing of diglycidyl ether of bisphenol A (DGEBA) epoxy with diethanolamine (DEA) is studied. DEA has three reactive groups, a secondary amine hydrogen and two hydroxyls. The secondary amine reacts rapidly, forming an adduct containing tertiary amines, epoxides and hydroxyls. The epoxides and hydroxyls then react in the presence of the amines to crosslink and vitrify the epoxy in the “gelation” reaction. The gelation reaction, the subject of this study, is not simple. The reaction exhibits unusual dependencies on both temperature and degree of cure. Previously, the general mechanisms of this curing process were explored by a number of us. In the present paper, both differential scanning calorimetry (DSC) and isothermal microcalorimetry (IMC) are used to determine a number of characteristic times associated with the reaction. The characteristic times show that the reaction rate has different functional forms at different temperatures and extents of reaction. This results from the reaction rate not depending solely upon the temperature and over-all extent-of-reaction. The concentration of a number of auxiliary reactive species that are generated in the course of the reaction (as well as their mobility and steric hindrance) appear to be key factors in defining the reaction kinetics. The dependence of the final network structure on cure schedule for this type of tertiary amine activated reaction is then discussed in the context of the literature. Lastly, in the Supplementary Material, Kamal-like functions are fit to the isothermal reaction kinetics, with the reader cautioned in applying the functions to non-isothermal cures.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Diagnostics for first plasma and development plan on KSTAR

The first plasma with target values of the plasma current and the pulse duration was finally achieved on June 13, 2008 in the Korea Superconducting Tokamak Advanced Research (KSTAR). The diagnostic systems played an important role in achieving successful first plasma operation for the KSTAR tokamak. The employed plasma diagnostic systems for the KSTAR first plasma including the magnetic diagnostics, millimeter-wave interferometer, inspection illuminator, H{sub {alpha}}, visible spectrometer, filterscope, and electron cyclotron emission (ECE) radiometer have provided the main plasma parameters, which are essential for the plasma generation, control, and physics understanding. Improvements to the first diagnostic systems and additional diagnostics including an x-ray imaging crystal spectrometer, reflectometer, ECE radiometer, resistive bolometer, and soft x-ray array are scheduled to be added for the next KSTAR experimental campaign in 2009.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Advanced Ultra-Supercritical Component Test (ComTest) Project for 760*C Steam Conditions

ComTest is a $27M Department of Energy-funded project. Phase I, which began in November 2015, served to identify the technology gaps, as well as the scope and cost of required testing. Phase II, which was awarded in December 2018, includes an advanced manufacturing effort to complete U.S. based supply chain development for full commercial scale (800-850 MWe) AUSC components made of nickel-based alloys, components operating at up to 760°C. Completion of Phase II scheduled for September 30, 2021. Strategic Objectives of U.S. AUSC Project include: Power Plant Efficiency Improvements –Develop cost-effective, reliable technologies to improve the efficiency of new and existing high-temperature advanced generation power plants. Close gaps to achieve readiness for commercial scale demonstration of Advanced Ultra-Supercritical (AUSC) technology. Fabricate full-scale versions of key nickel-based alloy components. Validate capabilities of US supply chain for cost certainty. Support cross-cutting high-temperature generation technologies. Obtain ASME Code approval for new materials, components and processes. Increase power plant steam temperatures for higher cycle efficiency (Note: Average efficiency of US coal-fired fleet = 33% HHV; A-USC plant efficiency over 47% HHV at 1,400°F (760°C) steam temperature).

fireside corrosion↗