Search NASA⌕ Search

SEARCH · Search NASA

Results for “Implementation Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,099 records · Page 61

Chicago Area Waterway System Microbiome Research

This report summarizes the research conducted by Argonne National Laboratory (Argonne) for the Metropolitan Water Reclamation District of Greater Chicago (MWRD) for the first five years (2013-2017) of a seven-year study with emphasis on the impact of disinfection (2016-2017) on the microbial community of the Chicago Area Waterway System (CAWS). The study examines microbial communities following disinfection of secondary treated effluents at the T.J. O’Brien (UV) and Calumet (chlorine and dechlorination) Water Reclamation Plants (WRPs) and the phased implementation of the Tunnel and Reservoir Plan (TARP). The Thornton Composite Reservoir (TCR) was completed in 2015. It provides 7.9 billion gallons of storage and since its completion has captured more than 11.0 billion gallons of combined stormwater and sewage from Calumet WRP that would otherwise overflow into CAWS in rainy weather. In addition to the effects of TARP and disinfection, we present an analysis of potential sources of the microbes found in the CAWS and the results of 16S rRNA amplicon gene sequencing which was used to characterize microbial community variability as a function of location, season, and environmental conditions. A total of 2,077 samples were collected from 2013 to 2017 from WRPs and CAWS and analyzed using high-throughput sequencing. The whole microbial community composition using all the genetic material in the environmental sample was characterized using 16S rRNA gene-based analysis, while functional subsystem attributes of these microbial communities were characterized using shotgun metagenomics. We used a Bayesian statistical tool, SourceTracker 2.0 to determine the likely sources of microbes found in CAWS by sampling location and sampling period.

54 ENVIRONMENTAL SCIENCES↗

Los Alamos National Laboratory Fall Avian Migration Monitoring Report 2010-2018

During the fall of 2018, biologists at Los Alamos National Laboratory completed the ninth year of monitoring fall migration passerines (songbirds). Songbirds were captured at a mist-netting station located in a wetland/riparian complex in Technical Area 36 on the north side of Pajarito Road in Los Alamos County. Captured birds were identified, measured, and banded with a United States Fish and Wildlife Service (USFWS) migratory bird band. Banding operations took place between August and October, with the completion of a total of 10 mist-netting sessions annually. This project was conducted as part of the implementation of the Biological Resources Management Plan and is in compliance with the 2013 Memorandum of Understanding between the USFWS and the United States Department of Energy/National Nuclear Security Administration and Executive Order 13186. Between 2010 and 2018 the overall number of birds and species captured was variable. We saw significant differences in the bird community composition when we compared earlier years to later years. Although environmental variables including a drought severity index, were not shown to influence the community composition, insectivorous birds and the percentage of hatch year birds were influenced by drought severity. Additionally, Audubon’s Warbler and Virginia’s Warbler numbers decreased from 2010 and showed declining trends in their abundances. The variability in bird populations is likely driven by regional climatic factors, but more data are needed for robust assessments.

54 ENVIRONMENTAL SCIENCES↗

National Hurricane Program Metrics Framework

The need for metrics for planning and response measures was identified as key gap to be addressed in the National Hurricane Program's (NHP) Technology Modernization effort. This document proposes a framework for defining a set of metrics for planning and response that will be implemented in the NHP products of hurricane evacuation studies (HES) and post-storm assessments (PSA). To determine the feasibility of this framework, a survey of current HES and PSAs was carried out followed by and then used to determine if the proposed metrics are currently captured. While there is a wide variety in data availability and detail, the implementation of these metrics is not only feasible but presents an opportunity to improve on current practices. The final implementation of this framework shall require the ongoing feedback from local, state, tribal, and federal stakeholders.

54 ENVIRONMENTAL SCIENCES↗

Enhanced Recovery Opportunities in the Appalachian Basin

The Midwest Regional Carbon Sequestration Partnership (MRCSP) has incorporated the work of geologic research teams (Geoteams) in its regional characterization, project planning and carbon dioxide (CO2) injection implementation work since the partnership was established by the U.S. Department of Energy (DOE) in 2003. Over this 16-year period, the cohort of Geoteams has grown from five to ten states and has contributed to the characterization of geologic sequestration opportunities, refinement of reservoir and seal data, and supported injection efforts through both predictive and post-injection assessments. The regional characterization work conducted by the Geoteams during the MRCSP Phase III project period (2010 – 2019) focused on the following tasks: (1) refinement of geologic seals/reservoir systems; (2) assessment of Atlantic Coastal Plain and offshore opportunities; (3) expanded assessments of oil and gas fields, particularly as they relate to enhanced recovery opportunities; (4) regional support for implementation of carbon capture utilization and storage (CCUS) in the partnership area; and (5) communication and data sharing. The findings of this work are summarized in the final report entitled Final Report of Geologic Carbon Capture Utilization and Storage Opportunities in the form of a state-by-state presentation for the MRCSP Region. In addition to the capstone deliverable mentioned above, the Geoteams have also prepared a series of topical reports to elaborate on specific geologic intervals and/or geographic areas of study completed during the Phase III project period. Specifically, these topical reports address: (1) the Atlantic Coastal Plain and adjacent offshore; (2) Cambro-Ordovician reservoirs/seals in the region; (3) enhanced oil and gas recovery opportunities in the Appalachian Basin; and (4) enhanced oil recovery (EOR) in the Michigan Basin. The remainder of this topical report presents our findings relative to enhanced recovery opportunities in the Appalachian Basin.

54 ENVIRONMENTAL SCIENCES↗

Enhanced Recovery Opportunities in the Appalachian Basin

The Midwest Regional Carbon Sequestration Partnership (MRCSP) has incorporated the work of geologic research teams (Geoteams) in its regional characterization, project planning and carbon dioxide (CO2) injection implementation work since the partnership was established by the U.S. Department of Energy (DOE) in 2003. Over this 16-year period, the cohort of Geoteams has grown from five to ten states and has contributed to the characterization of geologic sequestration opportunities, refinement of reservoir and seal data, and supported injection efforts through both predictive and post-injection assessments. The Appalachian Basin Geoteam consists of geologists from the state geological surveys of Kentucky, Maryland, New York, Ohio, Pennsylvania, and West Virginia. Pennsylvania and West Virginia led the research related to enhanced recovery opportunities in oil and gas fields, while Kentucky led the work associated with enhanced gas recovery (EGR) opportunities in organic-rich shales. The Appalachian Basin Geoteam evaluated reservoirs amenable to CO2-EOR and EGR using a combination of data sources and technical approaches. The Geoteam characterized the subsurface geology of the area in stepwise fashion, starting with existing geologic maps and fields/pools data generated as part of previous MRCSP regional characterization research. With this data, the Geoteam correlated stratigraphy and generated cross sections to delineate the extent, depths and thicknesses of those formations that may serve as reservoirs for either miscible or immiscible enhanced recovery projects. In addition, the team prepared structure and isopach maps for prospective formations, as well as assessments of gross and net porosity of these units. Once prospective localities were identified, the Geoteam selected a short list of oil fields in each of the three states for assessment for case study preparation.

01 COAL, LIGNITE, AND PEAT↗

DC-AC Tool: Fully Automating the Acquisition of AC Power Flow Solution

DC2AC is an automated tool for achieving a converged AC power flow solution from any dispatch, e.g., determined using DC power flow model based optimal power flow. The entire process is free of human interference. It is usually encountered in practice that, even with a DC power flow solution, acquiring the solved AC power flow solution, if exists, sometimes could be a challenging task, especially during the planning stage. It is also difficult to distinguish the unsolvable cases from diverging iterations. Manual adjustments to approach the desired power flow condition has been largely relied on in the past using lots of engineering heuristics. This tool provides a systematic way to first achieve a solvable AC power flow case by modifying the power flow condition, and then try to track the AC power flow solution while gradually removing the adopted changes. If all adopted changes can be completely removed, then the original AC power flow solution is obtained. Otherwise, insights for actionable controls are derived to help operation and planning. Currently, this tool has been implemented in Python using SIEMENS PTI PSS/E as power flow solver, where only adjusting generator terminal voltage set point is considered as an available means to try to turn an unsolved power flow to a solved one. In future, more means should be considered, including the operation of tap-changing transformers, switched shunts and redispatch of active power.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Development of a Portable In Situ Phosphorous Sensor

While phosphorus is a critical nutrient for all forms of life, runoff leads to phosphorus accumulation in surface water where it can cause a variety of health, environmental, and economic problems. The Department of Energy is interested in conducting long-term field experiments to monitor the impact of phosphorus in terrestrial and aquatic environments, and to better understand a cost vs. benefit analysis of reducing phosphorus pollution. Performing such long-term experiments requires affordable sensors capable of monitoring low-level phosphorus concentrations under challenging environmental conditions. However, such sensors are currently not available. The goal of this proposed project is to develop and demonstrate a low-cost portable phosphorus sensor suitable for in situ measurements. We will determine the technical requirements for a Raman-based sensor system, design and build a signal amplifier, integrate it with a Raman-based sensor, and demonstrate a proof-of-concept level sensor system. The expected accomplishments for Phase I include the identification of the technical requirements of a combined Raman laser/spectrometer and cavity enhancement system, building a proof-of-concept level sensor system capable of detecting orthophosphate compounds at the desired level of 0.25 mg P/L and organic P compounds, and verification of the sensor performance under laboratory and field conditions. In addition, we will identify initial hardening requirements that will need to be implemented during Phase II. While we plan to develop an integrated sensor system for monitoring phosphorus, the cavity-based enhancement system can also be used in combination with other (non-phosphorus) Raman sensors that we plan to develop or that are already commercially available. A recent market report highlights the increasing demand for such environmental monitoring applications, with the market for chemical detection anticipated to grow at a compound annual growth rate of 6.5% (2020-2025). Wide-spread monitoring of phosphorus could reduce the damage from eutrophication in freshwater, which is estimated to be $2.2 billion annually, thereby increasing biodiversity, reducing costs required for drinking water treatment, and decreasing economic losses related to recreation and angling and lake property values.

54 ENVIRONMENTAL SCIENCES↗

Social Aspects and Considerations for Agrivoltaics Implementation

Integrated PV technologies - such as agrivoltaics - have potential to address challenges associated with siting and land use for solar. This presentation provides an overview of agrivoltaic R&D activities in the United States and focuses on the non-technical aspects of implementation, specifically social considerations around collaboration, planning, and acceptance.

14 SOLAR ENERGY↗

Collaborative Enhancements to Unlock Interregional Transmission

Multiple recent studies highlight significant benefits associated with expansion of interregional transfer capabilities for efficiently adapting to these changes. Despite these proposed benefits, few, if any, interregional transmission projects have been built in recent memory . The objective of this report is to confront the barriers to interregional transmission that exist today and address them with potential reforms and collaborative solutions. This report identifies solutions with the potential for immediate beneficial impact on interregional transmission with the ultimate goal of allowing more effective identification and advancement of interregional transmission projects that create the most positive net value to the participating systems . It distinguishes between states, federal government, and planning regions as key actors in implementing solutions designed to be flexible to accommodate regional differences.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Radioactive Waste Management Basis

The purpose of this Radioactive Waste Management Basis is to describe the systematic approach for planning, executing, and evaluating the management of radioactive waste at LLNL. The implementation of this document will ensure that waste management activities at LLNL are conducted in compliance with the requirements of DOE Order 435.1, Radioactive Waste Management, and the Implementation Guide for DOE Manual 435.1-1, Radioactive Waste Management Manual. Technical justification is provided where methods for meeting the requirements of DOE Order 435.1 deviate from the DOE Manual 435.1-1 and Implementation Guide.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

REPORT OF ON-SITE INSPECTION WORKSHOP-16

The central issue addressed by this workshop was the task of making the on-site inspection (OSI) part of the Comprehensive Nuclear-Test-Ban Treaty verification system operationally ready at entry into force of the Treaty. It is recognized, and this was emphasized by the 2008 OSI Integrated Field Exercise (IFE), that it is not possible to develop every part of the OSI regime simultaneously. Therefore, it is necessary to prioritize the approach to OSI readiness. The reviews of the IFE have pointed to many elements of OSI readiness that still need development. The objective of this workshop was to provide priorities for the path forward for Working Group B to consider. Several critical areas have been identified that are related to the development of OSI readiness: (1) Technology development: Priorities are radionuclide and noble gas sampling and analysis, visual observation, multispectral/infrared imaging methods, active seismic methods and the recognition of the importance of signatures. (2) Organizational development: Priorities are health and safety, the Operations Support Centre, the Equipment Storage and Maintenance Facility, information technology data flow and communications. (3) Resources: The expertise to develop key parts of the OSI regime is not available within the current OSI Division staff. To develop these aspects of the regime will require more staff or supplements to the staff with cost-free experts or other means. Aspects of the system that could benefit from more staff include radionuclide and noble gas detection methods, data flow and communications, visual observation, multispectral/infrared methods and health and safety. As the path forward, participants of this workshop recognized a need to optimize the development of OSI priorities. The outcome of this workshop is to suggest for consideration an operational approach to OSI readiness that utilizes results of an evaluation of the relative effectiveness of OSI elements versus their relative maturity. By integrating such an assessment with considerations of integrated operational capabilities and the anticipated level of inspection team self-sufficiency and measurable milestone criteria, a set of priorities for OSI development can be developed. Once these priorities have been established, the Policy Making Organs can decide upon the milestones, strategic plan and action plan to serve as guidance for implementation by the Provisional Technical Secretariat. The suggested operational approach is as follows: (1) Assess the relative effectiveness (importance) of OSI elements versus their relative maturity; (2) Determine the anticipated level of self-sufficiency; (3) Define measurable milestone criteria; and (4) Result: Milestones for OSI readiness.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Net Zero Labs Pilot: NREL Roadmap to Decarbonization

NREL's Roadmap to decarbonize its campus aligns with Executive Order (EO) 14008, Tackling the Climate Crisis at Home and Abroad and EO 14057 Catalyzing America's Clean Energy Industries and Jobs through Federal Sustainability. NREL's strategic approach to reach net-zero emissions for its operational footprint and will occur in phases over the next decade. Decarbonizing NREL's footprint will require the elimination of greenhouse gas (GHG) emissions from all campus facilities' energy use and will be achieved through energy efficiency enhancements and the increased integration of clean energy sources. Engaging the private sector through an energy savings performance contract (ESPC) and relationships with NREL's utility providers will be crucial to NREL's implementation strategy.

decarbonize↗

Sensing and control of additive manufacturing processes

Systems, devices, and methods for additive manufacturing are provided that allow for components being manufactured to be assessed during the printing process. As a result, changes to a print plan can be considered, made, and implemented during the printing process. More particularly, in exemplary embodiments, a spectrometer is operated while a component is being printed to measure one or more parameters associated with one or more layers of the component being printed. The measured parameter(s) are then relied upon to determine if any changes are needed to the way printing is occurring, and if such changes are desirable, the system is able to implement such changes during the printing process. By way of non-limiting examples, printed material in one or more layers may be reheated to alter the printed component, such as to remove defects identified by the spectrometer data. A variety of systems, devices, and methods for performing real-time sensing and control of an additive manufacturing process are also provided.

Penny, Ryan Wade↗

Achievements and process improvements in processing transuranic waste at the TRU Waste Processing Center - 15488

Wastren Advantage, Inc., (WAI) is the DOE Prime contractor for the TRU Waste Processing Center (TWPC) located in Oak Ridge, TN. This paper highlights the TWPCs specific achievements and process improvements associated with both Contact (CH) and Remote Handled (RH), Transuranic (TRU) waste receipt processing and repackaging for disposal. The five key improvement areas and achievements include: - The TWPC installed, tested and operated successfully the Drum Venting System (DVS) to vent over-packed CH-TRU waste drums in several configurations including 55-gallon drums over-packed in 79 or 85-gallon drums. - A new Remote Drum Opener (RDO) system was designed, tested and placed in service to vent drums discovered in overpack boxes in the Box Breakdown Area and to vent overpack configurations that could not be handled in the standard DVS (e.g., 110 gallon overpacks and multiple drum configurations). - The Cask Processing Enclosure (CPE) approach to repackaging RH-TRU waste contained in concrete casks was developed and implemented - Hot Cell outage to incorporate planned equipment modifications and improvements to maintain processing rates. - To improve certification and segregation of CH-TRU from drums that meet Low Level Waste criteria for disposal at Nevada the TWPC added additional equipment/facilities for Non-Destructive Assay (NDA) and Real Time Radiography (RTR). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Refining Groundwater Monitoring Approaches Through an Objectives-Driven Process - 16333

Groundwater monitoring is conducted throughout the groundwater remediation process, from initial site characterization through demonstration of cleanup objectives attainment. The DOE uses the groundwater monitoring data to define plumes, manage ongoing remediation, and determine how close the contamination levels are to meeting an endpoint criteria, such as a drinking water standard. Due to the expense of groundwater sampling and analysis, the DOE Office of Environmental Management compiled a synopsis of monitoring technologies and approaches, and defined opportunities for improving environmental remediation monitoring. This information included techniques to optimize and streamline groundwater monitoring. At the Hanford Site, years of extensive groundwater monitoring have been applied to support characterization and remedy-selection activities. Continuation of this monitoring intensity would be costly and would need to be reviewed in the context of future activities for groundwater remedy implementation. A structured review of monitoring plans is underway and has identified significant potential changes to the monitoring approach. These changes have been developed based on careful definition of monitoring objectives and consideration of innovative and targeted techniques to gather the appropriate data for remedy performance monitoring and transition to longer-term monitoring and closure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Chooz A, First Pressurized Water Reactor to be Dismantled in France - 13445

Nine commercial nuclear power plants have been permanently shut down in France to date, of which the Chooz A plant underwent an extensive decommissioning and dismantling program. Chooz Nuclear Power Station is located in the municipality of Chooz, Ardennes region, in the northeast part of France. Chooz B1 and B2 are 1,500 megawatt electric (MWe) pressurized water reactors (PWRs) currently in operation. Chooz A, a 305 MWe PWR implanted in two caves within a hill, began operations in 1967 and closed in 1991, and will now become the first PWR in France to be fully dismantled. EDF CIDEN (Engineering Center for Dismantling and Environment) has awarded Westinghouse a contract for the dismantling of its Chooz A reactor vessel (RV). The project began in January 2010. Westinghouse is leading the project in a consortium with Nuvia France. The project scope includes overall project management, conditioning of the reactor vessel (RV) head, RV and RV internals segmentation, reactor nozzle cutting for lifting the RV out of the pit and seal it afterwards, dismantling of the RV thermal insulation, ALARA (As Low As Reasonably Achievable) forecast to ensure acceptable doses for the personnel, complementary vacuum cleaner to catch the chips during the segmentation work, needs and facilities, waste characterization and packaging, civil work modifications, licensing documentation. The RV and RV internals will be segmented based on the mechanical cutting technology that Westinghouse applied successfully for more than 13 years. The segmentation activities cover the cutting and packaging plan, tooling design and qualification, personnel training and site implementation. Since Chooz A is located inside two caves, the project will involve waste transportation from the reactor cave through long galleries to the waste buffer area. The project will end after the entire dismantling work is completed, and the waste storage is outside the caves and ready to be shipped either to the ANDRA (French National Radioactive Waste Management Agency) waste disposal facilities - (for low-level waste [LLW] and very low-level waste [VLLW], which are considered short lived) - or to the EDF Interim Storage Facility planned to be built on another site - (for low- and intermediate-level waste [LILW], which is considered long lived). The project has started with a detailed conceptual study that determines the step-by-step approach for dismantling the reactor and eventually supplying the packed containers ready for final disposal. All technical reports must be verified and approved by EDF and the French Nuclear Safety Authority before receiving the authorization to start the site work. The detailed conceptual study has been completed to date and equipment design and manufacturing is ongoing. This paper will present the conceptual design of the reactor internals segmentation and packaging process that will be implemented at Chooz A, including the planning, methodology, equipment, waste management, and packaging strategy. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Special Considerations for the Removal and Disposal of Micro-Reactor Experiments

Idaho National Laboratory (INL) is preparing to host several microreactor experiments through 2030 and beyond. Two new test beds currently under development will operate as microreactor or nuclear system experiment user facilities. Test bed experiments will be performed in series, with each nuclear experiment installed, operated, and removed before installation of the subsequent experiment. The necessarily brief transition period between experiments introduces unique equipment removal and radioactive waste disposal challenges. This paper evaluates equipment removal and radioactive waste management topics associated with tight sequencing of nuclear experiments and presents some of the solutions and approaches currently planned to meet these special considerations for one such experiment, the Molten Chloride Reactor Experiment (MCRE), slated for operation at INL’s Laboratory for Operation and Testing in the United States (LOTUS). The MCRE project is a collaboration between Southern Company Services, TerraPower, and INL, among others, to provide integral nuclear data that will advance molten salt fast reactor technology. MCRE will be the first critical fast-spectrum circulating fuel system ever operated and the first experiment operated in the LOTUS test bed. The experiment will nominally operate at zero power with planned low power excursions as part of operational planning for MCRE has been to minimize at-power operations to limit fission product formation while still achieving experimental objectives. After the experiment is complete, MCRE will be allowed to radioactively decay for a short period (nominally 90 days) prior to system defueling, flushing, removal, and disposal of all MCRE equipment, readying the test bed for the next nuclear experiment. Equipment removal and radioactive waste disposal have been integral to MCRE project planning since the Cooperative Research and Development Agreement was formalized in 2021. Due to requirements for future use of the test bed, the MCRE system, of necessity, must be removed in a much shorter time frame than typical for historic reactor decommissioning projects at INL. This results in minimal time for radioactive decay, resulting in not only elevated radiation dose rates but also the presence of short-to-medium-lived isotopes not typically encountered in the reactor decommissioning and radioactive waste management space. Additional unique constraints placed on the project include lack of intrinsic remote-operations capabilities in the test bed, space constraints in the test bed once MCRE has been installed, and contamination minimization requirements to return the test bed to as-found conditions to enable future use. This paper discusses planned solutions to these challenges. Approaches for implementing remote or semi-remote technologies in a non-hot cell environment with limited space availability are discussed. The paper also summarizes the systems engineering approach for concept development and design of equipment removal systems, which are being implemented concurrent with the MCRE design phase, providing feedback to system designers to incorporate features enabling efficient and safe equipment removal approaches. The timing of this paper at a relatively early phase of the project is meant to highlight the importance of early planning for nuclear system decommissioning while reactor design is ongoing to allow design feedback on componentry driven from decommissioning system needs. As new, innovative nuclear reactor technologies enter the nuclear market sector, reactor experiments are crucial for providing new integral nuclear data that establish safe operational margins for technology advancement. Microreactor experiments at INL will require safe, effective, and timely decommissioning approaches, which in turn require nuclear systems designed to expedite decommissioning. In addition to the advancement of nuclear reactor technologies, these nuclear experiments provide an opportunity to demonstrate, deploy, and test new removal and disposal capabilities to support the next generation of nuclear reactor technology.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TU-C-201-00: Clinical Implementation of HDR Brachytherapy

Recent use of HDR has increased while planning has become more complex often necessitating 3D image-based planning. While many guidelines for the use of HDR exist, they have not kept pace with the increased complexity of 3D image-based planning. Furthermore, no comprehensive document exists to describe the wide variety of current HDR clinical indications. This educational session aims to summarize existing national and international guidelines for the safe implementation of an HDR program. A summary of HDR afterloaders available on the market and their existing applicators will be provided, with guidance on how to select the best fit for each institution’s needs. Finally, the use of checklists will be discussed as a means to implement a safe and efficient HDR program and as a method by which to verify the quality of an existing HDR program. This session will provide the perspective of expert HDR physicists as well as the perspective of a new HDR user. Learning Objectives: Summarize national and international safety and staffing guidelines for HDR implementation Discuss the process of afterloader and applicator selection for gynecologic, prostate, breast, interstitial, surface treatments Learn about the use of an audit checklist tool to measure of quality control of a new or existing HDR program Describe the evolving use of checklists within an HDR program.

60 APPLIED LIFE SCIENCES↗