Search NASA⌕ Search

SEARCH · Search NASA

Results for “Program management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,099 records · Page 61

Design, building, and testing of the postlanding systems for the assured crew return vehicle

The design, building, and testing of the postlanding support systems for a water-landing Assured Crew Return Vehicle (ACRV) are presented. One ACRV will be permanently docked to Space Station Freedom, fulfilling NASA's commitment to Assured Crew Return Capability in the event of an accident or illness. The configuration of the ACRV is based on an Apollo Command Module (ACM) derivative. The 1990-1991 effort concentrated on the design, building, and testing of a one-fifth scale model of the egress and stabilization systems. The objective was to determine the feasibility of (1) stabilizing the ACM out of the range of motions that cause seasickness and (2) the safe and rapid removal of a sick or injured crew member from the ACRV. The development of the ACRV postlanding systems model was performed at the University of Central Florida with guidance from the Kennedy Space Center ACRV program managers. Emphasis was placed on four major areas. First was design and construction of a one-fifth scale model of the ACM derivative to accommodate the egress and stabilization systems for testing. Second was the identification of a water test facility suitable for testing the model in all possible configurations. Third was the construction of the rapid egress mechanism designed in the previous academic year for incorporation into the ACRV model. The fourth area was construction and motion response testing of the attitude ring and underwater parachute systems.

Hosterman, Kenneth C.↗

Natural environment application for NASP-X-30 design and mission planning

The NASA/MSFC Mission Analysis Program has recently been utilized in various National Aero-Space Plane (NASP) mission and operational planning scenarios. This paper focuses on presenting various atmospheric constraint statistics based on assumed NASP mission phases using established natural environment design, parametric, threshold values. Probabilities of no-go are calculated using atmospheric parameters such as temperature, humidity, density altitude, peak/steady-state winds, cloud cover/ceiling, thunderstorms, and precipitation. The program although developed to evaluate test or operational missions after flight constraints have been established, can provide valuable information in the design phase of the NASP X-30 program. Inputting the design values as flight constraints the Mission Analysis Program returns the probability of no-go, or launch delay, by hour by month. This output tells the X-30 program manager whether the design values are stringent enough to meet his required test flight schedules.

Johnson, D. L.↗

Rover concepts for lunar exploration

The paper describes the requirements and design concepts developed for the First Lunar Outpost (FLO) and the follow-on lunar missions by the Human Planet Surface Project Office at the Johnson Space Center, which include inputs from scientists, technologists, operators, personnel, astronauts, mission designers, and program managers. Particular attention is given to the requirements common to all rover concepts, the precursor robotic missions, the FLO scenario and capabilities, and the FLO evolution.

Connolly, John F.↗

Computer aided system engineering for space construction

This viewgraph presentation covers the following topics. Construction activities envisioned for the assembly of large platforms in space (as well as interplanetary spacecraft and bases on extraterrestrial surfaces) require computational tools that exceed the capability of conventional construction management programs. The Center for Space Construction is investigating the requirements for new computational tools and, at the same time, suggesting the expansion of graduate and undergraduate curricula to include proficiency in Computer Aided Engineering (CAE) though design courses and individual or team projects in advanced space systems design. In the center's research, special emphasis is placed on problems of constructability and of the interruptability of planned activity sequences to be carried out by crews operating under hostile environmental conditions. The departure point for the planned work is the acquisition of the MCAE I-DEAS software, developed by the Structural Dynamics Research Corporation (SDRC), and its expansion to the level of capability denoted by the acronym IDEAS**2 currently used for configuration maintenance on Space Station Freedom. In addition to improving proficiency in the use of I-DEAS and IDEAS**2, it is contemplated that new software modules will be developed to expand the architecture of IDEAS**2. Such modules will deal with those analyses that require the integration of a space platform's configuration with a breakdown of planned construction activities and with a failure modes analysis to support computer aided system engineering (CASE) applied to space construction.

Racheli, Ugo↗

California Student Get Away Special Payload GAS-450

The California Student Get Away Special Payload GAS-450, recently went into orbit on the STS-57 Mission, Space Shuttle, Endeavour, 21 June 1993, 6:14 AM and landed on the 29 June 1993 at Kennedy Space Center (KSC). Fifty students from 13 California Central Coast Schools and one in San Francisco designed and built 13 active experiments (6 modules) for this mission. Preliminary analysis of our completely reusable payload bus system indicated that the structure, power system, microprocessor, and sensor systems in each experiment module worked flawlessly. The experiments themselves performed exceptionally well with a 60 percent success ratio. The students are thoroughly documenting their own experiments and results via a standard research paper guideline generated by the GAS-450 technical staff. Lessons learned (program management and technical) are documented at the end of the paper. If any other organization needs payload/experiment development or NASA documentation assistance, then please contact us. We can help make your idea a space tested reality. Three years of intense effort culminated on 3 February 1993, the GSFC field operations team at Kennedy Space Center performed the final pressure decay and electrical tests upon the fully integrated GAS-450 flight canister. Subsequently, the payload was integrated with its parent GAS Bridge Assembly in mid-February and the bridge was transferred to the KSC orbiter team in late February 1993. The STS-57 mission originally scheduled to launch on the 29 April 1993 slipped until 21 June 1993. Our Payload shared the cargo bay with ten other GAS Canisters, the EUREKA experiment, the SHOOT experiment, and the SPACEHAB-1 module. The SIL technical staff retrieved the GAS-450 payload after flight from the NASA Spin Test Facility at KSC and shipped it back to California on the 22 July 1993 for student analysis at Allan Hancock College this summer.

Ray, Glen↗

The Telecommunications and Data Acquisition Report

This quarterly publication provides archival reports on developments in programs managed by JPL's Office of Telecommunications and Data Acquisition (TDA). In space communications, radio navigation, radio science, and ground-based radio and radar astronomy, it reports on activities of the Deep Space Network (DSN) in planning, supporting research and technology, implementation, and operations. Also included are standards activity at JPL for space data and information systems and reimbursable DSN work performed for other space agencies through NASA. The papers included in this document cover satellite tracking and ground-based navigation, spacecraft-ground communications, and optical communication systems for the Deep Space Network.

Yuen, Joseph H.↗

Final postflight hardware evaluation report RSRM-28 (STS-53)

The final report for the Clearfield disassembly evaluation and a continuation of the KSC postflight assessment for the RSRM-28 (STS-53) RSRM flight set is presented. All observed hardware conditions were documented on PFOR's and are included in Appendices A through C. Appendices D and E contain the measurements and safety factor data for the nozzle and insulation components. This report, along with the KSC Ten-Day Postflight Hardware Evaluation Report (TWR-64215), represents a summary of the RSRM-28 hardware evaluation. The as-flown hardware configuration is documented in TWR-63638. Disassembly evaluation photograph numbers are logged in TWA-1989. The RSRM-28 flight set disassembly evaluations described were performed at the RSRM Refurbishment Facility in Clearfield, Utah. The final factory joint demate occurred on July 15, 1993. Additional time was required to perform the evaluation of the stiffener rings per special issue 4.1.5.2 because of the washout schedule. The release of this report was after completion of all special issues per program management direction. Detailed evaluations were performed in accordance with the Clearfield PEEP, TWR-50051, Revision A. All observations were compared against limits that are also defined in the PEEP. These limits outline the criteria for categorizing the observations as acceptable, reportable, or critical. Hardware conditions that were unexpected and/or determined to be reportable or critical were evaluated by the applicable team and tracked through the PFAR system.

Starrett, William David, Jr.↗

Wiring for space applications program

The insulation testing and analysis consists of: identifying and prioritizing NASA wiring requirements; selecting candidate wiring constructions; developing test matrix and formulating test program; managing, coordinating, and conducting tests; and analyzing and documenting data, establishing guidelines and recommendations.

Hammoud, Ahmad↗

The Telecommunications and Data Acquisition Report

This quarterly publication provides archival reports on developments in programs managed by JPL's Office of Telecommunications and Data Acquisition (TDA). In space communications, radio navigation, radio science, and ground-based radio and radar astronomy, it reports on activities of the Deep Space Network (DSN). Also included is standards activity at JPL for space data and information systems and reimbursable DSN work performed for other space agencies through NASA. In the search for extraterrestrial intelligence (SETI), 'The TDA Progress Report' reports on implementation and operations for searching the microwave spectrum. In solar system radar, it reports on the uses of the Goldstone Solar System Radar for scientific exploration of the planets, their rings and satellites, asteroids, and comets. In radio astronomy, the areas of support include spectroscopy, very long baseline interferometry, and astrometry.

Posner, Edward C.↗

The Telecommunications and Data Acquisition Report

Reports on developments in programs managed by JPL's Office of Telecommunications and Data Acquisition (TDA) are provided. In space communications, radio navigation, radio science, and ground-based radio and radar astronomy, it reports on activities of the Deep Space Network (DSN) in planning, supporting research and technology, implementation, and operations. Also included are standards activity at JPL for space data and information systems and reimbursable DSN work performed for other agencies through NASA.

Yuen, Joseph H.↗

Volume serving and media management in a networked, distributed client/server environment

The E-Systems Modular Automated Storage System (EMASS) is a family of hierarchical mass storage systems providing complete storage/'file space' management. The EMASS volume server provides the flexibility to work with different clients (file servers), different platforms, and different archives with a 'mix and match' capability. The EMASS design considers all file management programs as clients of the volume server system. System storage capacities are tailored to customer needs ranging from small data centers to large central libraries serving multiple users simultaneously. All EMASS hardware is commercial off the shelf (COTS), selected to provide the performance and reliability needed in current and future mass storage solutions. All interfaces use standard commercial protocols and networks suitable to service multiple hosts. EMASS is designed to efficiently store and retrieve in excess of 10,000 terabytes of data. Current clients include CRAY's YMP Model E based Data Migration Facility (DMF), IBM's RS/6000 based Unitree, and CONVEX based EMASS File Server software. The VolSer software provides the capability to accept client or graphical user interface (GUI) commands from the operator's console and translate them to the commands needed to control any configured archive. The VolSer system offers advanced features to enhance media handling and particularly media mounting such as: automated media migration, preferred media placement, drive load leveling, registered MediaClass groupings, and drive pooling.

Herring, Ralph H.↗

Budget estimates, fiscal year 1995. Volume 2: Mission support and Inspector General

The mission support appropriations provides funding for NASA's civil service work force, space communication services, safety and quality assurance activities, and for maintenance activities for the NASA institution. These objectives are accomplished through the following elements: safety, reliability, and quality assurance; space communication services; research and program management; and construction of facilities.

Source record↗

Earth Observing System (EOS)/Advanced Microwave Sounding Unit-A (AMSU-A)

This is the twentieth monthly report for the Earth Observing System/Advanced Microwave Sounding Unit-A (EOS/AMSU-A), Contract NAS5-32314, and covers the period from 1 August 1994 through 31 August 1994. This period is the eighth month of the Implementation Phase which provides for the design, fabrication, assembly, and test of the first EOS/AMSU-A, the Protoflight Model. During this period the number one priority for the program continued to be the issuance of Requests for Quotations (RFQ) to suppliers and the procurement of the long-lead receiver components. Significant effort was also dedicated to preparation and conduct of internal design reviews and preparation for the PDR scheduled in September. An overview of the program status, including key events, action items, and documentation submittals, is provided in Section 2 of this report. The Program Manager's 'Priority Issues' are defined in Section 3. Section 4 through 7 provide detailed progress reports for the system engineering effort, each subsystem, performance assurance, and configuration/data management. Contractual matters are discussed in Section 8.

Source record↗

The Telecommunications and Data Acquisition Report

This quarterly publication provides archival reports on developments in programs managed by JPL's Telecommunications and Mission Operations Directorate (TMOD), which now includes the former Telecommunications and Data Acquisition (TDA) Office. In space communications, radio navigation, radio science, and ground-based radio and radar astronomy, it reports on activities of the Deep Space Network (DS) in planning, supporting research and technology, implementation, and operations. Also included are standards activity at JPL for space data and information systems and reimbursable DSN work performed for other space agencies through NASA. The preceding work is all performed for NASA's Office of Space Communications (OSC).

Yuen, Joseph H.↗

The Telecommunications and Data Acquisition Report

This quarterly publication provides archival reports on developments in programs managed by JPL's Telecommunications and Mission Operations Directorate (TMOD), which now includes the former Telecommunications and Data Acquisition (TDA) Office. In space communications, radio navigation, radio science, and ground-based radio and radar astronomy, it reports on activities of the Deep Space Network (DSN) in planning, supporting research and technology, implementation, and operations. Also included are standards activity at JPL for space data and information systems and reimbursable DSN work performed for other space agencies through NASA. The preceding work is all performed for NASA's Office of Space Communications (OSC).

Yuen, Joseph H.↗

Environmental projects. Volume 16: Waste minimization assessment

The Goldstone Deep Space Communications Complex (GDSCC), located in the MoJave Desert, is part of the National Aeronautics and Space Administration's (NASA's) Deep Space Network (DSN), the world's largest and most sensitive scientific telecommunications and radio navigation network. The Goldstone Complex is operated for NASA by the Jet Propulsion Laboratory. At present, activities at the GDSCC support the operation of nine parabolic dish antennas situated at five separate locations known as 'sites.' Each of the five sites at the GDSCC has one or more antennas, called 'Deep Space Stations' (DSS's). In the course of operation of these DSS's, various hazardous and non-hazardous wastes are generated. In 1992, JPL retained Kleinfelder, Inc., San Diego, California, to quantify the various streams of hazardous and non-hazardous wastes generated at the GDSCC. In June 1992, Kleinfelder, Inc., submitted a report to JPL entitled 'Waste Minimization Assessment.' This present volume is a JPL-expanded version of the Kleinfelder, Inc. report. The 'Waste Minimization Assessment' report did not find any deficiencies in the various waste-management programs now practiced at the GDSCC, and it found that these programs are being carried out in accordance with environmental rules and regulations.

Source record↗

NEIS (NASA Environmental Information System)

The NASA Environmental Information System (NEIS) is a tool to support the functions of the NASA Operational Environment Team (NOET). The NEIS is designed to provide a central environmental technology resource drawing on all NASA centers' capabilities, and to support program managers who must ultimately deliver hardware compliant with performance specifications and environmental requirements. The NEIS also tracks environmental regulations, usages of materials and processes, and new technology developments. It has proven to be a useful instrument for channeling information throughout the aerospace community, NASA, other federal agencies, educational institutions, and contractors. The associated paper will discuss the dynamic databases within the NEIS, and the usefulness it provides for environmental compliance efforts.

Cook, Beth↗