At least 1,099 records · Page 61

Risk Management on the National Compact Stellarator Project (NCSX)

In its simplest form, risk management is a continuous assessment from project start to completion that identifies what can impact your project (i.e., what the risks are)., which of these risks are important, and identification and implementation of strategies to deal with these risks (both threats and opportunities). The National Compact Stellerator Experiment (NCSX) Project was a "first-of-a-kind" fusion experiment that was technically very challenging, primarily resulting from the complex component geometries and tight tolerances. Initial risk quantification approaches proved inadequate and contributed to the escalation of costs as the design evolved and construction started. After the Project was well into construction, a new risk management plan was adopted. This plan was based on successful Department of Energy (DOE) and industrial risk management precepts. This paper will address the importance of effective risk management processes and lessons learned. It is of note that a steady reduction of risk was observed in the last six months of the project.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Capacity Investment under Bayesian Information Updates at Reporting Periods: Model and Application

We consider capacity addition decisions by a new product manufacturer faced with uncertain technology alternatives. The manufacturing capacity addition and technology development occurs in parallel, with preliminary results from a technology project's success providing valuable information to the manufacturer in adding capacity. We solve a stochastic dynamic program with Bayesian updates to obtain the manufacturer's expected profit‐maximizing capacity investment decision. Our model and applications are motivated by the Critical Materials Institute (CMI) (funded by the Department of Energy), which manages research projects focused on mitigating critical material constraints, vital to renewable energy technologies such as direct‐drive wind turbines, electric vehicles, and energy‐efficient lighting. We capture three unique aspects of the problem: first, the learning from project progress depends on task‐based stochastic outcomes and a project's percent‐done. Second, the underlying technology's profitability is based on a model of competition. Third, we evaluate the impact of progress across a portfolio of projects based on a manufacturer's capacity addition. We develop a heuristic that produces results that are close to optimal and can thus be used for large problem sizes. The managerial insights from an application of our model to CMI projects include: (i) technology projects that report the percent‐done of a project earlier increase expected manufacturer profit; (ii) careful choice of “safe bets,” that is, technologies with low profitability but a high probability of success, can increase expected manufacturer profit; (iii) a portfolio of projects can increase profits significantly over separate project evaluation; and (iv) dynamic management of project resources can increase overall profit.

Vedantam, Aditya↗

Managing Marine Energy Risks for Project Success

This presentation reviews recommended practices for marine energy risk management based on NLR's recent risk management framework publication (https://www.nrel.gov/docs/fy24osti/90212.pdf). This presentation will include a demonstration of risk management processes and techniques that everyone in the marine energy industry can use to successfully meet their project objectives. This presentation will include a description of methods to identify and manage risks that are specific to marine energy, while demonstrating this through tools such as risk registers, failure modes effects and criticality analysis (FMECA), and more tools that are currently being developed. The goal of this presentation is for the participants to have knowledge and access to tools to help them manage the risks specific to their marine energy projects.

13 HYDRO ENERGY↗

Exploring Legacy Document Management Systems to Increase Access to Project Data

The current Electronic Data Management System (EDMS) makes it difficult to efficiently access information in critical time frames. This project explored ways to allow Environmental Support and Services staff the ability to efficiently access documents with necessary historic information while leveraging existing data classification methods and the capabilities of EDMS.

99 GENERAL AND MISCELLANEOUS↗

IrrigationViz: A Geospatial Visualization Application to Facilitate Irrigation Modernization

Irrigation water delivery infrastructure, such as canals and pipelines, are essential to agriculture in the Western U.S., yet many of these systems are reaching the end of their useful lives. Reinvestment can achieve a wide variety of benefits, from water conservation to energy savings or renewable energy generation. Modernization requires significant planning, design, and implementation funding which can be a challenge for many irrigation districts. Here, this paper introduces IrrigationViz, a web-based mapping application designed to help irrigation districts visualize and generate high-level cost and benefit estimates for infrastructure modernization projects. These estimates can help water managers identify projects that benefit from additional engineering resources and ultimately obtain funding. IrrigationViz includes map interactions, graphs, and visualization components to facilitate planning and communication to stakeholders and funders. IrrigationViz combines user-provided information about a water-delivery system with public datasets and basic engineering formulas to generate estimates of the benefits of reinvestment. Estimates include the amount of water seepage in earthen canals, potential hydropower generation associated with replacing a canal with a pressurized pipe, and pipe size recommendations. We found that hydropower generation estimates compared favorably with real world projects, but seepage loss estimates showed high variability relative to on-the-ground measurements

99 - GENERAL AND MISCELLANEOUS↗

W.A. Parish Post-Combustion CO 2 Capture and Sequestration Demonstration Project (Final Technical Report)

The Petra Nova Project (Project) is a commercial scale post-combustion carbon capture project developed by a joint venture between NRG Energy, Inc. (NRG) and JX Nippon Oil Exploration (EOR) Limited (JX). The Project is designed to separate and capture carbon dioxide (CO2) from an existing coal-fired unit’s flue gas slipstream at NRG’s W.A. Parish Electric Generating Station (WAP) located southwest of Houston, Texas. The captured CO2 is dried, compressed, and transported via an 81-mile pipeline to the West Ranch oilfield (West Ranch) in Jackson County, Texas, where it is injected to boost oil production. The Project, which is partially funded by a grant (Grant) from the United States (U.S.) Department of Energy (DOE) under the Clean Coal Power Initiative (CCPI) Round 3, uses the Kansai Mitsubishi Carbon Dioxide Recovery advanced amine-based CO 2 absorption technology (KM-CDR Process®), which was jointly developed by Mitsubishi Heavy Industries, Ltd. (MHI) and the Kansai Electric Power Co. Inc., to treat and capture at least ninety percent (90%) of the CO 2 from a 240-megawatt equivalent (MWe) flue gas slipstream off of Unit 8 at WAP. When operating at full capacity, the Project captures approximately 5,200 short tons of CO 2 per day, which would otherwise be emitted into the atmosphere, representing the largest commercial scale deployment of post-combustion CO2 capture technology at a coal power plant to date. Under the Grant, the Project was managed in 3 phases: (1) Phase 1: Project Definition / Front End Engineering Design (FEED) (2) Phase 2: Detailed Engineering, Procurement & Construction (3) Phase 3: Demonstration and Monitoring. On December 29, 2016, commercial operation of the Project was achieved, ending Phase 2 and starting Phase 3, a 3-year demonstration period running from January 1, 2017 through December 31, 2019. The key objectives of Phase 3 were to (a) demonstrate the specific advanced technologies constructed during Phase 2 and (b) monitor the injected CO 2 at West Ranch to demonstrate technologies and protocols for monitoring, verification, and accounting (MVA). As of the end of Phase 3, Petra Nova captured 3,904,978 short tons of CO 2 (3,542,537 metric tons) that was transported to West Ranch. To support the DOE obligation to monitor, verify, and account for the sequestered CO 2 at West Ranch, Petra Nova contracted with the Bureau of Economic Geology (in the Jackson School of Geosciences at The University of Texas at Austin) to (a) design a monitoring program, (b) draft an MVA Plan for DOE review and approval, and (c) working with Petra Nova and the operator of West Ranch to manage and report on the MVA activity. This report discussed the technical aspects of the project during each of the 3 phases of the project as identified above.

01 COAL, LIGNITE, AND PEAT↗

EPRI Research Results: International Nuclear Power Plant Waste Classification - 17444

Different countries around the globe use varying schemes for the classification of radioactive waste. Many countries develop country specific waste classification schemes based on the International Atomic Energy Agency (IAEA) waste classification framework. The United States of America use the Class A, B, and C waste classification. Additionally, some countries use concentration limits to classify wastes while others use dose rate limits or a combination of concentration and dose rate limits. General comparisons have been made between the IAEA and the United States classification schemes, but a clear and well researched comparison of the international schemes was not evident in the available research data sets. In 2013 Electric Power Research Institute (EPRI) initiated the Comparison of Global Low and Intermediate Level Waste Management Methods project. The objective of the project was to understand how six countries managed their low and intermediate level wastes from generation to disposal. A major task of this project was to conduct a comparison of the international waste classification schemes. EPRI developed a set of reference waste volumes that are representative of nuclear power plant low-level radioactive waste in form and radioactivity concentrations (e.g. dry active waste, high activity resin, low activity resin, high activity filters and low activity filters). These waste volumes were then classified using the waste classification systems in place in several countries around the world. In 2016, EPRI presented a paper providing a status update on this research. This 2017 paper provides the final results of that research, show where comparisons and correlations can be made, and provide a discussion on how this information might inform international radioactive research and development and benchmarking of radioactive waste management strategies, operational experiences, best practices, and technology implementation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrating the Clearance in NPP Residual Material Management

Previous Experiences in decommissioning projects are being used to optimize the residual material management in NPP, metallic scrap usually. The approach is based in the availability of a materials Clearance MARSSIM-based methodology developed and licensed in Spain. A typical project includes the integration of segregation, decontamination, clearance, quality control and quality assurance activities. The design is based in the clearance methodology features translating them into standard operational procedures. In terms of ecological taxes and final disposal costs, significant amounts of money could be saved with this type of approaches. The last clearance project managed a total amount of 405 tons scrap metal and a similar amount of other residual materials occupying a volume of 1500 m{sup 3}. After less than a year of field works 251 tons were finally recycled in a non-licensed smelting facility. The balance was disposed as LILW. In the planning phase the estimated cost savings were 4.5 Meuro. However, today a VLLW option is available in European countries so, the estimated cost savings are reduced to 1.2 Meuro. In conclusion: the application of materials clearance in NPP decommissioning lessons learnt to the NPP residual material management is an interesting management option. This practice is currently going on in Spanish NPP and, in a preliminary view, is consistent with the new MARSAME Draft. An interesting parameter is the cost of 1 m3 of recyclable scrap. The above estimates are very project specific because in the segregation process other residual materials were involved. If the effect of this other materials is removed the estimated Unit Cost were in this project around 1700 euro/m{sup 3}, this figure is clearly below the above VLLW disposal cost of 2600 euro. In a future project it appears feasible to descend to 839 euro/m{sup 3} and if it became routine values and is used in big Decommissioning projects, around 600 euro/m{sup 3} or below possibly could be achieved. A rough economical analysis permits to estimate a saving around 2000 US$ to 13000 US$ per cubic meter of steel scrap according the variability of materials and disposal costs. Many learnt lessons of this practice were used as a feed back in the planning of characterization activities for decommissioning a Spanish NPP and today are considered as a significant reference in our Decommissioning engineering approaches.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Wind Energy Management System EMS Integration Project: Incorporating Wind Generation and Load Forecast Uncertainties into Power Grid Operations

The power system balancing process, which includes the scheduling, real time dispatch (load following) and regulation processes, is traditionally based on deterministic models. Since the conventional generation needs time to be committed and dispatched to a desired megawatt level, the scheduling and load following processes use load and wind and solar power production forecasts to achieve future balance between the conventional generation and energy storage on the one side, and system load, intermittent resources (such as wind and solar generation), and scheduled interchange on the other side. Although in real life the forecasting procedures imply some uncertainty around the load and wind/solar forecasts (caused by forecast errors), only their mean values are actually used in the generation dispatch and commitment procedures. Since the actual load and intermittent generation can deviate from their forecasts, it becomes increasingly unclear (especially, with the increasing penetration of renewable resources) whether the system would be actually able to meet the conventional generation requirements within the look-ahead horizon, what the additional balancing efforts would be needed as we get closer to the real time, and what additional costs would be incurred by those needs. To improve the system control performance characteristics, maintain system reliability, and minimize expenses related to the system balancing functions, it becomes necessary to incorporate the predicted uncertainty ranges into the scheduling, load following, and, in some extent, into the regulation processes. It is also important to address the uncertainty problem comprehensively by including all sources of uncertainty (load, intermittent generation, generators’ forced outages, etc.) into consideration. All aspects of uncertainty such as the imbalance size (which is the same as capacity needed to mitigate the imbalance) and generation ramping requirement must be taken into account. The latter unique features make this work a significant step forward toward the objective of incorporating of wind, solar, load, and other uncertainties into power system operations. Currently, uncertainties associated with wind and load forecasts, as well as uncertainties associated with random generator outages and unexpected disconnection of supply lines, are not taken into account in power grid operation. Thus, operators have little means to weigh the likelihood and magnitude of upcoming events of power imbalance. In this project, funded by the U.S. Department of Energy (DOE), a framework has been developed for incorporating uncertainties associated with wind and load forecast errors, unpredicted ramps, and forced generation disconnections into the energy management system (EMS) as well as generation dispatch and commitment applications. A new approach to evaluate the uncertainty ranges for the required generation performance envelope including balancing capacity, ramping capability, and ramp duration has been proposed. The approach includes three stages: forecast and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence levels. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis, incorporating all sources of uncertainties of both continuous (wind and load forecast errors) and discrete (forced generator outages and start-up failures) nature. A new method called the “flying brick” technique has been developed to evaluate the look-ahead required generation performance envelope for the worst case scenario within a user-specified confidence level. A self-validation algorithm has been developed to validate the accuracy of the confidence intervals.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Ubiquitous Computing and Monitoring System (UCoMS) for Discovery and Management of Energy Resources (Project Final Report)

The UCoMS research cluster has spearheaded three research areas since August 2004, including wireless and sensor networks, Grid computing, and petroleum applications. The primary goals of UCoMS research are three-fold: (1) creating new knowledge to push forward the technology forefronts on pertinent research on the computing and monitoring aspects of energy resource management, (2) developing and disseminating software codes and toolkits for the research community and the public, and (3) establishing system prototypes and testbeds for evaluating innovative techniques and methods. Substantial progress and diverse accomplishment have been made by research investigators in their respective areas of expertise cooperatively on such topics as sensors and sensor networks, wireless communication and systems, computational Grids, particularly relevant to petroleum applications.

02 PETROLEUM↗

An Approach to Data Management Planning for Protected Data Projects

This report describes what is required in a data management plan for data that needs to be protected in some fashion. Here we provide an overview of what a data manager should consider, including the data ingestion and various extract-transform-load processes, metadata considerations and documentation, to what might need to be accounted for in the event of data loss. In addition, this report includes two appendices: forms that, when filled out, make the user compliant with DOE data management requirements as well as additional requirements for handling protected data at ORNL.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

American Recovery and Reinvestment Act Federal Energy Management Program Technical Assistance Project 184 U.S. Customs and Border Protection Laboratory, Houston, Texas

This report documents the findings of an on-site energy audit of the U.S. Customs and Border Protection (CBP) Laboratory in Houston, Texas. The focus of the audit was to identify various no-cost and low-cost energy efficiency opportunities that, once implemented, would reduce electricity and gas consumption and increase the operational efficiency of the building. This audit also provided an opportunity to identify potential capital cost projects that should be considered in the future to acquire additional energy (electric and gas) and water savings to further increase the operational efficiency of the building.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Management of the Cs/Sr Capsule Project at the Hanford Site. Technology Readiness Assessment Report

The Federal Project Director (FPD) for the U.S. Department of Energy (DOE), Richland Operations Office (RL) Waste Management and D&D Division (WMD) requested a Technology Readiness Assessment (TRA) for the Management of the Cesium/Strontium Capsule Storage Project (MCSCP) at the Waste Encapsulation and Storage Facility (WESF) on the Hanford Site in Washington State. The MCSCP CD-1 TRA was performed by a team selected in collaboration between the Office of Environmental Management (EM) Chief Engineer (EM-3.3) and RL, WMD FPD. The TRA Team included subject matter and technical experts having experience in cask storage, process engineering, and system design who were independent of the MCSCP, and the team was led by the Director of Operations and Processes from the EM Chief Engineer's Office (EM-3.32). Movement of the Cs/Sr capsules to dry storage, based on information from the conceptual design, involves (1) capsule packaging, (2) capsule transfer, and (3) capsule storage. The project has developed a conceptual process, described in 30059-R-02, "NAC Conceptual Design Report for the Management of the Cesium and Strontium Capsules Project", which identifies the five major activities in the process to complete the transfer from storage pool to pad-mounted cask storage. The process, shown schematically in Figure 1, is comprised of the following process steps: (1) loading capsules into the UCS; (2) UCS processing; (3) UCS insertion into the TSC Basket; (4) cask transport from WESF to CSA and (5) extended storage at the CSA.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗