Search NASA⌕ Search

SEARCH · Search NASA

Results for “Reliability and Integrity Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,099 records · Page 61

Vulcan Test Platform: Demonstrating the Data Center as a Flexible Grid Asset

Explosive data center demand is outpacing grid infrastructure development. AI workloads and hyperscale cloud growth are creating unprecedented power requirements, while traditional grid expansion faces multi-year development timelines, regulatory hurdles, and decarbonization challenges. Sidewalk Infrastructure Partners recognized this impending crisis years ago and founded Verrus to develop an innovative solution: data centers that function as grid assets rather than passive loads. The Verrus approach integrates proprietary grid-aware controls with battery energy storage systems (BESS) in a medium-voltage architecture that delivers three critical capabilities: Fast-responding demand flexibility that can service requests from the utility within 10 seconds, Uninterrupted transition to islanded operation during grid disturbances, Continuous uptime assurance while maintaining all customer service level commitments Through Verrus' strategic partnership with the National Renewable Energy Laboratory (NREL), we validated these capabilities on Vulcan, a 70 MW utility-scale test platform powered by NREL's ARIES Virtual Emulation Environment. This deployment-ready technology has successfully demonstrated that Verrus data centers can deliver meaningful grid services while maintaining mission-critical reliability. This technical report outlines the design, methodology, and results of this emulated deployment, demonstrating that data centers can play a pivotal role in enhancing grid flexibility and reliability, without sacrificing service level guarantees.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Photovoltaic at Hollywood and Desert Breeze Recreational Centers

In accordance with the goals of the Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy for promoting solar energy as clean, carbon-free and cost-effective, the County believed that a recreational center was an ideal place to promote solar energy technologies to the public. This project included the construction of solar electricity generation facilities (40kW) at two Clark County facility sites, Desert Breeze Recreational Center and Hollywood Recreational Center, with educational kiosks and Green Boxes for classroom instruction. The major objectives and goals of this Solar Project include demonstration of state of the art technologies for the generation of electricity from solar technology and the creation of an informative and educational tool in regards to the benefits and process of generating alternative energy. Clark County partnered with Anne Johnson (design architect/consultant), Affiliated Engineers Inc. (AEI), Desert Research Institute (DRI), and Morse Electric. The latest photovoltaic technologies were used in the project to help create the greatest expected energy savings for60443 each recreational center. This coupled with the data created from the monitoring system will help Clark County and NREL further understand the real time outputs from the system. The educational portion created with AEI and DRI incorporates material for all ages with a focus on K - 12. The AEI component is an animated story telling the fundamentals of how sunlight is turned into electricity and DRI‘s creation of Solar Green Boxes brings environmental education into the classroom. In addition to the educational component for the public, the energy that is created through the photovoltaic system also translates into saved money and health benefits for the general public. This project has helped Clark County to further add to its own energy reduction goals created by the energy management agenda (Resolution to Encourage Sustainability) and the County’s Eco-initiative. Each site has installed photovoltaic panels on the existing roof structures that exhibit suitable solar exposure. The generation systems utilize solar energy creating electricity used for the facility’s lighting system and other electrical requirements. Unused electricity is sent to the electric utility grid, often at peak demand times. Educational signage, kiosks and information have been included to inform and expand the public’s understanding of solar energy technology. The Solar Green Boxes were created for further hands on classroom education of solar power. In addition, data is sent by a Long Term PV performance monitoring system, complete with data transmission to NREL (National Renewable Energy Laboratory), located in Golden, CO. This system correlates local solar irradiance and weather with power production. The expected outcomes of this Solar Project are as follows: (1) Successful photovoltaic electricity generation technologies to capture solar energy in a useful form of electrical energy. (2) Reduction of greenhouse gas emissions and environmental degradation resulting from reduced energy demand from traditional electricity sources such as fossil fuel fired and nuclear power plants. (3) Advance the research and development of solar electricity generation. (4) The education of the general public in regards to the benefits of environmentally friendly electricity generation and Clark County’s efforts to encourage sustainable living practices. (5) To provide momentum for the nexus for future solar generation facilities in Clark County facilities and buildings and further the County’s energy reduction goals. (6) To ultimately contribute to the reduction of dependence on foreign oil and other unsustainable sources of energy. This Solar Project addresses several objectives and goals of the U.S. Department of Energy’s Solar Energy Technology Program. The project improves the integration and performance of solar electricity directly through implementation of cutting edge technology. The project further addresses this goal by laying important ground work and infrastructure for integration into the utility grid in future related projects. There will also be added security, reliability, and diversity to the energy system by providing and using reliable, secure, distributed electricity in Clark County facilities as well as sending such electricity back into the utility electric grid. A final major objective met by the Solar Project will be the displacement of energy derived by fossil fuels with clean renewable energy created by photovoltaic panels.

14 SOLAR ENERGY↗

Final Report Start-Up and Commissioning Tests on the DuraMelter 1200 HLW Pilot Melter System Using AZ-101 HLW Simulants

This document provides the final report on data and results obtained from commissioning tests performed on the one-third scale DuraMelter{trademark} 1200 (DM 1200) HLW Pilot Melter system that has been installed at VSL with an integrated prototypical off-gas treatment system. That system has replaced the DM1000 system that was used for HLW throughput testing during Part BI [1]. Both melters have similar melt surface areas (1.2 m{sup 2}) but the DM1200 is prototypical of the present RPP-WTP HLW melter design whereas the DM1000 was not. These tests were performed under a corresponding RPP-WTP Test Specification and associated Test Plan. This report is a followup to the previously issued Preliminary Data Summary Report. The DM1200 system will be used for testing and confirmation of basic design, operability, flow sheet, and process control assumptions as well as for support of waste form qualification and permitting. This will include data on processing rates, off-gas treatment system performance, recycle stream compositions, as well as process operability and reliability. Consequently, this system is a key component of the overall HLW vitrification development strategy. The results presented in this report are from the initial series of short-duration tests that were conducted to support the start-up and commissioning of this system prior to conducting the main body of development tests that have been planned for this system. These tests were directed primarily at system 'debugging,' operator training, and procedure refinement. The AZ-101 waste simulant and glass composition that was used for previous testing was selected for these tests.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Microgrid optimized resource dispatch for public-purpose resiliency and sustainability. The Olney Town Center Microgrid Project

Communities in Atlantic coastal regions have in recent years sought to improve the resiliency of their critical infrastructure and public services, especially to protect against hurricanes and other events capable of causing widespread damage and disruption. As the backbone of any community’s critical functions, the electricity distribution system requires high resiliency in order to maintain local energy delivery services. Against this backdrop, the Project sought to develop a resilient energy microgrid control system capable of integrating distributed renewable energy resources, natural gas CHP units, energy storage, and demand-side management technologies in near-real-time optimization schemes for the community of Olney, Md. The Montgomery County Planning Board in 2005 established the Olney Town Center area as a “civic center/town commons,” in part because it serves as a key point of interaction in the community – but also because it contains numerous vital community assets. With a total peak electrical load of about 8 MW (including Montgomery General Hospital with a 2.4 MW peak), the Project area is a business and essential services area, directly serving a suburban population of more than 33,000 residents. It contains a hospital, police station, two fire stations, two schools, grocery stores, and gas stations, and the community’s water tower, among other things. Moreover, the location stands at the crossroads of two state highways that represent major regional arteries for commerce and public safety in Montgomery County. These characteristics made the Project area an appropriate setting for considering microgrid deployment. It presented a model of a typical Maryland suburban community, with geographic dispersion of vital assets over a sizeable area, and a combination of overhead distribution lines and underground cables serving those critical loads. Such a representative model helped to ensure the solutions developed and the scenarios tested would be readily applicable to other communities in the state and the region. Further, the Project’s outcomes and lessons provide insights to guide community microgrid design and development in many locations. To achieve Project objectives – including those established by the U.S. Department of Energy (DOE) National Energy Technology Laboratory – the Project team researched, developed, and tested in simulation a set of microgrid controls capable of maintaining electricity supplies for critical community loads in the event of a regional utility outage lasting many days or even weeks. Testing and analysis showed that the microgrid would be capable of maintaining electricity supply to critical loads essentially indefinitely in most outage scenarios, while also substantially improving overall reliability for microgrid customers. With targeted improvements in local utility distribution infrastructure, test analysis showed that the microgrid would be capable of reducing annual electricity outages for critical loads by 98%. Further, to help achieve environmental and efficiency policy goals established by both the State of Maryland and the federal government, the team designed the system to reduce the annual carbon footprint of served loads by 20%, and to improve system energy efficiency for those loads by at least 20%. Testing showed that, as designed, the system is capable of meeting these performance requirements, with potential for further improvements through more effective thermal energy utilization. This Final Report, comprised of four volumes and 11 annexes, presents the results of these project efforts, including feasibility assessment (section F) and guidance for decision-makers considering prospective deployment of public-purpose microgrid systems in Maryland communities.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Modernizing the Nuclear Industry and New Ways of Working

Nuclear energy is recognized as the most feasible energy source towards achieving nation-wide net-zero goals (COP 208, MIT). Additionally, the demand for reliable, consistent energy supply is soaring with the construction of energy hungry data centers and AI tools. This means the construction of new nuclear and the continuation of current nuclear are a high national priority. However, this leaves the nuclear industry with a workforce challenge. The rising demand for nuclear power is threatened by an underpopulated workforce. There exist a few contributors to the decreased workforce such as skewed workforce demographics resulting in large-scale workforce retirement. Also, some plants have observed difficulty hiring and retaining skill sets that typically comprise the nuclear power workforce – specifically skilled craftsman. Those who are graduating with desirable skills are seeking employment in sectors that are more modern and culturally more aligned with younger generational values. Lastly, within the nuclear sector, skilled employees will be a competitive commodity as advanced plants come online offering work environments that incorporate modern technologies, skill sets, and opportunities for career advancement. These factors emphasize the need for legacy plants to modernize with a focus on the workplace environment and culture that meets younger generations’ skills, cultural expectations, and desire for advancement opportunities. Nuclear plants are actively engaged in deploying advancements that improve the management of systems, structures, and components as well as process improvements and technologies that can reduce the costs of operation and maintenance. However, the advancements must also be analyzed, reviewed and deployed in a manner that considers the impact on how people within the organization collaborate, communicate, make decisions, and solve problems. Neglecting to consider the cultural impact of modernization risks poor adoption, unrealized opportunities, or insignificant change toward helping attract new employees. The traditional way of working is not necessarily the way new generations want to engage with their employer. For instance, in a survey performed by North American Young Generation in Nuclear the top three reasons for younger nuclear employees to seek other job opportunities was seeking better work-life balance, a lack of advancement opportunities, and work culture and leadership style differences (Smyth et al. 2022). Integrated Operations for Nuclear (ION) is an approach for the nuclear industry to create long-term strategic modernization plans and analyze each advancement for the impact on people and processes and measure how those impacts flow up to support high-level, long-term plant goals and requirements. One principle of ION is to replace the current labor-centric operation style in legacy nuclear plants with data-centric collaborative operation styles. This paper will explain how transitioning operations to leverage centralized skills and responsibility, multi-skilled teams, and collaborative decision making can flatten the hierarchical structure in plants, enable greater individual efficacy while also offering more experiences and advancement opportunities to staff. Adopting the ION way of working shifts the industry mind-set towards more networked, collaborative, and modern way of working that will attract skilled, next-generation workers to operate the legacy nuclear fleet.

99 - GENERAL AND MISCELLANEOUS↗

Progress on Advancing Robotic Ultrasonic Volumetric Inspection Technology for Hanford Under-tank Inspection - 19474

The Hanford River Protection Project is reliant on safe interim storage of high-level waste at the Hanford site and will continue to depend on it until the waste has been treated and vitrified by the Hanford Waste Treatment and Immobilization Plant (WTP). The Hanford double-shell tanks (DSTs) have provided interim storage since the DSTs were put into service (1971 - 1986) and the RPP will continue to rely on their service until least 2050, at which time the 27 in-service DSTs will be 14-54 years beyond their original design lives. As the DSTs continue to age and be operated beyond design life, reliable leak integrity assessments of primary tanks and secondary liners will become increasingly important in order to provide situational awareness to tank operations personnel and to support risk-informed decisions on the selection of DSTs as waste feed staging tanks and the order and timing of future DST refurbishment or, alternatively, DST retrieval sequence. This paper summarizes progress made in fiscal year (FY) 2018 on the engineering of a robotic air-slot volumetric inspection system (RAVIS) that is designed to perform ultrasonic (volumetric) leak integrity inspections of physically inaccessible primary tank bottom plates and welds. Leak integrity inspections performed with the RAVIS will supplement today's primary tank leak integrity inspections, which are currently limited to physically accessible sidewall plates and welds. The RAVIS will be deployed into air slots of the insulating concrete (refractory) pad beneath the primary tanks and use its ultrasonic guided wave phased-array (GWPA) sensor to electronically steer an ultrasonic beam 360-degrees around the sensor to volumetrically examine adjacent carbon steel plates and welds covered by refractory pad material. Deployments of RAVIS down multiple air-slots will be performed to determine which regions of a tank bottom have sound leak integrity or which regions are in need of future wall thickness restoration or weld repair due to pitting corrosion, general corrosion, or heat/stress-induced cracks. The initial RAVIS design and the flaw detection test results for the first air-slot GWPA sensor that was designed to fit inside the air-slots will be presented in this paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Wireless Infrastructure for Performing Monitoring, Diagnostics, and Control HVAC and Other Energy-Using Systems in Small Commercial Buildings

This project focused on developing a low-cost wireless infrastructure for monitoring, diagnosing, and controlling building systems and equipment. End users receive information via the Internet and need only a web browser and Internet connection. The system used wireless communications for: (1) collecting data centrally on site from many wireless sensors installed on building equipment, (2) transmitting control signals to actuators and (3) transmitting data to an offsite network operations center where it is processed and made available to clients on the Web (see Figure 1). Although this wireless infrastructure can be applied to any building system, it was tested on two representative applications: (1) monitoring and diagnostics for packaged rooftop HVAC units used widely on small commercial buildings and (2) continuous diagnosis and control of scheduling errors such as lights and equipment left on during unoccupied hours. This project developed a generic infrastructure for performance monitoring, diagnostics, and control, applicable to a broad range of building systems and equipment, but targeted specifically to small to medium commercial buildings (an underserved market segment). The proposed solution is based on two wireless technologies. The first, wireless telemetry, is used for cell phones and paging and is reliable and widely available. This risk proved to be easily managed during the project. The second technology is on-site wireless communication for acquiring data from sensors and transmitting control signals. The technology must enable communication with many nodes, overcome physical obstructions, operate in environments with other electrical equipment, support operation with on-board power (instead of line power) for some applications, operate at low transmission power in license-free radio bands, and be low cost. We proposed wireless mesh networking to meet these needs. This technology is relatively new and has been applied only in research and tests. This proved to be a major challenge for the project and was ultimately abandoned in favor of a directly wired solution for collecting sensor data at the building. The primary reason for this was the relatively short ranges at which we were able to effectively place the sensor nodes from the central receiving unit. Several different mesh technologies were attempted with similar results. Two hardware devices were created during the original performance period of the project. The first device, the WEB-MC, is a master control unit that has two radios, a CPU, memory, and serves as the central communications device for the WEB-MC System (Currently called the 'BEST Wireless HVAC Maintenance System' as a tentative commercial product name). The WEB-MC communicates with the local mesh network system via one of its antennas. Communication with the mesh network enables the WEB-MC to configure the network, send/receive data from individual motes, and serves as the primary mechanism for collecting sensor data at remote locations. The second antenna enables the WEB-MC to connect to a cellular network ('Long-Haul Communications') to transfer data to and from the NorthWrite Network Operations Center (NOC). A third 'all-in-one' hardware solution was created after the project was extended (Phase 2) and additional resources were provided. The project team leveraged a project funded by the State of Washington to develop a hardware solution that integrated the functionality of the original two devices. The primary reason for this approach was to eliminate the mesh network technical difficulties that severely limited the functionality of the original hardware approach. There were five separate software developments required to deliver the functionality needed for this project. These include the Data Server (or Network Operations Center), Web Application, Diagnostic Software, WEB-MC Embedded Software, Mote Embedded Software. Each of these developments was necessarily dependent on the others. This resulted in a challenging management task - requiring high bandwidth communications among all the team members. Fortunately, the project team performed exceptionally well together and was able to work through the various challenges that this presented - for example, when one software tool required a detailed description of the output of a second tool, before that tool had been fully designed.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Accelerating Hanford Site Cleanup through Operations Research Modeling - 20238

The Hanford Site cleanup effort will require the integration of dozens of unique facilities and processes, many of which will be first-of-a-kind in implementation and design. Each facility will be governed by its own set of operating logic, configured with a unique array of unit operations, and subject to a set of constraints that will affect its behavior. The collection of facilities have multiple points of interface, making the operations of any one facility potentially significant to the operations of other up- or downstream processes. It is therefore highly desirable to accurately predict these operations, as it allows for Site officials to identify and preempt bottlenecks and vulnerabilities before they unexpectedly inhibit the cleanup mission. With the quantity and complexity of the processes that will be on Site, building a pen-and-paper or even a spreadsheet-assisted model of the cleanup mission quickly becomes overwhelming in scope and inaccurate in execution. The Engineering organization for the Site's Tank Operations Contract (TOC) has therefore implemented the use of operations research (OR) modeling to simulate and predict future operations of Site facilities. These models are created using a discrete event simulation tool that allows for the development of detailed, versatile, and robust models. Not only can these models account for complex logical behaviors, but they can also simulate process details down to the level of vessel sizing, labor utilization, equipment reliability, and resource availability. To date, the TOC has developed OR models for several facilities on Site, including for single-shell tank (SST) farms, double-shell tank (DST) farms, the Effluent Treatment Facility (ETF), and the waste transfer system. These models have focused on identifying bottlenecks and operational constraints, and have been used to quantify the effects of implementing process changes. This latter point is particularly valuable, as it allows for several alternatives to be studied in a virtual setting before committing resources to making a change in the field. The decision to develop OR models has gained tremendous support from the Site's stakeholders and the U.S. Department of Energy (DOE) management, and has prompted the use of the tool to support additional internal and external initiatives. Recently, an initiative was proposed to use the models to help identify and provide quantitative backing for risks and opportunities for the TOC. This application of OR could not only help inform how the TOC manages its risks (e.g. quantities and types of spare parts), but could also help drive process improvements whose benefits might otherwise be hard to quantify. The models have also been used to drive the TOC's cloud computing, artificial intelligence (AI), and machine learning (ML) initiatives. These initiatives will not only improve the ability of the TOC to more rapidly respond to the needs of its customers, but it will also aid in the ability of the TOC to analyze and improve the processes it studies. Partnership with two external software development and consulting companies (Lanner and Ynformed) has furthered not only the application of AI and ML within the TOC, but has also spurred the development of new/improved software tools and platforms used by the companies. These partnerships have proven to be mutually beneficial and productive, and have set a precedent for the types of gains that can be made by exploring such options. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Combining of different data pools for calculating a reliable POD for real defects

Real defects are essential for the evaluation of the reliability of non destructive testing (NDT) methods, especially in relation to the integrity of components. But in most of the cases the amount of available real defects is not sufficient to evaluate the system. Model-assisted and transfer functions are one way to handle that challenge. This study is focused on a combination of different data pools to create a sufficient amount of data for the reliability estimation. A widespread approach for calculating the Probability of Detection (POD) was used on a radiographic testing (RT) method. The highest contrast to noise ratio (CNR) of each indication is usually selected as the signal in the 'â vs. a' (signal-response) approach for RT. By combining real and artificial defects (flat bottom holes, side drill holes, flat bottom squares, notches, etc) in RT the highest signals are close to each other, but the process of creating and evaluating real defects is much more complex. The solution is seen in the combination of real and artificial data using a weighted least square approach. The weights for real or artificial data were based on the importance, the value and the different detection behavior of the different data. For comparison, the alternative combination through the Bayesian Updating was also applied. As verification, a data pool with a large amount of real data was available. In an advanced approach for evaluating the digital RT data, the size of the indication (perpendicular to the X-ray beam) was introduced as additional information. The signal now consists of the CNR and the area of the indication. The detectability is changing depending on the area of the indication, a fact that was ignored in the previous POD calculations for RT. This points out that a weighted least square approach to pool the data might no longer be adequate. The Bayesian Updating of the estimated parameters of the relationship between the signal field (the area of the indication) and the geometry of the defects is seen as the appropriate model to combine the different defect types in a useful and meaningful way. This work was carried out together with the Finnish company for spent nuclear fuel and waste management - Posiva Oy. The digital RT is one of the NDT methods that might be used for the inspection of the weld of the copper canister to be used for the spent nuclear fuel in the Scandinavian concept of final disposal.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Call to Action for Global Access to and Harmonization of Quality Information of Individual Earth Science Datasets

Knowledge about the quality of data and metadata is important to support informed decisions on the (re)use of individual datasets and is an essential part of the ecosystem that supports open science. Quality assessments reflect the reliability and usability of data. They need to be consistently curated, fully traceable, and adequately documented, as these are crucial for sound decision- and policy-making efforts that rely on data. Quality assessments also need to be consistently represented and readily integrated across systems and tools to allow for improved sharing of information on quality at the dataset level for individual quality attribute or dimension. Although the need for assessing the quality of data and associated information is well recognized, methodologies for an evaluation framework and presentation of resultant quality information to end users may not have been comprehensively addressed within and across disciplines. Global interdisciplinary domain experts have come together to systematically explore needs, challenges and impacts of consistently curating and representing quality information through the entire lifecycle of a dataset. This paper describes the findings of that effort, argues the importance of sharing dataset quality information, calls for community action to develop practical guidelines, and outlines community recommendations for developing such guidelines. Practical guidelines will allow for global access to and harmonization of quality information at the level of individual Earth science datasets, which in turn will support open science.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

The X-43A Flight Research Program: Lessons Learned on the Road to Mach 10

During an aerospace engineer's undergraduate studies, he or she will attend classes in aerodynamics, thermodynamics, structures, stability and control, dynamics, design, propulsion, and computer science, along with the related courses in mathematics, physics, statistics, and chemistry required to understand the material. Upon graduation, the new engineer will have acquired a basic knowledge of how to build an aerospace vehicle. What only comes through experience, however, is the understanding of the inevitable imperfect process through which an aerospace vehicle is built. This is the adventure of turning a basic concept into functional hardware. Engineers working on a project must often deal with ambiguous situations. They are routinely asked by management to provide risk assessments of a project, yet even after careful analysis uncertainties remain. The project must be accomplished within finite limits of time and money. The question an engineer answers is whether the solution to potential problem is worth the cost and schedule delay, or if the solution might actually be worse than the problem it is meant to solve. Review protocols are established to ensure that an unknown has not been overlooked. But these cannot protect against an unknown unknown. Examples of these situations can be found in the history of the X-43A Hyper-X (Hypersonic Experiment) program. In this NASA project, a supersonic combustion ramjet (scramjet) engine was flight tested on a subscale vehicle. The X-43A Hyper-X Research Vehicle (HXRV) was launched from a B-52B mothership, then boosted to the test speed by a modified Pegasus rocket first stage, called the Hyper-X Launch Vehicle (HXLV). Once at the proper speed and altitude, the X-43A separated from the booster, stabilized itself, and then the engine test began. Although wind-tunnel scramjet engine tests had begun in the late 1950s, before the Hyper-X program there had never been an actual in-flight test of such an engine integrated with an appropriate airframe. Thus, while the scramjet had successfully operated in the artificial airflow of wind tunnels, the concept had yet to be proven in real air. These conditions meant changes in density and temperature, as well as changes in angle of attack and sideslip of a free-flying vehicle. A wind tunnel is limited in its ability to simulate these subtle factures, which have a major impact on almost any vehicle, but especially that of a scramjet's performance. The Hyper-X project was to provide a real-world benchmark of the ground test data. The full scale X-43A engine would be operated in the wind tunnel, and then flown, and the data from its operation would then be compared with projections. If these matched, the wind tunnel data would be considered a reliable design tool for future scramjet. If there were significant differences, the reasons for these would have to be identified. Until such information was available, scramjets would lack the technological maturity to be considered for future space launch or high-speed atmospheric flight vehicles.

Peebles, Curtis↗

Development of Candidate Airspace Procedures for Urban Air Mobility in the Dallas Area

As the concept of on-demand electric air taxis gains popularity and begins to take shape, many research efforts are underway to address the challenges of integrating this new class of passenger-carrying air vehicles into the already congested U.S. National Airspace System. Through collaborations between the National Aeronautics and Space Administration (NASA), the Federal Aviation Administration, and industry, this concept, commonly referred to as Urban Air Mobility (UAM), envisions a safe, reliable, and efficient mode of transportation traversing metropolitan and urban areas. Among the many challenges being tackled, airspace procedures and information requirements are critical areas of research that need to be addressed. In a joint effort between NASA and Joby Aviation, a human-in-the-loop study was conducted at the NASA Ames Research Center to evaluate initial and midterm operations with air traffic controllers and on-board UAM pilots in the Dallas area. This area was chosen due to its complex Class Bravo Airspace that extends to the surface over a relatively large area. To achieve the goals and objectives of the study, multiple preceding efforts were conducted to develop the candidate procedures and information requirements. This paper provides an overview of the operational concept used for the study, the process that was followed, and the findings from the two tabletop meetings and a shakedown activity. The combination of these led to a set of airspace procedures, letters of agreement, and information requirements that were evaluated in the human-inthe-loop study.

Urban Air Mobility↗

Leveraging Existing Assets for Long Duration Energy Storage

Increased renewables penetration to electrical grid is necessary to reduce overall emissions from the electrical power generation sector. Nonetheless, its integration creates challenges to grid operators who must match the power being generated by intermittent renewables and other traditional energy sources with the demand from consumers, while ensuring the reliability and power quality for the entire system. Energy storage has been proposed as an alternative to natural gas peaking plants and a form to deliver excess renewable energy generation at times of peak demand. For energy storage to provide benefits to end customers (energy consumers), it must be reliable, efficient, and cost effective. The Illinois Sustainable Technology Center (ISTC), one of the surveys that integrate the Prairie Research Institute (PRI), aims to develop a Center for Energy Storage at Existing Assets (CESEA) at UIUC with the participation of Waste Pressure Corp and Ecotek Engineering USA LLC. CESEA will focus on LDES systems that can integrate to existing infrastructure in a manner that reduces the initial capital expenditure and demonstrates the ability to repurpose fossil assets that would otherwise become stranded, to serve the energy transition. CESEA aims to leverage UIUC’s unique facilities to validate LDES systems performance at a relevant operating environment. UIUC’s facilities include a 85-MW combined heat and power (CHP) power plant, two (2) solar PV plants totaling over 18 MWdc of installed capacity, an electrical grid along with a substation at transmission and distribution voltages, a 22-mile gas pipeline network operating at two pressure levels, along with steam and chilled water distribution networks. The new LDES systems will connect to the existing UIUC grid through a new test electrical station, which will have the capacity to accommodate additional connections to test new devices and technologies as part of future CESEA R&D activities. The test electrical station will contain meters, instrumentation, and controls to accurately capture data and allow optimization of control algorithms. CESEA will initially focus on technologies that: i) utilize existing equipment or facilities to perform at least one of the process steps in LDES (charging, storage, or discharging), ii) leverage mature or commercially available components or controls, iii) show potential for cost-leadership in 10+ hour storage at a commercial scale. Initial technologies that were identified to meet these criteria include Compressed Gas Energy Storage (CGES), and TES. CGES stores electricity by raising the pressure of a compressible gas inside a control volume and converting the stored energy to electricity via expansion-generation. CGES is a generalization of CAES that covers any working gas (not just air). A successful CGES demo will help to circumvent many challenges faced by CAES (long development times due to site prospecting, high cost of compression and storage, heat recovery management, etc.) by: 1) utilizing existing infrastructure (compressors, pipelines, underground storage or pressure vessels) used in the transportation and storage of industrial gases for LDES charging and storage; 2) deploying over sites already-developed for industrial applications with minor additional work; 3) leveraging the price structure of commercial industrial gas to cover the costs of electricity used during charging. A previous DOE-sponsored conceptual study (DE-FE-0032018) estimated the levelized cost of energy of a 1.1 MW / 17 MWh CGES system at $0.08/kWh, with a commercial 10x scale system cost estimated at <$0.04/kWh (Giardinella, 2022). The pilot-sized system was estimated to avoid up to 2693 tons of CO2/year.

25 ENERGY STORAGE↗

NASA's Advanced Life Support Systems Human-Rated Test Facility

Future NASA missions to explore the solar system will be long-duration missions, requiring human life support systems which must operate with very high reliability over long periods of time. Such systems must be highly regenerative, requiring minimum resupply, to enable the crews to be largely self-sufficient. These regenerative life support systems will use a combination of higher plants, microorganisms, and physicochemical processes to recycle air and water, produce food, and process wastes. A key step in the development of these systems is establishment of a human-rated test facility specifically tailored to evaluation of closed, regenerative life supports systems--one in which long-duration, large-scale testing involving human test crews can be performed. Construction of such a facility, the Advanced Life Support Program's (ALS) Human-Rated Test Facility (HRTF), has begun at NASA's Johnson Space Center, and definition of systems and development of initial outfitting concepts for the facility are underway. This paper will provide an overview of the HRTF project plan, an explanation of baseline configurations, and descriptive illustrations of facility outfitting concepts.

NASA Discipline Number 61-10↗

Ensuring reliable connectivity to cellular-connected UAVs with up-tilted antennas and interference coordination

To integrate unmanned aerial vehicles (UAVs) in future large-scale deployments, a new wireless communication paradigm, namely, the cellular-connected UAV has recently attracted interest. However, the line-of-sight dominant air-to-ground channels along with the antenna pattern of the cellular ground base stations (GBSs) introduce critical interference issues in cellular-connected UAV communications. In particular, the complex antenna pattern and the ground reflection (GR) from the down-tilted antennas create both coverage holes and patchy coverage for the UAVs in the sky, which leads to unreliable connectivity from the underlying cellular network. To overcome these challenges, in this paper, we propose a new cellular architecture that employs an extra set of co-channel antennas oriented towards the sky to support UAVs on top of the existing down-tilted antennas for ground user equipment (GUE). To model the GR stemming from the down-tilted antennas, we propose a path-loss model, which takes both antenna radiation pattern and configuration into account. Next, we formulate an optimization problem to maximize the minimum signal-to-interference ratio (SIR) of the UAVs by tuning the up-tilt (UT) angles of the up-tilted antennas. Since this is an NP-hard problem, we propose a genetic algorithm (GA) based heuristic method to optimize the UT angles of these antennas. After obtaining the optimal UT angles, we integrate the 3GPP Release-10 specified enhanced inter-cell interference coordination (eICIC) to reduce the interference stemming from the down-tilted antennas. Our simulation results based on the hexagonal cell layout show that the proposed interference mitigation method can ensure higher minimum SIRs for the UAVs over baseline methods while creating minimal impact on the SIR of GUEs.

3GPP↗

Challenges and Lessons Learned in the Application of Autonomy to Space Operations

NASA's Space Operations Management Office (SOMO) is working toward a goal of providing an integrated infrastructure of mission and data services for space missions undertaken by NASA enterprises. A significant portion of this effort is focused on reducing the cost of these services. We are interested in the potential of autonomy to reduce operations costs. SOMO services support space missions, but are not part of the mission objectives; therefore the level of acceptable risk is very low. In fact, SOMO could be effective ly prevented from applying autonomy if customers merely perceive it as adding risk to their mission(s). We are interested in this workshop from the standpoint of understanding what can be done to realize the potential cost savings due to autonomy while maintaining acceptable risk and serving the needs of our customers. We would like to present our lessons learned so far in adopting autonomy and automation, which we think will contribute to clarifying the challenges facing the use of such technology. SOMO provides services to a diverse and ambitious set of mission customers. Many of these missions are groundbreaking missions for which communications, data, and other operations requirements sometimes cannot be clearly articulated early in the program. This motivates a need for systems that are robust in the face of unanticipated situations so that customer missions are not unreasonably constrained or impacted by "shortcomings" in SOMO services. One of SOMO's primary goals is to realize a paradigm in which SOMO acts as a service provider to organizations that fly space missions for NASA, other government agencies, and even the commercial sector. These organizations purchase SOMO services "by the pound" as customers. We have to provide systems that are not experiments themselves, but rather stable bases from which to do bold experiments. To this end, SOMO also seeks to work closely with industry to see that robust autonomy technology gets infused into products and services for the space industry and beyond. The potential for application of these technologies spans space-based communications networks (e.g. TDRSS) and ground-based assets including communication and tracking antenna systems, data networks, and control centers. There are several problems that are candidates for the application of autonomy, if it can be made reliable enough, including: antenna control, antenna scheduling, communication link scheduling and operation, navigation, attitude determination, fault detection, isolation, and reconfiguration (for spacecraft or ground assets), and mission-level planning and scheduling. Some attempts have been made to apply autonomy and automation in these areas in the past with varying degrees of success. We will present relevant case histories and the lessons inferred from them. Combining this past experience with anticipated future needs, we can clarify the challenges that must be met in order to realize the benefits of autonomy.

Forrest, David J.↗

Comprehensive assessment of deep reinforcement learning approaches for economic dispatch in nuclear-driven microgrids

As the electrical grid integrates more variable renewable energy sources such as wind and solar, the demand for distributed and flexible systems to address this increased variability becomes critical. Nuclear-driven microgrids provide a promising solution by offering stable generation to complement intermittent renewables, ensuring grid reliability and operating efficiency. This paper proposes a recurrent deep reinforcement learning framework for optimal economic dispatch in a nuclear-powered microgrid integrating renewable energy sources, small modular reactors, battery storage systems, and balance-of-plant dynamics. A three-agent control architecture is developed, where demand and renewable energy agents act as forecasters, and a reinforcement learning-based dispatch agent performs real-time energy allocation. A nonlinear programming formulation is first used to generate an optimal baseline for benchmarking. The proposed dispatch controller, based on Proximal Policy Optimization enhanced with Long Short-Term Memory networks, exploits temporal correlations in system dynamics by taking advantage of the time series used as inputs to improve policy robustness under uncertainty. Comparative analysis against established deep reinforcement learning methods, including Proximal Policy Optimization with a feedforward architecture, Soft Actor-Critic, and Twin Delayed Deep Deterministic Policy Gradient, demonstrates superior performance. Numerical results indicate that the proposed controller achieves a 0.39% cost reduction relative to the nonlinear programming benchmark and outperforms other learning-based methods by generating additional revenue of up to 0.35%. All reinforcement learning controllers compute dispatch actions in less than 0.3 s, resulting in a computational speedup of more than three orders of magnitude over the nonlinear programming baseline. The findings of this paper highlight their applicability for real-time operation and control in nuclear-integrated microgrids under volatile operating conditions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Demonstration of a fault impact reduction control module for wind turbines

Abstract. Traditionally, wind turbines in distributed applications make control decisions as isolated systems. They generally provide maximum power output during operation and manage internal faults with little consideration of the rest of the power system. Although fault detection and tolerance schemes are widely researched and implemented, controls to ameliorate such faults are uncommon in research and industry. The rapid shutdown of a wind turbine in a large transmission-connected wind plant will have a minimal impact on a large power system, but in a microgrid or isolated grid context the abrupt loss of a single wind turbine may cause grid instability and high stress on the system. This paper demonstrates a fault impact reduction control (FIRC) module for a wind turbine, which implements wider warning thresholds around fault thresholds. When the turbine crosses a warning threshold, the controller sends its predicted action to the grid controller, which facilitates the grid operator’s response to a potential wind turbine fault and then takes appropriate action to ameliorate the fault. Various test cases demonstrate the controller action under a variety of faults, and various scenarios demonstrate the grid benefit of an FIRC in both microgrid- and grid-connected contexts. The FIRC maximizes wind turbine generation and eases generation transition under a variety of fault scenarios. The FIRC module is easy to integrate with most existing controllers, just requiring derate capability, and can be easily modified to include the various warnings and thresholds that the user desires. This analysis is mainly performed in a MATLAB-Simulink-based research wind turbine model and is also implemented in the existing LabVIEW-based controller of the same research turbine at NREL.

17 WIND ENERGY↗