Search NASA⌕ Search

SEARCH · Search NASA

Results for “Repair”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,099 records · Page 61

Turbine superalloy component defect repair with low-temperature curing resin

Voids, cracks or other similar defects in substrates of thermal barrier coated superalloy components, such as turbine blades or vanes, are filled with resin, without need to remove substrate material surrounding the void by grinding or other processes. The resin is cured at a temperature under 200.degree. C., eliminating the need for post void-filling heat treatment. The void-filled substrate and resin are then coated with a thermal barrier coating.

36 MATERIALS SCIENCE↗

Window to the Hot Cell: The Challenges of Repairing a Specialized Nuclear Containment

Here, at the Idaho National Laboratory (INL) nuclear R&D site we come across a myriad of challenges and health hazards. Recently, a first time activity for the INL was to replace a hot cell window put in place circa 1977. This job evolution was complex in nature and involved several health and safety hazards. A hot cell is a containment designed to protect workers from radioactivity yet continue to allow work with remote handled tools and windows for visibility. The hot cell window weighed approximately 14,000 lbs. and was held in place by 1.6 cubic yards of high density grout. Removal of the window required abrasive grout removal techniques, radiological control efforts, specialized ventilation, and personal protective equipment utilization. In order to contain the large amounts of dust from the removal of concrete and potential contamination exposure a special containment tent and ventilation system was designed to protect workers in the surrounding areas from dust and debris. Once the window was removed it had to be further taken apart for shipment. While performing this activity, several lead sheets and lead wool was required to be removed. Overall it took 38 days to accomplish this task and had several organizations involved. There were no injuries or unexpected conditions that occurred during this job task. This was the first time this activity was performed at the INL and was completed in a successful manner. Further windows are set to be replaced in the near future.

99 GENERAL AND MISCELLANEOUS↗