Search NASA⌕ Search

SEARCH · Search NASA

Results for “Resource scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,099 records · Page 61

Resource Selection Using Execution and Queue Wait Time Predictions

We developed techniques to predict application execution times for instance-based learning with an average error of 33% of average run time. We developed techniques to predict queue wait times that included a simulation of scheduling algorithms and execution time predictions. We implemented these techniques for the NAS Origin cluster.

Smith, Warren↗

Department of Energy WindSentinel Loan Program Description

The U.S. Department of Energy (DOE) currently owns two AXYS WindSentinel buoys that collect a comprehensive set of meteorological and oceanographic data to support resource characterization for wind energy offshore. The two buoys were delivered to DOE’s Pacific Northwest National Laboratory (PNNL) in September, 2014. After acceptance testing and initial performance testing and evaluation at PNNL’s Marine Sciences Laboratory in Sequim, Washington, the buoys have been deployed off the U.S. East Coast. One buoy was deployed approximately 42 km east of Virginia Beach, Virginia from December, 2014 through June, 2016. The second buoy was deployed approximately 5 km off Atlantic City, New Jersey in November, 2015. Data from the buoys are available to the public. Interested parties can create an account and log in to http://offshoreweb.pnnl.gov. In response to a number of inquiries and unsolicited proposals, DOE’s Wind Energy Technologies Office is implementing a program, to be managed by PNNL, to lend the buoys to qualified parties for the purpose of acquiring wind resource characterization data in areas of interest for offshore wind energy development. This document describes the buoys, the scope of the loans, the process of how borrowers will be selected, and the schedule for implementation of this program, including completing current deployments.

17 WIND ENERGY↗

Intelligent Resource Management for Local Area Networks: Approach and Evolution

The Data Management System network is a complex and important part of manned space platforms. Its efficient operation is vital to crew, subsystems and experiments. AI is being considered to aid in the initial design of the network and to augment the management of its operation. The Intelligent Resource Management for Local Area Networks (IRMA-LAN) project is concerned with the application of AI techniques to network configuration and management. A network simulation was constructed employing real time process scheduling for realistic loads, and utilizing the IEEE 802.4 token passing scheme. This simulation is an integral part of the construction of the IRMA-LAN system. From it, a causal model is being constructed for use in prediction and deep reasoning about the system configuration. An AI network design advisor is being added to help in the design of an efficient network. The AI portion of the system is planned to evolve into a dynamic network management aid. The approach, the integrated simulation, project evolution, and some initial results are described.

Meike, Roger↗

National Space Transportation System (NSTS) technology needs

The National Space Transportation System (NSTS) is one of the Nation's most valuable resources, providing manned transportation to and from space in support of payloads and scientific research. The NSTS program is currently faced with the problem of hardware obsolescence, which could result in unacceptable schedule and cost impacts to the flight program. Obsolescence problems occur because certain components are no longer being manufactured or repair turnaround time is excessive. In order to achieve a long-term, reliable transportation system that can support manned access to space through 2010 and beyond, NASA must develop a strategic plan for a phased implementation of enhancements which will satisfy this long-term goal. The NSTS program has initiated the Assured Shuttle Availability (ASA) project with the following objectives: eliminate hardware obsolescence in critical areas, increase reliability and safety of the vehicle, decrease operational costs and turnaround time, and improve operational capability. The strategy for ASA will be to first meet the mandatory needs - keep the Shuttle flying. Non-mandatory changes that will improve operational capability and enhance performance will then be considered if funding is adequate. Upgrade packages should be developed to install within designated inspection periods, grouped in a systematic approach to reduce cost and schedule impacts, and allow the capability to provide a Block 2 Shuttle (Phase 3).

Winterhalter, David L.↗

Temporal planning for transportation planning and scheduling

In this paper we describe preliminary work done in the CORTES project, applying the Heuristic Scheduling Testbed System (HSTS) to a transportation planning and scheduling domain. First, we describe in more detail the transportation problems that we are addressing. We then describe the fundamental characteristics of HSTS and we concentrate on the representation of multiple capacity resources. We continue with a more detailed description of the transportation planning problem that we have initially addressed in HSTS and of its solution. Finally we describe future directions for our research.

Frederking, Robert E.↗

Robust and Opportunistic Planning for Planetary Exploration

This slide presentation discusses the use of robust planning for rover vehicles to enable planetary exploration. The objective of this work is to use onboard planning, scheduling and execution techniques to enable a rover to take autonomous action to take advantage of new opportunities, and to respond to unexpected problems, and to improve the overall utilization of rover resources.

onboard science analysis↗

Planning and Execution for an Autonomous Aerobot

The Aerial Onboard Autonomous Science Investigation System (AerOASIS) system provides autonomous planning and execution capabilities for aerial vehicles (see figure). The system is capable of generating high-quality operations plans that integrate observation requests from ground planning teams, as well as opportunistic science events detected onboard the vehicle while respecting mission and resource constraints. AerOASIS allows an airborne planetary exploration vehicle to summarize and prioritize the most scientifically relevant data; identify and select high-value science sites for additional investigation; and dynamically plan, schedule, and monitor the various science activities being performed, even during extended communications blackout periods with Earth.

Gaines, Daniel M.↗

Modeling a Civil Event Case Study for Consequence Management Using the IMPRINT Forces Module

A critical challenge in the Consequence Management (CM) domain is the appropriate allocation of necessary and skilled military and civilian personnel and materiel resources in unexpected emergencies. To aid this process we used the Forces module in the Improved Performance Research Integration Tool (IMPRINT). This module enables analysts to enter personnel and equipment capabilities, prioritized schedules and numbers available, along with unexpected emergency requirements in order to assess force response requirements. Using a suspected terrorist threat on a college campus, we developed a test case model which exercised the capabilities of the module, including the scope and scale of operations. The model incorporates data from multiple sources, including daily schedules and frequency of events such as fire calls. Our preliminary results indicate that the model can predict potential decreases in civilian emergency response coverage due to an involved unplanned incident requiring significant portions of police, fire and civil responses teams.

Gacy, Marc↗

The Fleet Application for Scheduling and Tracking (FAST) Management Website

The FAST application was designed to replace the paper and pen method of checking out and checking in GSA Vehicles at KSC. By innovating from a paper and pen based checkout system to a fully digital one, not only the resources wasted by printing the checkout forms have been reduced, but it also reduces significantly the time that users and fleet managers need to interact with the system as well as improving the record accuracy for each vehicle. The vehicle information is pulled from a centralized database server in the SPSDL. In an attempt to add a new feature to the FAST application, the author of this report (alongside the FAST developers) has been designing and developing the FAST Management Website. The GSA fleet managers had to rely on the FAST developers in order to add new vehicles, edit vehicles and previous transactions, or for generating vehicles reports. By providing an easy-to-use FAST Management Website portal, the GSA fleet managers are now able to easily move vehicles, edit records, and print reports.

Object-Oriented Programming↗

Performance of Heterogeneous Algorithm Scheduling in CMSSW

The CMS experiment started to utilize Graphics Processing Units (GPU) to accelerate the online reconstruction and event selection running on its High Level Trigger (HLT) farm in the 2022 data taking period. The projections of the HLT farm to the High-Luminosity LHC foresee a significant use of compute accelerators in the LHC Run 4 and onwards in order to keep the cost, size, and power budget of the farm under control. This direction of leveraging compute accelerators has synergies with the increasing use of HPC resources in HEP computing, as HPC machines are employing more and more compute accelerators that are predominantly GPUs today. In this work we review the features developed for the CMS data processing framework, CMSSW, to support the effective utilization of both compute accelerators and many-core CPUs within a highly concurrent task-based framework. We measure the impact of various design choices for the scheduling of heterogeneous algorithms on the event processing throughput, using the Run-3 HLT application as a realistic use case.

Bocci, Andrea↗

An expert system for simulating electric loads aboard Space Station Freedom

Space Station Freedom will provide an infrastructure for space experimentation. This environment will feature regulated access to any resources required by an experiment. Automated systems are being developed to manage the electric power so that researchers can have the flexibility to modify their experiment plan for contingencies or for new opportunities. To define these flexible power management characteristics for Space Station Freedom, a simulation is required that captures the dynamic nature of space experimentation; namely, an investigator is allowed to restructure his experiment and to modify its execution. This changes the energy demands for the investigator's range of options. An expert system competent in the domain of cryogenic fluid management experimentation was developed. It will be used to help design and test automated power scheduling software for Freedom's electric power system. The expert system allows experiment planning and experiment simulation. The former evaluates experimental alternatives and offers advice on the details of the experiment's design. The latter provides a real-time simulation of the experiment replete with appropriate resource consumption.

Kukich, George↗

An expert system for simulating electric loads aboard Space Station Freedom

Space Station Freedom will provide an infrastructure for space experimentation. This environment will feature regulated access to any resources required by an experiment. Automated systems are being developed to manage the electric power so that researchers can have the flexibility to modify their experiment plan for contingencies or for new opportunities. To define these flexible power management characteristics for Space Station Freedom, a simulation is required that captures the dynamic nature of space experimentation; namely, an investigator is allowed to restructure his experiment and to modify its execution. This changes the energy demands for the investigator's range of options. An expert system competent in the domain of cryogenic fluid management experimentation, was developed. It will be used to help design and test automated power scheduling software for Freedom's electric power system. The expert system allows experiment planning and experiment simulation. The former evaluates experimental alternatives and offers advice on the details of the experiment's design. The latter provides a real-time simulation of the experiment replete with appropriate resource consumption.

Kukich, George↗

CoreTSAR: Core Task-Size Adapting Runtime

Heterogeneity continues to increase at all levels of computing, with the rise of accelerators such as GPUs, FPGAs, and other co-processors into everything from desktops to supercomputers. As a consequence, efficiently managing such disparate resources has become increasingly complex. CoreTSAR seeks to reduce this complexity by adaptively worksharing parallel-loop regions across compute resources without requiring any transformation of the code within the loop. Lastly, our results show performance improvements of up to three-fold over a current state-of-the-art heterogeneous task scheduler as well as linear performance scaling from a single GPU to four GPUs for many codes. In addition, CoreTSAR demonstrates a robust ability to adapt to both a variety of workloads and underlying system configurations.

97 MATHEMATICS AND COMPUTING↗

On Secured Spinning Reserve Deployment of Energy-Limited Resources Against Contingencies

Featured with fast response abilities and high ramp rates, energy storage systems (ESS), such as pumped-storage hydropower (PSH) plants and battery storage systems (BSS), are considered as key first-responders to provide spinning reserve in response to system contingencies. However, ESSs are energy-limited resources, and their sustained spinning reserve deployment is restricted by the stored energy and available capacity. Indeed, the spinning reserve deployment against contingencies may deviate actual state-of-charge (SOC) from the scheduled value, inducing potential SOC boundary violations and non-dispatchability in later hours. This paper proposes the post-contingency operation model and the spinning reserve secure constraints to address these issues. The post-contingency operation model describes that spinning reserve from ESSs is promptly deployed when contingency occurs, and then gradually substituted by quick-start units when they are switched online. By leveraging this operation strategy, spinning reserve secure constraints in terms of SOC headrooms are adopted to guarantee its deplorability. Furthermore, a modified IEEE 118-bus system with multiple PSHs and BSSs is used to verify the proposed approach.

13 HYDRO ENERGY↗

Landsat-D - A systems overview

Landsat D, scheduled for launch in 1981, is designed to be a complete end-to-end highly automated data gathering and processing system providing a major step forward in global remote sensing for earth resources applications. This paper discusses the major components of the flight segment (the Multimission Modular Spacecraft, the Thematic Mapper and the Multispectral Scanner Subsystem) and of the ground segment (the Data Management System and the Landsat-D Assessment System). Descriptions and diagrams illustrating various aspects of flight and ground segments are provided.

Salomonson, V. V.↗

Lessons learned from the CSIS

A discussion is presented of the Centralized Storm Information System (CSIS), a joint effort by several organizations including NASA and the National Weather Service, which has been developed to aid the forecaster in evaluating weather data. The CSIS was developed to provide a handling, analyzing, intercomparison, and display system for real-time data from all available sources. The CSIS hardware and software, the impact of the CSIS, and the initial experience gained following the implementation of the CSIS are examined. Several general insights learned from this interactive processing system are examined in detail, including the benefits of an evolutionary bottom up rather than top down design approach, the crucial nature of scheduler function to any real time system, the recognition that meteorological interactive terminals requirements are different from image processing terminals requirements, and the knowledge that forecasters generate a large peak load on computer resources.

Mosher, F. R.↗

An Architecture to Enable Autonomous Control of Spacecraft

Autonomy is required for manned spacecraft missions distant enough that light-time communication delays make ground-based mission control infeasible. Presently, ground controllers develop a complete schedule of power modes for all spacecraft components based on a large number of factors. The proposed architecture is an early attempt to formalize and automate this process using on-vehicle computation resources. In order to demonstrate this architecture, an autonomous electrical power system controller and vehicle Mission Manager are constructed. These two components are designed to work together in order to plan upcoming load use as well as respond to unanticipated deviations from the plan. The communication protocol was developed using "paper" simulations prior to formally encoding the messages and developing software to implement the required functionality. These software routines exchange data via TCP/IP sockets with the Mission Manager operating at NASA Ames Research Center and the autonomous power controller running at NASA Glenn Research Center. The interconnected systems are tested and shown to be effective at planning the operation of a simulated quasi-steady state spacecraft power system and responding to unexpected disturbances.

space power systems↗

Packaging, Transportation and Recycling of NPP Condenser Modules - 12262

Perma-Fix was awarded contract from Energy Northwest for the packaging, transportation and disposition of the condenser modules, water boxes and miscellaneous metal, combustibles and water generated during the 2011 condenser replacement outage at the Columbia Generating Station. The work scope was to package the water boxes and condenser modules as they were removed from the facility and transfer them to the Perma-Fix Northwest facility for processing, recycle of metals and disposition. The condenser components were oversized and overweight (the condenser modules weighed ∼102,058 kg [225,000 lb]) which required special equipment for loading and transport. Additional debris waste was packaged in inter-modals and IP-1 boxes for transport. A waste management plan was developed to minimize the generation of virtually any waste requiring landfill disposal. The Perma-Fix Northwest facility was modified to accommodate the ∼15 m [50-ft] long condenser modules and equipment was designed and manufactured to complete the disassembly, decontamination and release survey. The condenser modules are currently undergoing processing for free release to a local metal recycler. Over three millions pounds of metal will be recycled and over 95% of the waste generated during this outage will not require land disposal. There were several elements of this project that needed to be addressed during the preparation for this outage and the subsequent packaging, transportation and processing. - Staffing the project to support 24/7 generation of large components and other wastes. - The design and manufacture of the soft-sided shipping containers for the condenser modules that measured ∼15 m X 4 m X 3 m [50 ft X 13 ft X 10 ft] and weighed ∼102,058 kg [225,000 lbs] - Developing a methodology for loading the modules into the shipping containers. - Obtaining a transport vehicle for the modules. - Designing and modifying the processing facility. - Movement of the modules at the processing facility. If any of these issues were not adequately resolved prior to the start of the outage, costly delays would result and the re-start of the power plant could be impacted. The main focus of this project was to find successful methods for keeping this material out of the landfills and preserving the natural resources. In addition, this operation provided a significant cost savings to the public utility by minimizing landfill disposal. The onsite portion of the project has been completed without impact to the overall outage schedule. By the date of presentation, the majority of the waste from the condenser replacement project will have been processed and recycled. The goals for this project included helping Energy Northwest maintain the outage schedule, package and characterize waste compliantly, perform transportation activities in compliance with 49CFR (Ref-1), and minimize the waste disposal volume. During this condenser replacement project, over three millions pounds of waste was generated, packaged, characterized and transported without injury or incident. It is anticipated that 95% of the waste generated during this project will not require landfill disposal. All of the waste is scheduled to be processed, decontaminated and recycled by June of 2012. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗