Challenges of Interpreting and Applying New J-STD-001 Cleanliness Standards in High Reliability Applications
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
In 2019 and 2020, Cultural Resource Analysts, Inc. (CRA), began preparing recordation packages for 18 World War II and Cold War Era buildings slated for demolition at the request of Consolidated Nuclear Security, LLC (CNS), on behalf of the U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA). The recordations for these 18 buildings, which are located within what is now known as the Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee, were prepared and submitted in two separate packages. The first report (EC-NP-004) was prepared as a mitigation measure to address adverse effects that will result from the proposed demolition of 16 support and ancillary buildings. The current report is the second of the two packages and addresses the last two of the 18 buildings slated for demolition (9201-5 and 9204-4), which are two of the large process buildings located at Y-12. All 18 of these buildings have previously been determined eligible for listing in the National Register of Historic Places (NRHP). The two buildings, Building 9201-5 and Building 9204-4, are located south of Bear Creek Road and west of the main Y-12 entrance gate. Both buildings were constructed as uranium enrichment facilities in support of the Manhattan Project, a top-secret World War II mission to develop the world’s first nuclear weapons. Building 9201-5, completed in October 1944, is the Alpha-5 process facility and Building 9204-4, completed in Fall 1945, is the Beta-4 process facility. Over the years, these facilities were repurposed for a number of different functions.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Twenty years have passed since the European Muon Collaboration announcedthat almost none of the spin of the proton was carried by its quarks -- the famous "proton spin crisis". We review the original work and initial theoretical ideas proposed to explain this finding before turning attention to the enormous progress that has been made over the two decades since that announcement. We show that within the present, much reduced experimental errors the spin problem has been resolved. The explanation is compared with both lattice QCD and recent data involving deeply virtual Compton scattering and found to be consistent. The response to this challenge has taught us a great deal about the non-perturbative structure of the nucleon.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Injecting fluids into a well deforms the enveloping rocks in a complex pattern that increases in magnitude and expands outward with time, and measurements of this strain field may be useful for monitoring the injection process. A pair of instruments capable of measuring four components of strain and two components of tilt has been developed. One instrument is designed to be removeable, whereas the other one is grouted in place. The removeable strainmeter provides versatility and lower cost because it can be relocated, whereas the grout-in instrument provides better coupling to the formation, which should improve the strain signal. The new strainmeters have been deployed along with a Gladwin strainmeter at the Avant Field, an oil field north of Tulsa, Oklahoma. Oil and water are being pumped out, and water is being injected in multiple boreholes that intersect the Bartlesville formation at a depth of approximately 500 m at the Avant Field. The strainmeters have been deployed at a depth of 30 m near well 9A, an injection well near the edge of the field. Results from a brief, 4-hr-long injection test into well 9A show that the radial and circumferential strain increase (become tensile) with time during injection, reaching a maximum of several 10s of nanostrain. In another example, data from the Gladwin strainmeter showed the strain field changing with time when an injection well 1 km away was shut-in. This caused the strain along a radial direction to become tensile, while the circumferential strain became compressive. This trend reversed a week later when injection into the well resumed. The major axis of the principle strain aligned with the shut-in well. The observed strain signals are similar to results from poroelastic analyses, and preliminary inverse analyses sugest that strain signals can be used to estimate reservoir characteristics at the Avant Field.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
There is currently a lack of software that meets the needs for the analysis of raw data produced by modern isotope ratio mass spectrometers for both R&D and routine use at SRNL and other US national labs • Needs to accommodate multiple isotope systems, instruments, and manufacturers • Include modern statistical methods and handling/visualization of uncertainty • Flexible software with transparent (no “black box”) and reproducible methods • This project is inspired by existing discipline-specific data analysis software (e.g., Tripoli1 , ET_Redux2 , IsoplotR3) used in the geochemical community • Our goal is to build an open source data analysis software package that focuses on flexibility, transparency, and reproducibility