Search NASA⌕ Search

SEARCH · Search NASA

Results for “technical potential”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,099 records · Page 61

Hybrid RANS/LES Simulation of Jet Surface Interaction Noise

NASA’s Commercial Supersonic Technology (CST) project has formulated a technical challenge to design a quiet propulsion system for a low boom supersonic aircraft that meets Federal Aviation Authority’s airport noise regulations with sufficient margin. Several proposed configurations take advantage of shielding from the wing or other air-frame components. Development of carefully validated computational tools are necessary for critically evaluating installation concepts that are currently being proposed to meet the technical challenge. Semi-empirical models that predict the noise reduction potential of arbitrary shielding surfaces are yet to mature. Another key challenge is the systematic assessment of additional noise from the interaction between high speed jet turbulence and a surface in it’s vicinity. As a first step towards predicting noise reduction due to radical installation concepts from first principles, we simulate the noise generated by a high speed turbulent round jet near a simple planar surface. Detailed comparisons are made with a dedicated experiment conducted at NASA’s Glenn Research Center. Sensitivity of far-field noise predictions to grid resolution is systematically documented. A permeable Ffowcs Williams Hawkings (FWH) surface enclosing both the jet and the shielding surface is used to predict far-field noise from the simulated flowfield. Details of the structured overset grids, numerical discretization, and turbulence model are provided. Near-field comparisons to PIV data and far-field comparisons to microphone array measurements are discussed. Excellent agreement for an initial validation study on an isolated free round jet was obtained and the findings were utilized in the jet surface interaction study. The split between shielded and reflected side of the microphone array was captured with good agreement, as well as the peak in the noise spectra due to scattering of turbulent energy into sound by the trailing edge of the surface.

Stich, Gerrit-Daniel↗

On-Orbit Cryogenic Refueling: Potential Mission Benefits, Associated Orbital Mechanics, and Fuel Transfer Thermodynamic Modeling Efforts

The placement of cryogenic fuel/propellant depot stations in Earth orbit has the potential to transform the nature and operations for many types of spaceflight missions. Today, spaceflight missions are almost universally required to carry the entire amount of fuel required for the mission, for the entire duration of the mission, from the point of launch. This is the rough equivalent of making a drive from Ohio to California, requiring the traveler to bring along the total sum of gasoline required for the entire trip, without being able to ‘fill-up’ anywhere along the route. Obviously, this framework of travel greatly encumbers the breadth, scope, and efficiency of potential journeys. Cryogenic fuel/propellant depots have not been implemented because many technical, operational, and engineering challenges still exist. These must be overcome prior to the placement of usable on-orbit propellant depots. This thesis investigates three specific engineering challenges related to on-orbit propellant depots, and presents the current state, technological challenges, and ultimate benefits of on-orbit cryogenic refueling.

No vent fill↗

Results and Lessons Learned From the DOE Commercial Building Partnerships: Preprint

Over the course of 5 years, NREL worked with commercial building owners and their design teams in the DOE Commercial Building Partnerships (CBP) to cut energy consumption by 50% in new construction (versus code) and by 30% in existing building pilot projects (versus code or pre-retrofit operational energy use depending on the preference of the Partner) using strategies that could be replicated across their building portfolios. A number of different building types were addressed, including supermarket, retail merchandise, combination big box (general merchandise and food sales), high rise office space, and warehouse. The projects began in pre-design and included a year of measurement data to evaluate performance against design expectations. Focused attention was required throughout the entire process to achieve a design with the potential to hit the energy performance target and to operate the resulting building to reach this potential. This paper will report quantitative results and cover both the technical and the human sides of CBP, including the elements that were required to succeed and where stumbling blocks were encountered. It will also address the impact of energy performance goals and intensive energy modeling on the design process innovations and best practices.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

An Instrumentation Wish List for High Power/High Brightness ERLS

The advent of the energy recovering linac (ERL) brings with it the promise of linac-quality beams generated with near storage ring efficiency. This potential will not, however, be fulfilled without overcoming a number of technical and operational challenges. We will review the basics of ERL dynamics and operation, and give examples of idiosyncratic ERL behavior and requirements posing particular challenges from the perspective of diagnostics and instrumentation. Beam performance parameters anticipated in next-generation ERLs will be discussed, and a ?wish list? for the instrumentation of these machines presented.

Douglas, David↗

Managing Low-Level Waste at Dounreay - 16269

Dounreay Site Restoration Limited (DSRL) is the site licence company responsible for the clean-up and demolition of Britain's former centre of fast reactor research and development. The Dounreay site requires facilities to dispose of up to 175,000 cubic metres of low level waste (LLW) that has been and will continue to be generated during the decommissioning and restoration of the site. In May 2014, construction of two new vaults for the disposal of LLW at Dounreay was completed, including the necessary roads, infrastructures and services, followed by an encapsulation plant in September 2014. The vaults are located immediately to the northeast of the Dounreay licensed site, on NDA-owned land. The facilities are for disposal of the solid LLW generated at Dounreay and the adjacent Vulcan site only. In 2004, following consultation with stakeholders and members of the public, Dounreay issued the 'Best Practicable Environmental Option (BPEO) Report' on the management of Dounreay LLW. This report assessed potential management options for LLW against a range of criteria, including technical, environmental, cost, health and safety issues. The study was conducted in line with best practice and involved consultation with a range of people, including the local community and organisations with an interest in radioactive waste management. The recommendations and conclusions from the study provided the basis for the 'Dounreay Solid LLW Overall Strategy', which was published in March 2005. A fundamental component of this strategy was the development of new below-ground disposal vaults for LLW at Dounreay. Siting the vaults on land at Dounreay avoids any need to transport the LLW away from Dounreay on public roads. Disposal at Dounreay therefore satisfies the proximity principle of managing the waste at source. Disposal at Dounreay is also consistent with UK Government Policy on LLW management, the Scottish Government's Radioactive Waste Management Policy and the Nuclear Decommissioning Authority's (NDA's) strategy on management of LLW from the UK nuclear industry. A planning application was initially lodged with the Highland Council in June 2006. The period for the determination of this application was extended to allow the Scottish Environment Protection Agency (SEPA) sufficient time to assess fully the supporting Environmental Safety Case (ESC). The planning application was re-activated in May 2008, and planning permission was granted by Highland Council in April 2009. The planning permission included 26 conditions on DSRL, covering a wide range of environmental issues such as construction noise/dust, traffic, visual impact and also a condition to develop a community fund aimed at socio-economic development of the area around the Dounreay site. After undertaking the necessary detailed design work, construction of the phase one vaults commenced in November 2011 by principal contractor, Graham Construction. Work was undertaken on both vaults simultaneously, excavating around 243,000 m{sup 3} of rock. When excavation was complete, steel reinforcement was placed and concrete poured to construct the floor slabs. This was followed by the construction of the reinforced walls and then the installation of the steel support structure and materials that form the roof. Mechanical and electrical installation then followed, in parallel with the construction of the vault apron, ramps and access roads. A pumping system and control building was also constructed to remove groundwater from around the vaults to allow the vaults to be kept dry while they are being filled with waste. A layer of excavated material, approximately 3 m thick, was placed across the existing ground surface between the vaults and the coast, to ensure the water table lies well below the new ground surface after closure of the vaults, and that any future trace contaminated groundwater flows out to the sea rather than to the soil zone. This layer is referred to in project documents as the 'enhanced geosphere'. After disposals are completed and the vaults are closed, this layer will be joined to the capping over the vaults so that the ensemble merges visually with the surrounding landscape. The original vegetation and soil mix will be returned as far as is practicable. An encapsulation plant has been constructed to fill the LLW containers with grout prior to disposal in the vault, similar to the process used at the national Low-Level Waste Repository facility (LLWR), near Drigg in Cumbria. The plant has the capacity to grout up to four containers per day. The grout fills voids in the container and helps provide chemical conditions in the vault that limit the release of radionuclides in the far future, after the vault has been penetrated by groundwater. On April 24 2015, active commissioning began at the Encapsulation Plant and LLW Vaults. Half-height ISO containers packed with low level waste are currently being filled with grout and disposed of in the LLW Vault. Also packaged Demolition Low Level Waste (DLLW) is being processed and disposed of in the Demolition Low Level Waste Vault. To date over 2500 packages of DLLW and 70 containers LLW have been disposed of. Completion of construction and the start of operating the Phase One vaults and encapsulation plant are fundamental to the successful and efficient decommissioning of the Dounreay site, upon which many millions of pounds of investment and hundreds of jobs rely.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced Test Reactor Safety Basis Update for Gas-Cooled Experiments

The Advanced Test Reactor (ATR) supports neutron irradiation of several types of experiments. One such experiment type is referred to as a gas leadout. Gas leadout experiments actively flow gas through the experiment which allows for active temperature control. It also allows for in-situ data of the experiment. For example, fission gas migration through a fuel sample can be monitored via activity of the sweep gas. Historically, ex-pile equipment and fission product monitors were housed in shielded ATR cubicles. Due to other facility updates, cubicle space is no longer available for gas leadout experiment equipment. To support continued operation of gas leadout experiments, ATR completed a safety basis update that supports a new housing for leadout equipment that may process potentially contaminated gas. In addition to the structure and associated equipment, technical safety requirements regarding handling and storage of experiments needed to be revised to support fueled gas leadout experiments and associated outage configurations. The safety basis update addressed the full lifecycle of these experiments, including experiment movement and interim storage, and credible abnormal events such as failures or leaks in contaminated gas tubing in occupied areas. This paper discusses the completed analyses performed to support the safety basis update associated with gas leadout experiments, including thermal-hydraulic evaluation, probabilistic analysis, and dose consequence analyses.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A High-Assay Low-Enriched Uranium Fuel Transportation Concept

The uranium 235U enrichment commonly used in fuel production for U.S. light water nuclear reactors typically does not exceed 5 wt%. In contrast, many of the currently investigated advanced reactor concepts demand fuel with higher enrichments. This includes high-assay low-enriched uranium (HALEU), characterized by a 235U enrichment of 5 to 20 wt%. The necessity of HALEU transportation in the fuel production cycle leads to new challenges caused by various technical and regulatory hurdles. Current U.S. Nuclear Regulatory Commission–approved transportation package designs for UF6 with enrichments above 5 wt% provide relatively small payloads [=116 kg (250 lb)]. Furthermore, in accordance with 10 CFR 71.55, package design activities for fissile material enriched above 5 wt% need to consider water infiltration in the containment as part of the criticality safety evaluations. This study presents a transportation package concept for HALEU advanced nuclear reactor fuel with a significantly higher payload of up to 376 kg (830 lb) of fissile material per package and up to 1881 kg (4149 lb) of HALEU per legal weight truck. The anticipated chemical form of the transported material is UO2 downblended from available highly enriched uranium. The concept utilizes a combination of existing transportation packaging, 18 inner canisters, and a novel basket design that includes a borated aluminum flux trap. Criticality and shielding evaluations; fundamental structural, confinement, and thermal assessments; and studies on package operations are presented. The results of this study build significant confidence in the technical feasibility of a high-capacity HALEU transportation package concept while demonstrating the concept’s potential to meet U.S. regulatory requirements.

Eidelpes, Elmar↗

Nebraska Integrated Carbon Capture and Storage Pre-Feasibility Study

In collaboration with the Nebraska Public Power District (NPPD), the Energy & Environmental Research Center (EERC) has conducted a pre-feasibility study for a commercial-scale carbon dioxide (CO 2 ) geologic storage complex in western Nebraska integrated with potential CO 2 capture at Gerald Gentleman Station (GGS). GGS is the largest coal-fired electricity-generating station in Nebraska, emitting 8.5 million metric tons (Mt) of CO 2 annually, and is located near the town of Sutherland. This pre-feasibility (Phase 1) project has been executed as part of the U.S. Department of Energy (DOE) CarbonSAFE program, a multiphase initiative to support the deployment of large-scale carbon capture and storage (CCS) projects. Each CarbonSAFE project is required to demonstrate the potential to capture and store at least 50 million tonnes (Mt) of CO 2 over a 25-year operational period. The EERC and NPPD established a coordination team to identify challenges to a potential Nebraska CCS project, comprising local stakeholder organizations, which met twice in Lincoln and via several Webinars, providing feedback and guidance throughout the pre-feasibility study. The EERC also secured the technical support of Schlumberger Carbon Services and Computer Modelling Group Ltd. (CMG). The project comprised four technical themes, all using published information sources. Regional and stakeholder analysis, including identification of sensitive environmental areas, potential resource conflicts, and strategies for public outreach. A review of geographic and socioeconomic characteristics, in combination with geologic characterization in the subbasinal analysis described below, identified an area to the southwest and within a 75-mile radius of GGS as the most prospective for development of a storage site. This area largely avoided lands with protected status such as wetlands. A public outreach plan has also been developed for implementation in any further phases of CCS assessment in western Nebraska, for example a CarbonSAFE Phase 2 feasibility study. Scenario analysis, addressing economic and regulatory factors. GGS is the only single major source of CO 2 emissions capable of satisfying the CarbonSAFE 50-Mt scale requirement within the study region. Chemical absorption using amines was identified as the most viable technology for postcombustion CO 2 capture at GGS. The total cost of a CCS project at GGS was estimated to be between $67/tonne CO 2 for capture and auxiliary boiler to minimize parasitic load and $70/tonne CO 2 avoided cost, using the Carnegie-Mellon University Integrated Environmental Control Model (IECM). The total avoided cost included the capture facility and parasitic load, a flue gas desulfurization plant required for the use of amine solvent technology, transport via pipeline, and dedicated storage infrastructure. Nebraska has no legislation in place to address typical CCS-specific issues, for example pore space ownership for storage. Long-term liability, therefore, falls under the U.S. Environmental Protection Agency Underground Injection Control (UIC) Class 6 program regulations. Subbasinal analysis, addressing the potential for a dedicated subsurface “container” to store the required 50-Mt quantity of CO 2 . Modeling and simulation studies identified an area to the southwest of GGS with the potential for storage of 50 Mt CO 2 in the Cloverly Formation, comprising sandstones with interbedded and intermingled shales. The area of review (AOR) that would be required for monitoring under a Class VI operating permit was estimated to be as high as 400–700 square miles, due to uncertain pressure effects. The viability of this storage option is subject to significant uncertainty due to the relatively limited amount of existing characterization data available to the pre-feasibility study; for example, dynamic simulation indicated that the proposed storage rate might require as little as two or as many as 14 injection wells. A key uncertainty is the relative proportion and distribution of sandstone and shale within the Cloverly Formation. A preliminary, semiquantitative risk assessment also suggested uncertainty over storage capacity and injectivity constitute the most significant project risks at this pre-feasibility stage. No assessed risks were considered to rule out the possibility of a project moving to deployment. National Risk Assessment Partnership (NRAP) validation, using software tools developed by the National Energy Technology Laboratory (NETL) to assess risks associated with the potential 50-Mt CO 2 storage complex. NRAP tools were used to assess hypothetical leakage scenarios. Results broadly supported the conclusion of the semiquantitative risk analysis – for example, even worst-case analysis of theoretical leakage scenarios found limited migration rates and impacts. In summary, the work undertaken in this Phase 1 pre-feasibility study has shown that western Nebraska has potential to host a commercial-scale CCS project, including a dedicated storage “container” for 50 Mt of CO 2 . However, the following key challenges would need to be overcome: The business case for deploying CCS projects is uncertain; recently announced federal tax credits and sales of CO 2 for enhanced oil recovery may not cover the full costs of a CCS project at GGS, as estimated by this pre-feasibility study. The potential 50-Mt CO 2 dedicated storage container defined in this pre-feasibility study should be regarded as having a relatively low level of readiness to support a CCS project. Public outreach would be a vital element in western Nebraska, where sensitivities around such environmental issues as water resource protection and pipeline construction would need to be carefully addressed.

54 ENVIRONMENTAL SCIENCES↗

Hyperthin Membranes for Gas Separations (Final Technical Report)

This final technical report summarizes DOE-supported research that we have carried out over the past 18 years; i.e., 09/01/2005-08/31/2023. Two hyperthin types of membranes that were reported most recently, which have practical potential for the separation of CO 2 from N 2 in flue are highlighted in this final technical report.

36 MATERIALS SCIENCE↗

The potential of space exploration for education

Space exploration and observations from space offer unique opportunities with respect to education. Recent technical advances have significantly increased the width and sensitivity of the electromagnetic spectrum window through which we are able to 'see' the universe. Observations from space have forced a realization that the earth is a beautiful, complex, and interconnected system. Space astronomy and the remote sensing of objects throughout our solar system have the potential of providing unique educational opportunities. Modern technologies have significantly reduced the cost of collecting, transmitting and processing data. Consequently, we are entering an age where it is possible to open up the process of discovery to almost everyone - and especially to young people throughout the world.

Shair, Fredrick H.↗

Insight into aquaculture's potential of marine annelid worms and ecological concerns: a review

Abstract Polychaetes are marine annelid worms that can contribute to aquaculture diversification. Its culture has been viable, and commercially attempted, but intensive production has progressed only in few countries around the world. In the countries with no production, marine polychaetes are imported or harvested. A strong and sustained research investment provided to a better understanding of the nutritional requirements and reproduction of some species. Recent studies showed new technical improvements, which can lead to an important progress in productivity and give a new impetus to the polychaete production. Some marine worm species were identified as good candidates for integrated multitrophic aquaculture. The development of cost‐effective aquaculture techniques for marine annelid worms is essential to ensure a balance between commercial interests and the preservation of ecosystems. The influence of polychaete aquaculture on the environment and vice versa raise important concerns related to ecological security and sustainability of this activity. This review focus on the main technical improvements and advances that have been made in areas as diverse as: aquaculture potential of polychaetes , reared species, main species used worldwide, and highlights biological and ecological concerns, important challenges and recommendations.

Pombo, Ana↗

Air Pollutant Emissions and Regulatory Implications of a Biorefinery Co-Processing Bio-Oil in a Petroleum Refinery: Preprint

Pyrolysis oil, often referred to as bio-oil when derived from biomass through a fast pyrolysis process, has attracted considerable attention because of the high carbonaceous matter and high heating value compared to the original biomass. Pyrolysis oil provides a viable link between the agriculture/forestry and (petro-) chemical industry. Utilizing existing fossil fuel infrastructure by introducing bio-oil in petroleum refineries to produce renewable hydrocarbon fuels (i.e., repurposing existing assets) is appealing due to its relatively low capital requirement. Our analysis examined the air pollutant emissions for a biorefinery utilizing an ex situ catalytic fast pyrolysis process to produce raw bio-oil, with a design capacity of 2,000 dry metric tons of biomass per day. Such a biorefinery is capable of providing sufficient bio-oil to a 4,200 barrels per day capacity of fluidized catalytic cracking unit if the bio-oil is co-processed at 5% (by volume) feed rate. This research is focused on understanding the potential air pollutant regulatory and permitting implications for a refinery co-processing 5% bio-oil with 95% vacuum gas oil in a fluidized catalytic cracking unit for two scenarios: the first case assumes that an ex situ biorefinery is collocated with a petroleum refinery, and the second one assumes that a petroleum refinery will receive bio-oil from a stand-alone biorefinery. We estimated the potential-to-emit values for 4 biorefinery and FCC sizes and assessed technically feasible emission control options that could help to avoid being subject to prevention of significant deterioration requirements due to petroleum refinery modifications to co-process bio-oil. This research fills gaps and overcomes barriers related to air permitting requirements for co-processing bio-oil in existing refineries for various stakeholders. The insights gained from this analysis can facilitate decision making and help expedite permitting processes for petroleum refineries, which seek opportunities to produce lower carbon fuels in their existing infrastructure.

09 BIOMASS FUELS↗

Air Pollutant Emissions and Regulatory Implications of a Biorefinery Co-Processing Bio-Oil in a Petroleum Refinery

Pyrolysis oil, often referred to as bio-oil when derived from biomass through a fast pyrolysis process, has attracted considerable attention because of the high carbonaceous matter and high heating value compared to the original biomass. Pyrolysis oil provides a viable link between the agriculture/forestry and (petro-) chemical industry. Utilizing existing fossil fuel infrastructure by introducing bio-oil in petroleum refineries to produce renewable hydrocarbon fuels (i.e., repurposing existing assets) is appealing due to its relatively low capital requirement. Our analysis examined the air pollutant emissions for a biorefinery utilizing an ex situ catalytic fast pyrolysis process to produce raw bio-oil, with a design capacity of 2,000 dry metric tons of biomass per day. Such a biorefinery is capable of providing sufficient bio-oil to a 4,200 barrels per day capacity of fluidized catalytic cracking unit if the bio-oil is co-processed at 5% (by volume) feed rate. This research is focused on understanding the potential air pollutant regulatory and permitting implications for a refinery co-processing 5% bio-oil with 95% vacuum gas oil in a fluidized catalytic cracking unit for two scenarios: the first case assumes that an ex situ biorefinery is collocated with a petroleum refinery, and the second one assumes that a petroleum refinery will receive bio-oil from a stand-alone biorefinery. We estimated the potential-to-emit values for 4 biorefinery and FCC sizes and assessed technically feasible emission control options that could help to avoid being subject to prevention of significant deterioration requirements due to petroleum refinery modifications to co-process bio-oil. This research fills gaps and overcomes barriers related to air permitting requirements for co-processing bio-oil in existing refineries for various stakeholders. The insights gained from this analysis can facilitate decision making and help expedite permitting processes for petroleum refineries, which seek opportunities to produce lower carbon fuels in their existing infrastructure.

09 BIOMASS FUELS↗

Final Technical Report: Impact of Wildfires on Solar Generation, Reserves, and Energy Prices

This study quantifies the potential impacts of wildfires on the California grid, specifically the impacts under three different wildfire scenarios: a "no wildfire" scenario and two wildfire-specific scenarios, "2020 wildfire" and "enhanced wildfire" (with both wildfire scenarios assuming spatial distribution of the wildfire location the same as the 2020 fires). The study combines each scenario with two solar energy infrastructures: one corresponding to the current solar installation and the other to future (midcentury) solar installation. The analysis is conducted using state-of-the-science modeling tools: primarily WRF-Chem for atmospheric modeling with chemistry to account for impacts of wildfires on solar radiation and PLEXOS for electricity market simulations. The analysis suggests that wildfires can significantly attenuate solar radiation at both short downwind distances as well as far from the emissions sources. Although the study is limited in scope, and the analysis studies only a few of the many factors that can affect photovoltaic generation and electricity markets, it indicates that wildfire smoke is an important factor that needs to be carefully considered and analyzed in planning the future grid.

electricity market↗

AN-Type Fittings in the International Space System (ISS) Node 2 Ammonia System Technical Assessment Report

Based on an anonymous request, an NESC Assessment Team was formed to investigate potential leakage problems from the ISS Program's Node 2 Anhydrous Ammonia System AN fittings. The Team's charter was to provide the ISS Program with a path to follow, which could include testing, to ensure the ISS Program felt confident that the AN fittings' leakage would not exceed specified limits in orbit. The findings from that assessment are contained in this document.

Cragg, Clinton H.↗

Behavior of Spinning Space Vehicles with Onboard Liquids, 2nd Edition, Technical Report B8030

Although the fundamental principles of spin stabilization are well established, uncertainty regarding the potential for rapid nutation growth caused by onboard liquids is a continuing concern. NASA and other organizations regularly encounter the issue of rapid nutation growth due to energy dissipation by liquids on spinning vehicles. Of concern is the stability of spinning upper stages and of spacecraft that spin for part or all of their missions. Several missions have required last-minute hardware or operational changes to deal with rapid nutation divergences that were identified late in the program. In some instances, major schedule slips were barely averted. In at least two cases, it was determined that a spinning upper stage was not a viable option. Historically, the "slosh" issue has been addressed by each space vehicle project individually, if it has been addressed at all. Due to budgetary and programmatic constraints, individual projects are unable to address the problem globally. Hence, there has been little effort to collect available test and flight data and use that data to make a coherent, unified picture of the "slosh" effect and how to deal with it. To some extent, each project has had to "reinvent the wheel", which can be both costly and risky. This study is a step toward correcting the situation. Specifically, the goal was to identify and collect available flight and test data for spinning vehicles with onboard liquid propellants. A total of 149 flight data points and 1,692 test points were collected as part of this study. This data was analyzed, correlated, and is presented here in a normalized form. In most cases, the normalization involves a dimensionless nutation time constant that can be used to predict performance of other vehicles with the same type of tank. For some configurations, it was also possible to identify conditions that can lead to resonance between nutational motion and liquid modes. Gaps in the knowledge base are identified and approaches to filling those gaps are outlined. The data presented here has two different but related uses. First, it can be applied directly to current and future spacecraft programs. Second, it can provide truth models for testing analytical techniques. Experience has shown that purely analytical models of the liquid "slosh" effect on spinning vehicles are unreliable unless they are validated against flight or test data. To the author's knowledge, this report contains the most extensive and varied data set available. As such, it should be a good resource for anyone seeking to develop and validate improved analytical techniques. All of the original digital data sets have been archived on disk, with copies provided to NASA/KSC. With some restrictions, many of these data sets can be made available to researchers within the United States. Whenever possible, spacecraft are identified by name in this report. However, several organizations provided access to data with the explicit proviso that their programs not be identified and that parameters be presented only in normalized form. These constraints have been respected.

Hubert, Carl↗

Benefits of Using a Mars Forward Strategy for Lunar Surface Systems

This paper identifies potential risk reduction, cost savings and programmatic procurement benefits of a Mars Forward Lunar Surface System architecture that provides commonality or evolutionary development paths for lunar surface system elements applicable to Mars surface systems. The objective of this paper is to identify the potential benefits for incorporating a Mars Forward development strategy into the planned Project Constellation Lunar Surface System Architecture. The benefits include cost savings, technology readiness, and design validation of systems that would be applicable to lunar and Mars surface systems. The paper presents a survey of previous lunar and Mars surface systems design concepts and provides an assessment of previous conclusions concerning those systems in light of the current Project Constellation Exploration Architectures. The operational requirements for current Project Constellation lunar and Mars surface system elements are compared and evaluated to identify the potential risk reduction strategies that build on lunar surface systems to reduce the technical and programmatic risks for Mars exploration. Risk reduction for rapidly evolving technologies is achieved through systematic evolution of technologies and components based on Moore's Law superimposed on the typical NASA systems engineering project development "V-cycle" described in NASA NPR 7120.5. Risk reduction for established or slowly evolving technologies is achieved through a process called the Mars-Ready Platform strategy in which incremental improvements lead from the initial lunar surface system components to Mars-Ready technologies. The potential programmatic benefits of the Mars Forward strategy are provided in terms of the transition from the lunar exploration campaign to the Mars exploration campaign. By utilizing a sequential combined procurement strategy for lunar and Mars exploration surface systems, the overall budget wedges for exploration systems are reduced and the costly technological development gap between the lunar and Mars programs can be eliminated. This provides a sustained level of technological competitiveness as well as maintaining a stable engineering and manufacturing capability throughout the entire duration of Project Constellation.

Mulqueen, Jack↗