Search NASA⌕ Search

SEARCH · Search NASA

Results for “FORGING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,117 records · Page 62

MODELING OF HIGH SPEED FRICTION STIR SPOT WELDING USING A LAGRANGIAN FINITE ELEMENT APPROACH

Friction stir spot welding (FSSW) has been shown to be capable of joining steels of very high strength, while also being very flexible in terms of controlling the heat of welding and the resulting microstructure of the joint. This makes FSSW a potential alternative to resistance spot welding (RSW) if tool life is sufficiently high, and if machine spindle loads are sufficiently low so that the process can be implemented on an industrial robot. Robots for spot welding can typically sustain vertical loads of about 8kN, but FSSW at tool speeds of less than 3000 rpm cause loads that are too high, in the range of 11-14 kN. Therefore, in the current work tool speeds of 3000 rpm and higher were employed, in order to generate heat more quickly and to reduce welding loads to acceptable levels. The FSSW process was modeled using a finite element approach with the Forge® software package. An updated Lagrangian scheme with explicit time integration was employed to model the flow of the sheet material, subjected to boundary conditions of a rotating tool and a fixed backing plate [3]. The modeling approach can be described as two-dimensional, axisymmetric, but with an aspect of three dimensions in terms of thermal boundary conditions. Material flow was calculated from a velocity field which was two dimensional, but heat generated by friction was computed using a virtual rotational velocity component from the tool surface. An isotropic, viscoplastic Norton-Hoff law was used to model the evolution of material flow stress as a function of strain, strain rate, and temperature. The model predicted welding temperatures and the movement of the joint interface with reasonable accuracy for the welding of a dual phase 980 steel.

Advanced High strength steel↗

Biomass Program Partners Fact Sheet

Meeting ambitious national targets for biofuels requires a radically accelerated level of technology research and infrastructure development. To expedite progress, the U.S. Department of Energy’s Biomass Program is forging collaborative partnerships with industry, academia, state governments, and diverse stakeholder groups.

biomass, collaboration, partnership, regional feed↗

Materials for Advanced Ultrasupercritical Steam Turbines Task 4: Cast Superalloy Development

The Steam Turbine critical stationary structural components are high integrity Large Shell and Valve Casing heavy section Castings, containing high temperature steam under high pressures. Hence to support the development of advanced materials technology for use in an AUSC steam turbine capable of operating with steam conditions of 760°C (1400°F) and 35 Mpa (5000 psia), Casting alloy selection and evaluation of mechanical, metallurgical properties and castability with robust manufacturing methods are mandated. Alloy down select from Phase 1 based on producability criteria and creep rupture properties tested by NETL-Albany and ORNL directed the consortium to investigate cast properties of Haynes 282 and Haynes 263. The goals of Task 4 in Phase 2 are to understand a broader range of mechanical properties, the impact of manufacturing variables on those properties. Scale up the size of heats to production levels to facilitate the understanding of the impact of heat and component weight, on metallurgical and mechanical behavior. GE Power & Water Materials and Processes Engineering for the Phase 2, Task 4.0 Castings work, systematically designed and executed casting material property evaluation, multiple test programs. Starting from 15 lbs. cylinder castings to world’s first 17,000 lbs. poured weight, heavy section large steam turbine partial valve Haynes 282 super alloy casting. This has demonstrated scalability of the material for steam Turbine applications. Activities under Task 4.0, Investigated and characterized various mechanical properties of Cast Haynes 282 and Cast Nimonic 263. The development stages involved were: 1) Small Cast Evaluation: 4 inch diam. Haynes 282 and Nimonic 263 Cylinders. This provided effects of liquidus super heat range and first baseline mechanical data on cast versions of conventional vacuum re-melted and forged Ni based super alloys. 2) Step block castings of 300 lbs. and 600 lbs. Haynes 282 from 2 foundry heats were evaluated which demonstrated the importance of proper heat treat cycles for Homogenization, and Solutionizing parameters selection and implementation. 3) Step blocks casting of Nimonic 263: Carried out casting solidification simulation analysis, NDT inspection methods evaluation, detailed test matrix for Chemical, Tensile, LCF, stress rupture, CVN impact, hardness and J1C Fracture toughness section sensitivity data and were reported. 4) Centrifugal Casting of Haynes 282, weighing 1400 lbs. with hybrid mold (half Graphite and half Chromite sand) mold assembly was cast using compressor casing production tooling. This test provided Mold cooling rates influence on centrifugally cast microstructure and mechanical properties. Graphite mold section out performs sand mold across all temperatures for 0.2% YS; %Elongation, %RA, UTS at 1400°F. Both Stress-LMP and conditional Fracture toughness plots data were in the scatter band of the wrought alloy. 5) Fundamental Studies on Cooling rates and SDAS test program. Evaluated the influence of 6 mold materials Silica, Chromite, Alumina, Silica with Indirect Chills, Zircon and Graphite on casting solidification cooling rates. Actual Casting cooling rates through Liquidus to Solidus phase transition were measured with 3 different locations based thermocouples placed in each mold. Compared with solidification simulation cooling rates and measurement of SDAS, microstructure features were reported. The test results provided engineered casting potential methods, applicable for heavy section Haynes 282 castings for optimal properties, with foundry process methods and tools. 6) Large casting of Haynes 282 Drawings and Engineering FEM models and supplemental requirements with applicable specifications were provided to suppliers for the steam turbine proto type feature valve casing casting. Molding, melting and casting pouring completed per approved Manufacturing Process Plan during 2014 Q4. The partial valve casing was successfully cast after casting methods were validated with solidification simulation analysis and the casting met NDT inspection and acceptance criteria. Heat treated and sectioned to extract trepan samples at different locations comparing with cast on coupons test data. Material properties requisite for design, such as tensile, creep/rupture, LCF, Fracture Toughness, Charpy V-notch chemical analysis testing were carried out. The test results will be presented in the final report. The typical Haynes 282 large size Steam Turbine production casting from Order to Delivery foundry schedule with the activity break up is shown in Figures 107 and 108. • From Purchase Order placement to Casting pouring ~ 26 weeks. 1. Sales and commercial review 3 2. Engineering Drawings/models review 4 3. Pattern and core box manufacturing 6 4. Casting process engineering review 4 5. FEM and solidification simulation analysis 4 6. Gating & Feeder Attachments, Ceramic tiling 2 7. Molding and coremaking production scheduling 6 8. Melting planning and schedule 3 9. Pouring, cooling and shake out 2 • From Pouring to casting Delivery ~ 29 weeks 10. Shot blast and riser cutting, gates removal 3 11. Homogenizing , solutionizing HT furnace prep 4 12. Grinding, Fettling 2 13. Aging HT Cycle, cooling 2 14. VT and LPT NDT inspections 2 15. Radiographic inspection 4 16. Mechanical testing, Chemical analysis test certs 4 17. Casting weld repair upgrades and Aging PWHT 4 18. NDT after weld repairs and casting upgrades 3 19. Casting Final Inspection and test certifications 3 20. Package and delivery 2 Hence the Total Lead time from P.O to Casting delivery is approximately 55 weeks. The Task 4.2 and Task 4.3 activities and reporting completed.

Thangirala, Mani↗

PERFORMANCE IMPROVEMENT OF CREEP-RESISTANT FERRITIC STEEL WELDMENTS THROUGH THERMO-MECHANICAL TREATMENT AND ALLOY DESIGN

Two different approaches have been proposed for improvement of cross-weld creep properties of the high temperature ferrous structural materials for fossil-fired energy applications. The traditional creep strength-enhanced ferritic (CSEF) steel weldments suffer from Type IV failures which occur at the fine-grained heat affected zone (FGHAZ). In order to minimize the premature failure at FGHAZ in the existing CSEF steels, such as modified 9Cr-1Mo ferritic-martensitic steels (Grade 91), a thermo-mechanical treatment consisting of aus-forging/rolling and subsequent aus-aging is proposed which promotes the formation of stable MX carbonitrides prior to martensitic transformation. Such MX remains undissolved during welding process, even in FGHAZ, which successfully improves the cross-weld creep properties. Another approach is to develop a new fully ferrtic, creep-resistant FeCrAl alloy which is essentially free from Type IV failure issues. Fe-30Cr-3Al base alloys with minor alloying additions were developed which achieved a combination of good oxidation/corrosion resistance and improved tensile and creep performance comparable or superior to Grade 92 steel.

Yamamoto, Yukinori↗

Obama Signs New START Treaty With Russians

Prague, Czech Republic President Obama: Finally, this day demonstrates the determination of the United States and Russia -- the two nations that hold over 90 percent of the world’s nuclear weapons -- to pursue responsible global leadership. Together, we are keeping our commitments under the Nuclear Non-Proliferation Treaty, which must be the foundation for global non-proliferation. While the New START treaty is an important first step forward, it is just one step on a longer journey. As I said last year in Prague, this treaty will set the stage for further cuts. And going forward, we hope to pursue discussions with Russia on reducing both our strategic and tactical weapons, including non-deployed weapons. President Medvedev and I have also agreed to expand our discussions on missile defense. This will include regular exchanges of information about our threat assessments, as well as the completion of a joint assessment of emerging ballistic missiles. And as these assessments are completed, I look forward to launching a serious dialogue about Russian-American cooperation on missile defense. But nuclear weapons are not simply an issue for the United States and Russia -- they threaten the common security of all nations. A nuclear weapon in the hands of a terrorist is a danger to people everywhere -- from Moscow to New York; from the cities of Europe to South Asia. So next week, 47 nations will come together in Washington to discuss concrete steps that can be taken to secure all vulnerable nuclear materials around the world in four years. And the spread of nuclear weapons to more states is also an unacceptable risk to global security -- raising the specter of arms races from the Middle East to East Asia. Earlier this week, the United States formally changed our policy to make it clear that those non-nuclear weapons states that are in compliance with the Nuclear Non-Proliferation Treaty and their non-proliferation obligations will not be threatened by America’s nuclear arsenal. This demonstrates, once more, America’s commitment to the NPT as a cornerstone of our security strategy. Those nations that follow the rules will find greater security and opportunity. Those nations that refuse to meet their obligations will be isolated, and denied the opportunity that comes with international recognition. That includes accountability for those that break the rules -- otherwise the NPT is just words on a page. That’s why the United States and Russia are part of a coalition of nations insisting that the Islamic Republic of Iran face consequences, because they have continually failed to meet their obligations. We are working together at the United Nations Security Council to pass strong sanctions on Iran. And we will not tolerate actions that flout the NPT, risk an arms race in a vital region, and threaten the credibility of the international community and our collective security. While these issues are a top priority, they are only one part of the U.S.-Russia relationship. Today, I again expressed my deepest condolences for the terrible loss of Russian life in recent terrorist attacks, and we will remain steadfast partners in combating violent extremism. We also discussed the potential to expand our cooperation on behalf of economic growth, trade and investment, as well as technological innovation, and I look forward to discussing these issues further when President Medvedev visits the United States later this year, because there is much we can do on behalf of our security and prosperity if we continue to work together. When one surveys the many challenges that we face around the world, it’s easy to grow complacent, or to abandon the notion that progress can be shared. But I want to repeat what I said last year in Prague: When nations and peoples allow themselves to be defined by their differences, the gulf between them widens. When we fail to pursue peace, then it stays forever beyond our grasp. This majestic city of Prague is in many ways a monument to human progress. And this ceremony is a testament to the truth that old adversaries can forge new partnerships. I could not help but be struck the other day by the words of Arkady Brish, who helped build the Soviet Union’s first atom bomb. At the age of 92, having lived to see the horrors of a World War and the divisions of a Cold War, he said, We hope humanity will reach the moment when there is no need for nuclear weapons, when there is peace and calm in the world. It’s easy to dismiss those voices. But doing so risks repeating the horrors of the past, while ignoring the history of human progress. The pursuit of peace and calm and cooperation among nations is the work of both leaders and peoples in the 21st century. For we must be as persistent and passionate in our pursuit of progress as any who would stand in our way. Once again, President Medvedev, thank you for your extraordinary leadership.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Micro Calorimeter for Batteries

As battery technology forges ahead and consumer demand for safer, more affordable, high-performance batteries grows, the National Renewable Energy Laboratory (NREL) has added a patented Micro Calorimeter to its existing family of R&D 100 Award-winning Isothermal Battery Calorimeters (IBCs). The Micro Calorimeter examines the thermal signature of battery chemistries early on in the design cycle using popular coin cell and small pouch cell designs, which are simple to fabricate and study.

25 ENERGY STORAGE↗

Developing a Streamlined Approach to Criticality Safety Analyst Training/Qualification

The Los Alamos National Laboratory (LANL) Criticality Safety Analyst (CSA) Qualification Standard was a multidivisional effort forged in late 2012. The result of the effort is a well-documented and efficient approach to training, encompassing local and national Nuclear Criticality Safety (NCS) training courses for incoming criticality safety staff, as well as a model for professional development of qualified CSAs at LANL. Five years later, the approach to training and qualification for CSAs has evolved into a streamlined safety management function, integrated in all phases of employee recruitment, development, deployment, and management.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Numerical Simulation Applications in the Design of EGS Collab Experiment 1

The United States Department of Energy, Geothermal Technologies Office (GTO) is funding a collaborative investigation of enhanced geothermal systems (EGS) processes at the meso-scale. This study, referred to as the EGS Collab project, is a unique opportunity for scientists and engineers to investigate the creation of fracture networks and circulation of fluids across those networks under in-situ stress conditions. The EGS Collab project is envisioned to comprise three experiments and the site for the first experiment is on the 4850 Level (4,850 feet below ground surface) in phyllite of the Precambrian Poorman formation, at the Sanford Underground Research Facility, located at the former Homestake Gold Mine, in Lead, South Dakota. Principal objectives of the project are to develop a number of intermediate-scale field sites and to conduct well-controlled in situ experiments focused on rock fracture behavior and permeability enhancement. Data generated during these experiments will be compared against predictions of a suite of computer codes specifically designed to solve problems involving coupled thermal, hydrological, geomechanical, and geochemical processes. Comparisons between experimental and numerical simulation results will provide code developers with direction for improvements and verification of process models, build confidence in the suite of available numerical tools, and ultimately identify critical future development needs for the geothermal modeling community. Moreover, conducting thorough comparisons of models, modelling approaches, measurement approaches and measured data, via the EGS Collab project, will serve to identify techniques that are most likely to succeed at the Frontier Observatory for Research in Geothermal Energy (FORGE), the GTO's flagship EGS research effort. As noted, outcomes from the EGS Collab project experiments will serve as benchmarks for computer code verification, but numerical simulation additionally plays an essential role in designing these meso-scale experiments. This paper describes specific numerical simulations supporting the design of Experiment 1, a field test involving hydraulic stimulation of two fractures from notched sections of the injection borehole and fluid circulation between sub-horizontal injection and production boreholes in each fracture individually and collectively, including the circulation of chilled water. Whereas the mine drift allows for accurate and close placement of monitoring instrumentation to the developed fractures, active ventilation in the drift cooled the rock mass within the experimental volume. Numerical simulations were executed to predict seismic events and magnitudes during stimulation, initial fracture orientations for smooth horizontal wellbores, pressure requirements for fracture initiation from notched wellbores, fracture propagation during stimulation between the injection and production boreholes, tracer travel times between the injection and production boreholes, produced fluid temperatures with chilled water injections, pressure limits on fluid circulation to avoid fracture growth, temperature environment surrounding the 4850 Level drift, and fracture propagation within a stress field altered by drift excavation, ventilation cooling, and dewatering.

15 GEOTHERMAL ENERGY↗

Developing EGS Collab Site Geologic Framework Models at the Sanford Underground Research Facility, Lead, South Dakota

The ongoing DOE/GTO funded EGS Collab project aims to stimulate and conduct inter-well flow tests at an intermediate (~10-20 m) in an underground mine in Lead, South Dakota. It is a collaborative initiative where several national laboratories, universities, and other institutions are working together to develop experimental, instrumentation, characterization, and monitoring tools and concepts that could be later employed at a full-scale EGS demonstration FORGE site. In this paper, we describe the development and workflow approach and some preliminary results of earth modeling task for EGS Collab project. We are creating earth models at three different domain scales – EGS Collab, Intermediate, and Large area – using RockWorks 17 software. Local geology, drifts/shafts, and 4850 L boreholes are incorporated in these models. Similarly, available and applicable physical/mechanical properties are also planned to be included in the earth models. Besides providing visualization of the local geology, mine architecture, and bore holes in the test site, the earth modeling task also envision to develop a series of 3-D block models (ASCII files for scattered data/point clouds in the form of X, Y, Z, g) for various physical/mechanical properties of rock. These 3-D block models will provide a consistent baseline value for a parameter of interest to all modeling/simulation groups involved in the EGS Collab project. For this task, we have assembled a preliminary suite of physical/mechanical properties of rocks. Some of the earth modeling results (3-D block models) have been tested by some modeling/simulation team members to test their applicability and for developing additional modeling capability or modifications in RockWorks exported 3-D block models. It is expected that the earth modeling results will be helpful for achieving the overall EGS Collab project objectives.

15 GEOTHERMAL ENERGY↗

Potential Experimental Topics for EGS Collab Experiment 3

To facilitate the success of FORGE, the DOE GTO has initiated a new research effort, the EGS Collab project, which will utilize readily accessible underground facilities that can refine our understanding of rock mass response to stimulation and provide a test bed at intermediate (~10 m) scale for the validation of thermal-hydrological-mechanical-chemical modeling approaches as well as novel monitoring tools. The first two EGS Experiments 1 and 2 are planned be performed under different stress/fracture conditions, and will evaluate different stimulation processes: Experiment 1 will focus on hydrofracturing of a competent rock mass, while Experiment 2 will concentrate on hydroshearing of a rock mass that contains natural fractures. Experiment 3 is scheduled to begin in 2019 will build off the lessons learned in Experiments 1 and 2 and will investigate alternate stimulation and operation methods to improve heat extraction in an EGS reservoir. This paper evaluates potential experiments that could potentially be conducted in Experiment 3. The two technical parameters defining energy extracted from EGS reservoirs with the highest economic uncertainty and risk are the production well flow rates and the reservoir thermal drawdown rate. A review of historical and currently on-going EGS studies has identified that over ½ of the projects have identified heat extraction challenges during their operation associated with these two parameters as well as some additional secondary issues. At present, no EGS reservoir has continuously produced flow rates on the order of 80 kg/s. Short circuiting (i.e. early thermal breakthrough) has been identified in numerous cases. In addition, working fluid loss (i.e. the difference between the injected fluid mass and the extracted fluid mass as compared to the injected mass) has been as high as 90%. Finally, the engineering aspects of operating a true EGS multi-fracture reservoir such as repairing/modifying fractures and controlling working fluid fluxes within multiple fractures for the effective EGS fracture management has not been sufficiently studied. To examine issues such as these, EGS Collab Experiment 3 may be conducted in the testbeds prepared for Experiments 1 and 2 by improving the previously performed stimulations, or conducted at a new site performing new stimulations with alternate method. Potential experiments may include using different stimulation and working fluids, evaluating different stimulation methods, using proppants to enhance permeability, and other high-risk high-reward methods that can be evaluated at the 10-m scale environment.

15 GEOTHERMAL ENERGY↗

The Necessity for Iteration in the Application of Numerical Simulation to EGS: Examples from the EGS Collab Test Bed 1

The United States Department of Energy, Geothermal Technologies Office (GTO) is funding a collaborative investigation of enhanced geothermal systems (EGS) processes at the meso-scale. This study, referred to as the EGS Collab project, is a unique opportunity for scientists and engineers to investigate the creation of fracture networks and circulation of fluids across those networks under in-situ stress conditions. The EGS Collab project is envisioned to comprise three experiments and the site for the first experiment is on the 4850 Level in phyllite of the Precambrian Poorman formation, at the Sanford Underground Research Facility, located at the former Homestake Gold Mine, in Lead, South Dakota. Principal objectives of the project are to develop a number of intermediate-scale field sites and to conduct well-controlled in situ experiments focused on rock fracture behavior and permeability enhancement. Data generated during these experiments will be compared against predictions of a suite of computer codes specifically designed to solve problems involving coupled thermal, hydrological, geomechanical, and geochemical processes. Comparisons between experimental and numerical simulation results will provide code developers with direction for improvements and verification of process models, build confidence in the suite of available numerical tools, and ultimately identify critical future development needs for the geothermal modeling community. Moreover, conducting thorough comparisons of models, modelling approaches, measurement approaches and measured data, via the EGS Collab project, will serve to identify techniques that are most likely to succeed at the Frontier Observatory for Research in Geothermal Energy (FORGE), the GTO's flagship EGS research effort. As noted, outcomes from the EGS Collab project experiments will serve as benchmarks for computer code verification, but numerical simulation additionally plays an essential role in designing these meso-scale experiments. This paper reviews specific numerical simulations supporting the design of experiments within Test Bed 1, a volume of phyllite rock under in-situ stress conditions off the western side of the West Access Drift on the 4850 Level, near Governor's Corner. Numerical simulations were executed prior to the start of hydraulic stimulation activities within Test Bed 1 following standard practices, using best estimates of principal stress conditions, thermal conditions, and the rock petrophysical properties, including geomechanical properties. These simulations indicated notching of the borehole would promote the initiation of transverse fractures, seismic magnitudes during the hydraulic stimulation would be below 0.1 magnitude on the Richter scale, a rock thermal conductivity of 5.0 W/m K yielded agreement with kISMET borehole temperature logs, back pressure on the production borehole would increase circulation across the test bed, and the production borehole would serve to halt propagation of the hydraulic fracture to the drift. Pre-existing natural fractures, heterogeneities in the rock properties, monitoring boreholes, and overlooked mine elements have prompted a second look at numerically modeling stimulation, fluid circulation, tracer migration, and thermal breakthrough. Numerical simulation is an invaluable tool for providing insight and understanding to complex physical processes. The success of simulations, however, often depends on including all of the salient features of the system in the founding conceptual model. This paper takes a retrospective look at examples where the conceptual model and simulation was sufficient to provide accurate forecasts and those where elements were missing, necessitating rethinking of the simulation.

15 GEOTHERMAL ENERGY↗

EGS Collab Project Experiment 1 Overview and Progress

Enhanced Geothermal Systems (EGS) offer the potential to extract and use large quantities of clean energy, but questions remain on reservoir creation and sustainability. The EGS Collab project, supported by the US Department of Energy’s Geothermal Technologies Office, is establishing a suite of highly monitored and well-characterized intermediate-scale (~10-20 m) field test beds along with fracture stimulation and interwell flow tests to better understand processes that control formation of effective subsurface heat exchangers. EGS Collab tests will provide a means of testing tools and concepts that could later be employed under geothermal reservoir conditions at DOE’s Frontier Observatory for Research in Geothermal Energy (FORGE) or enhanced geothermal systems. Key to the project is using numerical simulations in the experiment design and interpretation of results. Our first set of experiments is underway at the Sanford Underground Research Facility (SURF) in South Dakota. To date, stepwise stimulations have been performed at two locations, with the final stimulation connecting our injection and production wells. Numerous data have been collected and are currently being analyzed.

Enhanced Geothermal Systems, EGS Collab, Stimulati↗

Methods of Measuring Residual Stresses in Additively Manufactured 316L Stainless Steel

The microstructure of AM 316L stainless steel Is different from steel manufactured using conventional methods e.g. casting and forging. Data on the effects of residual stresses in the structural integrity and importance of AM parts (fatigue behavior) must be quantified. Evaluate different methods and identify a viable process for determining residual stresses in 316L stainless steel. Next step is to conduct measurements of residual stresses of samples fabricated by different manufacturers.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Getting Data Out of the Ground: Modern Data Challenges Facing EGS Collab, the DOE Geothermal Data Repository, and the Geothermal Industry

The amount of data being generated by the geothermal industry is increasing exponentially. Advanced tools, higher resolution sensors, and digitally integrated equipment are providing valuable insight into geothermal exploration and operational efficiencies, but the volumes of data they generate and the unique properties of Enhanced Geothermal System (EGS) projects are creating challenges of their own. This paper explores those challenges and the steps the U.S. Department of Energy (DOE) is taking to address them through comprehensive data management strategies, improvements to DOE's Geothermal Data Repository (GDR), and the development of a secure data collaboration tool for DOE's Frontier Observatory for Research in Geothermal Energy (FORGE) and EGS Collab projects.

15 GEOTHERMAL ENERGY↗

The Necessity for Iteration in the Application of Numerical Simulation to EGS: Examples from the EGS Collab Test Bed 1

The United States Department of Energy, Geothermal Technologies Office (GTO) is funding a collaborative investigation of enhanced geothermal systems (EGS) processes at the meso-scale. This study, referred to as the EGS Collab project, is a unique opportunity for scientists and engineers to investigate the creation of fracture networks and circulation of fluids across those networks under in-situ stress conditions. The EGS Collab project is envisioned to comprise three experiments and the site for the first experiment is on the 4850 Level in phyllite of the Precambrian Poorman formation, at the Sanford Underground Research Facility, located at the former Homestake Gold Mine, in Lead, South Dakota. Principal objectives of the project are to develop a number of intermediate-scale field sites and to conduct well-controlled in situ experiments focused on rock fracture behavior and permeability enhancement. Data generated during these experiments will be compared against predictions of a suite of computer codes specifically designed to solve problems involving coupled thermal, hydrological, geomechanical, and geochemical processes. Comparisons between experimental and numerical simulation results will provide code developers with direction for improvements and verification of process models, build confidence in the suite of available numerical tools, and ultimately identify critical future development needs for the geothermal modeling community. Moreover, conducting thorough comparisons of models, modelling approaches, measurement approaches and measured data, via the EGS Collab project, will serve to identify techniques that are most likely to succeed at the Frontier Observatory for Research in Geothermal Energy (FORGE), the GTO’s flagship EGS research effort. As noted, outcomes from the EGS Collab project experiments will serve as benchmarks for computer code verification, but numerical simulation additionally plays an essential role in designing these meso-scale experiments. This paper reviews specific numerical simulations supporting the design of experiments within Test Bed 1, a volume of phyllite rock under in-situ stress conditions off the western side of the West Access Drift on the 4850 Level, near Governor’s Corner. Numerical simulations were executed prior to the start of hydraulic stimulation activities within Test Bed 1 following standard practices, using best estimates of principal stress conditions, thermal conditions, and the rock petrophysical properties, including geomechanical properties. These simulations indicated notching of the borehole would promote the initiation of transverse fractures, seismic magnitudes during the hydraulic stimulation would be below 0.1 magnitude on the Richter scale, a rock thermal conductivity of 5.0 W/m K yielded agreement with kISMET borehole temperature logs, back pressure on the production borehole would increase circulation across the test bed, and the production borehole would serve to halt propagation of the hydraulic fracture to the drift. Pre-existing natural fractures, heterogeneities in the rock properties, monitoring boreholes, and overlooked mine elements have prompted a second look at numerically modeling stimulation, fluid circulation, tracer migration, and thermal breakthrough. Numerical simulation is an invaluable tool for providing insight and understanding to complex physical processes. The success of simulations, however, often depends on including all of the salient features of the system in the founding conceptual model. This paper takes a retrospective look at examples where the conceptual model and simulation was sufficient to provide accurate forecasts and those where elements were missing, necessitating rethinking of the simulation.

numerical simulation, EGS Collab, enhanced geother↗

The EGS Collab Project: Stimulation and Simulation

Development of Enhanced Geothermal Systems (EGS) requires accurate predictions of flow rates and temperatures at production wells over time. The concept of EGS is simple; however, complications from heterogeneity and complexity of fracture pathways may lead to channeling, short-circuiting, and premature thermal breakthrough. In the EGS Collab project, we are establishing a suite of highly monitored and well characterized intermediate-scale (~10-20 m) field test beds along with fracture stimulation and interwell flow tests to better understand processes that control formation of effective subsurface heat exchangers. EGS Collab experiments will provide a means of testing tools and concepts that could later be employed under geothermal reservoir conditions at FORGE or elsewhere. Key to the project is using numerical simulations in the experiment design and interpretation of results. Our tests will be well-controlled, in situ experiments focused on rock fracture behavior and permeability enhancement. Our pre- and post-test modeling results of each field experiment compared with detailed measurements will allow for improved model prediction and validation. We will use comprehensive instrumentation to collect high-quality and high-resolution geophysical and other fracture characterization and fluid flow data. We will analyze these data and compare them with models and field observations to further elucidate the basic relationships between stress, induced seismicity, and permeability enhancement. We will also observe and quantify other key governing parameters that impact permeability, and will attempt to understand how these parameters might change throughout the development and operation of an EGS project with the ultimate goal of enabling commercial viability of EGS. Our first set of experiments will be performed at the Sanford Underground Research Facility (SURF) in South Dakota. Our team is well underway with building the first field experiment test bed planned for this project, which is supported by the US Department of Energy’s Geothermal Technologies Office.

EGS Collab↗

EGS Collab Project Electrical Resistivity Tomography Characterization and Monitoring

The EGS (Enhanced Geothermal Systems) Collab project is performing stimulation experiments in highly monitored and well-characterized intermediate-scale (~10-20 m) field test beds. The characterization and monitoring system includes an array of electrodes grouted in place within six monitoring wells, with 16 electrodes per well. The electrodes enable characterization of the 3D low-frequency electrical properties of the host rock, and changes in those properties during stimulation and tracer testing using both static and time-lapse Electrical Resistivity Tomography. In this talk we present: 1) ERT array design and installation, 2) baseline (pre-stimulation) imaging results, 3) time-lapse data collected during stimulation operations, and 4) real-time imaging during clean water injections intended to illuminate flow paths as a decrease in bulk electrical conductivity. We will also discuss aspects and lessons learned for conducting ERT imaging operations in the presence of high fluid pressure gradients during stimulation and flow operations. Results to date reveal a highly heterogeneous rock fabric, ranging over four orders of magnitude in bulk electrical conductivity, and high polarization capacity. Baseline imaging results are consistent with borehole logs and core studies. Time-lapse imaging results to identify major flow paths during tracer studies are forthcoming and will be discussed during this presentation. Ultimately the ERT imaging data sets provide useful information for validating and verifying model predictions in preparation for research at DOE’s Frontier Observatory for Research in Geothermal Energy (FORGE).

electrical resistivity tomography, geophysics, geo↗

EGS Collab Project: Status, Tests, and Data

The EGS (Enhanced Geothermal Systems) Collab project is performing stimulation and flow experiments in highly-monitored and well-characterized intermediate-scale (approximately10 to 20 meter) field test beds at a depth of approximately 1,500 meters in the Sanford Underground Research Facility (SURF) in the Black Hills of South Dakota. Our fracture stimulation and interwell flow tests are performed to better understand processes that control formation of effective subsurface heat exchangers that are critical to the development and success of EGS. Different EGS Collab stimulations will be performed under dissimilar stress conditions produce data for model comparisons that better differentiate stimulation mechanisms and the evolution of permeability enhancement in crystalline rock. EGS Collab experiments provide a means of testing tools, concepts and strategies that could later be employed under geothermal reservoir conditions at DOE’s Frontier Observatory for Research in Geothermal Energy (FORGE) and other enhanced geothermal systems. Key to the project is using numerical simulations in the experiment design and interpretation of results, and the collection of high-quality stimulation/flow, thermal, and geologic/geophysical data. A wide range of geologic and geophysical data have been acquired and interpreted for pre-stimulation testbed characterization. Multiple stimulation and flow tests have been performed at SURF, and multiple data sets have been collected and analyzed during these tests including electrical resistance tomography, microseismic, continuous active source seismic monitoring, distributed temperature, and the SIMFIP tool has been used to identify fracture formation and characteristics. An overview of some of the numerical simulations and experiments performed at SURF are presented.

15 GEOTHERMAL ENERGY↗