Search NASA⌕ Search

SEARCH · Search NASA

Results for “Linear accelerators”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,117 records · Page 62

Neutralized Drift Compression Experiment (NDCX) - II Quarterly Report

LBNL has received American Recovery and Reinvestment Act (ARRA) funding to construct a new accelerator at Lawrence Berkeley National Laboratory (LBNL) to significantly increase the energy on target, which will allow both the Heavy Ion Fusion (HIF) and Warm Dense Matter (WDM) research communities to explore scientific conditions that have not been available in any other device. For NDCX-II, a new induction linear accelerator (linac) will be constructed at Lawrence Berkeley National Laboratory (LBNL). NDCX-II will produce nano-second long ion beam bunches to hit thin foil targets. The final kinetic energy of the ions arriving at the target varies according to the ion mass. For atomic mass unit of 6 or 7 (Lithium ions), useful kinetic energies range from 1.5 to 5 or more MeV. The expected beam charge in the 1 ns (or shorter) pulse is about 20 nanoCoulombs. The pulse repetition rate will be about once or twice per minute (of course, target considerations will often reduce this rate). Our approach to building the NDCX-II ion accelerator is to make use of the available induction modules and 200 kV pulsers from the retired ATA electron linac at LLNL. Reusing this hardware will maximize the ion energy on target at a minimum cost. Some modification of the cells (e.g., reduce the bore diameter and replace with higher field pulsed solenoids) are needed in order to meet the requirements of this project. The NDCX-II project will include the following tasks: (1) Physics design to determine the required ion current density at the ion source, the injector beam optics, the layout of accelerator cells along the beam line, the voltage waveforms for beam acceleration and compression, the solenoid focusing, the neutralized drift compression and the final focus on target; (2) Engineering design and fabrication of the accelerator components, pulsed power system, diagnostic system, and control and data acquisition system; (3) Conventional facilities; and (4) Installation and integration. The project will be considered completed when the accelerator and pulsed power systems are in place and tested, and we begin beam production and acceleration. The period of performance for this project is July 7, 2009 to Mar 31, 2012, and the total funding, including contingency, is $11.0 M.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

A compact electron source for the dielectric laser accelerator

In this work, we design and demonstrate a compact electron source that combines an integrated silicon nanotip photoemitter with a compact silicon-based electrostatic lens. The lens simultaneously accelerates electrons to 30 keV and focuses the resulting beam to a 0.4 μm (RMS) beam diameter with 62 pm-rad normalized emittance at a distance of 20 mm from the cathode. The compact nature of this lens provides a compelling source for dielectric laser accelerator (DLA) beamlines, ultrafast electron diffraction, or ultrafast electron microscopy. Driven by a 220 fs, 1960 nm pulsed laser beam, electron currents up to 28 electrons/pulse at 100 kHz are demonstrated. The electron bunch length is 540 ± 50 fs for photocurrents of <1 electron/pulse, increasing to 700 ± 80 fs for 28 electrons/pulse, as measured by cross correlation with a 220 fs pulsed laser beam. The maximum 5D peak brightness is measured to be 6.8 × 10 13 A/(m 2 rad 2 ) at 28 electrons/pulse. These results represent a significant step toward developing practical benchtop-sized linear accelerators based on DLA technology or compact ultrafast electron microscopy and diffraction applications.

47 OTHER INSTRUMENTATION↗

Quantifying Rigid and Nonrigid Motion of Liver Tumors During Stereotactic Body Radiation Therapy

Purpose: To quantify rigid and nonrigid motion of liver tumors using reconstructed 3-dimensional (3D) fiducials from stereo imaging during CyberKnife-based stereotactic body radiation therapy (SBRT). Methods and Materials: Twenty-three liver patients treated with 3 fractions of SBRT were used in this study. After 2 orthogonal kilovoltage images were taken during treatment, the 3D locations of the fiducials were generated by the CyberKnife system and validated using geometric derivations. A total of 4824 pairs of kilovoltage images from start to end of treatment were analyzed. For rigid motion, the rotational angles and translational shifts were reported by aligning 3D fiducial groups from different image pairs, using least-squares fitting. For nonrigid motion, we quantified interfractional tumor volume variations by using the proportional volume derived from the fiducials, which correlates to the sum of interfiducial distances. The individual fiducial displacements were also reported (1) after rigid corrections and (2) without angle corrections. Results: The proportional volume derived by the fiducials demonstrated a volume-increasing trend in the second (101.9% ± 3.6%) and third (101.0 ± 5.9%) fractions among most patients, possibly due to radiation-induced edema. For all patients, the translational shifts in left-right, anteroposterior, and superoinferior directions were 2.1 ± 2.3 mm, 2.9 ± 2.8 mm, and 6.4 ± 5.5 mm, respectively. The greatest translational shifts occurred in the superoinferior direction, likely due to respiratory motion from the diaphragm. The rotational angles in roll, pitch, and yaw were 1.2° ± 1.8°, 1.8° ± 2.4°, and 1.7° ± 2.1°, respectively. The 3D individual fiducial displacements with rigid corrections were 0.2 ± 0.2 mm and increased to 0.5 ± 0.4 mm without rotational corrections. Conclusions: Accurate 3D locations of internal fiducials can be reconstructed from stereo imaging during treatment. As an effective surrogate to tumor motion, fiducials provide a close estimation of both rigid and nonrigid motion of liver tumors. The reported displacements could be further utilized for tumor margin definition and motion management in conventional linear accelerator–based liver SBRT.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Electron Linac design to drive bright Compton back-scattering gamma-ray sources

The technological development in the field of high brightness linear accelerators and high energy/high quality lasers enables today designing high brilliance Compton-X and Gamma-photon beams suitable for a wide range of applications in the innovative field of nuclear photonics. The challenging requirements of this kind of source comprise: tunable energy (1-20 MeV), very narrow bandwidth (0.3%), and high spectral density (10{sup 4} photons/s/eV). We present here a study focused on the design and the optimization of an electron Linac aimed to meet the source specifications of the European Extreme Light Infrastructure-Nuclear Physics project, currently funded and seeking for an innovative machine design in order to outperform state-of-the-art facilities. We show that the phase space density of the electron beam, at the collision point against the laser pulse, is the main quality factor characterizing the Linac.

43 PARTICLE ACCELERATORS↗

Beam characteristics of energy-matched flattening filter free beams

Purpose: Flattening filter free (FFF) linear accelerators can increase treatment efficiency and plan quality. There are multiple methods of defining a FFF beam. The Elekta control system supports tuning of the delivered FFF beam energy to enable matching of the percentage depth-dose (PDD) of the flattened beam at 10 cm depth. This is compared to FFF beams where the linac control parameters are identical to those for the flattened beam. All beams were delivered on an Elekta Synergy accelerator with an Agility multi-leaf collimator installed and compared to the standard, flattened beam. The aim of this study is to compare “matched” FFF beams to both “unmatched” FFF beams and flattened beams to determine the benefits of matching beams. Methods: For the three modes of operation 6 MV flattened, 6 MV matched FFF, 6 MV unmatched FFF, 10 MV flattened, 10 MV matched FFF, and 10 MV unmatched FFF beam profiles were obtained using a plotting tank and were measured in steps of 0.1 mm in the penumbral region. Beam penumbra was defined as the distance between the 80% and 20% of the normalized dose when the inflection points of the unflattened and flattened profiles were normalized with the central axis dose of the flattened field set as 100%. PDD data was obtained at field sizes ranging from 3 cm × 3 cm to 40 cm × 40 cm. Radiation protection measurements were additionally performed to determine the head leakage and environmental monitoring through the maze and primary barriers. Results: No significant change is made to the beam penumbra for FFF beams with and without PDD matching, the maximum change in penumbra for a 10 cm × 10 cm field was within the experimental error of the study. The changes in the profile shape with increasing field size are most significant for the matched FFF beam, and both FFF beams showed less profile shape variation with increasing depth when compared to flattened beams, due to consistency in beam energy spectra across the radiation field. The PDDs of the FFF beams showed less variation with field size, the d{sub max} value was deeper for the matched FFF beam than the FFF beam and deeper than the flattened beam for field sizes greater than 5 cm × 5 cm. The head leakage when using the machine in FFF mode is less than half that for a flattened beam, but comparable for both FFF modes. The radiation protection dose-rate measurements show an increase of instantaneous dose-rates when operating the machines in FFF mode but that increase is less than the ratio of MU/min produced by the machine. Conclusions: The matching of a FFF beam to a flattened beam at a depth of 10 cm in water by increasing the FFF beam energy does not reduce any of the reported benefits of FFF beams. Conversely, there are a number of potential benefits resulting from matching the FFF beam; the depth of maximum dose is deeper, the out of field dose is potentially reduced, and the beam quality and penetration more closely resembles the flattened beams currently used in clinical practice, making dose distributions in water more alike. Highlighted in this work is the fact that some conventional specifications and methods for measurement of beam parameters such as penumbra are not relevant and further work is required to address this situation with respect to “matched” FFF beams and to determine methods of measurement that are not reliant on an associated flattened beam.

43 PARTICLE ACCELERATORS↗

Annual Site Environmental Report: 2006

This report provides information about environmental programs during the calendar year (CY) of 2006 at the Stanford Linear Accelerator Center (SLAC), Menlo Park, California. Activities that span the calendar year; i.e., stormwater monitoring covering the winter season of 2006/2007 (October 2006 through May 2007), are also included. Production of an annual site environmental report (ASER) is a requirement established by the United States Department of Energy (DOE) for all management and operating (M&O) contractors throughout the DOE complex. SLAC is a federally-funded research and development center with Stanford University as the M&O contractor. SLAC continued to follow the path to self-declare an environmental management system under DOE Order 450.1, 'Environmental Protection Program' and effectively applied environmental management in meeting the site's integrated safety and environmental management system goals. For normal daily activities, all SLAC managers and supervisors are responsible for ensuring that proper procedures are followed so that Worker safety and health are protected; The environment is protected; and Compliance is ensured. Throughout 2006, SLAC focused on these activities through the SLAC management systems. These systems were also the way SLAC approached implementing 'greening of the government' initiatives such as Executive Order 13148. The management systems at SLAC are effective, supporting compliance with all relevant statutory and regulatory requirements. The SLAC Office of Assurance was created during 2006 in response to DOE Order 226.1. During 2006, there were no reportable releases to the environment from SLAC operations, and there were no Notice of Violations issued to SLAC from any of the regulatory agencies that oversee SLAC. In addition, many improvements in waste minimization, recycling, stormwater drain system, groundwater restoration, and SLAC's chemical management system (CMS) were continued during 2006 to better manage chemical use. Program-specific details are discussed below. SLAC operates its air quality management program in compliance with its established permit conditions. The Bay Area Air Quality Management District (BAAQMD) did not conduct a facility inspection of SLAC during 2006, though it did visit the site on four different occasions. The BAAQMD did compliment SLAC for the overall configuration of SLAC's gasoline dispensing facility and of SLAC's asbestos/demolition notification program during two of the visits. DOE awarded SLAC the 2006 Best in Class for Pollution Prevention and Environmental Stewardship Accomplishment in recognition of SLAC's CMS program which manages the procurement and use of chemicals. As an example of the efficiency of the CMS, SLAC reviewed its use of gases and associated tanks and phased out numerous gas tanks that were no longer needed or were not acceptable for long-term storage, in turn, reducing SLAC's on-site chemical inventory. As part of SLAC's waste minimization and management efforts, more than one thousand tons of municipal solid waste was recycled by SLAC during 2006. SLAC operates its industrial and sanitary wastewater management program in compliance with established permit conditions. During 2006, SLAC obtained a new facility-wide wastewater discharge permit which replaced four separate permits that were previously issued to SLAC. In 2006, no radiological incidents occurred that increased radiation levels or released radioactivity to the environment. In addition to managing its radioactive wastes safely and responsibly, SLAC worked to reduce the amount of waste generated. SLAC has implemented programs and systems to ensure compliance with all radiological requirements related to the environment. The Environmental Restoration Program continued work on site characterization and evaluation of remedial alternatives at four sites with volatile organic compounds in groundwater and several areas with polychlorinated biphenyls and low concentrations of lead in soil. SLAC is regulated under a site cleanup requirements order (board order) issued by the California Regional Water Quality Control Board, San Francisco Bay Region (RWQCB) for the investigation and remediation of impacted soil and groundwater at SLAC. The new board order lists specific tasks and deadlines for groundwater and soil remedial investigation. All 2006 submittals to the board were completed on time.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Compact Gamma-ray Source Technology Development Study

This study focuses on the applicability of current accelerator and laser technologies to the construction of compact, narrow bandwidth, gamma-ray sources for DHS missions in illicit materials detection. It also identifies research and development areas in which advancement will directly benefit these light sources. In particular, we review the physics of Compton scattering based light sources and emphasize the source properties most important to Nuclear Resonance Fluorescence (NRF) applications of interest. The influences of laser and electron beam properties on the light source are examined in order to evaluate the utility of different technologies for this application. Applicable bulk and fiber-based laser systems and laser recirculation technologies are discussed and Radio Frequency (RF) Linear Accelerator (linac) technologies are examined to determine the optimal frequency and pulse formats achievable.

42 ENGINEERING↗

Measurements of the Electron Cloud Density in the PEP-II Low Energy Ring

Clouds of low energy electronsin the vacuum beam pipes of accelerators of positively charged particle beams present a serious limitation for operation of these machines at high currents. Because of the size of these accelerators, it is difficult to probe the low energyelectron clouds over substantial lengths of the beam pipe. We have developed a novel technique to directly measure the electron cloud density via the phase shift induced in a TE wave that is independently excited and transmitted over a section of the accelerator. We infer the absolute phase shift with relatively high accuracy from the phase modulation of the transmission due to the modulation of the electron cloud density from a gap in the positively charged beam. We have used this technique for the first time to measure the average electron cloud density over a 50 m straight section in the positron ring of the PEP-II collider at the Stanford Linear Accelerator Center. We have also measured the variation of the density by using low field solenoid magnets to control the electrons.

43 PARTICLE ACCELERATORS↗

Positive-ion accelerator mass spectrometry at ATLAS: Peaks and pits

Electron Cyclotron Resonance (ECR) ion sources and the production of multiple-charge positive ions with high efficiency in combination with a heavy-ion accelerator have opened the way to an alternative and complementary version of accelerator mass spectrometry (AMS). A notable strength of positive-ion over traditional AMS is the capability of ultra-high sensitivity detection of radioactive isotopes of noble gases, in particular 37 Ar (t 1/2 = 35 d) and 39 Ar (269 y). The complete dissociation of molecular ions in the ECR and in particular of hydride ions of neighboring stable isotopes results in superior isotopic separation. However, the use of high charge states, necessary for acceleration to high energy, entails the existence of severe transmission degeneracies with stable ions having nearly equal mass-to-charge ratios, in addition to that of stable isobaric ions. Separation or discrimination of these parasitic ions require powerful and sophisticated dispersive systems at detection stage. In conclusion, we review here work performed and in progress at the ATLAS facility of Argonne National Laboratory (ANL) where an ECR ion source, a Radio-Frequency Quadrupole (RFQ), a superconducting linear accelerator and a Gas-Filled Magnet (GFM) are used as an AMS setup.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Thomas Jefferson National Accelerator Facility

The Thomas Jefferson National Accelerator Facility (Jefferson Lab) in Newport News, Virginia, USA, is one of ten national laboratories under the aegis of the Office of Science of the U.S. Department of Energy (DOE). It is managed and operated by Jefferson Science Associates, LLC. The primary facility at Jefferson Lab is the Continuous Electron Beam Accelerator Facility (CEBAF) as shown in an aerial photograph in Figure 1. Jefferson Lab was created in 1984 as CEBAF and started operations for physics in 1995. The accelerator uses superconducting radio-frequency (srf) techniques to generate high-quality beams of electrons with high-intensity, well-controlled polarization. The technology has enabled ancillary facilities to be created. The CEBAF facility is used by an international user community of more than 1200 physicists for a program of exploration and study of nuclear, hadronic matter, the strong interaction and quantum chromodynamics. Additionally, the exceptional quality of the beams facilitates studies of the fundamental symmetries of nature, which complement those of atomic physics on the one hand and of high-energy particle physics on the other. The facility is in the midst of a project to double the energy of the facility and to enhance and expand its experimental facilities. Studies are also pursued with a Free-Electron Laser produced by an energy-recovering linear accelerator.

43 PARTICLE ACCELERATORS↗

Measurements of the Electron Cloud Density in the PEP-II Low Energy Ring

Clouds of low energy electrons in the vacuum beam pipes of accelerators of positively charged particle beams present a serious limitation for operation of these machines at high currents. Because of the size of these accelerators, it is difficult to probe the low energy electron clouds over substantial lengths of the beam pipe. We have developed a novel technique to directly measure the electron cloud density via the phase shift induced in a TE wave that is independently excited and transmitted over a section of the accelerator. We infer the absolute phase shift with relatively high accuracy from the phase modulation of the transmission due to the modulation of the electron cloud density from a gap in the positively charged beam. We have used this technique for the first time to measure the average electron cloud density over a 50 m straight section in the positron ring of the PEP-II collider at the Stanford Linear Accelerator Center. We have also measured the variation of the density by using low field solenoid magnets to control the electrons.

43 PARTICLE ACCELERATORS↗

The neutron dose equivalent evaluation and shielding at the maze entrance of a Varian Clinac 23EX treatment room

Purpose: To evaluate the neutron and photon dose equivalent rate (H{sub n,D} and H{sub G}) at the outer maze entrance and the adjacent treatment console area after the installation of a Varian Clinac 23EX accelerator with a higher beam energy than its predecessor. The evaluation was based on measurements and comparison with several empirical calculations. The effectiveness of borated polyethylene (BPE) boards, as a maze wall lining material, on neutron dose and photon dose reduction is also reported. Methods: A single energy Varian 6 MV photon linear accelerator (linac) was replaced with a Varian Clinac 23EX accelerator capable of producing 18 MV photons in a vault originally designed for the former accelerator. In order to evaluate and redesign the shielding of the vault, the neutron dose equivalent H{sub n,D} was measured using an Andersson-Braun neutron Rem meter and the photon dose equivalent H{sub G} was measured using a Geiger Mueller and an ion chamber {gamma}-ray survey meter at the outer maze entrance. The measurement data were compared to semiempirical calculations such as the Kersey method, the modified Kersey method, and a newly proposed method by Falcao et al. Additional measurements were taken after BPE boards were installed on the maze walls as a neutron absorption lining material. Results: With the gantry head tilted close to the inner maze entrance and with the jaws closed, both neutron dose equivalent and photon dose equivalent reached their maximum. Compared to the measurement results, the Kersey method overestimates the neutron dose equivalent H{sub n,D} by about two to four times (calculation/measurement ratio{approx_equal}2.4-3.8). Falcao's method largely overestimates the H{sub n,D} (calculation/measurement ratio{approx_equal}3.9-5.5). The modified Kersey method has a calculation to measurement ratio about 0.6-0.9. The photon dose equivalent calculation including McGinley's capture gamma dose equivalent equation estimates about 77%-98% of the measurement. After applying BPE boards as a lining material on the inner corner of the maze wall, the H{sub n,D} and the H{sub G} at maze entrance were decreased by 41% and 59%, respectively. Conclusions: This work indicates that the Kersey method overestimates the neutron dose equivalent H{sub n,D} for a Varian Clinac 23EX accelerator. The Falcao method overestimates the H{sub n,D} partially due to the discrepancy in the International Commission on Radiological Protection (ICRP) conversion factors caused by the uncertainties of the estimated average neutron energy. The modified Kersey method gives the closest estimation of a Varian Clinac 23EX accelerator operated at 18 MV photon mode in a maze with a similar design as in the authors' study. However, it should be used with caution because of its tendency to underestimate the H{sub n,D}. A borated polyethylene lining can provide a cost effective method to reduce neutron and photon dose equivalent at the maze door for an existing linac vault, following the installation of a higher energy linac.

60 APPLIED LIFE SCIENCES↗

S{sup 3}: The Super Separator Spectrometer for SPIRAL2 stable beams

S{sup 3}(Super Separator Spectrometer) is a device designed for experiments with the very high intensity stable beams of LINAG, the superconducting linear accelerator of GANIL, which will be built in the framework of SPIRAL2. These beams, which will provide ions with A/Q = 3 in SPIRAL2 phase one, can reach intensities up to 1mA for light ions, A<50. These unprecedented intensities open new opportunities in several physics domains, e.g. super-heavy and very-heavy nuclei, spectroscopy at and beyond the drip line, isomers and ground state properties, multi-nucleon transfer and deep-inelastic reactions. An international collaboration has been formed to propose physics experiments and develop technical solutions for this new instrument.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Simulation Of A Photofission-Based Cargo Interrogation System

A comprehensive model has been developed to characterize and optimize the detection of Bremsstrahlung x-ray induced fission signatures from nuclear materials hidden in cargo containers. An effective active interrogation system should not only induce a large number of fission events but also efficiently detect their signatures. The proposed scanning system utilizes a 9-MV commercially available linear accelerator and the detection of strong fission signals i.e. delayed gamma rays and prompt neutrons. Because the scanning system is complex and the cargo containers are large and often highly attenuating, the simulation method segments the model into several physical steps, representing each change of radiation particle. Each approximation is carried-out separately, resulting in a major reduction in computational time and a significant improvement in tally statistics. The model investigates the effect on the fission rate and detection rate by various cargo types, densities and distributions. Hydrogenous and metallic cargos, homogeneous and heterogeneous, as well as various locations of the nuclear material inside the cargo container were studied. We will show that for the photofission-based interrogation system simulation, the final results are not only in good agreement with a full, single-step simulation but also with experimental results, further validating the full-system simulation.

07 ISOTOPE AND RADIATION SOURCES↗

SU-E-T-246: Detector Selection for Small Field Measurements, a Comparative Study

Purpose: To compare commercially available detectors for small field dosimetry. Methods: PTW (Freiburg, Germany) diode E, PTW microDiamond, and SunNuclear (Melbourne, FL) Edge detector were used to measure output factors, PDD, and profiles on a Varian iX linear accelerator (Varian Medical Systems, Palo Alto, CA) using 6MV and 18MV photon beams. The water tank was set to 100cm SSD. Centering profiles at 5cm and 20cm depth confirmed an offset <0.1mm. High resolution PDD (0.1mm) aligned the collecting volume at water surface. For setup and linearity verification, PDD and profiles were matched to annual measurements, which were performed with an A1SL ion chamber.Scans were taken for 6X and 18X, for 10cmx10cm, 10cmx2cm, 10cmx1cm, and 10cmx0.5cm fields. Profiles were measured at Dmax (6X=1.5cm, 18X=3.5cm), 5cm, 10cm, and 20cm depths. All fields used 10cmx10cm jaws with the MLC defining the field in the X-direction. PDDs used 2mm step size and 0.2s discrete collecting time. Profiles used 1mm step size and a 0.4s discrete collecting time. Results: The PTW diode E and Edge detector exhibit centering stability, but all detectors require vertical shifts from Vendor defined vertical alignment. Output factor measurements reveal good agreement between detectors. The Edge detector demonstrates the sharpest penumbra and the closest consistent match to ion chamber measurements in the out of field regions for 6MV (3.2%). Each detector provides comparable curve quality for PDDs, with a maximum difference across detectors giving a standard deviation of 0.6% at 30cm depth, 18X, and 10cmx0.5cm. Profiles match closely across all detectors, depths, energies, and field sizes. The microDiamond detector produces the largest penumbra width, largest deviation from ion chamber dose in the tail region for 6MV, and exhibits centering instability. Conclusion: Based on our findings, the Edge detector was chosen for stereotactic measurements. The PTW diode E is an acceptable alternative.

60 APPLIED LIFE SCIENCES↗

Annual Site Environmental Report, 2007(ASER)

This report provides information about environmental programs during the calendar year (CY) of 2007 at the Stanford Linear Accelerator Center (SLAC), Menlo Park, California. Activities that span the calendar year, i.e., stormwater monitoring covering the winter season of 2007/2008 (October 2007 through May 2008), are also included. Production of an annual site environmental report (ASER) is a requirement established by the United States Department of Energy (DOE) for all management and operating (M&O) contractors throughout the DOE complex. SLAC is a federally-funded research and development center with Stanford University as the M&O contractor. Under Executive Order (EO) 13423 and DOE Order 450.1, 'Environmental Protection Program', SLAC effectively implemented and integrated the key elements of an Environmental Management System (EMS) to achieve the site's integrated safety and environmental management system goals. For normal daily activities, SLAC managers and supervisors are responsible for ensuring that policies and procedures are understood and followed so that: (1) Worker safety and health are protected; (2) The environment is protected; and (3) Compliance is ensured. Throughout 2007, SLAC focused on development and implementation of SLAC management systems to ensure continual improvement. These systems provided a structured framework for SLAC to implement 'greening of the government' initiatives such as EO 13148. Overall, management systems at SLAC are effective, supporting compliance with all relevant statutory and regulatory requirements. SLAC continues to demonstrate significant progress in implementing and integrating EMS into day-to-day operations at SLAC. The annual management review and ranking of environmental aspects were completed this year by SLAC's EMS Steering Committee, the Environmental Safety Committee (ESC) and thirteen objectives and targets were established for 2007. For each objective and target, a work plan, or Environmental Management Program (EMP) was completed and progress reports were routinely provided to SLAC senior management. During 2007, there were no reportable releases to the environment from SLAC operations. In addition, many improvements in waste minimization, recycling, stormwater management, groundwater restoration, and SLAC's chemical management system (CMS) were continued during 2007. SLAC replaced two process tanks at the Plating Shop which previously contained chromium solutions with non-chromium containing solutions, reducing the overall use of hazardous chemicals. In addition, 346 polychlorinated biphenyl (PCB)-contaminated capacitors were replaced with non-PCB capacitors, reducing the potential of a release of oil with PCBs during an event such as a fire or an earthquake. SLAC operates its industrial and sanitary wastewater management program in compliance with established permit conditions. During 2007, SLAC obtained a new facility-wide wastewater discharge permit which replaced four separate permits that were previously issued to SLAC. In 2007, no radiological incidents occurred that increased radiation levels or released radioactivity to the environment. In addition to managing its radioactive wastes safely and responsibly, SLAC worked to reduce the amount of waste generated. SLAC has implemented programs and systems to ensure compliance with all radiological requirements related to the environment. Specifically, the Radiation Protection Radiological Waste Management (RPRWM) Group developed a training course to certify Radioactive Waste Generators, conducted a training pilot, and developed a list of potential radioactive waste generators to train. In 2007, the SLAC Environmental Restoration Program continued work on site characterization and evaluation of remedial alternatives at four sites with volatile organic compounds in groundwater and several areas with polychlorinated biphenyls and low concentrations of lead in soil. SLAC is regulated under a site cleanup requirements order (board order) issued by the California Regional Water Quality Control Board (RWQCB), San Francisco Bay Region in May 2005 for the investigation and remediation of impacted soil and groundwater at SLAC. The board order lists specific tasks and deadlines for completion of groundwater and soil characterization and other remediation activities. All 2007 submittals to the RWQCB were completed and submitted on time.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Longitudinal Diagnostics for Short Electron Beam Bunches

Single-pass free electron lasers require high peak currents from ultra-short electron bunches to reach saturation and an accurate measurement of bunch length and longitudinal bunch profile is necessary to control the bunch compression process from low to high beam energy. The various state-of-the-art diagnostics methods from ps to fs time scales using coherent radiation detection, RF deflection, and other techniques are presented. The use of linear accelerators as drivers for free electron lasers (FEL) and the advent of single-pass (SASE) FELs has driven the development of a wide range of diagnostic techniques for measuring the length and longitudinal distribution of short and ultra-short electron bunches. For SASE FELs the radiation power and the length of the undulator needed to achieve saturation depend strongly on the charge density of the electron beam. In the case of X-ray FELs, this requires the accelerator to produce ultra-high brightness beams with micron size transverse normalized emittances and peak currents of several kA through several stages of magnetic bunch compression. Different longitudinal diagnostics are employed to measure the peak current and bunch profile along these stages. The measurement techniques can be distinguished into different classes. Coherent methods detect the light emitted from the beam by some coherent radiation process (spectroscopic measurement), or directly measure the Coulomb field traveling with the beam (electro-optic). Phase space manipulation techniques map the time coordinate onto a transverse dimension and then use conventional transverse beam diagnostics (transverse deflector, rf zero-phasing). Further methods measure the profile or duration of an incoherent light pulse emitted by the bunch at wavelengths much shorted than the bunch length (streak camera, fluctuation technique) or modulate the electron beam at an optical wavelength and then generate a narrow bandwidth radiation pulse with the longitudinal profile of the beam mapped onto (optical replicator). The operational needs for bunch length measurements to have fast acquisitions, to be used in feedback systems, to distinguish pulse to pulse changes and to be nondestructive or parasitically have resulted into developing many of the diagnostics into single-shot techniques and in the following the main discussion will emphasize them.

43 PARTICLE ACCELERATORS↗

Characterization of TLD-100 micro-cubes for use in small field dosimetry

At present there are no international regulations for the management of millimeter scale fields and there are no suggestions for a reference detector to perform the characterization and dose determination for unconventional radiation beams (small fields) so that the dosimetry of small fields remains an open research field worldwide because these fields are used in radiotherapy treatments. Sensitivity factors and reproducibility of TLD-100 micro-cubes (1×1×1 mm3) were determinate irradiating the dosimeters with a 6 MV beam in a linear accelerator dedicated to radiosurgery at the Instituto Nacional de Neurología y Neurocirugía (INNN). Thermoluminescent response as a function of dose was determined for doses in water between 0.5 and 3 Gy and two field sizes (2×2 cm2 and 10×10 cm2). It was found that the response is linear over the dose range studied and it does not depend on field size.

61 RADIATION PROTECTION AND DOSIMETRY↗