Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,117 records · Page 62

Waste-to-Energy Technical Assistance for Local Governments

The goal of this project is to mobilize data, information, and knowledge generated about organic waste streams to local governments and support their decision-making. It builds on previous work related to wet organic waste resources (food waste, sludge, manure, waste fats and oils). The project provides an improved understanding of local waste challenges and priorities to inform BETO's R&D strategies and decision-making. It also supports local governments' goals and plans related to sustainable waste management, enables energy and/or resource recovery projects development at municipal level, and facilitates public-private partnerships. A key challenge is associated with more activities requested by entities than program allows which is mitigated by prioritization by requesting agency. All FY21 and FY22 TA requests have been completed. Major accomplishments include: 1). 34 requests managed in the past two years, 2) Distilled key challenges faced by communities. Key outcomes include strong community participation since inception of the program, dedicated program web site, deliverables tailored to communities' needs, and distribution materials (e.g., fact sheets, brochures) for a broader audience.

BIOMASS FUELS↗

Geothermal Power Generation

The report provides an overview of the renewed market interest in using geothermal for power generation including a concise look at what's driving interest in geothermal power generation, the current status of geothermal power generation, and plans for the future. Topics covered in the report include: an overview of geothermal power generation including its history, the current market environment, and its future prospects; an analysis of the key business factors that are driving renewed interest in geothermal power generation; an analysis of the challenges that are hindering the implementation of geothermal power generation projects; a description of geothermal power generation technologies; a review of the economic drivers of geothermal power generation project success; profiles of the major geothermal power producing countries; and, profiles of the major geothermal power project developers.

15 GEOTHERMAL ENERGY↗

Regulatory risks paralyzing power industry while demand grows

2008 will be the year the US generation industry grapples with CO{sub 2} emission. Project developers are suddenly coal-shy, mostly flirting with new nuclear plants waiting impatiently in line for equipment manufacturers to catch up with the demand for wind turbines, and finding gas more attractive again. With no proven greenhouse gas sequestration technology on the horizon, utilities will be playing it safe with energy-efficiency ploys rather than rushing to contract for much-needed new generation.

20 FOSSIL-FUELED POWER PLANTS↗

Turkey opens electricity markets as demand grows

Turkey's growing power market has attracted investors and project developers for over a decade, yet their plans have been dashed by unexpected political or financial crises or, worse, obstructed by a lengthy bureaucratic approval process. Now, with a more transparent retail electricity market, government regulators and investors are bullish on Turkey. Is Turkey ready to turn the power on? This report closely examine Turkey's plans to create a power infrastructure capable of providing the reliable electricity supplies necessary for sustained economic growth. It was compiled with on-the-ground research and extensive interview with key industrial and political figures. Today, hard coal and lignite account for 21% of Turkey's electricity generation and gas-fired plants account for 50%. The Alfin Elbistan-B lignite-fired plant has attracted criticism for its lack of desulfurization units and ash dam facilities that have tarnished the industry's image. A 1,100 MW hard-coal fired plant using supercritical technology is under construction. 9 figs., 1 tab.

20 FOSSIL-FUELED POWER PLANTS↗

Revision of three-stakeholder signaling game for environmental impact assessment in China

Since environmental impact assessment (EIA) regulations were adopted in China 30 years ago, the implementation rate of EIA policies for development projects has been steadily increasing while national environmental quality keeps deteriorating. This contradiction prevents achievement of the goals that the regulations were originally created for, raising concerns regarding the EIA implementation process. One of the objectives of EIA is the evaluation of socio-economic costs introduced by various commercial activities. However, independent economic entities are inclined to break away from these cost related responsibilities, making it necessary for government agencies and EIA organizations to participate in the evaluation process. The practice of avoiding costs may also bring forth other issues, such as rent-seeking behavior and conspiracies. Reducing private costs and the tendency of the three EIA stakeholders to evade social responsibility are intertwined in every EIA process. Their activities are as follows: The government is the lawmaker whose attitude toward the EIA organization determines how business owners react in the EIA process. The government inclination can be interpreted as a signal from which enterprises can determine the nature of the government, which helps the enterprise owners formulate their future actions. A similar relationship also exists among the government, EIA organizations, and enterprise entities. Fundamentally, the correlations between the EIA stakeholders are determined by their socio-economic situation, namely, the economic costs and benefits they encounter. In this article, signaling game theory derived from the classic game theory is applied to describe the EIA process in China by analyzing the activities of the stakeholders and searching for game equilibrium solutions. The optimal reaction schema for stakeholders was obtained by transforming the equilibrium.

54 ENVIRONMENTAL SCIENCES↗

New work on updating and extending the nuclear data standards

An International Atomic Energy Agency (IAEA) Data Development Project was initiated to provide a mechanism for allowing new experimental data and improvements in evaluation procedures to be incorporated into new evaluations of the standards. The work on this project is ongoing. In the past very long periods sometimes occurred between evaluations of the standards. Through the use of this Project, such long periods should not occur. Work on the cross section standards through this Project has included an update of the experimental data to be used in the cross section standards evaluations, a study of the uncertainties obtained in the international standards evaluation, and improvements in the smoothing procedure for capture cross sections. It was decided that this Project should have a broader range of activities than just the cross section standards and thus encompass standards related activities. The following are being investigated: improvements in the gold cross section at energies below where it is considered a standard and work on certain cross sections that are not as well known as the cross section standards but could be very useful as reference cross sections relative to which certain types of cross section measurements can be made. This work includes prompt gamma-ray production in fast neutron-induced reactions, and work on the {sup 252}Cf spontaneous fission neutron spectrum and the {sup 235}U thermal neutron fission spectrum. Most of the data investigated through this Project are used in dosimetry applications. (authors)

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Overview of development and design of MPACT: Michigan parallel characteristics transport code

MPACT (Michigan Parallel Characteristics Transport Code) is a new reactor analysis tool. It is being developed by students and research staff at the University of Michigan to be used for an advanced pin-resolved transport capability within VERA (Virtual Environment for Reactor Analysis). VERA is the end-user reactor simulation tool being produced by the Consortium for the Advanced Simulation of Light Water Reactors (CASL). The MPACT development project is itself unique for the way it is changing how students do research to achieve the instructional and research goals of an academic institution, while providing immediate value to industry. The MPACT code makes use of modern lean/agile software processes and extensive testing to maintain a level of productivity and quality required by CASL. MPACT's design relies heavily on object-oriented programming concepts and design patterns and is programmed in Fortran 2003. These designs are explained and illustrated as to how they can be readily extended to incorporate new capabilities and research ideas in support of academic research objectives. The transport methods currently implemented in MPACT include the 2-D and 3-D method of characteristics (MOC) and 2-D and 3-D method of collision direction probabilities (CDP). For the cross section resonance treatment, presently the subgroup method and the new embedded self-shielding method (ESSM) are implemented within MPACT. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Assessment of the 2D MOC solver in MPACT: Michigan parallel characteristics transport code

MPACT (Michigan Parallel Characteristics Transport Code) is a new reactor analysis tool being developed by researchers at the University of Michigan as an advanced pin-resolved transport capability within VERA (Virtual Environment for Reactor Analysis). VERA is the end-user reactor simulation tool being developed by the Consortium for the Advanced Simulation of Light Water Reactors (CASL). The MPACT development project is itself unique for the way it is changing how students perform research to achieve the instructional and research goals of an academic institution, while providing immediate value to the industry. One of the major computational pieces in MPACT is the 2D MOC solver. It is critical that the 2D MOC solver provide an efficient, accurate, and robust solution over a broad range of reactor operating conditions. The C5G7 benchmark is first used to test the accuracy of the method with a fixed set of cross-sections. The VERA Core Physics Progression Problems are then used to compare the accuracy of both the 2D transport solver and also the cross-section treatments. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Challenges in the development of high-fidelity LWR core neutronics tools

Modern computing has made possible the solution of extremely large-scale reactor simulations, and the literature has numerous examples of high-resolution methods (often Monte Carlo) applied to full-core reactor problems. However, there are currently no examples in the literature of application of such 'High-Fidelity' or 'First Principles' methods to operating Light Water Reactor (LWR) analysis. This paper seeks to remind code developers, project managers, and analysts of the many important aspects of LWR simulation that must be incorporated to produce truly high-fidelity analysis tools. The authors offer a monetary prize to the first person (or group) that successfully solves a new two-cycle operational PWR depletion benchmark problem using high-fidelity tools and demonstrates acceptable accuracy by comparison with measured operational plant data (open source) provided to the reactor analysis community. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

The Full Scale Seal Experiment - A Seal Industrial Prototype for Cigeo - 13106

The Full Scale Seal (FSS) Experiment is one of various experiments implemented by Andra, within the frame of the Cigeo (the French Deep Geological Repository) Project development, to demonstrate the technical construction feasibility and performance of seals to be constructed, at time of Repository components (shafts, ramps, drifts, disposal vaults) progressive closure. FSS is built inside a drift model fabricated on surface for the purpose. Prior to the scale 1:1 seal construction test, various design tasks are scheduled. They include the engineering work on the drift model to make it fit with the experimental needs, on the various work sequences anticipated for the swelling clay core emplacement and the concrete containment plugs construction, on the specialized handling tools (and installation equipment) manufactured and delivered for the purpose, and of course on the various swelling clay materials and low pH (below 11) concrete formulations developed for the application. The engineering of the 'seal-as-built' commissioning means (tools and methodology) must also be dealt with. The FSS construction experiment is a technological demonstrator, thus it is not focused on the phenomenological survey (and by consequence, on the performance and behaviour forecast). As such, no hydration (forced or natural) is planned. However, the FSS implementation (in particular via the construction and commissioning activities carried out) is a key milestone in view of comforting phenomenological extrapolation in time and scale. The FSS experiment also allows for qualifying the commissioning methods of a real sealing system in the Repository, as built, at time of industrial operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radiological Modeling for Determination of Derived Concentration Levels of an Area with Uranium Residual Material - 13533

As a result of a pilot project developed at the old Spanish 'Junta de Energia Nuclear' to extract uranium from ores, tailings materials were generated. Most of these residual materials were sent back to different uranium mines, but a small amount of it was mixed with conventional building materials and deposited near the old plant until the surrounding ground was flattened. The affected land is included in an area under institutional control and used as recreational area. At the time of processing, uranium isotopes were separated but other radionuclides of the uranium decay series as Th-230, Ra-226 and daughters remain in the residue. Recently, the analyses of samples taken at different ground's depths confirmed their presence. This paper presents the methodology used to calculate the derived concentration level to ensure that the reference dose level of 0.1 mSv y-1 used as radiological criteria. In this study, a radiological impact assessment was performed modeling the area as recreational scenario. The modelization study was carried out with the code RESRAD considering as exposure pathways, external irradiation, inadvertent ingestion of soil, inhalation of resuspended particles, and inhalation of radon (Rn-222). As result was concluded that, if the concentration of Ra-226 in the first 15 cm of soil is lower than, 0.34 Bq g{sup -1}, the dose would not exceed the reference dose. Applying this value as a derived concentration level and comparing with the results of measurements on the ground, some areas with a concentration of activity slightly higher than latter were found. In these zones the remediation proposal has been to cover with a layer of 15 cm of clean material. This action represents a reduction of 85% of the dose and ensures compliance with the reference dose. (authors)

54 ENVIRONMENTAL SCIENCES↗

Recent results of the investigation of a micro-fluidic sampling chip and sampling system for hot cell aqueous processing streams

A Fuel Cycle Research and Development project has investigated an innovative sampling method that could evolve into the next generation sampling and analysis system for metallic elements present in aqueous processing streams. Initially sampling technologies were evaluated and micro-fluidic sampling chip technology was selected and tested. A conceptual design for a fully automated microcapillary-based system was completed and a robotic automated sampling system was fabricated. The mechanical and sampling operation of the completed sampling system was investigated. Different sampling volumes have been tested. It appears that the 10 μl volume has produced data that had much smaller relative standard deviations than the 2 μl volume. In addition, the production of a less expensive, mass produced sampling chip was investigated to avoid chip reuse thus increasing sampling reproducibility/accuracy. The micro-fluidic-based robotic sampling system's mechanical elements were tested to ensure analytical reproducibility and the optimum robotic handling of micro-fluidic sampling chips. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

ATRIUM{sup TM} 11 operating experience

AREVA NP developed the ATRIUM{sup TM}11 BWR fuel assembly to address the industry need for substantial improvements in fuel reliability and economic performance. The product development effort initially consisted of analytical design assessments and out-of-pile testing of prototype fuel assemblies and components. An integral component of the development project is a comprehensive in-pile demonstration program designed to fully exercise the new fuel assembly under a variety of operating conditions and to provide performance measurements of new design features. Fuel vendors, reactor operators, and regulators have successfully relied upon irradiation feedback derived from in-pile demonstration programs to safely introduce new features in reload quantities. The primary ATRIUM{sup TM} 11 in-pile demonstration program consists of 40 lead fuel assemblies (LFA) operating among five BWR reactors globally, covering the range of operational regimes and licensing environments necessary to confirm reload applications for the product. Since the initial irradiation in 2012, multiple pool-side inspection examinations have been performed. The inspection activities primarily focused on the new design features; including the spacer, fuel rod array, upper tie plate and fuel channel. These inspections have resulted in the collection of a substantial set of visual images, dimensional measurements, and performance feedback that are of general interest to the industry. Results from the inspections are compared to the database for existing products and to predetermined acceptance criteria. This paper provides details of the global in-pile demonstration program and the characteristics of the LFAs. Results of the inspection campaigns will be presented, including a summary of the technical assessment of specific new design features and the overall performance of the ATRIUM{sup TM} 11 product. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Contribution of the numerical simulations in the development of the French HLLW vitrification Processes - 15126

For many years, the CEA (Commissariat a l'energie Atomique et aux energies Alternatives) Marcoule France has developed various processes dedicated to radioactive waste confinement, especially vitrification processes for HLLW. For 10 years now, the numerical simulation has become an important tool for research and development projects held in the CEA-AREVA Joint Vitrification Laboratory (LCV). Induction heating, fluid mechanics and thermal simulations take part of all new R and D projects. The contributions of such simulations are, first, the enhancement of the working knowledge of existing process. Those data are very useful to define optimisation choices, for example upgrades made on the hot metallic melter used since the 90's at La Hague facility. Second, the simulations are, of course, also used at the conception stage of new processes as a tool allowing wide ranges parametric tests. This has been extensively used in the design of the cold crucible inductive melter (CCIM) commissioned in 2010 at La Hague plant. Finally, it is a powerful and relatively cheap tool for prospective studies for processes of the future. Whatever the purpose, the potential benefits are gains on the reliability, the output capacity and the life time. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Experimental Study on the Transfer of Cs, Sr, Pu and Water in Concrete for the Estimation of Contamination - 20085

As part of the 'Nuclear Energy Science and Technology and Human Resources Development project- through concentrating wisdom-by MEXT' in Japan, the major results from the second year of a project on the analysis of radionuclide contamination mechanisms of concrete and the estimation of contamination distribution at the Fukushima Daiichi nuclear power station active during 2018-2020 are presented. The transfer of Cs, Sr, Pu, and water through concrete was studied experimentally. In a saturated condition, the clay did not affect the transfer and Cs penetrated much faster than Sr. In the dried condition, clay retarded Cs transfer. Carbonation of the concrete retarded the transfer of Cs and Sr. Pu was expected to be precipitated immediately in a high pH condition of concrete. Water suction depends on the temperature. Further, the detailed mechanism was analyzed by {sup 1}H-NMR. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Opportunities to Implement Solutions to Achieve Remedial Action Objectives in Consideration of Stakeholder Interests - 20365

A case study in the implementation of a soils excavation and removal project conducted at a Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) vicinity property; an active commercial business, in a densely populated area, with significant operational, technical and, logistical constraints that were expected to limit areas that could be remediated. The United States Army Corps of Engineers-led (USACE) team successfully navigated complex overlapping stakeholder interests to achieve a more efficient and complete removal of contaminated soils and debris while minimizing unnecessary excess costs to the Government. This paper centers on FUSRAP activities at the FMSS vicinity property located at 149-151 Maywood Avenue, Maywood, Bergen County, New Jersey. For most of its FUSRAP history, this ∼109,000 square meter (27-acre) property housed a now-demolished ∼26,000 square meter (6.5-acre) warehouse operated by Sears Logistics Services, a unit of the Sears Roebuck Company (Figure 2). Sears ended its property lease and vacated the warehouse in December 2016. Given that long history and for the purposes of this paper, the property will be referred to as the 'Sears property' or simply 'the property.' The Sears property is approximately 109,000 square meters (27-acres) and is currently zoned for commercial use. The property is bound to the north and northwest by 100 West Hunter Avenue (the Stepan Company), to the northeast by 205 Maywood Avenue, to the east by Maywood Avenue, to the south by 23 West Howcroft Road, and to the west by businesses on NJ Route 17 and the NJ Route 17 roadway. Until December 2016, the property housed a warehouse and distribution center operated by Sears Logistical Services. On-site structures were demolished by the property owner in 2017. The warehouse covered the north section of the property along the Stepan Company property line. A railroad spur from the adjacent property now known as the Maywood Interim Storage Site (MISS) ended at the northeast corner of the warehouse. Wetlands were located east of the warehouse; the rest of the property was covered with paved parking lots and grassed areas. During remediation at the property, opportunities frequently arose where the project team was able to coordinate effectively with stakeholders to sequence remediation activities to facilitate removal of otherwise inaccessible soils and identify opportunities for materials reuse when supported by residual radiological and chemical levels. Some specific opportunities include: - remediating individual truck loading dock bays to maintain tenant operations; - working along a busy highway and in a utility corridor containing a 30-inch high pressure gas main; - remediating Lodi Brook and associated wetlands requiring bypass pumping and other diversionary structures to maintain local community stormwater drainage; - protecting during remediation and supporting access to facilitate tenant/owner maintenance of critical fire protection and water supply system service lines buried in contaminated soils and necessary for safe warehouse operations; and - coordinating with stakeholders to ensure non-radiological contaminants of concern for the site (unaffiliated with FUSRAP) were addressed by the responsible party in a manner that maximized benefit to all parties while supporting an efficient overall site remediation program. Once the property was vacant and the warehouse structure and radiologically non-impacted above-grade structures were demolished, the project identified an opportunity to significantly reduce the volume of waste associated with the foundation of the former warehouse, a foundation suspected of being partially constructed in radiologically contaminated soils. The project developed and implemented supplemental radiological verification survey and sampling strategies based on radiological cross-contamination risk potential with process flow-charts and screening-level based decision points; a program that classified saw-cut sections of concrete based on observed residual surface radioactivity conditions using a combination of gamma sensitive sodium-iodide scans and beta sensitive Geiger-Muller direct measurements. The proposed approach was reviewed with stakeholders with feedback, including consideration of applicable State of New Jersey Site Remediation Program criteria and guidance before implementation. Once classified, additional sampling was performed at frequencies driven by screening. The sampling methods, stockpile sampling frequencies, criteria and, approach to data evaluation were developed in consideration of existing site cleanup standards, regional background ranges, State of New Jersey radiological remediation program guidance, and specific stakeholder input With the property remediation and survey efforts nearly completed, it is relevant to examine retrospectively the objectives, assumptions and limitations in the remedial design (i.e., what was planned) versus what was able to be accomplished through effective teaming. Benefits to other environmental remediation site programs include better understanding of how to work effectively with stakeholders to achieve win-win outcomes, and approaches to site remediation, waste minimization and materials reuse that were successful in their overall outcomes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sensitivity Coefficients for Diffusion Coefficients and Other Reactor Physics Parameters using CE TSUNAMI-3D

The TSUNAMI (Tools for Sensitivity and Uncertainty Analysis Methodology Implementation) capabilities within the SCALE code system leverage sensitivity coefficients for many criticality safety applications, including quantifying the data-induced uncertainty in the eigenvalue of critical systems, quantifying computational biases, and selecting applicable benchmark experiments. TSUNAMI sensitivity and uncertainty analysis tools have traditionally been limited to criticality safety application spaces, but the introduction of Generalized Perturbation Theory (GPT) sensitivity methods by Jessee in 2009 and Perfetti in 2013 has extended the scope of SCALE adjoint-weighted sensitivity and uncertainty analysis to include reactor physics applications. The continuous-energy (CE) TSUNAMI-3D GPT sensitivity analysis methods were originally developed to calculate sensitivity coefficients for a limited number of reaction-rate responses using CE Monte Carlo methods. These tools were recently applied in an Oak Ridge National Laboratory (ORNL)-directed research and development project to improve the efficiency of {sup 252}Cf production in the High Flux Isotope Reactor (HFIR) by understanding the sensitivity of key heavy actinide capture-to- fission ratios to potential system design changes. This work further extends the applicability of the CE TSUNAMI- 3D GPT methods to reactor physics applications by enabling the calculation of sensitivity coefficients for an expanded set of reaction rate responses-including a first-ever capability for conducting sensitivity analysis of neutron diffusion coefficients.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Powering the Blue Economy: Foundational Research and Development

With increased use of the oceans for transportation, extraction of food, fibre, and minerals, recreation and tourism, and other blue economy industries, there is a need for additional power at sea. In the face of climate change, the increased power must come from renewable sources; often marine energy is the most energy-dense power source available. But we have little experience with adapting wave and tidal devices from large scale grid power to the specialized and small devices needed to power blue economy applications, nor the engineering solutions to support codesign of emerging marine industries. As directed by the U.S. Department of Energy (DOE), two DOE national laboratories have developed foundational research and development projects to replace conventional power or batteries at sea (ocean observation platforms), emerging industry power needs (offshore aquaculture operations), as well as examining common challenges for using marine power (efficient power systems, minimizing interference, optimizing materials and manufacturing).

marine energy↗