At least 1,117 records · Page 62

The decommissioning imperative - motivating progress in us used fuel management - 15185

When the Yucca Mountain project was terminated in 2010 there was approximately 3500 metric tons of used fuel stored at Independent Spent Fuel Storage Installations (ISFSIs) at which there was no operating reactor (10 shutdown plant sites and the GE Morris facility). By 2015, four additional sites with five reactors will have shut down, causing the amount of used fuel 'stranded' at sites where there is no operating reactor to nearly double to approximately 6900 metric tons which will be stored at a total of 15 sites. At each of these sites, once the reactors are decommissioned, the only thing preventing the land from being returned to communities for other uses is the remaining presence of the used fuel. The cost of maintaining 15 stand-alone ISFSIs is born by electric ratepayers and taxpayers. Going forward, the costs of maintaining stand-alone ISFSIs is certain to grow even if the number of stand-alone ISFSIs does not grow beyond the already announced shutdown of the Oyster Creek reactor in 2019 (which would increase the amount of stranded used fuel by another 10% and create a 16. stand-alone ISFSI). One reason for this cost escalation will be the need for ISFSI owners to renew storage licenses, and implement aging management programs to support these renewals, due to the continued delay in the federal program for removing the used fuel. Storage licenses at 10 of 16 stand-alone ISFSIs will expire by 2021, which is the earliest projected date at which the Department of Energy (DOE) has indicated it could have a pilot interim storage facility available - and nearly 3 decades before DOE projects a repository will be available. The burden and cost of continuing to renew storage licenses - and manage aging storage facilities - at 16 stand-alone sites instead of moving stranded used fuel to a single consolidated storage location or repository will likely be significant. Industry resources are increasingly being channeled into dry storage aging management activities as public and regulator interest in potential long-term degradation mechanism continues to grow. Whether the ultimate destination for used fuel is Yucca Mountain or some other location, the current stalemate preventing progress in the federal program to move it must be broken - and the increasing prominence of the decommissioned reactor quandary may very well be a pivotal factor in breaking that stalemate. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Potential Cost Implications of an Interim Storage Facility for Commercial SNF+ - 17132

The question of whether or not consolidated interim storage of commercial spent nuclear fuel (SNF) should be part of the federal waste management system as an intermediate step before permanent disposal has been debated for more than four decades. This paper summarizes an evaluation of the cost implications of incorporating a consolidated interim storage facility (ISF) into the waste management system (WMS). In this study, the order-of-magnitude estimates of total system costs were calculated and tabulated. The analyzed scenarios involve shipment of SNF from reactors in dual-purpose storage and transportation canisters (DPCs) currently being used by utilities for dry storage at reactor sites. A number of pertinent conclusions can be drawn from this evaluation, including: - Delay in repository availability increases total system costs. Any delay in opening a repository increases total system costs, regardless of whether the system has an ISF or not. This is due to the increased cost associated with an extended duration for storage, whether at multiple independent spent fuel storage installations (ISFSIs) or at an ISF, until waste can be disposed of.- There is a potential total system lifecycle cost avoidance in realistic scenarios with an ISF when compared to scenarios with no ISF. However, most of the cost avoidance occurs several decades after the ISF is opened. The total WMS cost differential over the long term is mainly attributed to the reduced operational costs of storing the fuel in a consolidated facility rather than at individual reactor sites. - Earlier establishment of an ISF allows for more avoidance of post-shutdown at-reactor storage costs for any repository opening date. An ISF allows earlier acceptance of fuel from reactors, which reduces at-reactor costs from a total system perspective. - Transportation costs have little impact on a WMS with or without an ISF. These impacts range from 3-11% of the total cost in all scenarios. Therefore, transporting the fuel twice does not appear to be a significant cost concern driver relative to other system costs. In conclusion, designing, licensing, and constructing an ISF will require a large near-term financial investment. However, reduced annual operating and maintenance costs for an integrated waste management system with an ISF, compared to a system without an ISF, could eventually result in system-wide (integrated) cost avoidance due to reductions in at-reactor storage costs in the long term. The largest cost avoidances would not occur for several decades, so assumptions about inflation, escalation, and discount rates will have a significant effect on potential economic impacts of an ISF. It should be noted that other benefits associated with the investment of an ISF-such as earlier removal of SNF from shutdown reactor sites, earlier prospects for site re-utilization, and additional overall integrated waste management system flexibility-were not addressed in this study. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fuel Pond Sludge - Lessons Learned from Initial De-sludging of Sellafield's Pile Fuel Storage Pond - 12066

The Pile Fuel Storage Pond (PFSP) at Sellafield was built and commissioned between the late 1940's and early 1950's as a storage and cooling facility for irradiated fuel and isotopes from the two Windscale Pile reactors. The pond was linked via submerged water ducts to each reactor, where fuel and isotopes were discharged into skips for transfer along the duct to the pond. In the pond the fuel was cooled then de-canned underwater prior to export for reprocessing. The plant operated successfully until it was taken out of operation in 1962 when the First Magnox Fuel Storage Pond took over fuel storage and de-canning operations on the site. The pond was then used for storage of miscellaneous Intermediate Level Waste (ILW) and fuel from the UK's Nuclear Programme for which no defined disposal route was available. By the mid 1970's the import of waste ceased and the plant, with its inventory, was placed into a passive care and maintenance regime. By the mid 1990s, driven by the age of the facility and concern over the potential challenge to dispose of the various wastes and fuels being stored, the plant operator initiated a programme of work to remediate the facility. This programme is split into a number of key phases targeted at sustained reduction in the hazard associated with the pond, these include: - Pond Preparation: Before any remediation work could start the condition of the pond had to be transformed from a passive store to a plant capable of complex retrieval operations. This work included plant and equipment upgrades, removal of redundant structures and the provision of a effluent treatment plant for removing particulate and dissolved activity from the pond water. - Canned Fuel Retrieval: Removal of canned fuel, including oxide and carbide fuels, is the highest priority within the programme. Handling and export equipment required to remove the canned fuel from the pond has been provided and treatment routes developed utilising existing site facilities to allow the fuel to be reprocessed or conditioned for long term storage. - Sludge Retrieval: In excess of 300 m{sup 3} of sludge has accumulated in the pond over many years and is made up of debris arising from fuel and metallic corrosion, wind blown debris and bio-organic materials. The Sludge Retrieval Project has provided the equipment necessary to retrieve the sludge, including skip washer and tipper machines for clearing sludge from the pond skips, equipment for clearing sludge from the pond floor and bays, along with an 'in pond' corral for interim storage of retrieved sludge. Two further projects are providing new plant processing routes, which will initially store and eventually passivate the sludge. - Metal Fuel Retrieval: Metal Fuel from early Windscale Pile operations and various other sources is stored within the pond; the fuel varies considerably in both form and condition. A retrieval project is planned which will provide fuel handling, conditioning, sentencing and export equipment required to remove the metal fuel from the pond for export to on site facilities for interim storage and disposal. - Solid Waste Retrieval: A final retrieval project will provide methods for handling, retrieval, packaging and export of the remaining solid Intermediate Level Waste within the pond. This includes residual metal fuel pieces, fuel cladding (Magnox, aluminium and zircaloy), isotope cartridges, reactor furniture, and miscellaneous activated and contaminated items. Each of the waste streams requires conditioning to allow it to be and disposed of via one of the site treatment plants. - Pond Dewatering and Dismantling: Delivery of the above projects will allow operations to progressively remove the radiological inventory, thereby reducing the hazard/risk posed by the plant. This will then allow subsequent dewatering of the pond and dismantling of the structure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Spent Nuclear Fuel Receipt Rate Analysis within an Integrated Waste Manage-ment System Architecture that Includes Consolidated Interim Storage

A key parameter in analyzing the performance of an integrated waste management system (IWMS) architecture for the disposition of spent nuclear fuel (SNF) is the SNF receipt rate from reactor and other custodian sites. The introduction of one or more federal consolidated interim storage facilities (CISFs) into the IWMS architecture can enable the receipt rate profile as a function of time to be accelerated relative to system architectures without a CISF. The question then arises as to what an optimal SNF receipt rate profile for an IWMS architecture might be in view of practical constraints and desired system performance attributes and associated metrics. This paper describes a sensitivity study on SNF receipt rates and the associated results for a selected set of IWMS scenarios aimed an in-forming near-term planning for interim storage capabilities and transportation assets. Two different strategies are compared, one that fills an initial CISF quickly and then idles the transportation system while a disposal system is prepared, and a second strategy that aims to provide a more continuous use of transportation assets and receipt capabilities at the IWMS while the disposal system is readied for SNF receipt. Cost considerations and other factors such as impact on timing of clearing reactor sites of SNF, efficient use of capital assets, and other metrics, including those which may be important to a CISF host community, are examined. Based on the analysis, an initial approach is presented targeting a continuous receipt strategy while having the flexibility to step up receipt capabilities to a reasonable degree when needed and beneficial within overall system constraints.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Design and Validation Testing of TruckScan to Assay Large Sacks of Fukushima Radioactive Debris on a Truck

As a result of the March 2011 earthquake and resulting tsunami in Japan, there was a serious accident at the Fukushima Dai-ichi Nuclear Power Plant. This accident has contaminated soil and vegetation in a wide area around the plant. Decontamination projects over the last 4 years have resulted in large numbers of 1 cubic meter canvas bags of debris, commonly called Super Sacks [SS]. These are currently stored nearby where they were generated, but starting in 2015, they will be moved to various Interim Storage Facilities [ISF]. Trucks will typically carry 8-20 of these SSs. When the trucks arrive at the ISF they need to be rapidly sorted into groups according to radioactivity level, for efficient subsequent processing. Canberra Industries, Inc. [CI] has designed a new truck monitoring system 'TruckScan' for use at these ISFs. The TruckScan system must measure the entire truck loaded with multiple closely packed SSs, and generate a nuclide specific assay report showing the radioactivity in each individual SS. The Canberra-Japan office, along with Obayashi Corporation have performed validation testing to demonstrate to the regulatory authorities that the proposed technique was sufficiently accurate. These validation tests were conducted at a temporary storage area in Fukushima prefecture. Decontaminated waste of various representative types and of various levels of radioactivity was gathered and mixed to create homogeneous volumes. These volumes were sampled multiple times and assayed with laboratory HPGe detectors to determine the reference concentration of each pile. Multiple SSs were loaded from each pile. Some of the SSs were filled 50% full, others 75% full, and others 100% full, to represent the typical loading configuration of the existing SSs in the field. The content of the SSs are either sand, soil, or vegetation with densities ranging from 0.3 g/cc - 1.6 g/cc. These SSs with known concentrations of Cs-134 and Cs-137 were then loaded onto trucks in a variety of configurations, typical of how they might be on the real trucks. A partial system was installed at the site and used to assay these trucks with the various loading configurations. Whereas the full system will have 8 collimated 3 x 3'' NaI detectors, the test system only had two detectors; therefore the truck was moved and counted 4 times. The data were acquired and analyzed with the Canberra Genie software to determine the peak counts for both Cesium nuclides. That data was then analyzed with a prototype version of a Maximum Entropy algorithm, to determine the individual SS activity. The goal of the validation tests was to demonstrate that the system could detect 1000 Bq/kg in 15 seconds, and to determine how accurately it could quantify individual SSs. The validation tests demonstrated that the product would perform as predicted. The TruckScan results were consistent with the sample assay results [y = 1.0029 x, R{sup 2} = 0.914]. The Total Propagated Uncertainty, including both uncertainties from these tests and others that were estimated but not tested was 16.6% percent. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress in Defining the UK Highly Active Storage Tanks POCO Strategy - 16134

In the UK Highly Active (HA) waste is stored in stainless steel tanks prior to encapsulation in glass in one of three operating vitrification plants. Significant progress has been made in recent years towards the reduction in the volume of HA Liquor (HAL) stored in these tanks and a number of the tanks are now operating at heel levels. As a result, a strategy is being developed to carry out Post Operational Clean Out (POCO) of some tanks while reprocessing operations continue, thus enabling accelerated and more cost effective clean-up of these HA facilities. This paper, and subsequent conference presentation, will highlight some of the key aspects of this strategy, including a description of the challenges and progress made so far to help facilitate the clean-up mission without having a detrimental effect on ongoing reprocessing operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Extended Storage of High Burn-up Fuel Cask R and D Project - 16591

Under contract by EPRI and DOE, AREVA Federal Services LLC (AFS) is leading a team consisting of AREVA Inc. and Dominion Virginia Power (Dominion) to develop and conduct a full-scale confirmatory Research project with HBU fuel. A test plan was developed using an existing AREVA Transnuclear (TN) TN-32 bolted storage cask with a modified, specially instrumented lid to be engineered and then loaded with multiple cladding types of HBU pressurized water reactor (PWR) UNF from Dominion's North Anna Power Station (this modified cask is identified as TN-32B). Seven specially designed thermocouple lances, each containing nine detectors, will be inserted into the designated fuel assembly guide tubes through the modified cask lid. The loaded cask with the monitoring system will be placed into dry storage on the existing North Anna Independent Spent Fuel Storage Installation (ISFSI) pad for a period of extended monitoring. In addition, design modifications to the lid have been incorporated to permit periodic gas sampling of the cask internals during the storage period on the ISFSI pad. The fuel selected for this research project ranges in average assembly burnup between 50 GWD/MTU to 67 GWD/MTU. The instrumentation used to collect the thermal data is very similar to in-core thermocouple detectors used at nuclear power plants and is considered very reliable for this application. Prior to cask loading at North Anna, a series of 'fit up' tests will be performed at the fabricator to ensure proper alignment, fit and function of the modified cask and related instrumentation and equipment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remaining Sites Verification Package for the 600-243 Petroleum-Contaminated Soil Bioremediation Pad, Waste Site Reclassification Form 2007-033

The 600-243 waste site consisted of a bioremediation pad for petroleum-contaminated soils resulting from the 1100 Area Underground Storage Tank (UST) upgrades in 1994. In accordance with this evaluation, the verification sampling results support a reclassification of this site to Interim Closed Out. The results of verification sampling show that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also demonstrate that residual contaminant concentrations are protective of groundwater and the Columbia River.

1100 Area Underground Storage Tank↗

Finite Element Structural Analysis Evaluating New Retrieval Strategies in the Hanford Waste Tanks 1 - 19125

Several waste retrieval methods being considered for the Hanford underground single- and double-shell nuclear waste storage tanks would require changes to the equipment loads above the tanks or structural modifications to the tanks themselves. Detailed structural analysis has been used in the planning phase to ensure that the reinforced concrete tanks continue to meet structural design codes in the modified configuration of these waste retrieval options. The feasibility of installing new single and multiple large risers penetrating the tank dome was evaluated using this approach. This paper summarizes the structural analysis methods and design codes used to evaluate the introduction of new unreinforced penetrations in a single-shell tank dome. The anticipated equipment loads during current and future waste retrieval operations are evaluated to ensure the continued structural integrity of the tank under thermal, dead weight, and seismic loads. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated salt waste processing at the Savannah River Site - 15301

Treatment and disposition of salt waste is the critical path to completion of the Savannah River Site Liquid Waste (LW) Disposition and Cleanup Program. The new Salt Waste Processing Facility (SWPF) is a critical link in the pre-treatment chain and will process high curie salt waste removed from various SRS liquid waste storage tanks. Significant infrastructure modifications are needed in the existing LW facilities in order to integrate the SWPF into the LW system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Case Study of Urban Residential Remediation and Restoration in Port Hope, Canada - 13250

The Canadian Municipality of Port Hope, Ontario, is located some 100 km east of Toronto and has been the location of radium and/or uranium refining since the 1930's. Historically, these activities involved materials containing radium-226, uranium, arsenic and other contaminants generated by the refining process. In years past, properties and sites in Port Hope became contaminated from spillage during transportation, unrecorded, un-monitored or unauthorized diversion of contaminated fill and materials, wind and water erosion and spread from residue storage areas. Residential properties in Port Hope impacted by radioactive materials are being addressed by the Canadian federal government under programs administered by the Low-Level Radioactive Waste Management Office (LLRWMO) and the Port Hope Area Initiative Management Office (PHAIMO). Issues that currently arise at these properties are addressed by the LLRWMO's Interim Waste Management Program (IWM). In the future, these sites will be included in the PHAIMO's Small Scale Sites (SSS) remedial program. The LLRWMO has recently completed a remediation and restoration program at a residential property in Port Hope that has provided learnings that will be applicable to the PHAIMO's upcoming SSS remedial effort. The work scope at this property involved remediating contaminated refinery materials that had been re-used in the original construction of the residence. Following removal of the contaminated materials, the property was restored for continued residential use. This kind of property represents a relatively small, but potentially challenging subset of the portfolio of sites that will eventually be addressed by the SSS program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Instrumentation. Nondestructive Examination for Verification of Canister and Cladding Integrity - FY2013 Status Update

This report documents FY13 efforts for two instrumentation subtasks under storage and transportation. These instrumentation tasks relate to developing effective nondestructive evaluation (NDE) methods and techniques to (1) verify the integrity of metal canisters for the storage of used nuclear fuel (UNF) and to (2) characterize hydrogen effects in UNF cladding to facilitate safe storage and retrieval.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Computational scheme for burnup credit applied to long term waste disposal - 14448

The application of burnup credit (BUC) to criticality safety evaluations (CSE) of geological repositories for long term disposal of spent nuclear fuel (SNF) is under consideration in Switzerland. Therefore, in collaboration with the national waste management organization, PSI is conducting research towards the development of a BUC methodology tailored for Swiss specific applications. As part of this research, a computational sequence from the in-core burnup phase, through the interim storage, until final disposal is being established. The tools selected for this methodology, referred to as BUCSS-R (Burnup Credit System for Swiss reactors and Repositories), are CASMO for the in-core fuel depletion, the decay module of SERPENT for the decay calculations, and MCNP for the criticality calculations. In connection to BUCSS-R, a computational interface to validated reference core models of the Swiss reactors is being developed. The purpose is to apply reconstructed depletion histories based on real core operation conditions with CASMO assembly calculations, to transfer the pin wise nuclide compositions at discharge to the subsequent SERPENT decay calculations, and afterwards to the final MCNP criticality calculations. An objective of this paper is to present the elements of the BUCSS-R methodology, and to show a first application to so-called bounding analyses of a preliminary Swiss disposal canister design loaded with fuel assembly types operated in a Swiss PWR reactor. The rationale for these bounding analyses is that before starting the integration of methodologies for bias and uncertainty quantifications, the span of the k-eff variation between fresh and burnt fuel loadings should first be quantified in a realistic manner. The obtained results are reported in this paper together with studies performed in order to evaluate the effects from burnup levels and nuclides credit at flooded conditions on the k-eff values. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Update Direct-Strike Lightning Environment for Stockpile-to-Target Sequence

The University of Florida has surveyed all relevant publications reporting lightning characteristics and presents here an up-to-date version of the direct-strike lightning environment specifications for nuclear weapons published in 1989 by R. J. Fisher and M. A. Uman. Further, we present functional expressions for current vs. time, current derivative vs. time, second current derivative vs. time, charge transfer vs. time, and action integral (specific energy) vs. time for first return strokes, for subsequent return strokes, and for continuing currents; and we give sets of constants for these expressions so that they yield approximately the median and extreme negative lightning parameters presented in this report. Expressions for the median negative lightning waveforms are plotted. Finally, we provide information on direct-strike lightning damage to metals such as stainless steel, which could be used as components of storage containers for nuclear waste materials; and we describe UF's new experimental research program to add to the sparse data base on the properties of positive lightning. Our literature survey, referred to above, is included in four Appendices. The following four sections (II, III, IV, and V) of this final report deal with related aspects of the research: Section II. Recommended Direct-Strike Median and Extreme Parameters; Section III. Time-Domain Waveforms for First Strokes, Subsequent Strokes, and Continuing Currents; Section IV. Damage to Metal Surfaces by Lightning Currents; and Section V. Measurement of the Characteristics of Positive Lightning. Results of the literature search used to derive the material in Section II and Section IV are found in the Appendices: Appendix 1. Return Stroke Current, Appendix 2. Continuing Current, Appendix 3. Positive Lightning, and Appendix 4. Lightning Damage to Metal Surfaces.

42 ENGINEERING↗

SYSTEM PLANNING WITH THE HANFORD WASTE OPERATIONS SIMULATOR

At the U. S. Department of Energy's Hanford Site in southeastern Washington State, 216 million liters (57 million gallons) of nuclear waste is currently stored in aging underground tanks, threatening the Columbia River. The River Protection Project (RPP), a fully integrated system of waste storage, retrieval, treatment, and disposal facilities, is in varying stages of design, construction, operation, and future planning. These facilities face many overlapping technical, regulatory, and financial hurdles to achieve site cleanup and closure. Program execution is ongoing, but completion is currently expected to take approximately 40 more years. Strategic planning for the treatment of Hanford tank waste is by nature a multi-faceted, complex and iterative process. To help manage the planning, a report referred to as the RPP System Plan is prepared to provide a basis for aligning the program scope with the cost and schedule, from upper-tier contracts to individual facility operating plans. The Hanford Tank Waste Operations Simulator (HTWOS), a dynamic flowsheet simulation and mass balance computer model, is used to simulate the current planned RPP mission, evaluate the impacts of changes to the mission, and assist in planning near-term facility operations. Development of additional modeling tools, including an operations research model and a cost model, will further improve long-term planning confidence. The most recent RPP System Plan, Revision 4, was published in September 2009.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modeling Electric Vehicle Benefits Connected to Smart Grids

Connecting electric storage technologies to smartgrids will have substantial implications in building energy systems. Local storage will enable demand response. Mobile storage devices in electric vehicles (EVs) are in direct competition with conventional stationary sources at the building. EVs will change the financial as well as environmental attractiveness of on-site generation (e.g. PV, or fuel cells). In order to examine the impact of EVs on building energy costs and CO2 emissions in 2020, a distributed-energy-resources adoption problem is formulated as a mixed-integer linear program with minimization of annual building energy costs or CO2 emissions. The mixed-integer linear program is applied to a set of 139 different commercial buildings in California and example results as well as the aggregated economic and environmental benefits are reported. The research shows that considering second life of EV batteries might be very beneficial for commercial buildings.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of Neutron Absorber Panels from Zion Spent Fuel Pool

In spent fuel pools (SFPs), fixed neutron absorber materials are used to increase storage capacity while maintaining criticality safety margins. BORAL{sup R} is a commonly used neutron absorber material for both wet (SFPs) and dry storage (casks). The specific questions surrounding fixed neutron absorber materials include the following: 1. What are the conditions of the neutron absorber panels in SFPs? Is there any gross degradation that could cause potential concern for criticality safety of the pools? 2. Is the coupon monitoring approach adequate for monitoring the conditions of the panels as part of an aging management program? 3. For plants that do not have coupons, do current in situ measurement approaches provide accurate results? Could such in situ approaches be used as an alternative monitoring approach? In order to shed light on these technical questions using actual plant data, EPRI initiated the Zion comparative analysis project at the decommissioning Zion Nuclear Power Plant in late 2014. An overview of the Zion plant, SFP, and project was described in a previous publication. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗