Search NASA⌕ Search

SEARCH · Search NASA

Results for “SPACE STATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,117 records · Page 62

Space station needs, attributes, and architectural options. Volume 1. Executive summary

The initial space station should be manned, placed in 28.5 deg orbit, and provide substantial economic, performance, and social benefits. The most beneficial space station capabilities include: a space test facility; a transport harbor; satellite servicing and assembly; and an observatory. A space industrial park could be added once further development effort validates the cost and expanding commercial market for space processed materials. The potential accrued gross mission model benefit derived from these capabilities is $5.9B without the industrial park, and $9.3B with it. An unclassified overview of all phases of the study is presented.

Pritchard, E. B.↗

Space station needs, attributes and architectural options study. Volume 3: Mission requirements

User missions that are enabled or enhanced by a manned space station are identified. The mission capability requirements imposed on the space station by these users are delineated. The accommodation facilities, equipment, and functional requirements necessary to achieve these capabilities are identified, and the economic, performance, and social benefits which accrue from the space station are defined.

Source record↗

Space Station payload scheduling

A solution algorithm is presented for the scheduling of payloads for NASA's proposed Space Station. The payload scheduling problem possesses some unique and unusual features that cannot be adequately addressed using static scheduling theory. The solution algorithm is demonstrated with a hypothetical Space Station example that involves 10 payloads and 3 crewmembers with a varied skill profile. A constrained version of the algorithm is compared with three other scheduling heuristics through use of the Space Station Operations Model which can simulate orbital activities. The constrained solution algorithm outperforms the three other scheduling heuristics in the minimization of makespan.

Luxhoj, James T.↗

Space Station Freedom operations planning

This paper addresses the development of new planning methodologies which will evolve to serve the Space Station Freedom program; these planning processes will focus on the complex task of effectively managing the resources provided by the Space Station Freedom and will be made available to the diverse international community of space station users in support of their ongoing investigative activities.

Smith, Kevin J.↗

Space Station Freedom user's guide

This guide is intended to inform prospective users of the accommodations and resources provided by the Space Station Freedom program. Using this information, they can determine if Space Station Freedom is an appropriate laboratory or facility for their research objectives. The steps that users must follow to fly a payload on Freedom are described. This guide covers the accommodations and resources available on the Space Station during the Man-Tended Capability (MTC) period, scheduled to begin the end of 1996, and a Permanently Manned Capability (PMC) beginning in late 1999.

Source record↗

Monographs in Aerospace History Series No. 11. Together in Orbit: The Origins of International Participation in the Space Station

This essay is a history and analysis of the steps leading to the origins of the space station partnership between the United States and its closest allies. It traces the process that led to the decision to invite other countries to participate in the project and their reasons for accepting that invitation. Not covered in this account are the difficult negotiations during the 1984-1988 period that led first to an initial set of agreements that allowed the prospective partners to work together during the early stages of the space station program and then to the final set of agreements creating the original space station partnership. Also, the 1993 invitation to the Russian Federation to join the original partners is not discussed, nor are the subsequent negotiations to revise the 1988 agreements.

Logsdon, John M.↗

Risks and issues in fire safety on the Space Station

A fire in the inhabited portion of a spacecraft is a greatly feared hazard, but fire protection in space operations is complicated by two factors. First, the spacecraft cabin is an enclosed volume, which limits the resources for fire fighting and the options for crew escape. Second, an orbiting spacecraft experiences a balance of forces, creating a near-zero-gravity (microgravity) environment that profoundly affects the characteristics of fire initiation, spread, and suppression. The current Shuttle Orbiter is protected by a fire-detection and suppression system whose requirements are derived of necessity from accepted terrestrial and aircraft standards. While experience has shown that Shuttle fire safety is adequate, designers recognize that improved systems to respond specifically to microgravity fire characteristics are highly desirable. Innovative technology is particularly advisable for the Space Station, a forthcoming space community with a complex configuration and long-duration orbital missions, in which the effectiveness of current fire-protection systems is unpredictable. The development of risk assessments to evaluate the probabilities and consequences of fire incidents in spacecraft are briefly reviewed. It further discusses the important unresolved issues and needs for improved fire safety in the Space Station, including those of material selection, spacecraft atmospheres, fire detection, fire suppression, and post-fire restoration.

Friedman, Robert↗

Space Station Workstation Technology Workshop Report

This report describes the results of a workshop conducted at Goddard Space Flight Center (GSFC) to identify current and anticipated trends in human-computer interface technology that may influence the design or operation of a space station workstation. The workshop was attended by approximately 40 persons from government and academia who were selected for their expertise in some aspect of human-machine interaction research. The focus of the workshop was a 1 1/2 brainstorming/forecasting session in which the attendees were assigned to interdisciplinary working groups and instructed to develop predictions for each of the following technology areas: (1) user interface, (2) resource management, (3) control language, (4) data base systems, (5) automatic software development, (6) communications, (7) training, and (8) simulation. This report is significant in that it provides a unique perspective on workstation design for the space station. This perspective, which is characterized by a major emphasis on user requirements, should be most valuable to Phase B contractors involved in design development of the space station workstation. One of the more compelling results of the workshop is the recognition that no major technological breakthroughs are required to implement the current workstation concept. What is required is the creative application of existing knowledge and technology.

Moe, K. L.↗

Space station systems analysis study. Part 1, volume 1: Executive study

Potential space station system options were examined for a permanent, manned, orbital space facility and to provide data to NASA program planners and decision makers for their use in future program planning. There were ten space station system objectives identified. These were categorized into five major objectives and five supporting objectives. The major objectives were to support the development of: (1) satellite power systems, (2) nuclear energy plants in space, (3) space processing, (4) earth services, and (5) space cosmological research and development. The five supporting objectives, to define space facilities which would be basic building blocks for future systems, were: (1) a multidiscipline science laboratory, (2) an orbital depot to maintain, fuel, and service orbital transfer vehicles, (3) cluster support systems to provide power and data processing for multiple orbital elements, (4) a sensor development facility, and (5) the facilities necessary to enhance man's living and working in space.

Source record↗

Enhancing Future Commercial Space Stations: Applying ISS Insights to Environmental Control and Life Support Systems (ECLSS) Development

The expansion of space exploration to commercial space stations represents a shift from government-led endeavors to a new competitive era driven by private companies and innovative forces. The journey to actualize these celestial outposts is fraught with difficulties, including the intricate establishment of Environmental Control and Life Support systems (ECLSS) within these commercial space stations. By applying the insights gleaned from the ISS, particularly during the initial conceptual design phase of the commercial developments, there is an opportunity to circumvent some of the teething issues and optimize the development process. Furthermore, applying insights from the ISS ECLSS design, development, test, and maintenance phases has the potential to enhance system compatibility and mitigate the challenges associated with upgrading a fixed design. This approach can lead to lower costs due to fewer iterations and streamlined processes. This paper will conduct an in-depth evaluation of the ECLS system from both system and operational perspectives with the aim to provide a knowledge capture for early-stage design considerations to bolster the development of sustainable, efficient, and habitable commercial space stations.

ISS↗

Enhancing Future Commercial Space Stations: Applying ISS Insights to Environmental Control and Life Support Systems (ECLSS) Development

The expansion of space exploration to commercial space stations represents a shift from government-led endeavors to a new competitive era driven by private companies and innovative forces. The journey to actualize these celestial outposts is fraught with difficulties, including the intricate establishment of Environmental Control and Life Support systems (ECLSS) within these commercial space stations. By applying the insights gleaned from the ISS, particularly during the initial conceptual design phase of the commercial developments, there is an opportunity to circumvent some of the teething issues and optimize the development process. Furthermore, applying insights from the ISS ECLSS design, development, test, and maintenance phases has the potential to enhance system compatibility and mitigate the challenges associated with upgrading a fixed design. This approach can lead to lower costs due to fewer iterations and streamlined processes. This paper will conduct an in-depth evaluation of the ECLS system from both system and operational perspectives with the aim to provide a knowledge capture for early-stage design considerations to bolster the development of sustainable, efficient, and habitable commercial space stations.

ISS↗

Adaptive Attitude Control System For Space Station

Report presents theoretical foundation for attitude control system for proposed Space Station Freedom in orbit around Earth. Intended to maintain space station in torque equilibrium with designated axes of its structure aligned with local vertical, local along-trajectory horizontal, and local across-trajectory horizontal axes, respectively. System required to provide desired combination of control performance and stability in presence of disturbances (e.g., variations in masses of payloads, movements of astronauts and equipment, atmospheric drag, gravitational anomalies, and interactions with docking spacecraft).

Boussalis, Dhemetrios↗

Assessment of mixed fleet potential for space station launch and assembly

Reductions in expected STS flight rates of the Space Shuttle since the 51-L accident raise concerns about the ability of available launch capacity to meet both payload-to-orbit and crew rotation requirements for the Space Station. In addition, it is believed that some phases of Station build-up could be expedited using unmanned launch systems with significantly greater lift capacity than the STS. Examined is the potential use of expendable launch vehicles (ELVs), yet-to-be-developed unmanned shuttle-derived vehicles (SDVs), and international launch vehicles for meeting overall launch requirements to meet Space Station program objectives as defined by the 1986 Critical Evaluation Task Force (CETF). The study concludes that use of non-STS transportation can help meet several important program objectives as well as reduce the total number of STS flights. It also finds, however, that reduction of Space Station-dedicated STS flights below 8 per year forces a reduction in Station crew size assuming the CETF 90 day crew stay time baseline and seriously impairs scientific utilization of the Station.

Deryder, L. J.↗

Space Station Freedom - Technical and management challenges

The development of the Space Station is reviewed, focusing on the technical and managerial aspects of the program. The optimization of the Space Station configuration, utilization impacts on design, technical aspects of the distribution systems, and the problems of designing for a lifetime of 30 years or more are discussed. In addition, cost reduction studies, testing and verification, determining the assembly sequence, and operational communications and support systems are examined. Managerial aspects of the program include organization, program control, management tools and processes, and the integration of elements from the international partners.

Moser, Thomas L.↗

Space Station Furnace Facility. Volume 2: Summary of technical reports

The Space Station Furnace Facility (SSFF) is a modular facility for materials research in the microgravity environment of the Space Station Freedom (SSF). The SSFF is designed for crystal growth and solidification research in the fields of electronic and photonic materials, metals and alloys, and glasses and ceramics, and will allow for experimental determination of the role of gravitational forces in the solidification process. The facility will provide a capability for basic scientific research and will evaluate the commercial viability of low-gravity processing of selected technologically important materials. In order to accommodate the furnace modules with the resources required to operate, SSFF developed a design that meets the needs of the wide range of furnaces that are planned for the SSFF. The system design is divided into subsystems which provide the functions of interfacing to the SSF services, conditioning and control for furnace module use, providing the controlled services to the furnace modules, and interfacing to and acquiring data from the furnace modules. The subsystems, described in detail, are as follows: Power Conditioning and Distribution Subsystem; Data Management Subsystem; Software; Gas Distribution Subsystem; Thermal Control Subsystem; and Mechanical Structures Subsystem.

Source record↗

International Space Station Research: Accomplishments and Pathways for Exploration and Fundamental Research

Beginning with the launch of the European Columbus module planned for December 2007, we approach a transition in the assembly of the International Space Station (ISS) that is of great importance for the sciences. During the following 18 months, we will operate the first experiments in Columbus physical science resource facilities and also launch and commission the Japanese Kibo module. In addition, two Multi-purpose Logistics Module (MPLM) flights will deliver the U.S. Combustion Integrated Rack (CIR) and Fluids Integrated Rack (FIR) along with their first science experiments. These facilities provide significant new capabilities for basic and applied physical science research in microgravity. New life support technologies will come online throughout 2008, and we will reach the milestone of a 6-person crew planned for April 2009. A larger crew enables significant more scientific use of all the facilities for the life of ISS. Planning for the use of the International Space Station as a national laboratory is also maturing as we near the completion of assembly, enabling access to ISS as a research platform for other government agencies and the private sector. The latest updates on National Laboratory implementation will also be provided in this presentation. At the same time as these significant increases in scientific capability, there have been significant ongoing accomplishments in NASA's early ISS research both exploration related and fundamental research. These accomplishments will be reviewed in context as harbingers of the capabilities of the International Space Station when assembly is complete. The Vision for Space Exploration serves to focus NASA's applied investigations in the physical sciences. However, the broader capability of the space station as a National Laboratory and as a nexus for international collaboration will also influence the study of gravity-dependent processes by researchers around the world.

Robinson, Julie A.↗

Large Deployable Reflector (LDR) Requirements for Space Station Accommodations

Top level requirements for assembly and integration of the Large Deployable Reflector (LDR) Observatory at the Space Station are examined. Concepts are currently under study for LDR which will provide a sequel to the Infrared Astronomy Satellite and the Space Infrared Telescope Facility. LDR will provide a spectacular capability over a very broad spectral range. The Space Station will provide an essential facility for the initial assembly and check out of LDR, as well as a necessary base for refurbishment, repair and modification. By providing a manned platform, the Space Station will remove the time constraint on assembly associated with use of the Shuttle alone. Personnel safety during necessary EVA is enhanced by the presence of the manned facility.

Crowe, D. A.↗