Search NASA⌕ Search

SEARCH · Search NASA

Results for “DOLLARS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,135 records · Page 63

DOE Office of Environmental Management, 2016 Year in Review

2016 accomplishments and primary areas of focus for the Department of Energy's (DOE's) Office of Environmental Management and EM sites are presented. For DOE EM, these include Focusing on the Field, Teaming with Cleanup Partners, Developing New Technology, and Maximizing Cleanup Dollars. Major 2016 achievements are highlighted for EM, Richland Operations Office, Office of River Protection, Savannah River Site, Oak Ridge, Idaho, Waste Isolation Pilot Plant, Los Alamos, Portsmouth, Paducah, West Valley Demonstration Project, and the Nevada National Security Site,

54 ENVIRONMENTAL SCIENCES↗

Zero Energy With an Affordable Price Tag: Friends School of Portland

More than half of all operating school districts in the U.S. are in rural areas. These small schools operate at a different scale and have different needs than their city counterparts. In 2003-2004, 20% of public schools in the U.S. served fewer than 200 students(1). Although the Friends School of Portland - which was designed to achieve both zero energy performance and Passivhaus certification - is an independent school, it faced financial constraints similar to those faced by many other small schools throughout the country. The project was financed through a capital campaign and a mortgage that forced a hard cost cap on the project, so the project team had to be diligent about every dollar that was spent. In its first year of operation, the school site energy use intensity was just 12 kbtu/ft2, a bit more than the 9 kbtu/ft2 predicted.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Modeling Framework and Results to Inform Charging Infrastructure Investments

The plug-in electric vehicle (PEV) market is experiencing rapid growth with dozens of battery electric (BEV) and plug-in hybrid electric (PHEV) models already available and billions of dollars being invested by automotive manufacturers in the PEV space. Electric range is increasing thanks to larger and more advanced batteries and significant infrastructure investments are being made to enable higher power fast charging. Costs are falling and PEVs are becoming more competitive with conventional vehicles. Moreover, new technologies such as connectivity and automation hold the promise of enhancing the value proposition of PEVs. This presentation outlines a suite of projects funded by the U.S. Department of Energy's Vehicle Technology Office to conduct assessments of the economic value and charging infrastructure requirements of the evolving PEV market. Individual assessments include national evaluations of PEV economic value (assuming 73M PEVs on the road in 2035), national analysis of charging infrastructure requirements (with community and corridor level resolution), and case studies of PEV ownership in Columbus, OH and Massachusetts.

33 ADVANCED PROPULSION SYSTEMS↗

Increasing Resiliency Through Renewable Energy Microgrids

This paper describes a methodology to quantify the economic and resiliency benefit provided by renewable energy (RE) in a hybrid RE-storage-diesel microgrid. We present a case study to show how this methodology is applied to a multi-use/ multi-function telecommunications facility in southern California. In the case study, we first identify photovoltaic (PV) and battery energy storage system (BESS) technologies that minimize the lifecycle cost of energy at the site under normal, grid-connected operation. We then evaluate how those technologies could be incorporated alongside existing diesel generators in a microgrid to increase resiliency at the site, where resiliency is quantified in terms of the amount of time that the microgrid can sustain the critical load during a grid outage. We find that adding PV and BESS to the existing backup diesel generators with a fixed fuel supply extends the amount of time the site could survive an outage by 1.8 days, from 1.7 days for the existing diesel-only backup system to 3.5 days for the PV/diesel/BESS hybrid system. Furthermore, even after diesel fuel supplies are exhausted, the site can continue to operate critical loads during daytime hours using just the PV/BESS when there is sufficient solar resource. We find that the site can save approximately 100,000 dollars in energy costs over the 25-year lifecycle while doubling the amount of time they can survive an outage. Here, the methodology presented here provides a template for increasing resiliency at telecomm sites by implementing renewable energy solutions, which provide additional benefits of carbon emission reduction and energy cost savings.

24 POWER TRANSMISSION AND DISTRIBUTION↗

LCOH Estimated from Existing Geothermal District Heating Systems in the U.S.

Levelized cost of heat for geothermal district heating systems in the US was calculated from reported construction and operation costs obtained from a literature review. These costs were inflation adjusted to 2016 dollars. To obtain geothermal district heating levelized cost of heat, capital costs were amortized over 30 years with an interest rate of 4%. These results suggest that the levelized cost of heat produced in these systems is on the order of $35,750 per gigawatt hr (thermal). Expressed in more common units, the levelized cost of geothermal district heat is $36/MWh (~$10.5/MMBtu). This cost is reflective of state-of-the-art systems at the time of installation and does not account for recent technology advances such as combine heating/cooling systems and storage systems.

15 GEOTHERMAL ENERGY↗

Communities of the Future: Accelerating Zero Energy District Master Planning: Preprint

Zero energy districts aggregate multiple buildings and optimize energy efficiency, district thermal energy, and renewable energy generation among those buildings so that on-site renewable energy can offset the energy use at a district scale. Zero energy districts have the potential to dramatically improve the economic competitiveness, resiliency, environmental quality, and energy independence of communities. The U.S. Department of Energy (DOE) Zero Energy Districts Accelerator (ZEDA) brings together district developers, planners, owners, national experts, and key stakeholders to develop the energy master planning documents needed for zero energy district development and replication. Through this effort, DOE is working with pioneering leaders to understand and address barriers to achieving zero energy districts. Each district partner will complete detailed energy master plans that provide the framework necessary to achieve ambitious energy goals. These complex projects represent billions of dollars of investment and are creating the communities of the future. ZEDA partners are using best-practice approaches to realize energy performance goals for the entire building and district life cycle. Their successful strategies will be documented and made available to promote replication in cities around the world that are setting aggressive energy goals. This paper introduces zero energy districts, reviews the structure of ZEDA, discusses the value of energy master planning, presents barriers to zero energy districts and how these are being addressed by zero energy district pioneers, and suggests pathways for wide-scale replication.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Precast Concrete Molds Fabricated with Big Area Additive Manufacturing

The traditional process of making precast concrete molds requires significant manual labor. The molds are made using hardwood, cost tens of thousands of dollars, and take weeks to build. Once built, a mold will last 5-10 pulls before becoming too heavily degraded to continue use. With additive manufacturing, the same mold can be built in eight hours, post-machined in eight hours, costs about $9000, and is project to last nearly 200 pulls. Oak Ridge National Laboratory has been working with Big Area Additive Manufacturing (BAAM) to fabricate concrete molds for a new high-rise apartment complex in New York. The molded pieces will form structural window supports for the hundreds of windows in building façade. The magnitude of window molds is where additive manufacturing can shine when producing the geometry. This paper will discuss the methods and findings of using BAAM to replace conventional precast concrete pattern making.

Roschli, Alex↗

Remote Sampling of Failed Spallation Neutron Source Targets

The Spallation Neutron Source (SNS) is a unique high powered particle accelerator-based source of neutrons for research and development purposes. Protons are accelerated into a mercury-filled stainless steel target where they “spall” off neutrons that are then collimated into beams for use in multiple experiments simultaneously. The mercury targets are intended to last up to one year and then must be changed out remotely due to activation by the high intensity proton and neutron beams. In the recent past several of these million dollar targets have failed in a matter of weeks. A team was assembled to acquire samples that could be used for diagnostics of the failures. The team developed a remote sampling tool that was small, economical, simple, easy to use, and could be fabricated and deployed quickly.

Noakes, Mark↗

Materials for Advanced Ultra-Supercritical (AUSC) Steam Turbines – AUSC Component Demonstration

The work by the United States Department of Energy (U.S. DOE)/Ohio Coal Development Office (OCDO) Advanced Ultra-Supercritical (AUSC) Steam Boiler and Turbine Materials Consortia from 2001 through September 2015 was primarily focused on lab scale and pilot scale materials testing. The field testing included air-cooled probes and steam-cooled “loops” that were installed into existing utility boilers to gain exposure of these materials to realistic conditions of high temperature and corrosion due to the constituents in the coal ash. Successful research and development resulted in identification of metallic alloy materials and fabrication processes suited for power generation applications with metal temperatures up to approximately 1472°F (800°C). These materials or alloys have shown, in extensive laboratory tests and shop fabrication studies, to have excellent applicability for high-efficiency low CO2 transformational power generation technologies. However, as valuable as these material field tests have been for obtaining information, their scale is significantly below that required to minimize the risk associated with a power company building a multi-billion-dollar AUSC power plant. To decrease the identified risk barriers to full-scale implementation of these advanced materials, the U.S. DOE/OCDO AUSC Steam Boiler and Turbine Materials Consortia identified the key areas of the technology that need to be tested at a larger scale. Based upon the recommendations and outcome of a Consortia-sponsored workshop with the U.S.’s leading utilities, a Component Test (ComTest) Program for AUSC was proposed. The AUSC ComTest program would define materials performance requirements, plan for overall advanced system integration, design critical component tests, fabricate components for testing from advanced materials, and carry out the tests. A Pre-FEED evaluation of the test facility including the evaluation of three potential sites has been completed and previously reported. This report describes the Front-End Engineering Design (FEED), Detailed Engineering and the Environmental Assessment of the ComTest project. A significant amount of work was accomplished during Phase 1 to identity the components, as well as the component size, that would be manufactured from advanced alloys such as INCONEL 740H or HAYNES 282 alloys. Pathways to supply these components for ComTest have been identified as well as any further development that would be required. Every project of this nature has challenges and this project was no exception. The greatest challenge has been the project cost. Largely due to the infrastructure and balance of plant equipment upgrades required for Youngstown Thermal, the estimated project cost for the “base case” project was greater than originally budgeted. The project team spent a significant amount of time exploring opportunities for reducing the project cost. These options included: • Youngstown Thermal was exploring building a Combined Heat and Power (CHP) unit at their facility. The Youngstown Thermal staff, supported by Thermal Engineering Group, worked with the project team to determine whether it was economically desirable to supply ComTest with steam and other utilities, which would be supplied by the CHP project. • The project team also evaluated opportunities to optimize the project scope to reduce cost, such as reducing project scope by eliminating the Superheater Outlet Header test. • Southern Company had offered two sites as possible host locations for ComTest. Both sites had infrastructure in place such as steam from an existing unit, natural gas, cooling water and ample electrical power that would be required to be added at the Youngstown Thermal site. Utilizing this existing infrastructure could reduce the project cost. An additional project challenge was the departure of Babcock and Wilcox from the project in September 2016. This project setback was overcome by GE Power’s willingness to assume the design of the ComTest superheater. Since the project could not proceed without the superheater, this was a very positive project development. The merger of the GE Power and Alstom Power steam turbine divisions created synergies leading to the conclusion that instead of building a small-scale turbine, a more practical and useful endeavor would be to validate the manufacturing technology and supplier readiness for fabricating and machining full scale steam turbine components. Consequently, in March 2017, GE Power decided that a steam turbine test would not be necessary as part of the ComTest demonstration. Removing the operational testing of the steam turbine from ComTest further reduced the total project cost. Additionally, there was an opportunity to move ComTest from Youngstown Thermal to one of the Southern Company sites and operate ComTest at supercritical steam conditions and test the steam turbine main stop/control valve at a temperature and pressure that would be representative of the conditions of a high pressure steam turbine inlet valve. The steam could also possibly be returned to the host boiler so there would be no economic penalty of using this steam for ComTest. Relocating the project could further reduce the project cost due to the infrastructure already in place, including high pressure natural gas and cooling water, and the potential for heat integration, allowing a reduction of operating costs. Due to these potential cost reductions, it was decided to move the project away from Youngstown Thermal in March 2017. As integrating ComTest at the Southern Company site was explored, an issue was raised regarding the integration of the ComTest cycle with the plant steam cycle. Steam would be supplied to ComTest at nominally ~3865 psia and 775°F. The steam would be heated with natural gas to 1400°F for the valve test and then cooled to 1000°F so that the steam would be returned to the host boiler at the same conditions as their high pressure steam turbine inlet. However, there were concerns raised that the addition of the energy (natural gas) to the steam could trigger a New Source Review on the unit. Southern Company did not want ComTest to cause this review, so condensing all of the steam exiting ComTest and returning it to the host steam cycle as condensate was explored to insure there would be no implication that ComTest was adding energy to the host plant’s steam cycle. Ultimately, Southern Company decided that they wanted to “decouple” ComTest from the operating unit, making ComTest self-supporting, similar to the Youngstown Thermal “base case.” Without the steam turbine, the project team reached a consensus that operating the ComTest Superheater and steam turbine valves at the typical pressure of a package boiler (~1000 psig) would not generate enough useful technical information to justify the cost of the test. Therefore, it was decided in the December 2017 project quarterly meeting to cancel the operational phase of ComTest. Throughout the engineering phase of ComTest, manufacturing and supply chain challenges were identified. When GE Power recommended dropping the steam turbine test from ComTest, they identified many important manufacturing issues that should be evaluated and demonstrated. Other challenges had been raised by the GE Power group designing the superheater as well as those engineering components such as pressure relief and steam turbine bypass valves. In the December 2017 meeting, the project team decided that it was more beneficial to the AUSC technology to pursue these manufacturing and supply chain issues as Phase 2 of the ComTest project. This report is organized in the following manner: • Section 2 discusses the ComTest project background and organization. • Section 3 discussed project management. • Section 4 discusses the design of the ComTest AUSC components – the Superheater, steam turbine and Superheater Outlet Header. • Section 5 discusses the implementation of ComTest at Youngstown Thermal and the Southern Company site. • Section 6 discusses the development of the AUSC Supply Chain • Section 7 discusses the recommended plan for Phase 2 of ComTest

01 COAL, LIGNITE, AND PEAT↗

Melter Modeling over a Range of Scales to Support Vitrification at the WTP

Computational modeling is a powerful complement to laboratory experiments and testing of systems at various scales. When properly applied and validated, computational fluid dynamics (CFD) can provide information not readily obtainable by physical testing, especially in cases where the operating environment does not permit visual observation or the insertion of typical data acquisition instrumentation as in the case of waste glass vitrification. A series of CFD and heat transfer models over a range of scales are being developed to support melter operations at the Hanford Waste Treatment and Immobilization Plant. This paper provides a description of the models and the resulting information they provide that can be used to improve melter throughput, as well as aid in evaluating and resolving operating plant issues or upsets. This work is important for the WTP operation by providing a potential for model-predictive control of the melter operation. Increases in the rate of glass production and avoiding idling can significantly decrease the duration and cost of the vitrification campaign, potentially saving billions of dollars.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Geothermal Drilling: A Baseline Study of Nonproductive Time Related to Lost Circulation

A single production geothermal well costs up to seven million dollars and a typical geothermal field contains 10 to 20 wells for a development cost of potentially $140 million according to a Geothermal Resources Group study. Capital cost coupled with exploration and resource uncertainty lead to high upfront project risk. This study analyzed the time and cost of detailed geothermal drilling operations. We found the largest cause of nonproductive time in geothermal wells is advancing through lost circulation zones, where drilling fluid is lost from the well. Mitigation measures implemented during lost circulation events can increase drilling time by a significant fraction of the drilling days. There is opportunity to reduce the drilling costs by addressing logistical inefficiencies and ineffective mitigation measures to minimize nonproductive time. This study reviewed daily drilling data for 38 geothermal wells drilled since 2009 in the U.S. The analysis presented here summarizes the lost circulation events identified in the available drilling data by assessing time per event, costs incurred, materials used, success of mitigation strategies, and resolution time. This study found that wells averaged over 100 hours of unprogrammed nonproductive time due to lost circulation, adding an estimated $185,000 to each well in rig costs. A plan for future research aimed at reducing lost circulation nonproductive time and cost is presented. operations. We found the largest cause of nonproductive time in geothermal wells is advancing through lost circulation zones, where drilling fluid is lost from the well. Mitigation measures implemented during lost circulation events can increase drilling time by a significant fraction of the drilling days. There is opportunity to reduce the drilling costs by addressing logistical inefficiencies and ineffective mitigation measures to minimize nonproductive time. This study reviewed daily drilling data for 38 geothermal wells drilled since 2009 in the U.S. The analysis presented here summarizes the lost circulation events identified in the available drilling data by assessing time per event, costs incurred, materials used, success of mitigation strategies, and resolution time. This study found that wells averaged over 100 hours of unprogrammed nonproductive time due to lost circulation, adding an estimated $185,000 to each well in rig costs. A plan for future research aimed at reducing lost circulation nonproductive time and cost is presented.

15 GEOTHERMAL ENERGY↗

Co-Optimization of Fuels & Engines: Scientific Innovation for Efficient, Clean, and Affordable Transportation

While vehicles are becoming more efficient, the properties of conventional fuels continue to limit the performance of internal combustion engines in most cars and trucks currently on U.S. roads. The Department of Energy (DOE) Co-Optimization of Fuels & Engines (Co-Optima) initiative is bringing together top scientists, engineers, and analysts from nine national laboratories with more than 20 university and industry partners across the country to investigate fuels and engines as dynamic design variables that can work together to boost efficiency and performance, while minimizing emissions. Applications include the entire on-road fleet, from light-duty (LD) passenger cars to heavy-duty (HD) freight trucks. The objective scientific outcomes of this initiative will provide American industry and policymakers with the knowledge, data, and tools needed to decide which changes could prove most viable and beneficial for drivers, businesses, and the environment. Potential benefits include dramatic improvements in vehicle fuel economy and increases in the use of domestically sourced fuel for transportation, in turn creating new U.S. jobs and keeping energy dollars in the United States, while reducing emissions and costs for consumers and commercial operators at the pump.

09 BIOMASS FUELS↗

QP Statistics Spotlight: Practical versus Statistical Priorities

Randomization during data collection in a designed experiment is an effective strategy for reducing system bias and ensuring independent observations1, but at what cost should it be fully implemented? We recently encountered a scenario that highlights an important aspect of collaboration2 between statisticians, scientists and engineers – the idea of compromise for the sake of achieving wins for all team members. In a multi-million-dollar experiment with a fixed amount of time on the test equipment, each experimental run involved resetting the input values and then waiting for the continuous process to reach a new equilibrium. For example, the temperature of the furnace could be reset, but it takes some time for the test chamber to reach the new temperature and rest at that temperature for a while until all components in the chamber settle at that new setting. Similarly, a critical gas flow component also required a settling period before data could be collected that would be representative of that input setting value. In all, the experiment involved 5 factors, where 4 of the 5 were time-consuming and costly to adjust, with the duration of time needed to reach new equilibrium being dependent on how far the previous setting was from the new one for the combination of these 4 factors. For example, changing from 150° to 200° would reach equilibrium faster than changing from 100° to 200°.

97 MATHEMATICS AND COMPUTING↗

Confirming the Strength of Residential Roof Structures for Solar Installations

The rooftop solar PV permitting process involves a number of steps and varies greatly, even between neighboring cities. Jurisdictions follow state or national codes, but each may interpret the codes in their own way and insert additional requirements. In some locations, a rooftop structural analysis conducted by a professional engineer is required before a rooftop solar permit is issued. The extra step is not universally applied across states or municipalities, and can alter scheduling logistics and add hundreds of dollars to the cost of the system.

14 SOLAR ENERGY↗

Communities of the Future: Accelerating Zero Energy District Master Planning

Zero energy districts aggregate multiple buildings and optimize energy efficiency, district thermal energy, and renewable energy generation among those buildings so that on-site renewable energy can offset the energy use at a district scale. Zero energy districts have the potential to dramatically improve the economic competitiveness, resiliency, environmental quality, and energy independence of communities. The U.S. Department of Energy (DOE) Zero Energy Districts Accelerator (ZEDA) brings together district developers, planners, owners, national experts, and key stakeholders to develop the energy master planning documents needed for zero energy district development and replication. Through this effort, DOE is working with pioneering leaders to understand and address barriers to achieving zero energy districts. Each district partner will complete detailed energy master plans that provide the framework necessary to achieve ambitious energy goals. These complex projects represent billions of dollars of investment and are creating the communities of the future. ZEDA partners are using best-practice approaches to realize energy performance goals for the entire building and district life cycle. Their successful strategies will be documented and made available to promote replication in cities around the world that are setting aggressive energy goals. This paper introduces zero energy districts, reviews the structure of ZEDA, discusses the value of energy master planning, presents barriers to zero energy districts and how these are being addressed by zero energy district pioneers, and suggests pathways for wide-scale replication.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Opportunities in Intense Ultrafast Lasers: Reaching for the Brightest Light

The laser has revolutionized many areas of science and society, providing bright and versatile light sources that transform the ways we investigate science and enable trillions of dollars of commerce. Now a second laser revolution is under way with pulsed petawatt-class lasers (1 petawatt: 1 million billion watts) that deliver nearly 100 times the total world’s power concentrated into a pulse that lasts less than one-trillionth of a second. Such light sources create unique, extreme laboratory conditions that can accelerate and collide intense beams of elementary particles, drive nuclear reactions, heat matter to conditions found in stars, or even create matter out of the empty vacuum. These powerful lasers came largely from U.S. engineering, and the science and technology opportunities they enable were discussed in several previous National Academies’ reports. Based on these advances, the principal research funding agencies in Europe and Asia began in the last decade to invest heavily in new facilities that will employ these high-intensity lasers for fundamental and applied science. No similar programs exist in the United States. This report was commissioned by four U.S. agencies—the Office of Naval Research (ONR), the Air Force Office of Scientific Research (AFOSR), the Department of Energy’s Office of Science (DOE-SC), and the National Nuclear Security Administration (NNSA)—to assess the opportunities and to recommend a path forward for possible U.S. investments in this area of science.

47 OTHER INSTRUMENTATION↗

Super Hot EGS and the Newberry Deep Drilling Project

A productive geothermal well drilled into super-hot rock (SHR) with a temperature above 400°C will produce super-critical fluid. At a flow rate of 60 kg/s, a SHR well could produce 50 MWe compared to 5-7 MWe for the same flow at 200°C. Even though these deeper, super-hot wells will cost more, the high energy density means power produced by engineered geothermal systems (EGS) can meet the market ($46 MW-hr) by directly tapping the heat source. We propose a proof of concept where hot rock is close to the surface (~5 km), and the cost of drilling and EGS stimulation will be lowest. A suitable, ready-to-go SHR site is on Newberry Volcano, Oregon, one of the largest geothermal heat reservoirs in the USA, extensively studied for the last 40 years. Millions of dollars have already been invested in the site by private geothermal developers and the US Department of Energy (DOE), resulting in a ready-to-use facility with the necessary infrastructure, environmental permits, land commitments, and monitoring plans. The Newberry Deep Drilling Project (NDDP) will be located at an idle geothermal exploration well, NWG 46-16, drilled in 2008, 3500 m deep and 320°C at bottom, which will be deepened another 1000 to 1300 m to reach 500 °C. The original well was drilled with few lost circulation zones and the temperature profile indicates conductive heat flow. Compared to other SHR projects world-wide, this well would return more materials (cuttings, core and fluids) with more predictable drilling conditions, thus providing a suite of data near and across the brittle-ductile transition in silicarich rocks. After drilling, a hydraulic well stimulation will both change the pore pressure in fractures and cool the fracture walls resulting in permeability enhancement through both thermal fracturing, and hydro-shearing. The first step for the NDDP was an International Continental Drilling Program (ICDP) sponsored workshop held at the OSU-Cascades campus in Bend from Sept. 10-14, 2017. The workshop concluded by setting ambitious goals for NDDP: 1) test EGS above the critical point of water, 2) collect samples of rocks within the brittle-ductile transition, 3) investigate volcanic hazards, 4) study magmatic geomechanics, 5) calibrate geophysical imaging techniques, and 6) test technology for drilling, well completion, and geophysical monitoring in a very high temperature environment. The second step, completed January 15, 2018, was submitting a proposal to ICDP for 46-16 deepening. The next steps will be to continue building a team with project, technology, and investment partners to make NDDP a reality.

EGS, Geothermal, Newberry↗

Opportunities in Intense Ultrafast Lasers: Reaching for the Brightest Light

The laser has revolutionized many areas of science and society, providing bright and versatile light sources that transform the ways we investigate science and enables trillions of dollars of commerce. Now a second laser revolution is underway with pulsed petawatt-class lasers (1 petawatt: 1 million billion watts) that deliver nearly 100 times the total world’s power concentrated into a pulse that lasts less than one-trillionth of a second. Such light sources create unique, extreme laboratory conditions that can accelerate and collide intense beams of elementary particles, drive nuclear reactions, heat matter to conditions found in stars, or even create matter out of the empty vacuum. These powerful lasers came largely from U.S. engineering, and the science and technology opportunities they enable were discussed in several previous National Academies’ reports. Based on these advances, the principal research funding agencies in Europe and Asia began in the last decade to invest heavily in new facilities that will employ these high-intensity lasers for fundamental and applied science. No similar programs exist in the United States. Opportunities in Intense Ultrafast Lasers assesses the opportunities and recommends a path forward for possible U.S. investments in this area of science.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗