Characterisation Progress at the Windscale Pile Reactors. Challenges and Results
The decommissioning of the Windscale Pile 1 reactor, fifty years after the 1957 fire, is one of the most technically challenging decommissioning projects in the United Kingdom, if not the world. The decommissioning is being performed by an Alliance of the United Kingdom Atomic Energy Authority (UKAEA), CH2M HILL International Nuclear Services (CHNS) Ltd. and AMEC, NNC. The 1957 Windscale Pile 1 accident is summarized. The resulting fire caused significant characterisation challenges. Challenges to intrusive characterization included hypothesized uranium hydride causing re-ignition of the core fire, unknown fuel configurations leading to a reactor criticality and graphite dust explosions. As a result, the Pile 1 facilities were sealed, isolated and managed in a monitoring and surveillance regime while plans for dismantling were developed. For years the intrusive inspection of the fire damaged region of Pile 1, estimated to contain 15 tonnes of fuel, was precluded based on safety grounds. In June of 2006 the United Kingdom Health and Safety Directorate approved a new Pile 1 safety case that successfully demonstrated that Pile 1 presents a minimal safety risk with no credible risk of a core fire, criticality or graphite dust explosion. Adoption of the new safety case enabled the intrusive inspections of the fire damaged region. Characterisation activities planned and performed since the safety case approval, were prioritised relative to the results potential to mitigate decommissioning project risks. D-Void examinations, irradiation foil hole intrusive inspections, bio-shield and thermal shield plate characterizations were performed. Results obtained allow determination of waste stream composition and confirmation of assumed design conditions. Changes to the strategic approach to safely and efficiently decommission the two Windscale Pile Reactors include waste packaging and storage facilities and confirmation of design assumptions. Fuel channel endoscope inspections have confirmed the strategic approach to safely and efficiently decommission the Windscale Pile 1 Reactor. The first detailed images from deep within the Pile 1 fire affected zone(FAZ) since the 1957 fire are discussed. The decommissioning impacts of these images are provided. Characterisation has confirmed design assumptions and supported decommissioning option evaluation. The results confirmed that the decommissioning strategy of a top down approach, employing an array of light weight, high payload robotic arms to remove the damaged fuel, the graphite core, activated metals and concrete remains the most efficient decommissioning method. (authors)