Search NASA⌕ Search

SEARCH · Search NASA

Results for “MONITOR PROGRAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,135 records · Page 63

NNSS Soils Monitoring: Plutonium Valley (CAU 366) FY2019

Desert Research Institute (DRI) conducted a field assessment of the potential for radionuclide-contaminated soil to be transported from the Plutonium Valley Dispersion Sites Contamination Area (CA) because of both wind and storm water runoff. This activity supported U.S. Department of Energy (DOE) Environmental Management Nevada Program (EM NV) efforts to establish post-closure monitoring plans for the Plutonium Valley Dispersion Sites Corrective Action Unit (CAU) 366. The DRI task was intended to identify the likely mechanism(s) of transport and determine the meteorological conditions that might cause the movement of radionuclide-contaminated soils. The emphasis of the work was on collecting sediment transported by channelized storm runoff and measuring airborne dust concentrations and associated wind conditions. These data will facilitate an appropriate post-closure monitoring program. In 2011, DRI installed meteorological monitoring stations north and south of the Plutonium Valley CA—known as Pu Valley North and Pu Valley South, respectively—as well as a fluvial sediment sampling station within the CA. Since installation, temperature, wind speed, wind direction, relative humidity, precipitation, solar radiation, barometric pressure, soil temperature, volumetric soil moisture content, and airborne particulate concentrations have been collected at both meteorological stations. The maximum, minimum, and average or total (as appropriate) for each of these parameters were recorded for each 10-minute interval. The sediment sampling station included an automatically activated sampling pump with collection bottles for suspended sediment, which was activated when sufficient flow was present in the channel, and passive traps for bedload material that was transported down the channel during runoff events. This report presents data collected from these stations during fiscal year (FY) 2019. During the FY2019 (October 1, 2018, through September 30, 2019) reporting period, the warmest month was July and the coldest month was February. Monthly total solar radiation was highest in June or July (depending on the station) and lowest in December. Monthly mean wind speeds were highest during February. At the Pu Valley North station, winds were commonly northerly, northwesterly, and southerly. At the Pu Valley South station, the wind direction was more variable and winds frequently came from most directions, excluding westerly and northwesterly winds. Winds above 15.0 miles per hour (mph) (24.1 kilometers per hour [km/hr]) were frequently southerly at both stations, and less-frequent strong winds were northerly (at the Pu Valley South station) or northwesterly (at the Pu Valley North station). Monthly average relative humidity ranged from 18 percent in August to 62 percent in January and February. Monthly total precipitation ranged from zero at both stations in September to 2.23 inches (in) (56.6 millimeters [mm]) during February at the Pu Valley South station and 2.09 in (53.1 mm) during March at the Pu Valley North station. From October 1, 2018, through September 30, 2019, the total precipitation was 8.23 in (209 mm) and 8.15 in (207 mm) at the Pu Valley South and Pu Valley North stations, respectively. The largest daily precipitation totals of 1.46 in (37.1 mm) and 1.14 in (29.0 mm) occurred at the Pu Valley South and Pu Valley North stations, respectively, on March 6, 2019. However, the ISCO autosampler was not activated during any storm event in FY2019 because the channel water depth measurements were insufficient for suspended sediment sample collection. Additionally, because no significant flow through the channel was indicated, no bedload samples were collected. Light breezes of 0.0 mph to 5.0 mph (0.0 km/hr to 8.0 km/hr) occurred most frequently (approximately 55 percent to 57 percent of the time). The frequency of occurrence diminished exponentially as the wind speed increased such that winds in excess of 25.0 mph (40.2 km/hr) occurred less than 0.01 percent of the time. Winds in excess of 15.0 mph (24.1 km/hr) were most commonly southerly, which is likely controlled by the topography of the valley because topographic highs define the east and west sides of the valley and converge toward the north.The concentrations of PM2.5 (particulate matter with an aerodynamic diameter ≤2.5 micrometers [μm]) and PM10 (particulate matter with an aerodynamic diameter ≤10 μm) in the air generally increase as wind speed increases. However, the particle profiler at the Pu Valley South station regularly malfunctioned, which resulted in poor data quality and a limited period of record within FY2019. Therefore, discussion of the annual dust observations is mostly limited to the Pu Valley North station. At the Pu Valley North station, significant increases in windblown dust concentrations were observed when wind speeds exceeded 15.0 mph (24.1 km/hr), especially during southerly winds. When all wind speeds were considered, high dust concentrations at the Pu Valley North station were frequently associated with northerly, northwesterly, or southerly winds. The majority of PM10 transport at the Pu Valley North station occurred when winds were blowing northerly and northwesterly because of the high frequency of winds up to 15.0 mph (24.1 km/hr). The ratio of PM10 to PM2.5 is a qualitative indicator of the proximity of dust sources to the observation point and the values of the PM10 to PM2.5 ratio tend to be higher nearer to the source. The PM10 to PM2.5 ratio increased from 1.2 to 2.8 with higher wind speeds at the Pu Valley North station. This increase suggests that some locally sourced PM10 was present in the air when local winds exceeded 15.0 mph (24.1 km/hr). Local dust suspension is interpreted during major dust events when peaks in the PM10 to PM2.5 ratio occur simultaneously with the maximum wind speed and the peak PM10 concentration. Analysis of the five major dust events in FY2019 revealed that northerly winds were dominant in three events and southerly winds were dominant in two events. Local suspension of dust within Plutonium Valley is suspected to have occurred during two of the five major events (April 9, 2019, and September 28 to 29, 2019), and a nonlocal source of dust is presumed for the three other major dust events (October 14, 2018; May 16, 2019; and September 2, 2019). The three suspected regional dust transport events exhibited winds that typically did not exceed the 15.0 mph (24.1 km/hr) wind speed threshold for local dust transport and featured PM10 to PM2.5 ratios that indicate large-scale regional dust transport. Similar event characteristics (e.g., wind speed and PM10 concentration) were observed at air monitoring stations approximately 70 mi (113 km) to the northwest within the Tonopah Test Range (TTR). Therefore, these three regional events may not reflect transport from the Plutonium Valley CA. Routine monitoring of meteorological and hydrologic parameters at Plutonium Valley has been discontinued at the request of EM NV, effective at the conclusion of FY2019. Environmental data acquisition has been completed, and both Pu Valley North and Pu Valley South meteorological stations within Plutonium Valley as well as the ISCO autosampler station within the CA were removed on October 14, 2019.

54 ENVIRONMENTAL SCIENCES↗

Monitoring Potential Transport of Radioactive Contaminants in Shallow Ephemeral Channels: FY2019

Desert Research Institute (DRI) conducted a field assessment of the potential for contaminated soil to be transported from the Smoky Site Contamination Area (CA) because of storm runoff. This activity supported U.S. Department of Energy (DOE) Environmental Management Nevada Program (EM NV) efforts to establish post-closure monitoring plans for the Smoky Site Soils Corrective Action Unit (CAU) 550. The work was intended to confirm the likely mechanism of transport and determine the meteorological conditions that might cause the movement of contaminated soils, as well as determine the particle size fraction most closely associated with transported radionuclide-contaminated soils. These data will facilitate the design of the appropriate post-closure monitoring program. In 2011, DRI installed a meteorological monitoring station on the west side of the Smoky Site CA and a hydrologic (runoff) monitoring station within the CA, near the east side. The meteorological station collected air temperature, wind speed, wind direction, relative humidity, precipitation, solar radiation, barometric pressure, soil temperature, and soil water content data. The maximum, minimum, and average or total values (as appropriate) for each of these parameters were recorded for each 10-minute interval. The maximum, minimum, and average water depth in the flume installed at the hydrologic station were also recorded for each 10-minute interval. This report presents the data collected from these stations during fiscal year (FY) 2019. During the FY2019 reporting period, the warmest months were June, July, and August and the coldest were December and February. The highest monthly solar radiation (i.e., sunshine) values were recorded in June, July, and August, whereas December through February had the lowest solar radiation values. Monthly mean wind speeds were highest in the spring (April) and early summer (June). Winds were predominantly from the north, except in February, July, August, and September when winds were mostly from the west. The monthly average relative humidity ranged from 17 percent to approximately 60 percent. Humidity was lowest in the summer and highest in the winter. Monthly total precipitation ranged from 0.0 during August and September to 2.22 inches (in) (56.39 millimeters [mm]) in February. Total precipitation for FY2019 was 7.83 in (198.88 mm). During the reporting period, a single, nonzero, flow event was recorded at the flume. This occurred over two days between March 6 and 7, 2019, in response to 1.16 in (29.46 mm) of precipitation falling within 9.3 hours on March 6, 2019. This event produced a peak water depth of 0.39 in (0.99 centimeters [cm]) in the flume, and runoff was measured for approximately 23.5 hours. However, the maximum recorded flow depth was less than the limit for flow discharge and velocity that can be calculated for the six-inch (15 cm) throat of a Parshall flume. The runoff event produced insufficient flow velocities through the natural channel to cause local erosion and transport of bedload materials. No bedload samples were collected for radiological analysis. Observing meteorological and environmental conditions that lead to storm runoff will help identify the parameters and threshold conditions that should be incorporated into post-closure monitoring plans for this and similar Soils CAU sites. Routine monitoring of meteorological and hydrologic parameters at the Smoky Site CA has been discontinued at the request of EM NV, effective at the conclusion of FY2019. Environmental data acquisition was completed and the meteorological and runoff monitoring stations were removed from the Smoky Site on October 15, 2019.

54 ENVIRONMENTAL SCIENCES↗

Component Repair Times Obtained from MSPI Data

Information concerning times to repair or restore equipment to service given a failure is valuable to probabilistic risk assessments (PRAs). Examples of such uses in modern PRAs include estimation of the probability of failing to restore a failed component within a specified time period (typically tied to recovering a mitigating system before core damage occurs at nuclear power plants) and the determination of mission times for support system initiating event (SSIE) fault tree models. Information on equipment repair or restoration times applicable to PRA modeling is limited and dated for U.S. commercial nuclear power plants. However, the Mitigating Systems Performance Index (MSPI) program covering all U.S. commercial nuclear power plants provides up-to-date information on restoration times for a limited set of component types. This paper describes the MSPI program data available and analyzes the data to obtain median and mean component restoration times as well as non-restoration cumulative probability curves. The MSPI program provides guidance for monitoring both planned and unplanned outages of trains of selected mitigating systems deemed important to safety. For systems included within the MSPI program, plants monitor both train UA and component unreliability (UR) against baseline values. If the combined system UA and UR increases sufficiently above established baseline results (converted to an estimated change in core damage frequency or CDF), a “white” (or worse) indicator is generated for that system. That in turn results in increased oversight by the US Nuclear Regulatory Commission (NRC) and can impact a plant’s insurance rating. Therefore, there is pressure to return MSPI program components to service as soon as possible after a failure occurs. Three sets of unplanned outages might be used to determine the component repair durations desired in this article: all unplanned outages for the train type that includes the component of interest, only unplanned outages associated with failures of the component of interest, and only unplanned outages associated with PRA failures of the component of interest. The paper will describe how component repair times can be generated from each set and which approach is most applicable. Repair time information will be summarized for MSPI pumps and diesel generators using data over 2003 – 2007. Also, trend information over 2003 – 2012 will be presented to indicate whether the 2003 – 2007 repair time information is still considered applicable. For certain types of pumps, mean repair times are significantly higher than the typically assumed 24 h duration.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2007

Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2007. The report summarizes the calendar year (CY) 2007 environmental protection program at the WVDP. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment.

10 CFR 851, Worker Safety & Health Program↗

Monitoring Potential Transport of Radioactive Contaminants in Shallow Ephemeral Channels: FY2018

Desert Research Institute (DRI) is conducting a field assessment of the potential for contaminated soil to be transported from the Smoky Site Contamination Area (CA) as a result of storm runoff. This activity supports U.S. Department of Energy (DOE) Environmental Management Nevada Program (EM NV) efforts to establish post-closure monitoring plans for the Smoky Site Soils Corrective Action Unit (CAU) 550. The work is intended to confirm the likely mechanism of transport and determine the meteorological conditions that might cause the movement of contaminated soils, as well as determine the particle size fraction that is most closely associated with transported radionuclide-contaminated soils. These data will facilitate the design of the appropriate post-closure monitoring program. In 2011, DRI installed a meteorological monitoring station on the west side of the Smoky Site CA and a hydrologic (runoff) monitoring station within the CA, near the east side. The meteorological station collects air temperature, wind speed, wind direction, relative humidity, precipitation, solar radiation, barometric pressure, soil temperature, and soil water content data. The maximum, minimum, and average or total values (as appropriate) for each of these parameters are recorded for each 10-minute interval. The maximum, minimum, and average water depth in the flume installed at the hydrologic station are also recorded for each 10-minute interval. This report presents the data collected from these stations during fiscal year (FY) 2018. During the FY2018 reporting period, the warmest months were June, July, and August and the coldest were December through March. Solar radiation showed the same seasonal trend. Monthly mean wind speeds were highest in the spring (March through May) and early summer (June). Winds were generally from the west during the summer and from the north throughout the fall and winter. The monthly average relative humidity ranged from the mid-teens to approximately 50 percent. Humidity was lowest in the fall and highest in the winter. Monthly total precipitation ranged from 0 in October, December, and June to approximately 1.38 inches (in) (35.05 millimeters [mm]) in July. Total precipitation for FY2018 was 3.86 in (98.04 mm). During the reporting period, two runoff events were recorded at the flume. One occurred on July 14, 2018, in response to precipitation earlier the same day. This event produced a peak water depth of 11.26 in (28.60 centimeters [cm]) in the flume, which is equivalent to a discharge of 1.86 cubic feet per second (cfs) (0.05 cubic meters per second [cm/s]) and a velocity of 3.97 feet per second (fps) (1.21 meters per second [m/s]) through the flume. Applying the flume hydraulic measurements to the channel geometry at the nearest surveyed cross-section it was determined that the velocity through the channel was 1.29 fps (0.39 m/s), which is sufficient to transport silts and fine sands. The second flow event occurred in response to earlier precipitation on September 4, 2018. This event produced a peak water depth of 0.78 in (1.98 cm) in the flume, which is equivalent to a discharge of 0.03 cfs (0.001 cm/s) and a velocity of 1.17 fps (0.36 m/s) through the flume. Applying the flume hydraulic measurements to the channel geometry at the nearest surveyed cross-section it was determined that the velocity through the channel was 0.03 fps (0.01 m/s). Although neither runoff event produced sufficient flow velocities through the natural channel to cause local erosion and transport of coarser bedload materials, the velocity of the first runoff event was sufficient to transport silts and fine sands, which have been shown to be preferentially associated with radionuclide contaminants. Therefore, a sampling event was planned after the first flow event in conjunction with a periodic maintenance inspection. As no suspended load sampling is available at this location, bedload samples were collected from the vicinity of the flume on August 7, 2018. The collected sediment was separated into three particle size fractions and each fraction was analyzed for americium-241 (Am-241), plutonium-238 (Pu-238), and plutonium-239/240 (Pu-239/240) by alpha spectrometry. The two smaller particle size fractions had higher concentrations of all three radionuclides than the largest particle size fraction. Additionally, Pu-239/240 had the highest concentration and Pu-238 had the lowest concentration in all samples. The same relationship between the concentrations of Pu-238 and Pu-239/240 was seen in samples reported in FY2013 and FY2014. Observation of meteorological and environmental conditions that lead to storm runoff will help identify parameters and threshold conditions that should be incorporated into postclosure monitoring plans for this and similar sites as well as aid in determining appropriate closure strategies for other Soils CAUs.

54 ENVIRONMENTAL SCIENCES↗

Monitoring Potential Transport of Radioactive Contaminants in Shallow Ephemeral Channels: FY2017

The Desert Research Institute (DRI) is conducting a field assessment of the potential for contaminated soil to be transported from the Smoky Site Contamination Area (CA) as a result of storm runoff. This activity supports U.S. Department of Energy (DOE) Environmental Management Nevada Program (EM-NV) efforts to establish post-closure monitoring plans for the Smoky Site Soils Corrective Action Unit (CAU) 550. The work is intended to confirm the likely mechanism of transport and determine the meteorological conditions that might cause the movement of contaminated soils, as well as determine the particle size fraction that is most closely associated with transported radionuclide-contaminated soils. These data will facilitate the design of the appropriate post-closure monitoring program. In 2011, DRI installed a meteorological monitoring station on the west side of the Smoky Site CA and a hydrologic (runoff) monitoring station within the CA, near the east side. Air temperature, wind speed, wind direction, relative humidity, precipitation, solar radiation, barometric pressure, soil temperature, and soil water content are collected at the meteorological station. The maximum, minimum, and average or total values (as appropriate) for each of these parameters are recorded for each 10-minute interval. The maximum, minimum, and average water depth in the flume installed at the hydrology station are also recorded for every 10-minute interval. This report presents data collected from these stations during fiscal year (FY) 2017.

(CA)↗

Mapping National Forest Aboveground Biomass in Mexico By Integrating GEDI and Landsat Times Series Data

Mexico is one of the countries with great potential for the UN's Reducing Emissions from Deforestation and Forest Degradation (REDD+) program, a key nature-based solution for the forest sector. To monitor carbon stock changes, there is a growing demand for unbiased Monitoring Reporting Verification (MRV) systems to facilitate effective forest management and climate change mitigation strategies. Remote sensing-based national aboveground biomass density (AGBD) estimation over Mexico is scarce and often limited to one-time static mapping, leading to spatiotemporal inconsistency in inputs. As an effort under NASA's Carbon Monitoring System (CMS) program, we have developed a remote sensing-based approach to create consistent historical AGBD maps of Mexico using multi-stream remote sensing data, including spaceborne lidar GEDI and long-term Landsat time series, as well as topographic information. We employ the continuous change detection and classification (CCDC) algorithm for temporal modeling of Landsat surface reflectance, followed by the inference of forest AGBD using a random forest machine learning algorithm with the temporal information of land surface dynamics extracted by the CCDC as input. GEDI provides unprecedented forest structure and AGBD sampling datasets for model training and validation practices. In this presentation, we share the progress made in developing a spatially explicit mapping of historical AGBD changes associated with land surface changes and post-disturbance landscapes.

Taejin Park↗

Comparison of RF BPM Receivers for NSLS-II Project

The NSLS-II Light Source being built at Brookhaven National Laboratory requires submicron stability of the electron orbit in the storage ring in order to utilize fully very small emittances and electron beam sizes. This sets high stability requirements for beam position monitors and a program has been initiated for the purpose of characterizing RF beam position monitor (BPM) receivers in use at other light sources. Present state-of-the-art performance will be contrasted with more recently available technologies.

43 PARTICLE ACCELERATORS↗

FY2010 ANNUAL REVIEW E-AREA LOW-LEVEL WASTE FACILITY PERFORMANCE ASSESSMENT AND COMPOSITE ANALYSIS

The E-Area Low-Level Waste Facility (ELLWF) consists of a number of disposal units described in the Performance Assessment (PA)(WSRC, 2008b) and Composite Analysis (CA)(WSRC, 1997; WSRC, 1999): Low-Activity Waste (LAW) Vault, Intermediate Level (IL) Vault, Trenches (Slit Trenches [STs], Engineered Trenches [ETs], and Component-in-Grout [CIG] Trenches), and Naval Reactor Component Disposal Areas (NRCDAs). This annual review evaluates the adequacy of the approved 2008 ELLWF PA along with the Special Analyses (SAs) approved since the PA was issued. The review also verifies that the Fiscal Year (FY) 2010 low-level waste (LLW) disposal operations were conducted within the bounds of the PA/SA baseline, the Savannah River Site (SRS) CA, and the Department of Energy (DOE) Disposal Authorization Statement (DAS). Important factors considered in this review include waste receipts, results from monitoring and research and development (R&D) programs, and the adequacy of controls derived from the PA/SA baseline. Sections 1.0 and 2.0 of this review are a summary of the adequacy of the PA/SA and CA, respectively. An evaluation of the FY2010 waste receipts and the resultant impact on the ELLWF is summarized in Section 3.1. The results of the monitoring program, R&D program, and other relevant factors are found in Section 3.2, 3.3 and 3.4, respectively. Section 4.0 contains the CA annual determination similarly organized. SRS low-level waste management is regulated under DOE Order 435.1 (DOE, 1999a) and is authorized under a DAS as a federal permit. The original DAS was issued by the DOE-Headquarters (DOE-HQ) on September 28, 1999 (DOE, 1999b) for the operation of the ELLWF and the Saltstone Disposal Facility (SDF). The 1999 DAS remains in effect for the regulation of the SDF. Those portions of that DAS applicable to the ELLWF were superseded by revision 1 of the DAS on July 15, 2008 (DOE, 2008b). The 2008 PA and DAS were officially implemented by the facility on October 31, 2008 and are the authorization documents for this FY2010 Annual Review. Department of Energy Headquarters approval of the 2008 DAS was subject to numerous conditions specified in the document. Two of those conditions are to update the ELLWF closure plan and monitoring plan to align with the conceptual model analyzed in the PA. Both of these conditions were met with the issuance of the PA Monitoring Plan (Millings, 2009a) and the Closure Plan (Phifer et al, 2009a). The PA Monitoring Plan was approved by DOE on July 22, 2009 and the Closure Plan was approved by DOE on May 21, 2009. Both will be updated as needed to remain consistent with the PA. The DAS also specifies that the maintenance plan include activities to resolve each of the secondary issues identified in the DOEHQ review of the 2008 PA that were not completely addressed either with supplemental material provided to the review team or in final revisions to the PA. These outstanding issues were originally documented in the 2008 update of the PA/CA Maintenance Plan (WSRC, 2008a) and in subsequent PA/CA Maintenance Plans (most recently SRNS, 2010a) as required and are actively being worked.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Individual Radiation Protection Monitoring in the Marshall Islands. Utrōk Atoll (2010-2012)

As a hard copy supplement to the Marshall Islands Program website (https://marshallislands.llnl.gov), this document provides an overview of the individual radiological surveillance monitoring program established in support of residents of Utrōk Atoll and nonresident citizens of the Utrōk Atoll population group, along with full disclosure of verified measurement data (2010-2012). The Utrōk Atoll Whole Body Counting Facility has been temporarily stationed on Majuro Atoll and, in cooperation with the Utrōk Atoll Local Government, serves as a national radiological facility open to the general public.

61 RADIATION PROTECTION AND DOSIMETRY↗

Mechanical systems readiness assessment and performance monitoring study

The problem of mechanical devices which lack the real-time readiness assessment and performance monitoring capability required for future space missions is studied. The results of a test program to establish the feasibility of implementing structure borne acoustics, a nondestructive test technique, are described. The program included the monitoring of operational acoustic signatures of five separate mechanical components, each possessing distinct sound characteristics. Acoustic signatures were established for normal operation of each component. Critical failure modes were then inserted into the test components, and faulted acoustic signatures obtained. Predominant features of the sound signature were related back to operational events occurring within the components both for normal and failure mode operations. All of these steps can be automated. The structure borne acoustics technique lends itself to reducing checkout time, simplifying maintenance procedures, and reducing manual involvement in the checkout, operation, maintenance, and fault diagnosis of mechanical systems.

Source record↗

Design Support of an Above Cap-rock Early Detection Monitoring System using Simulated Leakage Scenarios at the FutureGen2.0 Site

The FutureGen 2.0 Project will design and build a first-of-its-kind, near-zero emissions coal-fueled power plant with carbon capture and storage (CCS). To assess storage site performance and meet the regulatory requirements of the Class VI Underground Injection Control (UIC) Program for CO 2 Geologic Sequestration, the FutureGen 2.0 project will implement a suite of monitoring technologies designed to evaluate CO 2 mass balance and detect any unforeseen loss in CO 2 containment. The monitoring program will include direct monitoring of the reservoir, and early-leak-detection monitoring directly above the primary confining zone. This preliminary modeling study described here focuses on hypothetical leakage scenarios into the first permeable unit above the primary confining zone (Ironton Sandstone) and is used to support assessment of early-leak detection capabilities. Future updates of the model will be used to assess potential impacts on the lowermost underground source of drinking water (Saint Peter Sandstone) for a range of theoretical leakage scenarios. This preliminary modeling evaluation considers both pressure response and geochemical signals in the overlying Ironton Sandstone. This model is independent of the FutureGen 2.0 reservoir model in that it does not simulate caprock discontinuities, faults, or failure scenarios. Instead this modeling effort is based on theoretical, volumetric-rate based leakage scenarios. The scenarios include leakage of 1% of the total injected CO 2 mass, but spread out over different time periods (20, 100, and 500 years) with each case yielding a different mass flux (i.e., smaller mass fluxes for longer duration leakage cases]. A brine leakage scenario using a volumetric leakage similar to the 20 year 1% CO 2 case was also considered. A framework for the comparison of the various cases was developed based on the exceedance of selected pressure and geochemical thresholds at different distances from the point of leakage and at different vertical positions within the Ironton Sandstone. These preliminary results, and results from an updated models that incorporate additional site-specific characterization data, support development/refinement of the monitoring system design.

54 ENVIRONMENTAL SCIENCES↗

TRIPLICATE SODIUM IODIDE GAMMA RAY MONITORS FOR THE SMALL COLUMN ION EXCHANGE PROGRAM

This technical report contains recommendations from the Analytical Development (AD) organization of the Savannah River National Laboratory (SRNL) for a system of triplicate Sodium Iodide (NaI) detectors to be used to monitor Cesium-137 ({sup 137}Cs) content of the Decontaminated Salt Solution (DSS) output of the Small Column Ion Exchange (SCIX) process. These detectors need to be gain stabilized with respect to temperature shifts since they will be installed on top of Tank 41 at the Savannah River Site (SRS). This will be accomplished using NaI crystals doped with the alpha-emitting isotope, Americium-241({sup 241}Am). Two energy regions of the detector output will be monitored using single-channel analyzers (SCAs), the {sup 137}Cs full-energy {gamma}-ray peak and the {sup 241}Am alpha peak. The count rate in the gamma peak region will be proportional to the {sup 137}Cs content in the DSS output. The constant rate of alpha decay in the NaI crystal will be monitored and used as feedback to adjust the high voltage supply to the detector in response to temperature variation. An analysis of theoretical {sup 137}Cs breakthrough curves was used to estimate the gamma activity expected in the DSS output during a single iteration of the process. Count rates arising from the DSS and background sources were predicted using Microshield modeling software. The current plan for shielding the detectors within an enclosure with four-inch thick steel walls should allow the detectors to operate with the sensitivity required to perform these measurements. Calibration, testing, and maintenance requirements for the detector system are outlined as well. The purpose of SCIX is to remove and concentrate high-level radioisotopes from SRS salt waste resulting in two waste streams. The concentrated high-level waste containing {sup 137}Cs will be sent to the Defense Waste Processing Facility (DWPF) for vitrification and the low-level DSS will be sent to the Saltstone Production Facility (SPF) to be incorporated into grout.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Microbial Monitoring of the International Space Station

Humans living and working in the harsh environment of space present many challenges for habitability engineers and microbiologists. Spacecraft must provide an internal environment in which physical (gas composition, pressure, temperature, and humidity), chemical, and biological environmental parameters are maintained at safe levels. Microorganisms are ubiquitous and will accompany all human-occupied spacecraft, but if biological contamination were to reach unacceptable levels, long-term human space flight would be impossible. Prevention of microbiological problems, therefore, must have a high priority. Historically, prevention of infectious disease in the crew has been the highest priority, but experience gained from the NASA-Mir program showed that microbial contamination of vehicle and life-support systems, such as biofouling of water and food, are of equal importance. The major sources of microbiological risk factors for astronauts include food, drinking water, air, surfaces, payloads, research animals, crew members, and personnel in close contact with the astronauts. In our efforts to eliminate or mitigate the negative effects of microorganisms in spacecraft, the National Aeronautics and Space Administration (NASA) implemented comprehensive microbial analyses of the major risk factors. This included the establishment of acceptability requirements for food, water, air, surfaces, and crew members. A robust monitoring program was then implemented to verify that the risks were within acceptable limits. Prevention of microbiological problems is preferred over mitigation of problems during flight, and preventive steps must begin very early in the design phase. Spacecraft development must include requirements to control free water from humidity, condensate, hygiene activities, and other releases. If water is available, microbes are likely to grow because sufficient nutrients are potentially available. Materials selected for the spacecraft must not promote or support microbial growth. Air filtration can dramatically reduce the number of airborne bacteria, fungi, and particulates in spacecraft breathing air. Waterborne bacteria can be reduced to acceptable levels by thermal inactivation of bacteria during water processing, along with a residual biocide, and filtration at the point of use can ensure safety. System design must include onboard capability to achieve recovery of the system from contamination. Robust housekeeping procedures that include periodic cleaning and disinfection will prevent high levels of microbial growth on surfaces. Food for consumption in space must be thoroughly tested for excessive microbial content and pathogens before launch. Thorough preflight examination of flight crews, consumables, payloads, and the environment can greatly reduce pathogens in spacecraft. Many of the lessons learned from the Space Shuttle and previous programs were applied in the early design phase of the International Space Station, resulting in the safest space habitat to date. This presentation describes the monitoring program for the International Space Station and will summarize results from preflight and on-orbit monitoring.

Pierson, Duane L.↗