Search NASA⌕ Search

SEARCH · Search NASA

Results for “MONITOR PROGRAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,135 records · Page 63

Sci-Fri AM: Quality, Safety, and Professional Issues 05: QC Program Management and the Benefits of QATrack+

Purpose: Treatment unit uptime statistics are typically used to monitor radiation equipment performance. The Ottawa Hospital Cancer Centre has introduced the use of Quality Control (QC) test success as a quality indicator for equipment performance and overall health of the equipment QC program. Methods: Implemented in 2012, QATrack+ is used to record and monitor over 1100 routine machine QC tests each month for 20 treatment and imaging units ( http://qatrackplus.com/ ). Using an SQL (structured query language) script, automated queries of the QATrack+ database are used to generate program metrics such as the number of QC tests executed and the percentage of tests passing, at tolerance or at action. These metrics are compared against machine uptime statistics already reported within the program. Results: Program metrics for 2015 show good correlation between pass rate of QC tests and uptime for a given machine. For the nine conventional linacs, the QC test success rate was consistently greater than 97%. The corresponding uptimes for these units are better than 98%. Machines that consistently show higher failure or tolerance rates in the QC tests have lower uptimes. This points to either poor machine performance requiring corrective action or to problems with the QC program. Conclusions: QATrack+ significantly improves the organization of QC data but can also aid in overall equipment management. Complimenting machine uptime statistics with QC test metrics provides a more complete picture of overall machine performance and can be used to identify areas of improvement in the machine service and QC programs.

60 APPLIED LIFE SCIENCES↗

Southwestern Regional Partnership For Carbon Sequestration (Phase 2) Pump Canyon CO2- ECBM/Sequestration Demonstration, San Juan Basin, New Mexico

Within the Southwest Regional Partnership on Carbon Sequestration (SWP), three demonstrations of geologic CO{sub 2} sequestration are being performed -- one in an oilfield (the SACROC Unit in the Permian basin of west Texas), one in a deep, unmineable coalbed (the Pump Canyon site in the San Juan basin of northern New Mexico), and one in a deep, saline reservoir (underlying the Aneth oilfield in the Paradox basin of southeast Utah). The Pump Canyon CO{sub 2}-enhanced coalbed methane (CO{sub 2}/ECBM) sequestration demonstration project plans to demonstrate the effectiveness of CO{sub 2} sequestration in deep, unmineable coal seams via a small-scale geologic sequestration project. The site is located in San Juan County, northern New Mexico, just within the limits of the high-permeability fairway of prolific coalbed methane production. The study area for the SWP project consists of 31 coalbed methane production wells located in a nine section area. CO{sub 2} was injected continuously for a year and different monitoring, verification and accounting (MVA) techniques were implemented to track the CO{sub 2} movement inside and outside the reservoir. Some of the MVA methods include continuous measurement of injection volumes, pressures and temperatures within the injection well, coalbed methane production rates, pressures and gas compositions collected at the offset production wells, and tracers in the injected CO{sub 2}. In addition, time-lapse vertical seismic profiling (VSP), surface tiltmeter arrays, a series of shallow monitoring wells with a regular fluid sampling program, surface measurements of soil composition, CO{sub 2} fluxes, and tracers were used to help in tracking the injected CO{sub 2}. Finally, a detailed reservoir model was constructed to help reproduce and understand the behavior of the reservoir under production and injection operation. This report summarizes the different phases of the project, from permitting through site closure, and gives the results of the different MVA techniques.

01 COAL, LIGNITE, AND PEAT↗

Annual Report of Monitoring at Morrill, Kansas, in 2013

Carbon tetrachloride contamination in groundwater at Morrill, Kansas, was initially identified in 1985 during statewide testing of public water supply wells for volatile organic compounds (VOCs). High levels of nitrate were also present in the public water supply wells. The city of Morrill is located in Brown County in the northeastern corner of the state, about 7 mi east of Sabetha (Figure 1.1). The population of Morrill as of the 2010 Census was approximately 230 (down from 277 in 2000). All residents of Morrill now obtain their drinking water from the Sabetha municipal water system via a pipeline constructed in 1991. Because the identified carbon tetrachloride contamination in groundwater could potentially be linked, in part, to historical use of carbon tetrachloride-based fumigants at its former facility, in 2003 the CCC/USDA assumed responsibility for investigation of the carbon tetrachloride contamination. The CCC/USDA involvement began with development and implementation of a work plan for a Phase I expedited site characterization. That investigation and subsequent investigations were performed by the Environmental Science Division of Argonne National Laboratory. The initial investigation by the CCC/USDA in 2003 determined that soils at the former facility were not impacted by grain fumigation activities. Neither carbon tetrachloride nor chloroform (the primary degradation product of carbon tetrachloride) was detected in nearsurface soils or in subsurface soils collected to bedrock. Because no identifiable human health risk was associated with either carbon tetrachloride or chloroform in shallow soils, the conclusion was that no further threat of contamination to groundwater was present. In September 2005, the CCC/USDA initiated periodic sampling of groundwater, in accord with a program approved by the KDHE (2005), to monitor carbon tetrachloride concentrations in the groundwater. The report presents the data generated during the 2013 monitoring period.

54 ENVIRONMENTAL SCIENCES↗

Advancing Replicable Solutions for High-Performance Homes in the Southeast - JMC - Patrick Square

The work presented in this report advances the goals of the U.S. Department of Energy Building America program by improving the energy peformance of affordable and market-rate housing. Southface Energy Institute (Southface), part of the U.S. Department of Energy Building America research team Partnership for Home Innovation, worked with owners and builders with various market constraints and ultimate goals for three projects in three climate zones (CZs): Savannah Gardens in Savannah, Georgia (CZ 2); JMC Patrick Square in Clemson, South Carolina (CZ 3); and LaFayette in LaFayette, Georgia (CZ 4). This report documents the design process, computational energy modeling, construction, envelope performance metrics, long-term monitoring results, and successes and failures of the design and execution of these highperformance homes. The JMC Patrick Square project is a single floor with 1,828 ft2 of conditioned living space, three bedrooms, two bathrooms, and an attached two-car garage. This small-scale production builder wanted to increase its level of energy efficiency beyond its current green building practices, including bringing ducts into conditioned space. The team met this goal through a combination of upgrade measures and achieved many Zero Energy Ready Home program requirements. Monitoring the four ducted HPWHs in LaFayette and one in Savannah revealed that HPWH exhaust air impacts attic air during HPWH runtime only, and attic conditions return to previous levels shortly after the HPWH turns off. The HPWH did not appear to impact the loads on the heating and cooling systems, which were also placed in the attic. HPWHs should not be considered dehumidifiers if one is needed in an attic or basement/crawlspace. Ducting the HPWHs did not negatively impact performance compared to other published data of field performance. Changing duct configurations also did not alter the coefficient of performance. HPWHs in efficiency mode (heat pump only) could satisfy hot water demand for most residents. This mode maximizes energy efficiency. Adding .5 in. of insulated sheathing using the Huber ZIP System R Sheathing reduced peak summer temperatures and increased minimum winter temperatures inside the wall assemblies compared to the neighboring home. The neighboring home experienced significantly more risk of condensation and failed the American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc., Standard 160-2009: Criteria for Moisture-Control Design Analysis in Buildings. Despite the fact that energy modeling predicted only a 2% annual savings from the insulated sheathing, preliminary data indicate that reduced heating, ventilating, and air-conditioning runtimes and energy consumption attributed to this measure provide significantly greater savings. Additional research is necessary.

Array↗

Frisker Response to Soil Concentrations (Bq/g) Compared to NaI(Tl) - 19338

The Chalk River Laboratories (CRL) began nuclear operations in 1947. Portions of the site land areas have become radiologically contaminated through the 1952 National Reactor Experimental (NRX) accident and/or waste management activities over the past 70 years of site operations. The Environmental Remediation Projects Group (ERP) characterizes, and performs risk assessment, and remedial actions, as required over these contaminated land areas. ERP work activities are subject to controls established by CRL's Radiation Protection (RP) Group such that RP establishes the radiological controls and monitoring requirements for ERP field work activities. The different methods of monitoring soil contamination between ERP and the RP program present some challenges in the interpretation and comparison of the two sets of results and the soil disposition. ERP utilizes NaI(Tl) scintillation detectors and MARSSIM land scanning techniques to measure soil concentrations between sample locations and in excavated materials. Whereas, RP utilizes surface contamination monitoring equipment in the form of a 15.5 cm{sup 2} open area pancake Geiger-Mueller (GM) tube detector to measure soil contamination levels reported in counts per minute (cpm). This paper presents a method to evaluate the theoretical best responses that could be obtained from surface contamination monitoring instrumentation for a known concentration (1 Bq/g) of various radionuclides. A static efficiency of cpm/Bq{sup -1} g{sup -1} is obtained from these calculations. These contamination monitoring sensitivities are then used in a MARSSIM scanning sensitivity equation and compared to the scanning sensitivity of an NaI(Tl) scintillation detector. The results demonstrate that the sensitivity of the frisker probes to particle radiations (betas for pancake) tend to fall in a range of only a few cpm/Bq{sup -1} g{sup -1}. Rather, the primary static response of the pancake probe to soil contamination is from gamma radiation where a value of 36 cpm/Bq{sup -1} g{sup -1} for Cs-137 was obtained at 2.54 cm distance without the application of scanning statistics. In comparison, a 7.6 cm x 7.6 cm NaI(Tl) detector has a Cs-137 static response factor of 10,000 cpm/Bq{sup -1} g{sup -1} at 15 cm distance without applying scanning statistics. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Status of HLW disposal in the USA and rational, progressive, paths forward based upon lessons learned in the USA and abroad since 1973 - 15103

The development of the USA's only candidate (since 1987) HLW-repository at the Yucca Mountain (YM) site, Nevada, was halted by the Obama administration in 2009. Four years later, the Obama administration proposed a new strategy for the back end of the nuclear fuel cycle that would open a consent-based HLW repository 'by 2048'. At the end of 2014, both the YM HLW repository and the new HLW-disposition (storage and disposal) strategy remain on hold due to lack of enabling legislation. With this as background, and based upon our active involvement in, monitoring of, and reporting on HLW management programs in the USA and abroad since 1973, we submit that: 1. Politics, political will, and legal actions and outcomes will continue to govern progress. 2. Public acceptance and sustained support (PASS) may influence politics and political will. 3. PASS is time-dependent and governed by: a. Ideologies; b. Perceived benefits and risks; c. Level and equity of radiation protection provided by applicable regulations; d. Perceived robustness/safety of the proposed disposition concept; and e. Perceived credibility and competency vested in the involved organizations and their respective leaders (= TRUST). We therefore recommend that the USA concurrently pursues at least two, 'centralized' HLW-storage and -disposal solutions based upon best-available relevant knowledge and majority-PASS at facility-host locations. Furthermore, safe(r) and more secure disposal of defense/government-generated HLW could probably commence at least 15 years earlier than 'by 2048' in/at: 1. The YM repository/site. 2. The WIPP repository/site. 3. 'Local' deep boreholes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Factors Affecting Bait Site Visitation: Area of Influence of Baits

Baiting is a fundamental strategy for the global management of wild pigs (Sus scrofa); however, little information exists on how anthropogenic bait affects wild pig movements on a landscape. We investigated factors that are important in determining the spatial area of attraction for wild pigs to bait (‘area of influence’ of a bait site) using data from Global Positioning System (GPS) collars and locations of bait sites. We monitored movements of wild pigs in 2 distinct study areas in the United States from February to September 2016 and used locational data using GPS collars to analyze the influence of habitat quality (dependent on site), home range size, number of bait sites in the home range, distance to a bait site, and sex in relation to movement in time and space. We determined the average area of influence by calculating the area of a circle with the radius as the average maximum distance travelled by wild pigs to reach a bait site. The average area of influence for our bait sites was 6.7 km 2 (or a radius of approximately 1.5 km), suggesting a bait spacing of approximately 1.5 km would be adequate to capture visitation by most wild pigs and a spacing of 3 km could allow substantial visitation while minimizing redundant effort depending on the spatial structure of the populations. Eighty percent of wild pigs first visited bait sites within 8.9 days after bait deployment; and they visited earlier when their home range size was larger. As the number of bait sites in an individual's home range increased, individual pigs visited more bait sites, and the probability of a visit increased dramatically up to approximately 5 bait sites and much less thereafter. Wild pigs travelled farther distances to visit bait sites in lower quality habitat. Our results support the hypothesis that habitat quality can mediate the efficacy of baiting programs for wildlife by influencing their movement patterns and motivation to use anthropogenic resources. Our results suggest wild pigs will travel extensively within their home range to visit bait sites, and that in lower quality habitat, most animals will find bait sites more quickly. Determining the area of influence of bait sites can increase the efficacy of planning and monitoring management programs. Overall, our study provides new information to help managers plan baiting designs to attract the greatest number of pigs.

59 BASIC BIOLOGICAL SCIENCES↗

Progress in Addressing Workers' Concerns Related to Chemical Vapors at the Hanford Site - 19054

Washington River Protections Solutions, LLC (WRPS) is the prime contractor for the Department of Energy (DOE) Tank Farm Operations at the Hanford Site, and is responsible for the management and retrieval of millions of gallons of radioactive and chemical wastes, stored in 177 underground tanks; a legacy of decades of production activities at the Site. The potential for workforce exposure to the chemical vapors from the tanks has long been a concern for the workforce and for DOE and its tank contractors; concerns about tank vapors is an issue that pre-dates WRPS's incumbency as the Tank Operations Contractor. In response to an increase in the number of tank vapor events reported by workers at the Hanford Site in 2014, WRPS commissioned the Savannah River National Laboratory with establishing and overseeing a panel of external, independent experts (Tank Vapor Assessment Team (TVAT)) to examine chemical vapor management and related worker-protection measures at the Hanford Tank Farms. The TVAT released the Hanford Tank Vapor Assessment Report (SRNL-RP-2014-00791) in late 2014, which included several recommendations to reduce the potential for chemical vapor exposures. From 2015- 2018, governmental and external groups conducted additional assessments to review the progress made in implementing the TVAT recommendations, and the overall Industrial Hygiene (IH) program. All of these assessments specifically recommended WRPS take action to improve communications with the workforce around the subject of tank vapors. Some further recommended assessing the effectiveness of vapors-related communications. In fiscal year 2016, WRPS and DOE Office of River Protection (DOE-ORP) formed an Integrated Project Team (IPT) to: (1) develop the strategy for addressing chemical vapors and (2) define the future chemical vapor protection actions at the Tank Farms. The actions are designed to address the recommendations from the external assessments as part of the overall effort to mitigate vapors-related exposure incidences, and to ensure workers are safe and feel safe while working in and around the Hanford Tank Farms. A comprehensive vapor management communication plan, engagement processes, and effectiveness measurements were established as essential components of the IPT effort. The Chemical Protection Program Office (CPPO) was formed, in part, to deliver on these IPT initiatives, monitor performance, and drive improvements to WRPS's vapors-related communications and engagement efforts at the Hanford Tank Farms. The CPPO was created as a temporary program office tailored to address these unique challenges by augmenting traditional company performance monitoring and communications (i.e. all employee e-mails, posters, and formal briefings). Modeled in broad concept after the successful program office WRPS created to support the American Recovery and Reinvestment Act, CPPO has also proven successful in its mission. Because concerns about chemical vapors in the workplace were expressed by the workforce, they are a key stakeholder. As such, the CPPO has concentrated its information sharing efforts toward the WRPS workforce. With a focus on empathetic engagement, continuous improvement, and transparent information sharing, the CPPO has developed and implemented a strategy for improving worker trust in vapors-related communications and increasing the workforce knowledge of responses taken to address chemical vapors. Effective implementation of this strategy is demonstrated by the results of workforce surveys, which indicate measured and important improvement in the effectiveness of vapors-communications and the knowledge level workers report about vapor issues compared to the previous year. This paper discusses the utilization of a temporary program office and the unique approach that the CPPO implemented to achieve success, including: strategic application of the technical and communications staff skill mix of the organization (including talent development opportunities such as stretch assignments for WRPS's Strategic Talent Development program members and support from WRPS college interns), teaming with other WRPS' organizations such as IH, Engineering and Communications and Public Relations (C and PR), the development of new types of information sharing to support the effort, and the methods by which the effectiveness of the communications efforts are measured to drive continuous improvement. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Starting up an Enterprise-Wide Project Management Office

An enterprise-wide Project Management Office (PMO) can be successfully launched and institutionalized using effective organization strategies, methods, and techniques. This paper provides a step-by-step process for starting up an enterprise-wide PMO using proven techniques to ensure that the new organization receives executive management support and aligns with the larger enterprise’s business strategies and objectives. This paper discusses different types of PMOs that are appropriate, depending upon an organization’s structure and business objectives. This paper further provides the reader with an understanding of how to deal with start-up and implementation challenges that are common in multi-business unit organizations; how to launch PMO programs and services and gain stakeholder acceptance; how to monitor, measure, and report PMO implementation progress and effectivenss; and how to apply accepted management assurance and oversight methodologies to verify and validate the effectiveness of developed processes and programs and continuously improve both the processes and implementation.

Andrews, Thomas D.↗

NGSI: IAEA Verification of UF6 Cylinders

The International Atomic Energy Agency (IAEA) is often ignorant of the location of declared, uranium hexafluoride (UF6) cylinders following verification, because cylinders are not typically tracked onsite or off. This paper will assess various methods the IAEA uses to verify cylinder gross defects, and how the task could be ameliorated through the use of improved identification and monitoring. The assessment will be restricted to current verification methods together with one that has been applied on a trial basis—short-notice random inspections coupled with mailbox declarations. This paper is part of the NNSA Office of Nonproliferation and International Security’s Next Generation Safeguards Initiative (NGSI) program to investigate the concept of a global monitoring scheme that uniquely identifies and tracks UF6 cylinders.

cylinder monitoring tracking IAEA↗

INL Site ARG-US Implementation – FY22 Activities and FY23 Plans

The Packaging Certification and Life Cycle Management program at Argonne National Laboratory (ANL) developed a suite of monitoring systems collectively referred to here as ARG-US. ARG-US provides necessary data for nuclear facility and system operation and maintenance, and has been previously demonstrated in hot cells, radioactive material (RAM) storage areas, and RAM shipment trucks. It has also been installed directly on RAM storage and shipment containers. ARG-US offers some unique advantages over other commercially available systems by using wireless data connections, battery power supplies, and customizable monitoring methods. Idaho National Laboratory (INL) has been tasked with investigating applications for ARG-US at INL site facilities, which are operated by several different contractors. The initial investigation scope centered on CPP-603 Irradiated Fuel Storage Facility in relation to the upcoming Department of Energy (DOE) Spent Nuclear Fuel (SNF) Packaging Demonstration. The investigation has been led by the Used Fuel Management Department in INL’s Nuclear Science and Technology (NS&T) directorate. This investigation is expected to recommend INL site processes or facilities in which to implement ARG-US systems. INL has engaged local site technical and oversight representatives, security, nuclear safeguards, and program management personnel to identify good candidates for ARG-US test implementations. INL has identified the following high-level goals for any INL site implementation of ARG-US: provide unique testing environments, prompt development of new monitoring methods/techniques for the ARG-US suite, and acquire useful monitoring for the user facility. As a result, INL suggests three program areas for further investigation: CPP-603 Fuel Handling Cave (FHC), legacy mixed waste storage systems at Idaho Nuclear Technology & Engineering Center (INTEC) known as the “Tank Farm,” and periodic and emergency environmental monitoring. This progress report relates activities undertaken in this investigation, describes the preliminary areas of interest for limited scope ARG-US testing or implementation, and relays expected actions for completing the task scope. This report offers an opportunity to the program sponsor, technical leads at ANL, and INL site representatives to give feedback on the initial assessment and make recommendations on the forthcoming activities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transient Efficiency, Flexibility, and Reliability Optimization of Coal-Fired Power Plants - Final Report

This program developed an advanced model-based monitoring and model-predictive control algorithms for a coal fired power plant (CFPP), and deployed these algorithms in a real-time platform to demonstrate performance benefits for transient flexibility and plant operation efficiency. More specifically, the objectives were successfully achieved through a combination of (i) developing a high-fidelity transient plant model in Apros, which was used as a high-fidelity plant simulation between $100-50\% TMCR$ where TMCR denotes the turbine maximum continuous rating, i.e., baseload, (ii) developing a very fast physics-based reduced-order model (ROM) of the plant, which ran more than $100\times$ faster than real-time, enabling its use as real-time embedded model for model-based estimation (MBE) and model predictive control (MPC) (iii) implementing a real-time MBE based on ROM using a robust unscented Kalman filter (UKF) to continuously tune the ROM to match the measurements from high-fidelity Apros plant model despite significant plant-model mismatch, and thus, obtain a Digital Twin of the plant (iv) designing and implementing a real-time MPC with dual objectives of transient plant load tracking with high ramp rates and minimizing coal consumption, i.e., improving plant efficiency in the baseload-partload operation range of $100-50\% TMCR$. Each key element above was developed and tested individually, and has been reported in corresponding Topical Reports. Finally, all the individual elements were integrated in an overall closed-loop system, that was successfully tested in desktop Simulink test harness simulations with ROM or high-fidelity model as the plant. Thereafter, the Simulink implementation was used to auto-generate C-code and deploy as real-time Docker microservice containers in Linux, and validate that they can run in real-time in the hardware-in-the loop (HIL) setup and produce the same results as in Simulink. The results of the integrated simulation tests in Simulink as well as the real-time HIL deployment are documented in this final report, showing good load tracking for load ramps at $3-4\%/min$ ramp rates, and achieving up to $5.5\%$ reduction in coal relative to baseline operation at $50\% TMCR$ load. The desktop and HIL simulations show successful performance of the overall model based estimation and control solution and achieve the key objectives of the program for flexible, efficient and reliable operation of subcritical coal fired power plants.

20 FOSSIL-FUELED POWER PLANTS↗

Transient Efficiency, Flexibility, and Reliability Optimization of Coal-Fired Power Plants - Final Program Review

This program developed an advanced model-based monitoring and model-predictive control algorithms for a coal fired power plant (CFPP), and deployed these algorithms in a real-time platform to demonstrate performance benefits for transient flexibility and plant operation efficiency. More specifically, the objectives were successfully achieved through a combination of (i) developing a high-fidelity transient plant model in Apros, which was used as a high-fidelity plant simulation between $100-50\% TMCR$ where TMCR denotes the turbine maximum continuous rating, i.e., baseload, (ii) developing a very fast physics-based reduced-order model (ROM) of the plant, which ran more than $100\times$ faster than real-time, enabling its use as real-time embedded model for model-based estimation (MBE) and model predictive control (MPC) (iii) implementing a real-time MBE based on ROM using a robust unscented Kalman filter (UKF) to continuously tune the ROM to match the measurements from high-fidelity Apros plant model despite significant plant-model mismatch, and thus, obtain a Digital Twin of the plant (iv) designing and implementing a real-time MPC with dual objectives of transient plant load tracking with high ramp rates and minimizing coal consumption, i.e., improving plant efficiency in the baseload-partload operation range of $100-50\% TMCR$. Each key element above was developed and tested individually, and has been reported in corresponding Topical Reports. Finally, all the individual elements were integrated in an overall closed-loop system, that was successfully tested in desktop Simulink test harness simulations with ROM or high-fidelity model as the plant. Thereafter, the Simulink implementation was used to auto-generate C-code and deploy as real-time Docker microservice containers in Linux, and validate that they can run in real-time in the hardware-in-the loop (HIL) setup and produce the same results as in Simulink. The results of the integrated simulation tests in Simulink as well as the real-time HIL deployment are documented in this final report, showing good load tracking for load ramps at $3-4\%/min$ ramp rates, and achieving up to $5.5\%$ reduction in coal relative to baseline operation at $50\% TMCR$ load. The desktop and HIL simulations show successful performance of the overall model based estimation and control solution and achieve the key objectives of the program for flexible, efficient and reliable operation of sub-critical coal fired power plants.

20 FOSSIL-FUELED POWER PLANTS↗

Site Environmental Report for 2010 Sandia National Laboratories, California.

Sandia National Laboratories, California (SNL/CA) is a government-owned/contractor-operated laboratory. Sandia Corporation, a Lockheed Martin Company, manages and operates the laboratory for the Department of Energy's National Nuclear Security Administration (NNSA). The NNSA Sandia Site Office administers the contract and oversees contractor operations at the site. This Site Environmental Report for 2010 was prepared in accordance with DOE Order 231.1A (DOE 2004a). The report provides a summary of environmental monitoring information and compliance activities that occurred at SNL/CA during calendar year 2010. General site and environmental program information is also included. The Site Environmental Report is divided into ten chapters. Chapter 1, the Executive Summary, highlights compliance and monitoring results obtained in 2010. Chapter 2 provides a brief introduction to SNL/CA and the existing environment found on site. Chapter 3 summarizes SNL/CA's compliance activities with the major environmental requirements applicable to site operations. Chapter 4 presents information on environmental management, performance measures, and environmental programs. Chapter 5 presents the results of monitoring and surveillance activities in 2010. Chapter 6 discusses quality assurance. Chapters 7 through 9 provide supporting information for the report and Chapter 10 is the report distribution list.

54 ENVIRONMENTAL SCIENCES↗

Site environmental report for 2009 : Sandia National Laboratories, California.

Sandia National Laboratories, California (SNL/CA) is a government-owned/contractor-operated laboratory. Sandia Corporation, a Lockheed Martin Company, operates the laboratory for the Department of Energy's National Nuclear Security Administration (NNSA). The NNSA Sandia Site Office oversees operations at the site, using Sandia Corporation as a management and operating contractor. This Site Environmental Report for 2009 was prepared in accordance with DOE Order 231.1A (DOE 2004a). The report provides a summary of environmental monitoring information and compliance activities that occurred at SNL/CA during calendar year 2009. General site and environmental program information is also included. The Site Environmental Report is divided into ten chapters. Chapter 1, the Executive Summary, highlights compliance and monitoring results obtained in 2009. Chapter 2 provides a brief introduction to SNL/CA and the existing environment found on site. Chapter 3 summarizes SNL/CA's compliance activities with the major environmental requirements applicable to site operations. Chapter 4 presents information on environmental management, performance measures, and environmental programs. Chapter 5 presents the results of monitoring and surveillance activities in 2009. Chapter 6 discusses quality assurance. Chapters 7 through 9 provide supporting information for the report and Chapter 10 is the report distribution list.

54 ENVIRONMENTAL SCIENCES↗

Long-Term Monitoring & Stewardship at Los Alamos National Laboratory [Slides]

Development and implementation of the Institutional Control Evaluation Project will include: Evaluate institutional surface water controls and infrastructure installed by LANL. Implement pilot project in the Los Alamos Canyon Watershed Spring, 2020. Initial evaluations will include canyon bottom controls with plan to expand program as funding allows. This will be a building block for successful Long-Term Monitoring and Stewardship (LTM&S) Program.

54 ENVIRONMENTAL SCIENCES↗

Integrated Reflection Seismic Monitoring and Reservoir Modeling for Geologic CO 2 Sequestration

The US DOE/NETL CCS MVA program funded a project with Fusion Petroleum Technologies Inc. (now SIGMA) to model the proof of concept of using sparse seismic data in the monitoring of CO 2 injected into saline aquifers. The goal of the project was to develop and demonstrate an active source reflection seismic imaging strategy based on deployment of spatially sparse surface seismic arrays. The primary objective was to test the feasibility of sparse seismic array systems to monitor the CO 2 plume migration injected into deep saline aquifers. The USDOE/RMOTC Teapot Dome (Wyoming) 3D seismic and reservoir data targeting the Crow Mountain formation was used as a realistic proxy to evaluate the feasibility of the proposed methodology. Though the RMOTC field has been well studied, the Crow Mountain as a saline aquifer has not been studied previously as a CO 2 sequestration (storage) candidate reservoir. A full reprocessing of the seismic data from field tapes that included prestack time migration (PSTM) followed by prestack depth migration (PSDM) was performed. A baseline reservoir model was generated from the new imaging results that characterized the faults and horizon surfaces of the Crow Mountain reservoir. The 3D interpretation was integrated with the petrophysical data from available wells and incorporated into a geocellular model. The reservoir structure used in the geocellular model was developed using advanced inversion technologies including Fusion's ThinMAN™ broadband spectral inversion. Seal failure risk was assessed using Fusion's proprietary GEOPRESS™ pore pressure and fracture pressure prediction technology. CO 2 injection was simulated into the Crow Mountain with a commercial reservoir simulator. Approximately 1.2MM tons of CO 2 was simulated to be injected into the Crow Mountain reservoir over 30 years and subsequently let 'soak' in the reservoir for 970 years. The relatively small plume developed from this injection was observed migrating due to gravity to the apexes of the double anticline in the Crow Mountain reservoir of the Teapot dome. Four models were generated from the reservoir simulation task of the project which included three saturation models representing snapshots at different times during and after simulated CO 2 injection and a fully saturated CO 2 fluid substitution model. The saturation models were used along with a Gassmann fluid substitution model for CO 2 to perform fluid volumetric substitution in the Crow Mountain formation. The fluid substitution resulted in a velocity and density model for the 3D volume at each saturation condition that was used to generate a synthetic seismic survey. FPTI's (Fusion Petroleum Technologies Inc.) proprietary SeisModelPRO™ full acoustic wave equation software was used to simulate acquisition of a 3D seismic survey on the four models over a subset of the field area. The simulated acquisition area included the injection wells and the majority of the simulated plume area.

02 PETROLEUM↗

HDG-1 Experiment Irradiation Monitoring Data Qualification Final Report

SUMMARY The U.S. Department of Energy (DOE) Advanced Reactor Technologies (ART) Graphite Research and Development (GRD) Program is conducting a series of six experiments to quantify the effects of irradiation on nuclear-grade graphite. This report documents the qualification of irradiation monitoring data for the fifth experiment, High Dose Graphite-1 (HDG-1). Qualified monitoring data are required by the ART program to support the design and licensing of the first high-temperature reactor (HTR) nuclear plant. Data are classified as Qualified if they meet the usage requirements described in the experiment planning and quality assurance (QA) documents, Failed if they do not meet those requirements and provide no usable information, or Trend if they do not fully meet all requirements but still provide useful information subject to an assessment of how any deficiencies may affect a particular use of the data. HDG-1 irradiation began with Advanced Test Reactor (ATR) Cycle 168B on August 24, 2020, and concluded after Cycle 173C on January 27, 2025. The HDG-1 capsule was removed from the reactor core twice—during core internal change (CIC) Cycle 170A and powered axial locator mechanism (PALM) Cycle 172A—to prevent overheating of the graphite specimens during high-power PALM cycles. The capsule was therefore irradiated during a total of seven normal ATR cycles: 168B, 169A, 171A, 171B, 173A, 173B, and 173C. Irradiation monitoring data evaluated in this report include thermocouple (TC) temperature, gas flow rate, gas moisture, gas pressure, specimen load, and graphite stack displacement. Temperature. A total of 14,508,065 TC temperature records were captured. Of these, 13,901,785 (95.8%) are Qualified and 606,280 (4.2%) are Failed. The principal source of failed temperature data was the instrument failure of TC-9 (Zone 2) on June 24, 2024, and TC-10 (Zone 1) on July 5, 2024, near the end of Cycle 173A, which resulted in 595,554 Failed readings. An additional 379 missing values and 10,347 slightly negative values from TC-13 during ATR outages are also Failed. Neither TC-9 nor TC-10 was used as a temperature-control TC, and their failures did not compromise capsule condition monitoring. Correlation analysis of all 13 TCs found no evidence of virtual junction formation. Control chart analysis revealed clear downward drift of approximately 80°C for TC-6 (Zone 3) relative to other stable TCs, and possible downward drift of approximately 60°C for TC-13 relative to the Zone 5 control TC (TC-1), though TC-13 remained consistent with the Zone 2 control TC (TC-12). Gas flow. A total of 20,088,090 gas flow rate records were captured. Of these, 19,941,463 (99.3%) are Qualified and 146,627 (0.7%) are Failed due to missing values. All argon, helium, and total gas flow data were within expected ranges throughout the irradiation. Gas moisture. A total of 1,116,005 outlet gas moisture values were captured. Of these, 1,101,421 (98.7%) are Qualified and 14,584 (1.3%) are Failed, comprising 14,556 out-of-range values and 28 missing values. The out-of-range moisture values exceeded 22,000 ppmv for approximately 1 week at the beginning of Cycle 173A, when accumulated moisture evaporated after the capsule was retrieved from water storage during PALM Cycle 172A and reinserted into the east flux trap. Moisture levels returned to below 25 ppmv for the remaining three cycles, and the transient high-moisture event did not affect the integrity of specimen irradiation. Gas pressure. A total of 7,812,035 gas pressure values were captured. Of these, 6,642,048 (85.0%) are Qualified and 1,169,987 (15.0%) outlet pressure values are Failed, comprising 718,537 zero outlet pressure values due to sensor failure from Cycle 168B through Cycle 171B, 54,550 missing values, and 396,900 too-low outlet pressure values, ranging from 1.1 to 1.6 psia after sensor replacement during Cycle 173A. Load. A total of 6,696,030 load values were captured. Of these, 6,694,580 (99.98%) are Qualified and 1,450 (0.02%) are Failed due to missing values. Applied loads to the six specimen stacks were stable throughout the irradiation. Stack displacement. A total of 6,696,030 displacement values were captured. Of these, 5,713,297 (85.32%) are Qualified and 3,781 (0.06%) are Failed due to missing values. Stack displacement increased consistently throughout the irradiation, reaching approximately 3.08 in. for Channels 5 and 6 by the end of irradiation. 978,952 (14.62%) substantially elevated displacements observed for Channel 6 beginning in Cycle 171A and for Channel 5 beginning in Cycle 173A are assigned Trend status. Raising pressure. A total of 1,115,999 raising pressure values were captured. Of these, 1,115,430 (99.95%) are Qualified and 569 (0.05%) are Failed due to missing values. Ram pressure. A total of 6,696,030 ram pressure values were captured. Of these, 6,692,249 (99.95%) are Qualified and 3,484 (0.05%) are Failed due to missing values. Stack raising was perf

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗