At least 1,135 records · Page 63

SRF Test Areas Cryogenic System Controls Graphical User Interface

Fermi National Accelerator Laboratory has constructed a superconducting 1.3 GHz cavity test facility at Meson Detector Building (MDB) and a superconducting 1.3 GHz cryomodule test facility located at the New Muon Lab Building (NML). The control of these 2K cryogenic systems is accomplished by using a Synoptic graphical user interface (GUI) to interact with the underlying Fermilab Accelerator Control System. The design, testing and operational experience of employing the Synoptic client-server system for graphical representation will be discussed. Details on the Synoptic deployment to the MDB and NML cryogenic sub-systems will also be discussed. The implementation of the Synoptic as the GUI for both NML and MDB has been a success. Both facilities are currently fulfilling their individual roles in SCRF testing as a result of successful availability of the cryogenic systems. The tools available for creating Synoptic pages will continue to be developed to serve the evolving needs of users.

43 PARTICLE ACCELERATORS↗

Performance of the new EBIS preinjector

The construction and initial commissioning phase of a new heavy ion preinjector was completed at Brookhaven in September, 2010, and the preinjector is now operational. This preinjector, using an EBIS source to produce high charge state heavy ions, provided helium and neon ion beams for use at the NASA Space Radiation Laboratory in the Fall of 2010, and gold and uranium beams are being commissioned during the 2011 run cycle for use in RHIC. The EBIS operates with an electron beam current of up to 10 A, to produce mA level currents in 10-40 {micro}s beam pulses. The source is followed by an RFQ and IH linac to accelerate ions with q/m > 0.16 to an energy of 2 MeV/amu, for injection into the Booster synchrotron. The performance of the preinjector is presented, including initial operational experience for the NASA and RHIC programs.

43 PARTICLE ACCELERATORS↗

The Closed Orbit Measurement System at the DELTA Synchrotron Radiation Facility And First Investigations Concerning the Installation of a Beam Based BPM Calibration System

For a synchrotron radiation source it is necessary to operate a monitoring system to determine the beam position with high resolution and accuracy with respect to the axis of the quadrupole magnets. In this paper the present closed orbit measurement system of the DELTA SR-Facility, concerning the hardware setup, data processing and the calibration methods, will be presented. The results of the calibration measurements and the recent operating experience will be discussed. These results show, that the system is close to the design resolution. But the BPM offsets with respect to the magnetic center of the quadrupole magnets turn out to be not acceptable. For some BPMs they are in the order of several 100 micro m. Therefore it was decided to install a beam based BPM calibration system in the near future . This system should allow to determine the BPM offsets relative to the center of the quadrupole magnets for all 40 BPMs. It is planned to install a system in order to change the focussing strength of each quadrupole individually either in a static or dynamic way.

43 PARTICLE ACCELERATORS↗

Modeling algae growth in an open-channel raceway.

Cost-effective implementation of microalgae as a solar-to-chemical energy conversion platform requires extensive system optimization; computer modeling can bring this to bear. This work uses modified versions of the U.S. Environmental Protection Agency's (EPA's) Environmental Fluid Dynamics Code (EFDC) in conjunction with the U.S. Army Corp of Engineers water-quality code (CE-QUAL) to simulate hydrodynamics coupled to growth kinetics of algae (Phaeodactylum tricornutum) in open-channel raceways. The model allows the flexibility to manipulate a host of variables associated with raceway-design, algal-growth, water-quality, hydrodynamic, and atmospheric conditions. The model provides realistic results wherein growth rates follow the diurnal fluctuation of solar irradiation and temperature. The greatest benefit that numerical simulation of the flow system offers is the ability to design the raceway before construction, saving considerable cost and time. Moreover, experiment operators can evaluate the impacts of various changes to system conditions (e.g., depth, temperature, flow speeds) without risking the algal biomass under study.

09 BIOMASS FUELS↗

An Investigation of Digital Instrumentation and Control System Failure Modes

A study sponsored by the Nuclear Regulatory Commission study was conducted to investigate digital instrumentation and control (DI&C) systems and module-level failure modes using a number of databases both in the nuclear and non-nuclear industries. The objectives of the study were to obtain relevant operational experience data to identify generic DI&C system failure modes and failure mechanisms, and to obtain generic insights, with the intent of using results to establish a unified framework for categorizing failure modes and mechanisms. Of the seven databases studied, the Equipment Performance Information Exchange database was found to contain the most useful data relevant to the study. Even so, the general lack of quality relative to the objectives of the study did not allow the development of a unified framework for failure modes and mechanisms of nuclear I&C systems. However, an attempt was made to characterize all the failure modes observed (i.e., without regard to the type of I&C equipment under consideration) into common categories. It was found that all the failure modes identified could be characterized as (a) detectable/preventable before failures, (b) age-related failures, (c) random failures, (d) random/sudden failures, or (e) intermittent failures. The percentage of failure modes characterized as (a) was significant, implying that a significant reduction in system failures could be achieved through improved online monitoring, exhaustive testing prior to installation, adequate configuration control or verification and validation, etc.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Next-Generation Parallel File System Environment for the OLCF

When deployed in 2008/2009 the Spider system at the Oak Ridge National Laboratory s Leadership Computing Facility (OLCF) was the world s largest scale Lustre parallel file system. Envisioned as a shared parallel file system capable of delivering both the bandwidth and capacity requirements of the OLCF s diverse computational environment, Spider has since become a blueprint for shared Lustre environments deployed worldwide. Designed to support the parallel I/O requirements of the Jaguar XT5 system and other smallerscale platforms at the OLCF, the upgrade to the Titan XK6 heterogeneous system will begin to push the limits of Spider s original design by mid 2013. With a doubling in total system memory and a 10x increase in FLOPS, Titan will require both higher bandwidth and larger total capacity. Our goal is to provide a 4x increase in total I/O bandwidth from over 240GB=sec today to 1TB=sec and a doubling in total capacity. While aggregate bandwidth and total capacity remain important capabilities, an equally important goal in our efforts is dramatically increasing metadata performance, currently the Achilles heel of parallel file systems at leadership. We present in this paper an analysis of our current I/O workloads, our operational experiences with the Spider parallel file systems, the high-level design of our Spider upgrade, and our efforts in developing benchmarks that synthesize our performance requirements based on our workload characterization studies.

99 GENERAL AND MISCELLANEOUS↗

The SLAC P2 Marx

A proposed high energy physics accelerator, the International Linear Collider, will require greater than five hundred rf stations. Each station is composed of a klystron driven by a modulator. Recently, the SLAC P2 Marx was designated the baseline modulator for the ILC. This paper describes some key features of this modulator and presents recent experimental results. The P2 Marx is presently being transported to another facility for lifetime testing. Here, we will gain understanding of how the Marx performs into a klystron load and gain experience operating the Marx for longer periods. Long term plans include the possibility of using this rf station for L-band technology demonstration at SLAC. While the Marx was designed with the ILC in mind, the topology can be readily applied to several different applications. We are currently evaluating the use of the topology for ESS, CLIC, and upgrades for systems at Fermi National Accelerator Laboratory. Because of the modular nature of the cell and the robustness of the control system, many different combinations of series and parallel operation are possible along with different load currents and pulse shapes.

43 PARTICLE ACCELERATORS↗

Design and Performance of South Ukraine Nuclear Power Plant Mixed Cores

In 2010, 42 Westinghouse fuel assemblies (WFAs) were loaded into the core of South Ukraine Nuclear Power Plant (SUNPP) Unit 3 after four successful cycles with 6 Westinghouse Lead Test Assemblies. The scope of safety substantiating documents required for the regulatory approval of this mixed core was extended considerably, particularly with development and implementation of new methodologies and 3-D kinetic codes. Additional verification for all employed codes was also performed. Despite the inherent hydraulic non-uniformity of a mixed core, it was possible to demonstrate that all design and operating restrictions for three different types of fuel (TVS-M, TVSA and WFA) loaded in the core were conservatively met. This paper provides the main results from the first year of operation of the core loaded with 42 WFAs, the predicted parameters for the transition and equilibrium cycles with WFAs, comparisons of predicted versus measured core parameters, as well as the acceptable margin evaluation results for reactivity accidents using the 3-D kinetic codes. To date WFA design parameters have been confirmed by operation experience.

Abdullayev, A M↗

Reliability Estimation for Double Containment Piping

Double walled or double containment piping is considered for use in the ITER international project and other next-generation fusion device designs to provide an extra barrier for tritium gas and other radioactive materials. The extra barrier improves confinement of these materials and enhances safety of the facility. This paper describes some of the design challenges in designing double containment piping systems. There is also a brief review of a few operating experiences of double walled piping used with hazardous chemicals in different industries. This paper recommends approaches for the reliability analyst to use to quantify leakage from a double containment piping system in conceptual and more advanced designs. The paper also cites quantitative data that can be used to support such reliability analyses.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Activities in Support of Continuing the Service of Nuclear Power Plant Safety-Related Concrete Structures

Nuclear power plant (NPP) concrete structures are described. In-service inspection and testing requirements in the U.S. are summarized. The license renewal process in the U.S. is outlined and its current status provided. Operating experience related to performance of the concrete structures is presented. Basic components of a program to manage aging of the concrete structures are identified and described: (1) Degradation mechanisms, damage models, and material performance; (2) Assessment and remediation: i.e., component selection, in- service inspection, non-destructive examinations, and remedial actions; and (3) Estimation of performance at present or some future point in time: i.e., application of structural reliability theory to the design and optimization of in-service inspection/maintenance strategies, and determination of the effects of degradation on plant risk. Finally, areas are noted where additional research would be of benefit to aging management of nuclear power plant concrete structures.

codes and standards↗

Wind Energy Deployment in Isolated Islanded Power Systems: Challenges & Realities (Poster)

Rising costs of fuels, energy surety, and the carbon impacts of diesel fuel are driving remote and islanded communities dependent on diesel power generation to look for alternatives. Over the past few years, interest in using wind energy to reduce diesel fuel consumption has increased dramatically, potentially providing economic, environmental, social, and security benefits to the energy supply of isolated and islanded communities. However, the task of implementing such systems has remained elusive and subject to many cases of lower-than-expected performance. This poster describes the current status of integrating higher contribution wind technology into islanded power systems, the progress of recent initiatives implemented by the U.S. Department of Energy and Interior, and some of the lingering technical and commercial challenges. Operating experience from a number of power systems is described. The worldwide market for wind development in islanded communities (some of these supplying large domestic loads) provides a strong market niche for the wind industry, even in the midst of a slow global recovery.

17 WIND ENERGY↗

Utilization of Local Law Enforcement Aerial Resources in Consequence Management (CM) Response

During the past decade the U.S. Department of Homeland Security (DHS) was instrumental in enhancing the nation’s ability to detect and prevent a radiological or nuclear attack in the highest risk cities. Under the DHS Securing the Cities initiative, nearly 13,000 personnel in the New York City region have been trained in preventive radiological and nuclear detection operations, and nearly 8,500 pieces of radiological detection equipment have been funded. As part of the preventive radiological/nuclear detection (PRND) mission, several cities have received funding to purchase commercial aerial radiation detection systems. In 2008, the U.S. Department of Energy, National Nuclear Security Administration Aerial Measuring System (AMS) program started providing Mobile Aerial Radiological Surveillance (MARS) training to such assets, resulting in over 150 HAZMAT teams’ officers and pilots from 10 law enforcement organizations and fire departments being trained in the aerial radiation detection. From the beginning, the MARS training course covered both the PRND and consequence management (CM) missions. Even if the law enforcement main focus is PRND, their aerial assets can be utilized in the collection of initial radiation data for post-event radiological CM response. Based on over 50 years of AMS operational experience and information collected during MARS training, this presentation will focus on the concepts of CM response using aerial assets as well as utilizing law enforcement/fire department aerial assets in CM. Also discussed will be the need for establishing closer relationships between local jurisdictions’ aerial radiation detection capabilities and state and local radiation control program directors, radiological health department managers, etc. During radiological events these individuals may become primary experts/advisers to Incident Commanders for radiological emergency response, especially in the early stages of a response. The knowledge of the existence, specific capabilities, and use of local aerial radiation detection systems would be critical in planning the response, even before federal assets arrive on the scene. The relationship between local and federal aerial assets and the potential role for the further use of the MARS training and expanded AMS Reachback capabilities in facilitating such interactions will be discussed.

consequence management, CM, local law enforcement,↗

Individual Differences in Human Reliability Analysis

While human reliability analysis (HRA) methods include uncertainty in quantification, the nominal model of human error in HRA typically assumes that operator performance does not vary significantly when they are given the same initiating event, indicators, procedures, and training, and that any differences in operator performance are simply aleatory (i.e., random). While this assumption generally holds true when performing routine actions, variability in operator response has been observed in multiple studies, especially in complex situations that go beyond training and procedures. As such, complexity can lead to differences in operator performance (e.g., operator understanding and decision-making). Furthermore, psychological research has shown that there are a number of known antecedents (i.e., attributable causes) that consistently contribute to observable and systematically measurable (i.e., not random) differences in behavior. This paper reviews examples of individual differences taken from operational experience and the psychological literature. The impact of these differences in human behavior and their implications for HRA are then discussed. We propose that individual differences should not be treated as aleatory, but rather as epistemic. Ultimately, by understanding the sources of individual differences, it is possible to remove some epistemic uncertainty from analyses.

99 GENERAL AND MISCELLANEOUS↗

NSLS-II Radio Frequency Systems

The National Synchrotron Light Source II is a 3 GeV X-ray user facility commissioned in 2014. The NSLS-II RF system consists of the master oscillator, digital low level RF controllers, linac, booster and storage ring RF sub-systems, as well as a supporting cryogenic system. Here we will report on RF commissioning and early operation experience of the system.

3 GeV↗

Simulation of Multipacting in SC Low Beta Cavities at FNAL

Proton Improvement Plan-II at Fermilab is a plan for improvements to the accelerator complex aimed at providing a beam power capability of at least 1 MW on target at the initiation of LBNE (Long Base Neutrino Experiment) operations. The central element of the PIP-II is a new 800 MeV superconducting linac, injecting into the existing Booster. Multipacting affects superconducting RF cavities in the entire range from high energy elliptical cavities to coaxial resonators for low-beta applications. This work is focused on multipacting study in the low-beta 325 MHz spoke cavities; namely SSR1 and SSR2, which are especially susceptible to the phenomena. The extensive simulations of multipacting in the cavities with updated material properties and comparison of the results with experimental data helped us to improve overall reliability and accuracy of these simulations. Our practical approach to the simulations is described in details. For SSR2, which has a high multipacting barrier right at the operating power level, some changes of the cavity shape to mitigate this harmful phenomenon are proposed.

43 PARTICLE ACCELERATORS↗

BAYESIAN CALIBRATION OF SAFETY CODES USING DATA FROM SEPARATE-AND INTEGRAL EFFECTS TESTS

Large-scale system codes for simulation of safety performance of nuclear plants may contain parameters whose values are not known very accurately. In order to be able to use the results of these simulation codes with confidence, it is important to learn how the uncertainty on the values of these parameters affects the output of the codes. New information from tests or operating experience is incorporated into safety codes by a process known as calibration, which reduces uncertainty in the output of the safety code, and thereby improves its support for decision-making. Modern analysis capabilities afford very significant improvements on classical ways of doing calibration, and the work reported here implements some of those improvements. The key innovation has come from development of safety code surrogate model (code emulator) construction and prediction algorithms. A surrogate is needed for calibration of plant-scale simulation codes because the multivariate nature of the problem (i.e., the need to adjust multiple uncertain parameters at once to fit multiple pieces of new information) calls for multiple evaluations of performance, which, for a computation-intensive model, makes calibration very computation-intensive. Use of a fast surrogate makes the calibration processes used here with Markov Chain Monte Carlo (MCMC) sampling feasible. Moreover, most traditional surrogates do not provide uncertainty information along with their predictions, but the Gaussian Process (GP) based code surrogates used here do. This improves the soundness of the code calibration process. Results are demonstrated on a simplified scenario with data from Separate and Integral Effect Tests.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Development of a Fleet-Level Human Factors Engineering Program to Support the Digital Modernization of Multiple Turbine Control Systems

A number of years ago, Duke Energy and the United States (U.S.) Department of Energy (DOE) entered into a collaboration to support Duke’s digital upgrade activities for the main control rooms at three of their commercial nuclear power stations. The collaboration specifically focused on the human factors engineering (HFE) aspects of Duke’s plans to upgrade the legacy turbine control systems (TCS) at their Brunswick, Robinson, and Harris plants. This TSC upgrade involved installing a common digital control system (DCS), or distributed instrumentation and control (I&C) system platform, which multiple digital plant control systems can be integrated onto as the control rooms are modernized over time. Given the breadth and depth of the scope of this upgrade, DOE researchers at Idaho National Laboratory (INL) with expertise in human factors collaborated with Duke throughout the entire HFE life cycle to help ensure the upgrade was performed in a manner consistent with regulatory human factors review criteria, such as the U.S. Nuclear Regulatory Commission’s (NRC) Human Factors Engineering Program Review Model (NUREG 0711, 2012). This paper describes the HFE researchers performed through the early and middle phases of these TCS upgrades. Specific HFE activities include: 1) the development of a human factors program management plan, 2) performing an operational experience review, 3) evaluating the design human system interface while it was still in the early stages of development, and 4) developing a framework to help map these HFE activities to NUREG-0711 to help understand and catalog the value of different types and phases of human performance data collection. These four HFE activities are described in more detail below.

99 GENERAL AND MISCELLANEOUS↗

Re-Evaluating the Current Safety Goals

The Safety Goals adopted by the US NRC consist of two qualitative safety goals (QSGs) backed up by two quantitative health objectives (QHOs). The QHOs establish risk limits for severe accidents in terms of their radiological consequences, in particular, the average individual health risks of early fatality and latent cancers from radiation exposure of members of the public living in the vicinity of a nuclear power plant. This paper is devoted to a re-examination of the coverage of the current safety goals in evaluating the actual risk posed by nuclear power plant operation. Experience of recent Level 3 PRAs suggests that given a high likelihood of evacuation of the close-in population before any release occurs, the current QHOs are satisfied by large margins. However, the experience of an actual severe accident at Fukushima showed that actual human health effects from released radiation were not the dominant consequences; there were no early fatalities and no measurable increases expected in cancer rates above the baseline rates in the Japanese population. Hence, regardless of accident probability, Fukushima-type accidents would satisfy the NRC’s health-related safety goals. However, there were very significant societal costs, in that large numbers of people were relocated for long periods. We argue that, in addition to the risks addressed in current safety goals, societal risk should also be evaluated. The paper discusses specific possibilities for a goal and an associated quantitative objective.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗